CN109322252A CN201811202511.6A CN201811202511A CN109322252A CN 109322252 A CN109322252 A CN 109322252A CN 201811202511 A CN201811202511 A CN 201811202511A CN 109322252 A CN109322252 A CN 109322252A
Authority
CN
China
Prior art keywords
steel box
bracket
girder
tooling
under
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811202511.6A
Other languages
Chinese (zh)
Inventor
刘继超
金东华
连海建
张振华
石初旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201811202511.6A priority Critical patent/CN109322252A/en
Publication of CN109322252A publication Critical patent/CN109322252A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of interim matching, fixed structure and methods for Large-span Steel Box Beam free cantilever erection, the structure includes tooling, steel box-girder, " bracket ", tooling is respectively welded on the outside of the top plate of two sections of steel box-girders, drawing is connected by several Screw arbor with nut at both-ends between two toolings, be respectively welded on the inside of the bottom plate of two sections of steel box-girders " bracket ", under " bracket ", and upper " bracket " under " bracket " in two sections of steel box-girders splicings above and below overlap and shelve.The present invention has many advantages, such as economic, practical, quick, efficient, accurate, reusable, specific manifestation are as follows: accelerates the speed of steel box-girder floating jib section installation, improves the splicing accuracy of beam section, keeps steel box-girder smaller, more attractive at bridge line style deviation;Reduce crane barge to the holding time of navigable river;It recycles, reduces measure cost.

Description

Interim matching, fixed structure and method for Large-span Steel Box Beam free cantilever erection
Technical field
The present invention relates to it is a kind of matched for assembled interim of steel box girder cantilever, fixed structure, be particularly suitable for anxious curve, Hyperbola, Large-span Steel Box Beam are constructed across quick, the accurate free cantilever erection such as river, road.
Background technique
Shanghai City north transverse passage-way new construction I Biao Beihong road overpass mainline crosses over Suzhou River, and span reaches 153m, is designed as double Curve, single box single chamber steel box-girder construction;Construction is using cantilever+big segment closure assembling process.
It due to cantilever segment longer (10~14m of section length), heavier (most heavy 90t), and is curve shape, so to cantilever Section between temporarily matching, fixation it is more demanding, it is necessary to be provided simultaneously with the mechanical characteristics such as shearing resistance, bending resistance, resistance to compression, antitorque. Traditional code plate is used temporarily to be matched, fixed using between the steel box girder segment of Support Method installation, but for the cantilever Segment only simply uses code plate, it is difficult to guarantee the precision of steel box girder assembling.
It finds a kind of not only economical, convenient and practical but also has innovative interim matching, fixation this moment imperative.
Summary of the invention
The purpose of the present invention is to solve large span, anxious curve, rapid, the accurate free cantilever erections of hyperbolic steel box beam Technical problem, and a set of interim matching, fixed structure and the method assembled for steel box girder cantilever designed.
The technical scheme is that a kind of for the interim matching of Large-span Steel Box Beam free cantilever erection, fixed structure, packet Tooling, steel box-girder, " bracket " are included, tooling is respectively welded on the outside of the top plate of two sections of steel box-girders, it is several right to pass through between two toolings Draw screw rod to connect to drawing, be respectively welded on the inside of the bottom plate of two sections of steel box-girders " bracket ", under " bracket ", and upper " bracket " and under " bracket " overlap joint is shelved up and down in two sections of steel box-girder splicings.
Further, it is opened in each tooling there are four Φ 40mm bolt hole, passes through four Φ 36mm Screw arbor with nut at both-ends between tooling It is connected to drawing;The tension of every Screw arbor with nut at both-ends is 28t, shearing resistance 17t.
Further, upper " bracket " and under " bracket " overlap joint lay-down location level, perpendicular up and down in two sections of steel box-girders splicings To interface there are the gap of 2cm, gap adjusts the elevation and plan-position of two sections of steel box-girders by pad sheet metal.
A kind of interim matching for Large-span Steel Box Beam free cantilever erection, fixed structure construction method, including following step It is rapid:
(1) tooling, upper " bracket ", under " bracket ", the single component processing and fabricating of Screw arbor with nut at both-ends and steel box-girder processing system Make;
(2) tooling, upper " bracket ", under after " bracket " acceptance(check), be accurately positioned, and be welded to steel box-girder top, bottom On plate;
(3) in construction site, the boom segments of a upper steel box-girder carry out down after elevation, main line, camber retest-ok The assembly of the boom segments of one steel box-girder;
(4) boom segments of steel box-girder are hung to assembled position, boom segments Primary Location by live crane barge;
(5) " bracket " on steel box-girder Mosaic face, under " bracket " dock, worn between tooling to drawing pull rod;
(6) it is finely tuned by loop wheel machine, Screw arbor with nut at both-ends is adjusted, and upper " bracket " level, vertical interface add between " bracket " under It welds sheet metal to adjust, realizes the accurate positioning of the boom segments of steel box-girder;
(7) groove penetration welds between the beam body of steel box-girder, and crane barge pine hook is withdrawn from the arena after the completion of backing welding;
(8) weld seam all complete by welding, and Screw arbor with nut at both-ends is removed, tooling, upper " bracket ", under " bracket " cut off;
(9) boom segments for successively carrying out next segment steel case are assembled.
Beneficial achievement of the invention is:
(1) the problems such as conventional code plate welding quantity is more, intensity is low, adjustment is inconvenient, splicing locating periodically is long is solved;
(2) present invention is repeatable is recycled, and has saved measure cost;
(3) present invention realizes quick, the accurate construction of steel box girder cantilever assembly, and it is partially worse small, more beautiful to make into bridge line style It sees;
(4) rapid free cantilever erection, reducing holding time of the crane barge to navigation channel, (large-scale self-propelled loop wheel machine is to social road Occupancy), to society, traffic influence substantially reduce.
Detailed description of the invention
Fig. 1 is interim matching of the invention, fixed structure general arrangement;
Fig. 2 is tool structure figure;
(a) main view, (b) A-A cross-sectional view, (c) B-B cross-sectional view, (d) C-C cross-sectional view;
Fig. 3 be under " bracket " structural map;
(a) main view, (b) A-A cross-sectional view, (c) B-B cross-sectional view,
Fig. 4 is upper " bracket " structural map;
(a) main view, (b) A-A cross-sectional view, (c) B-B cross-sectional view, (d) C-C cross-sectional view.
Specific embodiment
With reference to the accompanying drawing with northern rainbow grade separation specific example, the embodiment for patent that the present invention is further explained.
As shown in Figures 1 to 4, the interim matching assembled for steel box girder cantilever of the invention, fixed structure, including tooling 1, split bolt 2, under " bracket " 3, upper " bracket " 4.
(1) tooling 1 is welded on the outside of the top plate of the first and second steel box-girder 5,6, and is arranged symmetrically in steel box-girder top plate piece two Side;
(2) as opened shown in Fig. 2 (a)~(d) in each tooling 1, there are four Φ 40mm bolt hole, the first and second steel box-girders 5,6 Tooling 1 by four 2 pairs of Φ 36mm Screw arbor with nut at both-ends drawing, each 2 tension 28t of screw rod, shearing resistance 17t;
(3) under " bracket " 3 (see Fig. 3 (a)~(c)) and upper " bracket " 4 be respectively welded at first (see Fig. 4 (a)~(d)), On the inside of the bottom plate of two steel box-girders 5,6, and it is arranged symmetrically in the two sides of box beam bottom plate piece;
(4) " bracket " 4 on, under " bracket " 3 overlap joint is shelved up and down in steel box-girder splicing, horizontal, vertical interface stays There is the gap of 2cm, gap adjusts elevation and the plan-position of steel box-girder by pad sheet metal;(5) tooling 1, upper " bracket " 4, Under " bracket " 3 be welded using 20mm thickness Q345 steel plate, need to together with steel box-girder processing and fabricating, be welded as a whole;
(6) steel box girder assembling and weld after the completion of, this measure is cut off in beam body, subsequent reuse.
Tooling 1, upper " bracket " 4, under " bracket " 3 be all made of the welding of 20mm thickness Q345 steel plate, weld seam form is between steel plate Twin fillet wolt;Tooling 1, upper " bracket " 4, under the welding of " bracket " 3 complete and after acceptance(check), can weld with steel box-girder, weldering Slit formula is also twin fillet wolt.Tooling 1, upper " bracket " 4, under " bracket " 3 must be accurately positioned with steel box-girder welding position, with Guarantee subsequent steel box girder assembling precision.
Concrete construction method of the invention:
(1) tooling, upper " bracket ", under " bracket ", the single component processing and fabricating of Screw arbor with nut at both-ends, steel box-girder processing and fabricating;
(2) tooling, upper " bracket ", under after " bracket " acceptance(check), be accurately positioned, and be welded to steel box-girder top, bottom Plate;
(3) steel box-girder is qualified through factory inspection and acceptance, site acceptance;
(4) in construction site, the boom segments of a upper steel box-girder carry out down after elevation, main line, camber retest-ok The assembly of the boom segments of one steel box-girder;
(5) cantilever segment is hung to assembled position, preliminary (thick) positioning of boom segments by live crane barge (loop wheel machine);
(6) " bracket " on steel box-girder Mosaic face, under " bracket " dock, worn between tooling to drawing pull rod;
(7) it is finely tuned by loop wheel machine, Screw arbor with nut at both-ends is adjusted, and upper " bracket " level, vertical interface add between " bracket " under The a series of measures such as sheet metal adjusting are welded, realize the accurate positioning of steel box girder cantilever segment;
(8) groove penetration welds between the beam body of steel box-girder, and crane barge pine hook is withdrawn from the arena after the completion of backing welding;
(9) weld seam all complete by welding, and Screw arbor with nut at both-ends is removed, tooling, upper " bracket ", under " bracket " cut off;
(10) next segment steel box girder cantilever section assembling is successively carried out.

Claims (4)

1. a kind of for the interim matching of Large-span Steel Box Beam free cantilever erection, fixed structure, including tooling, steel box-girder, " bracket ", It is characterized by: tooling is respectively welded on the outside of the top plate of two sections of steel box-girders, by several Screw arbor with nut at both-ends to drawing between two toolings Connection, be respectively welded on the inside of the bottom plate of two sections of steel box-girders " bracket ", under " bracket ", and upper " bracket " and under " bracket " at two sections Overlap joint is shelved up and down in steel box-girder splicing.
2. according to claim 1 for the interim matching of Large-span Steel Box Beam free cantilever erection, fixed structure, feature exists In: it is opened in each tooling there are four Φ 40mm bolt hole, is connected by four Φ 36mm Screw arbor with nut at both-ends to drawing between tooling;Every The tension of Screw arbor with nut at both-ends is 28t, shearing resistance 17t.
3. according to claim 1 for the interim matching of Large-span Steel Box Beam free cantilever erection, fixed structure, feature exists In: upper " bracket " and under " bracket " overlap joint lay-down location level, vertical interface stay up and down in two sections of steel box-girders splicings There is the gap of 2cm, gap adjusts the elevation and plan-position of two sections of steel box-girders by pad sheet metal.
4. a kind of using any interim matching for being used for Large-span Steel Box Beam free cantilever erection of claim 1-3, fixed knot The construction method of structure, which comprises the following steps:
(1) tooling, upper " bracket ", under " bracket ", the single component processing and fabricating of Screw arbor with nut at both-ends and steel box-girder processing and fabricating;
(2) tooling, upper " bracket ", under after " bracket " acceptance(check), be accurately positioned, and be welded to steel box-girder top, on bottom plate;
(3) in construction site, the boom segments of a upper steel box-girder carry out next steel after elevation, main line, camber retest-ok The assembly of the boom segments of box beam;
(4) boom segments of steel box-girder are hung to assembled position, boom segments Primary Location by live crane barge;
(5) " bracket " on steel box-girder Mosaic face, under " bracket " dock, worn between tooling to drawing pull rod;
(6) finely tuned by loop wheel machine, Screw arbor with nut at both-ends is adjusted, upper " bracket " under between " bracket " level, vertical interface be welded with it is thin Steel plate is adjusted, and realizes the accurate positioning of the boom segments of steel box-girder;
(7) groove penetration welds between the beam body of steel box-girder, and crane barge pine hook is withdrawn from the arena after the completion of backing welding;
(8) weld seam all complete by welding, and Screw arbor with nut at both-ends is removed, tooling, upper " bracket ", under " bracket " cut off;
(9) next segment steel box girder cantilever section assembling is successively carried out.
CN201811202511.6A 2018-10-16 2018-10-16 Interim matching, fixed structure and method for Large-span Steel Box Beam free cantilever erection Pending CN109322252A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811202511.6A CN109322252A (en) 2018-10-16 2018-10-16 Interim matching, fixed structure and method for Large-span Steel Box Beam free cantilever erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811202511.6A CN109322252A (en) 2018-10-16 2018-10-16 Interim matching, fixed structure and method for Large-span Steel Box Beam free cantilever erection

Publications (1)

Publication Number Publication Date
CN109322252A true CN109322252A (en) 2019-02-12

Family

ID=65262701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811202511.6A Pending CN109322252A (en) 2018-10-16 2018-10-16 Interim matching, fixed structure and method for Large-span Steel Box Beam free cantilever erection

Country Status (1)

Country Link
CN (1) CN109322252A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898653A (en) * 2019-03-30 2019-06-18 中国二十二冶集团有限公司 Box beam joint connection in site method
CN111021256A (en) * 2019-12-19 2020-04-17 中建六局土木工程有限公司 Construction method for hoisting heavy-tonnage high-precision steel box girder
CN111042001A (en) * 2020-01-16 2020-04-21 中建七局安装工程有限公司 Temporary anchoring support-free construction method for prefabricated section beam closure section
CN111172885A (en) * 2020-01-19 2020-05-19 石岩 Steel box girder butt joint detection assembly and butt joint method
CN112095479A (en) * 2020-09-22 2020-12-18 马亮 Bridge translation butt joint positioner
CN114351598A (en) * 2022-01-26 2022-04-15 中铁二十二局集团第三工程有限公司 Construction method for hoisting steel box girder in confined space of complex navigation water area
CN114369993A (en) * 2022-03-04 2022-04-19 中铁长安重工有限公司 Steel box girder large section lap joint installation device and method
CN114960457A (en) * 2022-06-30 2022-08-30 中国一冶集团有限公司 Split type steel bridge hoisting horizontal interval fine adjustment device and construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050234555A1 (en) * 2004-04-16 2005-10-20 Depuy Spine, Inc. Intervertebral disc with monitoring and adjusting capabilities
CN101487232A (en) * 2009-01-05 2009-07-22 广州市市政集团有限公司 Steel box girder assembling construction method
CN202466414U (en) * 2011-12-27 2012-10-03 中交第二航务工程局有限公司 Large-segment steel box girder matching bracket structure
CN103194983A (en) * 2013-04-26 2013-07-10 上海市城市建设设计研究总院 Segmental precast assembly method and segmental precast assembly structure for cantilever arm of large capping beam
CN104389268A (en) * 2014-11-14 2015-03-04 中铁大桥局集团第二工程有限公司 Steel tower column with positioning structure and hoisting construction method thereof
CN205012227U (en) * 2015-05-27 2016-02-03 中铁十五局集团第一工程有限公司 Interim locking device is assembled to curvilinear figure head tower post festival section
CN106677065A (en) * 2017-01-25 2017-05-17 中铁大桥局第七工程有限公司 Positioning guiding and locking device for hoisting of oblique steel tower with special-shaped section
CN106835997A (en) * 2017-03-21 2017-06-13 中国葛洲坝集团第二工程有限公司 Steel box-girder lifts interim accurate positioning device and localization method
TWM566730U (en) * 2018-05-29 2018-09-11 佳彧機械工程有限公司 Rear truss connection fixture of cantilever work vehicle

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050234555A1 (en) * 2004-04-16 2005-10-20 Depuy Spine, Inc. Intervertebral disc with monitoring and adjusting capabilities
CN101487232A (en) * 2009-01-05 2009-07-22 广州市市政集团有限公司 Steel box girder assembling construction method
CN202466414U (en) * 2011-12-27 2012-10-03 中交第二航务工程局有限公司 Large-segment steel box girder matching bracket structure
CN103194983A (en) * 2013-04-26 2013-07-10 上海市城市建设设计研究总院 Segmental precast assembly method and segmental precast assembly structure for cantilever arm of large capping beam
CN104389268A (en) * 2014-11-14 2015-03-04 中铁大桥局集团第二工程有限公司 Steel tower column with positioning structure and hoisting construction method thereof
CN205012227U (en) * 2015-05-27 2016-02-03 中铁十五局集团第一工程有限公司 Interim locking device is assembled to curvilinear figure head tower post festival section
CN106677065A (en) * 2017-01-25 2017-05-17 中铁大桥局第七工程有限公司 Positioning guiding and locking device for hoisting of oblique steel tower with special-shaped section
CN106835997A (en) * 2017-03-21 2017-06-13 中国葛洲坝集团第二工程有限公司 Steel box-girder lifts interim accurate positioning device and localization method
TWM566730U (en) * 2018-05-29 2018-09-11 佳彧機械工程有限公司 Rear truss connection fixture of cantilever work vehicle

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
施力可: "钢桁架系杆拱桥节段缆索吊装施工工艺", 《公路交通科技(应用技术版)》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898653A (en) * 2019-03-30 2019-06-18 中国二十二冶集团有限公司 Box beam joint connection in site method
CN111021256A (en) * 2019-12-19 2020-04-17 中建六局土木工程有限公司 Construction method for hoisting heavy-tonnage high-precision steel box girder
CN111042001A (en) * 2020-01-16 2020-04-21 中建七局安装工程有限公司 Temporary anchoring support-free construction method for prefabricated section beam closure section
CN111042001B (en) * 2020-01-16 2022-03-25 中建七局安装工程有限公司 Temporary anchoring support-free construction method for prefabricated section beam closure section
CN111172885A (en) * 2020-01-19 2020-05-19 石岩 Steel box girder butt joint detection assembly and butt joint method
CN112095479A (en) * 2020-09-22 2020-12-18 马亮 Bridge translation butt joint positioner
CN114351598A (en) * 2022-01-26 2022-04-15 中铁二十二局集团第三工程有限公司 Construction method for hoisting steel box girder in confined space of complex navigation water area
CN114351598B (en) * 2022-01-26 2023-09-22 中铁二十二局集团第三工程有限公司 Hoisting construction method for steel box girder in limited space of complex navigable water area
CN114369993A (en) * 2022-03-04 2022-04-19 中铁长安重工有限公司 Steel box girder large section lap joint installation device and method
CN114960457A (en) * 2022-06-30 2022-08-30 中国一冶集团有限公司 Split type steel bridge hoisting horizontal interval fine adjustment device and construction method

Similar Documents

Publication Publication Date Title
CN109322252A (en) Interim matching, fixed structure and method for Large-span Steel Box Beam free cantilever erection
CN109594474A (en) A kind of limited bracket construction method of Long span S-shaped steel box-girder
CN104060523B (en) A kind of ultra-large type bridge box beam component, jig frame special and its assemble method
CN105970836A (en) Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever
CN203160133U (en) Three-dimensional combined accurate positioning device for stayed-cable bridge body cable duct
CN101487232A (en) Steel box girder assembling construction method
CN103696374B (en) Horizontal curve section is greatly across freely-supported steel trussed beam cantilever erection method
CN111254835A (en) Continuous matching construction method for steel box girder segments in factory
CN105507155A (en) Construction process for installation of small-segment steel box girder
CN115162182B (en) Cantilever type steel box girder high-precision cable hoisting construction method
CN109610851A (en) A kind of assembled moulding bed and its construction method of curved surface truss
CN108103949A (en) A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process
CN111119070B (en) Method for erecting W-shaped steel truss girder by adopting symmetrical gantry crane suspension assembly
CN101324054B (en) Incremental launching positioning construction method of bridge subsection girder temporary pier
CN114575268A (en) Light hydraulic sliding internal mold system of cantilever cast-in-place hanging basket
CN110093862A (en) Vertically and horizontally assembled three working face Bridge Erectors and bent cap can be achieved without sidewalk section assembling engineering method
CN104652828A (en) Heavy-duty steel structure cast-steel joint high-altitude bulk construction method
CN106869319A (en) Large span steel truss installation method
CN208649894U (en) A kind of steel anchor beam and steel corbel unit spelling moulding bed
CN108978485B (en) Method for on-site installation of anchor plate of steel structure cable-stayed bridge
CN110409320A (en) A kind of the concrete cast-in-situ bracket and its construction method of adjustable slope
CN208136724U (en) A kind of great cantilever plane swivel structure
CN102995570A (en) Stiffening steel truss lower node location die
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN113235433B (en) Method and device for accurately and quickly positioning cable saddle of cable-separating pipe of short-tower cable-stayed bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212

RJ01 Rejection of invention patent application after publication