CN103114553A - 一种土石坝管涌溃决现场试验方法 - Google Patents

一种土石坝管涌溃决现场试验方法 Download PDF

Info

Publication number
CN103114553A
CN103114553A CN2013100899785A CN201310089978A CN103114553A CN 103114553 A CN103114553 A CN 103114553A CN 2013100899785 A CN2013100899785 A CN 2013100899785A CN 201310089978 A CN201310089978 A CN 201310089978A CN 103114553 A CN103114553 A CN 103114553A
Authority
CN
China
Prior art keywords
dam
piping
water pipe
earth
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100899785A
Other languages
English (en)
Other versions
CN103114553B (zh
Inventor
李云
严秀俊
刘本芹
王晓刚
祝龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Original Assignee
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources filed Critical Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority to CN201310089978.5A priority Critical patent/CN103114553B/zh
Publication of CN103114553A publication Critical patent/CN103114553A/zh
Application granted granted Critical
Publication of CN103114553B publication Critical patent/CN103114553B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)
  • Examining Or Testing Airtightness (AREA)

Abstract

本发明涉及一种土石坝管涌溃决过程现场试验方法,在坝体内预设薄弱层,并在薄弱层内埋设多孔管的方法形成管涌通道,促使大坝形成管涌溃坝。采用本方法进行试验时有效避免了在坝内无法形成稳定渗流通道和无法形成管涌溃坝,避免了试验中管涌通道形成时间无法控制,进而导致现场试验失败,甚至导致出现难以预料的突发性溃坝事件,引发生命财产损失。提高试验成功率,确保试验资料完整。本发明中所涉及的方法可控制现场管涌试验开展的时间,对提高大尺度现场管涌试验成功率,掌握土石坝管涌溃坝机理具有重要的价值,对于推动我国溃坝水力学学科发展具有重要的意义。

Description

一种土石坝管涌溃决现场试验方法
技术领域
本发明涉及一种土石坝管涌溃坝现场试验方法,属于水利工程科学试验领域。
背景技术
我国已建水库大坝8.8万多座、小型塘坝640多万座,其中90%以上为土石坝。这些水库建设年代久远,许多都是当地农民自建,水文系列短,对水库防洪库容和泄洪能力估计不足,许多水库设计和建设标准低,一旦发生溃坝事故,将会给下游带来严重的灾难。据统计,土石坝溃坝事件中管涌溃坝比例高达29%,是土石坝溃坝的主要原因之一。
然而由于土石坝管涌溃决过程伴随着管涌通道的内部冲刷,内部通道坍塌等复杂过程,溃决过程具有强非线性、非恒定性,迄今管涌溃决过程预测依然非常困难。对于无粘性材料构筑的坝体,由于溃坝水流多为急变流,无粘性泥沙运移的控制方程在管涌内部冲刷过程中不适用。而对于粘性材料构筑的坝体,由于粘性土泥沙运移理论尚不成熟,因此,当前物理缩尺模型难以得到合理的管涌溃决过程。换言之,迄今开展的室内试验,大多无法很好的解决比尺问题,室内管涌溃坝试验成果更多是定性的成果,而非定量成果。开展现场大尺度管涌溃坝试验是迄今最为可靠的研究方法。
由于现场大尺度试验涉及到水库、下游行洪区场地使用,水库水源供应等问题,每次现场大尺度溃坝试验经费巨大,保证管涌溃决过程充分发展(初始管涌通道-通道扩宽-下游坝坡及坝顶下陷-溃决)是土石坝管涌溃决过程现场试验成败的关键。
因此,找出一种提高坝体内管涌通道的形成率并促使大坝形成管涌溃坝的现场试验方法成为亟需解决的问题。
发明内容
本发明要解决的技术问题是:提出一种土石坝管涌溃决过程现场试验方法,提高现场大尺度管涌溃坝试验成功率。
本发明为解决上述技术问题提出的技术方案是:一种土石坝管涌溃决过程现场试验方法,其特征在于采用如下步骤:
a、在坝基上用土石物料堆筑试验坝体;
b、按照试验预设的位置在坝体内铺设可产生管涌通道的薄弱层
c、在所述薄弱层内设置贯穿所述坝体的水管,所述水管的上游端设有阀门,所述水管的管壁上开有沿其轴向方向间隔分布的通孔,所述水管的下游端封闭;
c、在所述薄弱层与所述坝体的上游坡面相接处设有粘土覆盖层;
d、打开所述水管上游端的阀门,使水流灌入水管并从水管管体上的通孔流出,冲蚀薄弱层并形成稳定的管涌通道,最终发生溃坝。
本发明的有益效果是:
本发明提供了一种土石坝管涌溃决过程现场试验方法,在坝体内预设薄弱层,并在薄弱层内埋设多孔管的方法形成管涌通道,促使大坝形成管涌溃坝。采用本方法进行试验时有效避免了在坝内无法形成稳定渗流通道和无法形成管涌溃坝,避免了试验中管涌通道形成时间无法控制,进而导致现场试验失败,甚至导致出现难以预料的突发性溃坝事件,引发生命财产损失。提高试验成功率,确保试验资料完整。本发明中所涉及的方法可控制现场管涌试验开展的时间,对提高大尺度现场管涌试验成功率,掌握土石坝管涌溃坝机理具有重要的价值,对于推动我国溃坝水力学学科发展具有重要的意义。
上述技术方案的完善和改进有:
为了保证水流均匀,防止管涌通道内因局部出水不畅而导致通道堵塞而导致试验失败,所述水管管壁上的通孔总面积与所述水管横断面面积之比小于1;另外,为保证通孔有足够的出水量,通孔总面积与所述水管横断面面积之比大于0.5。
为了防止水管的出水流速不均匀,所述水管的上游端的高程大于所述水管的下游端的高程,所述水管与水平面形成的夹角大于0度且小于7度。
为了有利于形成管涌通道,所述薄弱层主要由细砂或中砂铺设而成,所述薄弱层的厚度大于0.6m,且宽度大于1.5m。
粘土覆盖层的厚度为0.5m,覆盖层范围大于上游坝坡侧薄弱层范围。
附图说明
下面结合附图对本发明的土石坝管涌溃决过程现场试验方法作进一步说明。
图1是本发明中所涉及的土石坝的横向剖面图。
图2是本发明中所涉及的土石坝的纵向剖面图。
图3是图1中A部的放大图。
图4是本发明中所涉及的水管的结构示意图。
具体实施方式
实施例一
根据图1、2和3所示,本实施例中的坝顶高程8.0m,管涌通道位于距离坝基1m的位置,坝上水位7.6m。
现拟开展现场管涌溃坝试验。为确保该试验顺利实施,在坝体1内的距离坝基1m高的位置处铺设主要由砂构成的薄弱层2(当然也可以采用其它易在水流的冲刷作用下流失的材料铺设),薄弱层2的深度为0.6m,宽度为1.5m,砂子选细度模数2.2-1.6之间的细砂。
薄弱层2内,埋设一根直径30cm的水管3,水管3沿坝体1的上、下游方向贯穿坝体1。
如图4所示,水管3的管体上开有沿其轴向方向间隔分布的通孔6,水管3管壁上的通孔6总面积与所述水管3横断面面积之比大于0.5且小于1,本实施例中为0.9。
水管3的上游端的高程大于所述水管的下游端的高程,水管3与水平面形成的夹角应大于0度并小于7度,本实施例中为1度。
水管3下游端封闭,上游端采用阀门4封闭,必须要可随时打开。
为避免发生水从薄弱层2的上游侧进入管涌通道,干扰试验进行,薄弱层在坝体上游坡面的出口处设置厚度为0.5m的粘土覆盖层5,覆盖层高度为1m,宽度为2.2m。覆盖层范围大于上游坝坡侧薄弱层范围。
实施例二
根据图1、2和3所示,本实施例中的坝顶高程8.0m,管涌通道位于距离坝基1m的位置,坝上水位7.6m。
现拟开展现场管涌溃坝试验。为确保该试验顺利实施,在坝体1内的距离坝基1m高的位置处铺设主要由砂构成的薄弱层2(当然也可以采用其它易在水流的冲刷作用下流失的材料铺设),薄弱层2的深度为0.6m,宽度为1.5m,砂子选细度模数2.2-1.6之间的细砂。
薄弱层2内,埋设一根直径20cm的水管3,水管3沿坝体1的上、下游方向贯穿坝体1。
如图4所示,水管3的管体上开有沿其轴向方向间隔分布的通孔6,水管3管壁上的通孔6总面积与所述水管3横断面面积之比大于0.5且小于1,本实施例中为0.8。
水管3的上游端的高程大于所述水管的下游端的高程,水管3与水平面形成的夹角应大于0度并小于7度,本实施例中为6度。
水管3下游端封闭,上游端采用阀门4封闭,必须要可随时打开。
为避免发生水从薄弱层2的上游侧进入管涌通道,干扰试验进行,薄弱层在坝体上游坡面的出口处设置厚度为0.5m的粘土覆盖层5,,覆盖层高度为1m,宽度为2.2m。覆盖层范围大于上游坝坡侧薄弱层范围。
本发明的不局限于上述实施例,凡采用等同替换形成的技术方案,均落在本发明要求的保护范围内。

Claims (5)

1.一种土石坝管涌溃决过程现场试验方法,其特征在于采用如下步骤:
a、在坝基上用土石物料堆筑试验坝体;
b、按照试验预设的位置在坝体内铺设可产生管涌通道的薄弱层
c、在所述薄弱层内设置贯穿所述坝体的水管,所述水管的上游端设有阀门,所述水管的管壁上开有沿其轴向方向间隔分布的通孔,所述水管的下游端封闭;
c、在所述薄弱层与所述坝体的上游坡面相接处设有粘土覆盖层;
d、打开所述水管上游端的阀门,使水流灌入水管并从水管管体上的通孔流出,冲蚀薄弱层并形成稳定的管涌通道,最终发生溃坝。
2.根据权利要求1所述土石坝管涌溃决过程现场试验方法,其特征在于:所述水管管壁上的通孔总面积与所述水管横断面面积之比大于0.5且小于1。
3.根据权利要求1所述土石坝管涌溃决过程现场试验方法,其特征在于:所述水管的上游端的高程大于所述水管的下游端的高程,所述水管与水平面形成的夹角大于0度且小于7度。
4.根据权利要求1所述土石坝管涌溃决过程现场试验方法,其特征在于:所述薄弱层主要由细砂或中砂铺设而成,所述薄弱层的厚度大于0.6m,且宽度大于1.5m。
5.根据权利要求1所述土石坝管涌溃决过程现场试验方法,其特征在于:所述粘土覆盖层的厚度为0.5m,覆盖层范围大于上游坝坡侧薄弱层范围。
CN201310089978.5A 2013-03-20 2013-03-20 一种土石坝管涌溃决现场试验方法 Active CN103114553B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310089978.5A CN103114553B (zh) 2013-03-20 2013-03-20 一种土石坝管涌溃决现场试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310089978.5A CN103114553B (zh) 2013-03-20 2013-03-20 一种土石坝管涌溃决现场试验方法

Publications (2)

Publication Number Publication Date
CN103114553A true CN103114553A (zh) 2013-05-22
CN103114553B CN103114553B (zh) 2015-02-04

Family

ID=48412978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310089978.5A Active CN103114553B (zh) 2013-03-20 2013-03-20 一种土石坝管涌溃决现场试验方法

Country Status (1)

Country Link
CN (1) CN103114553B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276688A (zh) * 2013-05-23 2013-09-04 中国长江三峡集团公司 模拟瞬间全部溃坝的实验水槽装置
CN106368165A (zh) * 2016-10-26 2017-02-01 水利部交通运输部国家能源局南京水利科学研究院 含上部缺陷堤坝渗透破坏模拟试验装置及其构建方法
CN109163877A (zh) * 2018-07-12 2019-01-08 水利部交通运输部国家能源局南京水利科学研究院 土质堤坝管涌险情的大尺度现场试验模拟装置
CN111877251A (zh) * 2020-07-03 2020-11-03 重庆交通大学 一种模拟堤坝管涌通道发展的模型试验方法及其模型
CN113219549A (zh) * 2021-05-10 2021-08-06 昆明理工大学 一种尾矿库因渗流、管涌破坏而导致溃坝的模拟装置
CN115356078A (zh) * 2022-07-01 2022-11-18 中国地质调查局成都地质调查中心(西南地质科技创新中心) 模拟库水岸坡管涌过程的试验方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1250126A (zh) * 1998-10-05 2000-04-12 张耀伦 灌注高水速凝固化材料根治管涌及用旋喷加固堤防的方法
JP4067113B1 (ja) * 2007-08-01 2008-03-26 英将 太田 堤防の崩壊防止工法
JP2008115545A (ja) * 2006-11-01 2008-05-22 Yamaguchi Univ 河川流量平準化方法
CN102051895A (zh) * 2009-11-05 2011-05-11 北汽福田汽车股份有限公司 一种挖掘机行走控制的装置和方法
CN102277850A (zh) * 2011-05-05 2011-12-14 水利部交通运输部国家能源局南京水利科学研究院 堤防工程砂土管涌破坏发展过程模型试验装置
CN102608290A (zh) * 2012-03-07 2012-07-25 河海大学 可以模拟土体上覆压力的大尺度管涌试验装置及测试方法
US20120269577A1 (en) * 2011-04-20 2012-10-25 Christensen Arthur E Apparatus for and methods of stabilizing a leaking dam or levee

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1250126A (zh) * 1998-10-05 2000-04-12 张耀伦 灌注高水速凝固化材料根治管涌及用旋喷加固堤防的方法
JP2008115545A (ja) * 2006-11-01 2008-05-22 Yamaguchi Univ 河川流量平準化方法
JP4067113B1 (ja) * 2007-08-01 2008-03-26 英将 太田 堤防の崩壊防止工法
CN102051895A (zh) * 2009-11-05 2011-05-11 北汽福田汽车股份有限公司 一种挖掘机行走控制的装置和方法
US20120269577A1 (en) * 2011-04-20 2012-10-25 Christensen Arthur E Apparatus for and methods of stabilizing a leaking dam or levee
CN102277850A (zh) * 2011-05-05 2011-12-14 水利部交通运输部国家能源局南京水利科学研究院 堤防工程砂土管涌破坏发展过程模型试验装置
CN102608290A (zh) * 2012-03-07 2012-07-25 河海大学 可以模拟土体上覆压力的大尺度管涌试验装置及测试方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周健等: ""管涌现象研究的进展与展望"", 《地下空间》, vol. 24, no. 4, 31 December 2004 (2004-12-31), pages 536 - 542 *
陈生水等: ""土石坝溃决模拟及水流计算研究进展"", 《水利科学进展》, vol. 19, no. 6, 30 November 2008 (2008-11-30), pages 903 - 910 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276688A (zh) * 2013-05-23 2013-09-04 中国长江三峡集团公司 模拟瞬间全部溃坝的实验水槽装置
CN103276688B (zh) * 2013-05-23 2015-05-20 中国长江三峡集团公司 模拟瞬间全部溃坝的实验水槽装置
CN106368165A (zh) * 2016-10-26 2017-02-01 水利部交通运输部国家能源局南京水利科学研究院 含上部缺陷堤坝渗透破坏模拟试验装置及其构建方法
CN106368165B (zh) * 2016-10-26 2018-05-29 水利部交通运输部国家能源局南京水利科学研究院 含上部缺陷堤坝渗透破坏模拟试验装置及其构建方法
CN109163877A (zh) * 2018-07-12 2019-01-08 水利部交通运输部国家能源局南京水利科学研究院 土质堤坝管涌险情的大尺度现场试验模拟装置
CN111877251A (zh) * 2020-07-03 2020-11-03 重庆交通大学 一种模拟堤坝管涌通道发展的模型试验方法及其模型
CN111877251B (zh) * 2020-07-03 2021-12-03 重庆交通大学 一种模拟堤坝管涌通道发展的模型试验方法及其模型
CN113219549A (zh) * 2021-05-10 2021-08-06 昆明理工大学 一种尾矿库因渗流、管涌破坏而导致溃坝的模拟装置
CN113219549B (zh) * 2021-05-10 2024-03-01 昆明理工大学 一种尾矿库因渗流、管涌破坏而导致溃坝的模拟装置
CN115356078A (zh) * 2022-07-01 2022-11-18 中国地质调查局成都地质调查中心(西南地质科技创新中心) 模拟库水岸坡管涌过程的试验方法
CN115356078B (zh) * 2022-07-01 2024-07-02 中国地质调查局成都地质调查中心(西南地质科技创新中心) 模拟库水岸坡管涌过程的试验方法

Also Published As

Publication number Publication date
CN103114553B (zh) 2015-02-04

Similar Documents

Publication Publication Date Title
CN103114553B (zh) 一种土石坝管涌溃决现场试验方法
CN105887886B (zh) 一种强岩溶发育地层帷幕灌浆施工方法
CN103114552B (zh) 一种用于模拟管涌溃坝试验的土石坝
CN105201448A (zh) 一种高压大流量涌水通道内阻水注浆封堵方法
CN107288657A (zh) 地下工程顶部弱胶结岩体渗透破坏区注浆综合控制方法
CN105201001B (zh) 一种岩溶地区大型溶洞的复合防渗结构及其施工方法
CN101831924A (zh) 地下结构物阻断地下水渗流的模拟装置
CN105569062A (zh) 渗透弱化减排降水法
CN205062827U (zh) 一种岩溶地区大型溶洞的复合防渗结构
CN203213068U (zh) 一种用于模拟管涌溃坝试验的土石坝
CN104131535B (zh) 一种高聚物复合加筋土石坝抗震结构及其施工方法
CN213277027U (zh) 一种用于演练基地模拟堤防管涌险情的装置
CN103147422A (zh) 一种土石坝漫顶溃坝现场试验方法
CN109914390A (zh) 一种用于咬合式排桩施工冷缝的注浆结构及施工方法
CN203584445U (zh) 一种分级可控锚杆注浆支护围岩加固成套系统
CN202323899U (zh) 一种用于导流洞地下闸室群的布置结构
CN104594369A (zh) 喀斯特地区高压群孔置换灌浆方法及其结构
CN211777313U (zh) 一种水平定向钻孔口保压封堵装置
CN104912057B (zh) 地下连续墙施工方法
CN104790380B (zh) 地下连续墙骨架
CN209816830U (zh) 一种用于咬合式排桩施工冷缝的注浆结构
CN204266222U (zh) 适用于喀斯特地区的群孔置换灌浆结构
CN113638399A (zh) 实时动态可重复可逆注浆从旁侧控制土体变形的方法
CN208966349U (zh) 一种基于小导管注浆的注浆孔装置
CN105887778A (zh) 一种高压隧洞附近临空面的可控排水系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Yun

Inventor after: Yan Xiujun

Inventor after: Liu Benqin

Inventor after: Wang Xiaogang

Inventor after: Zhu Long

Inventor after: ANDRE CULLER VAN

Inventor before: Li Yun

Inventor before: Yan Xiujun

Inventor before: Liu Benqin

Inventor before: Wang Xiaogang

Inventor before: Zhu Long

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI YUN YAN XIUJUN LIU BENQIN WANG XIAOGANG ZHU LONG TO: LI YUN YAN XIUJUN LIU BENQIN WANG XIAOGANG ZHU LONG ANDRE COULEWAN

C14 Grant of patent or utility model
GR01 Patent grant