CN103132455B - Three-dimensional combined type cable-stayed bridge body cable duct accurate positioning device and positioning method - Google Patents
Three-dimensional combined type cable-stayed bridge body cable duct accurate positioning device and positioning method Download PDFInfo
- Publication number
- CN103132455B CN103132455B CN201310077928.5A CN201310077928A CN103132455B CN 103132455 B CN103132455 B CN 103132455B CN 201310077928 A CN201310077928 A CN 201310077928A CN 103132455 B CN103132455 B CN 103132455B
- Authority
- CN
- China
- Prior art keywords
- guide pipe
- cable guide
- welded
- cable
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310077928.5A CN103132455B (en) | 2013-03-12 | 2013-03-12 | Three-dimensional combined type cable-stayed bridge body cable duct accurate positioning device and positioning method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310077928.5A CN103132455B (en) | 2013-03-12 | 2013-03-12 | Three-dimensional combined type cable-stayed bridge body cable duct accurate positioning device and positioning method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103132455A CN103132455A (en) | 2013-06-05 |
CN103132455B true CN103132455B (en) | 2015-06-10 |
Family
ID=48492864
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310077928.5A Active CN103132455B (en) | 2013-03-12 | 2013-03-12 | Three-dimensional combined type cable-stayed bridge body cable duct accurate positioning device and positioning method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103132455B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110280838B (en) * | 2018-08-08 | 2021-07-30 | 江苏中铁山桥重工有限公司 | Method for positioning and cutting hole on surface of spherical steel structure |
CN109137737B (en) * | 2018-09-04 | 2024-03-26 | 中交路桥华南工程有限公司 | Cable conduit positioning device |
CN109629395B (en) * | 2019-02-02 | 2024-02-02 | 中铁十五局集团第一工程有限公司 | Limiting V-shaped clamping plate for positioning concrete stay cable guide pipe and use method |
CN110241735B (en) * | 2019-06-14 | 2024-02-27 | 中铁大桥局集团第一工程有限公司 | Positioning and adjusting device and method for main tower cable guide pipe of cable-stayed bridge |
CN110553127A (en) * | 2019-08-15 | 2019-12-10 | 中铁上海工程局集团有限公司 | Adjustable support device and use method thereof |
CN112609576B (en) * | 2020-11-19 | 2022-05-31 | 中铁二局集团有限公司 | Method and device for positioning and installing spatial attitude of stay cable guide pipe |
CN113481868B (en) * | 2021-07-30 | 2022-07-26 | 中国建筑第八工程局有限公司 | Cableway positioning device and method with anchor point adjusting structure for cable-stayed bridge |
CN114000411B (en) * | 2021-11-16 | 2023-04-18 | 中铁七局集团有限公司 | Cable-stayed bridge cable guide pipe positioning method |
CN115045190A (en) * | 2022-06-01 | 2022-09-13 | 中冶天工集团有限公司 | Steel anchor box mounting mechanism and mounting method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1113016A (en) * | 1997-06-26 | 1999-01-19 | Kumagai Gumi Co Ltd | Tensioning platform of diagonal of cable stayed bridge |
CN1339634A (en) * | 2000-08-24 | 2002-03-13 | 湖南省公路桥梁建设总公司 | Measuring and positioning method for stayed-cable steel sleeve of stayed-cable bridge |
CN101736698A (en) * | 2009-12-15 | 2010-06-16 | 中交路桥华北工程有限公司 | Accurate positioning method for cable-stayed bridge pylon cable guide pipe |
KR101184773B1 (en) * | 2012-05-04 | 2012-09-20 | 주식회사 후레씨네코리아 | Constructing method of cable bridge using free cantilever method |
CN102828470A (en) * | 2012-09-05 | 2012-12-19 | 中建七局第二建筑有限公司 | Method for locating main girder cable sleeve of cable-stayed bridge |
CN203160133U (en) * | 2013-03-12 | 2013-08-28 | 中铁四局集团第二工程有限公司 | Three-dimensional combined accurate positioning device for stayed-cable bridge body cable duct |
-
2013
- 2013-03-12 CN CN201310077928.5A patent/CN103132455B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1113016A (en) * | 1997-06-26 | 1999-01-19 | Kumagai Gumi Co Ltd | Tensioning platform of diagonal of cable stayed bridge |
CN1339634A (en) * | 2000-08-24 | 2002-03-13 | 湖南省公路桥梁建设总公司 | Measuring and positioning method for stayed-cable steel sleeve of stayed-cable bridge |
CN101736698A (en) * | 2009-12-15 | 2010-06-16 | 中交路桥华北工程有限公司 | Accurate positioning method for cable-stayed bridge pylon cable guide pipe |
KR101184773B1 (en) * | 2012-05-04 | 2012-09-20 | 주식회사 후레씨네코리아 | Constructing method of cable bridge using free cantilever method |
CN102828470A (en) * | 2012-09-05 | 2012-12-19 | 中建七局第二建筑有限公司 | Method for locating main girder cable sleeve of cable-stayed bridge |
CN203160133U (en) * | 2013-03-12 | 2013-08-28 | 中铁四局集团第二工程有限公司 | Three-dimensional combined accurate positioning device for stayed-cable bridge body cable duct |
Also Published As
Publication number | Publication date |
---|---|
CN103132455A (en) | 2013-06-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103132455B (en) | Three-dimensional combined type cable-stayed bridge body cable duct accurate positioning device and positioning method | |
CN203160133U (en) | Three-dimensional combined accurate positioning device for stayed-cable bridge body cable duct | |
CN104070316B (en) | A kind of assembled group of welded H section steel is to device and using method thereof | |
CN109322252A (en) | Interim matching, fixed structure and method for Large-span Steel Box Beam free cantilever erection | |
CN206786135U (en) | A kind of pipeline waterborne and π type compensator hoisting bracket | |
CN104895035A (en) | High-efficiency mounting method of large ship reception chamber of vertical ship lift and auxiliary tool device for mounting and location | |
CN201343385Y (en) | Concentrated driving finished product checking crane | |
CN105507155A (en) | Construction process for installation of small-segment steel box girder | |
CN204298720U (en) | A kind of concrete box girder being provided with cable guide pipe positioner | |
CN203866831U (en) | Telescopic splicing guide frame for large-diameter steel protecting cylinder | |
CN208981156U (en) | Temporary structure is used in a kind of installation of Continuous steel girder bridge | |
CN204455862U (en) | A kind of steel box-girder seam angle rackwork | |
CN208632979U (en) | The three-dimensional adjustment tooling positioned in erection process for precast segment spliced girder | |
CN203889895U (en) | Clamp lifting device | |
CN1614195A (en) | Construction method for going through subway station by double circular shielding | |
CN203034818U (en) | Special fixture for installation of adjustable embedded part | |
CN104929375A (en) | Large-span truss short-stroke hydraulic jack synchronous slide method and device | |
CN205343431U (en) | Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar | |
CN205271476U (en) | Positioner | |
CN105537470B (en) | A kind of fluid pressure type pier shaft steel bar meter mould bases and pier shaft reinforcement construction technique | |
CN104326359A (en) | Clamper for clamping I-steel | |
CN205171465U (en) | A supplementary radial gate hinge installation device | |
CN103981893B (en) | The hanging reinforced device and method of combustion turbine foundation built-in bolt | |
CN209117293U (en) | A kind of calibration fixture of suspension and support anti-seismic performance detection device | |
CN203571219U (en) | Novel cable tray for bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA RAILWAY CORPORATION Free format text: FORMER OWNER: NO.2 ENGINEERING CO., LTD., ZHONGTIE NO.4 BUREAU GROUP Effective date: 20150615 Owner name: CHINA TIESIJU CIVIL ENGINEERING GROUP CO., LTD. NO Effective date: 20150615 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150615 Address after: 100844 Fuxing Road, Beijing, Haidian District, No. 10 Patentee after: CHINA RAILWAY CORPORATION Patentee after: China Tiesiju Civil Engineering Group Co., Ltd. Patentee after: No.2 Engineering Co., Ltd., Zhongtie No.4 Bureau Group Address before: Li River Road, Xiangcheng Economic Development Zone, Suzhou City, Jiangsu Province, No. 9 215131 Patentee before: No.2 Engineering Co., Ltd., Zhongtie No.4 Bureau Group |