CN105297742A - 一种地下空间止水支护的结构及方法 - Google Patents

一种地下空间止水支护的结构及方法 Download PDF

Info

Publication number
CN105297742A
CN105297742A CN201510697315.0A CN201510697315A CN105297742A CN 105297742 A CN105297742 A CN 105297742A CN 201510697315 A CN201510697315 A CN 201510697315A CN 105297742 A CN105297742 A CN 105297742A
Authority
CN
China
Prior art keywords
pipe
underground
freezing
construction
connects
Prior art date
Application number
CN201510697315.0A
Other languages
English (en)
Inventor
张晋勋
江华
江玉生
武福美
杨昊
Original Assignee
北京城建集团有限责任公司
中国矿业大学(北京)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北京城建集团有限责任公司, 中国矿业大学(北京) filed Critical 北京城建集团有限责任公司
Priority to CN201510697315.0A priority Critical patent/CN105297742A/zh
Publication of CN105297742A publication Critical patent/CN105297742A/zh

Links

Abstract

本发明公开了一种地下空间止水支护的结构及方法,所述地下空间止水支护的结构的上部止水支护为地下连续墙结构,下部止水支护为冻结壁结构。

Description

一种地下空间止水支护的结构及方法
技术领域
[0001 ] 本发明涉及地下空间止水技术领域,特别是涉及一种地下空间止水支护的结构。
背景技术
[0002] 城市深部地下空间的开发和利用已经成为人类扩大生存空间的重要手段和发展趋势,但随着开挖深度的增加,地下工程将面临高地压、高水压等问题,传统支护方法(如:注浆法,地下连续墙、旋喷粧等)会出现不适用或者支护成本大大增加等现象。
[0003] 因此希望有一种地下空间止水支护的结构及方法来克服或至少减轻上述的缺陷。
发明内容
[0004] 本发明的目的在于提供一种地下空间止水支护的结构及方法来克服现有技术中存在的上述问题。
[0005] 为实现上述目的,本发明提供一种地下空间止水支护的结构,所述地下空间止水支护的结构的上部止水支护为地下连续墙结构,下部止水支护为冻结壁结构。
[0006] 优选地,所述地下连续墙结构包括:导墙、接头管、冻结管和钢筋笼,在所述导墙的轴线位置,用泥浆形成沟槽,在所述沟槽内设置依次设置所述接头管和绑扎冻结管的钢筋
Μίι ο
[0007] 优选地,所述冻结壁结构包括:进液管、出液管、配液管、制冷站和集液管,所述进液管和出液管设置在所述冻结管内,所述进液管的一端连接所述配液管,所述配液管连接所述制冷站;所述出液管的一端连接所述集液管,所述集液管连接所述制冷站,所述配液管和集液管形成冻结回路。
[0008] —种地下空间止水支护方法包括以下步骤:
[0009] (1)地下连续墙导墙的施工:沿施工边界进行地下连续墙导墙放线、开挖、砌筑;
[0010] (2)地下连续墙沟槽的施工:采用液压抓斗挖掘机,在所述导墙的轴线位置,自上而下垂直施工,在泥浆的保护下,形成沟槽,待槽壁满足要求后,进行槽底清渣,形成一单元地下连续墙沟槽;
[0011] (3)地下连续墙施工:在所述沟槽中先吊放接头管,再吊放绑扎冻结管的钢筋笼,地下连续墙的水下砼浇筑,抽拔接头管,形成一单元连续墙体;
[0012] (4)冻结管的钻进及冻结网络铺设:将步骤(3)中的所述冻结管继续钻进至设计高度,待连续墙全部施工完成后,在所述每根冻结管内插入进液管和出液管至设计高度,进液管另一端连接配液管,配液管连接制冷站;出液管另一端连接集液管,集液管同样连接制冷站,配液管和集液管形成冻结回路;
[0013] (5)冻结壁的形成:启动所述制冷站,使低温CaCl2溶液在所述冻结管内循环,通过测定预先埋置的测温管和水文管数据,确定冻结壁的温度和厚度,当冻结壁交圈后,进入维护冻结期,地下工程可进行施工作业。
[0014] (6)冻结管回收:地下构筑物施工完成后,可自然解冻,也可人工快速解冻,恢复地下水流速后,拔出并回收所述冻结管,冻结孔进行人工回填以完成整个地下工程施工作业。
[0015] 本发明提供了一种地下空间止水支护的结构及方法,所述地下空间止水支护的结构及方法组合了地下连续墙和冻结法的施工特点及适用性,由于组合结构的冻结区域只存在于地下连续墙以下区域,冻结区域只要能形成冻结壁即可,没有强度要求,因此,能够大大减少电能的消耗,体现节能的特点。
附图说明
[0016] 图1是组合地下连续墙和冻结结构的平面示意图。
[0017] 图2是坑底有稳定不透水层时组合地下连续墙和冻结结构的剖面示意图。
[0018] 图3是坑底没有稳定不透水层或不透水层较深时组合地下连续墙和冻结结构的剖面示意图。
[0019] 图4是冻结管结构剖面示意图。
[0020] 图5是冻结柱未交圈的平面结构示意图。
[0021] 图6是冻结柱交圈形成完整冻结壁的平面结构示意图。
具体实施方式
[0022] 为使本发明实施的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行更加详细的描述。在附图中,自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。所描述的实施例是本发明一部分实施例,而不是全部的实施例。下面通过参考附图描述的实施例是示例性的,旨在用于解释本发明,而不能理解为对本发明的限制。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。下面结合附图对本发明的实施例进行详细说明。
[0023] 在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底” “内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明保护范围的限制。
[0024] 冻结法主要是依靠人工制冷技术将地层中的水冻起来,形成不透水帷幕,工程开挖在帷幕中进行,当施工完成后冻结冰帷幕解冻,恢复原地下水流动路径,整个施工过程无人工材料进入地下,对地下水环境不造成影响,是一种绿色环保的施工技术。
[0025] 在本发明一宽泛实施例中:本发明提供一种地下空间止水支护的结构,所述地下空间止水支护的结构的上部止水支护为地下连续墙结构,下部止水支护为冻结壁结构。
[0026] 在本发明另一宽泛实施例中:地下空间止水支护方法包括以下步骤:
[0027] (1)地下连续墙导墙的施工:沿施工边界进行地下连续墙导墙放线、开挖、砌筑;
[0028] (2)地下连续墙沟槽的施工:采用液压抓斗挖掘机,在所述导墙的轴线位置,自上而下垂直施工,在泥浆的保护下,形成沟槽,待槽壁满足要求后,进行槽底清渣,形成一单元地下连续墙沟槽;
[0029] (3)地下连续墙施工:在所述沟槽中先吊放接头管,再吊放绑扎冻结管的钢筋笼,地下连续墙的水下砼浇筑,抽拔接头管,形成一单元连续墙体;
[0030] (4)冻结管的钻进及冻结网络铺设:将步骤(3)中的所述冻结管继续钻进至设计高度,待连续墙全部施工完成后,在所述每根冻结管内插入进液管和出液管至设计高度,进液管另一端连接配液管,配液管连接制冷站;出液管另一端连接集液管,集液管同样连接制冷站,配液管和集液管形成冻结回路;
[0031] (5)冻结壁的形成:启动所述制冷站,使低温CaCl2溶液在所述冻结管内循环,通过测定预先埋置的测温管和水文管数据,确定冻结壁的温度和厚度,当冻结壁交圈后,进入维护冻结期,地下工程可进行施工作业。
[0032] (6)冻结管回收:地下构筑物施工完成后,可自然解冻,也可人工快速解冻,恢复地下水流速后,拔出并回收所述冻结管,冻结孔进行人工回填以完成整个地下工程施工作业。
[0033] 在一未图示实施例中,所述地下连续墙结构包括:导墙、接头管、冻结管和钢筋笼,在所述导墙的轴线位置,用泥浆形成沟槽,在所述沟槽内设置依次设置所述接头管和绑扎冻结管的钢筋笼。
[0034] 如图4所示,所述冻结壁结构包括:进液管、出液管、配液管、制冷站和集液管,所述进液管和出液管设置在所述冻结管内,所述进液管的一端连接所述配液管,所述配液管连接所述制冷站;所述出液管的一端连接所述集液管,所述集液管连接所述制冷站,所述配液管和集液管形成冻结回路。
[0035] 地下连续墙组合冻结联合支护结构综合了地下连续墙强支护的优点和冻结法高效止水且绿色环保的优点,并且解决了两者造价高的缺点。依靠地下连续墙的支护作用维系地下工程开挖的稳定性,上部通过地下连续墙止水,下部通过冻结壁止水,两者结合使得施工作业面处于“干燥”状态。
[0036] 由于地层复杂多变,将地下水分为两类,一类是有稳定不透水层的地下水环境,另一类是没有稳定不透水层或者不透水层较深的地下水环境。
[0037] 如图2所示的第一类情况,可以将冻结管钻入不透水层中,这样组合地下连续墙、冻结壁和不透水层会形成一个封闭的帷幕空间,此时施工作业面内不会有地下水出现。
[0038] 如图3所示的第二类情况,冻结管无法触及不透水层,坑内的地下水和坑外的地下水连通的,可以通过适当延长冻结管长度,进而增大水利路径来抑制地下水流速,并在基坑内设置排水井,以保证施工作业面“干燥”。但此时应对冻结高度、抽水栗的流量以及地下水流速进行验算,防止地下水流速过大导致冻结壁交圈失败,甚至淹坑等事故的发生。
[0039] 最后需要指出的是:以上实施例仅用以说明本发明的技术方案,而非对其限制。尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。

Claims (4)

1.一种地下空间止水支护的结构,其特征在于:所述地下空间止水支护的结构的上部止水支护为地下连续墙结构,下部止水支护为冻结壁结构。
2.如权利要求1所述的地下空间止水支护的结构,其特征在于:所述地下连续墙结构包括:导墙、接头管、冻结管和钢筋笼,在所述导墙的轴线位置,用泥浆形成沟槽,在所述沟槽内设置依次设置所述接头管和绑扎冻结管的钢筋笼。
3.如权利要求2所述的地下空间止水支护的结构,其特征在于:所述冻结壁结构包括:进液管、出液管、配液管、制冷站和集液管,所述进液管和出液管设置在所述冻结管内,所述进液管的一端连接所述配液管,所述配液管连接所述制冷站;所述出液管的一端连接所述集液管,所述集液管连接所述制冷站,所述配液管和集液管形成冻结回路。
4.一种地下空间止水支护方法,其特征在于,包括以下步骤: (1)地下连续墙导墙的施工:沿施工边界进行地下连续墙导墙放线、开挖、砌筑; (2)地下连续墙沟槽的施工:采用液压抓斗挖掘机,在所述导墙的轴线位置,自上而下垂直施工,在泥浆的保护下,形成沟槽,待槽壁满足要求后,进行槽底清渣,形成一单元地下连续墙沟槽; (3)地下连续墙施工:在所述沟槽中先吊放接头管,再吊放绑扎冻结管的钢筋笼,地下连续墙的水下砼浇筑,抽拔接头管,形成一单元连续墙体; (4)冻结管的钻进及冻结网络铺设:将步骤(3)中的所述冻结管继续钻进至设计高度,待连续墙全部施工完成后,在所述每根冻结管内插入进液管和出液管至设计高度,进液管另一端连接配液管,配液管连接制冷站;出液管另一端连接集液管,集液管同样连接制冷站,配液管和集液管形成冻结回路; (5)冻结壁的形成:启动所述制冷站,使低温CaCl2溶液在所述冻结管内循环,通过测定预先埋置的测温管和水文管数据,确定冻结壁的温度和厚度,当冻结壁交圈后,进入维护冻结期,地下工程可进行施工作业。 (6)冻结管回收:地下构筑物施工完成后,可自然解冻,也可人工快速解冻,恢复地下水流速后,拔出并回收所述冻结管,冻结孔进行人工回填以完成整个地下工程施工作业。
CN201510697315.0A 2015-10-22 2015-10-22 一种地下空间止水支护的结构及方法 CN105297742A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510697315.0A CN105297742A (zh) 2015-10-22 2015-10-22 一种地下空间止水支护的结构及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510697315.0A CN105297742A (zh) 2015-10-22 2015-10-22 一种地下空间止水支护的结构及方法

Publications (1)

Publication Number Publication Date
CN105297742A true CN105297742A (zh) 2016-02-03

Family

ID=55195504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510697315.0A CN105297742A (zh) 2015-10-22 2015-10-22 一种地下空间止水支护的结构及方法

Country Status (1)

Country Link
CN (1) CN105297742A (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603966A (zh) * 2016-02-29 2016-05-25 中建三局集团有限公司 一种用于逆作法的变截面墙式竖向支承结构及其施工方法
CN105780780A (zh) * 2016-04-15 2016-07-20 肖锐 一种桩墙结合支护结构
CN105887936A (zh) * 2016-05-13 2016-08-24 中国矿业大学 一种预埋冻结管的槽壁接头封水方法
CN105908765A (zh) * 2016-06-16 2016-08-31 中铁工程设计咨询集团有限公司 用于保护地下水环境的明挖隧道止水结构及施工方法
CN105909260A (zh) * 2016-06-16 2016-08-31 山东省地矿工程勘察院 用于保护地下水环境的地铁车站止水结构及其施工方法
CN105926636A (zh) * 2016-05-13 2016-09-07 中国矿业大学 深基坑冻结封底施工方法
CN106088104A (zh) * 2016-06-27 2016-11-09 中国矿业大学 人工冻结联合地下连续墙支护超深基坑的施工方法
CN106121686A (zh) * 2016-06-16 2016-11-16 山东省地矿工程勘察院 用于保护地下水环境的暗挖隧道止水结构及其施工方法
CN107059841A (zh) * 2017-05-05 2017-08-18 李延川 地下空间支护结构及施工方法
CN109505295A (zh) * 2018-11-19 2019-03-22 上海市基础工程集团有限公司 地下连续墙接缝止水冷冻施工工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296235A (ja) * 1995-04-26 1996-11-12 Shimizu Corp 人工凍結領域を制御した止水工法
CN1534142A (zh) * 2003-04-01 2004-10-06 中国矿业大学 地下连续墙冻结施工工法
CN101634148A (zh) * 2009-08-05 2010-01-27 朱奎 一种土钉墙基坑支护及施工方法
TWI321183B (en) * 2006-05-09 2010-03-01 Yang Yuan Chen The method of liquid nitrogen ground freezing for underground sewer jack-piping
CN104120712A (zh) * 2013-04-28 2014-10-29 杨哲 一种地下连续墙的施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296235A (ja) * 1995-04-26 1996-11-12 Shimizu Corp 人工凍結領域を制御した止水工法
CN1534142A (zh) * 2003-04-01 2004-10-06 中国矿业大学 地下连续墙冻结施工工法
TWI321183B (en) * 2006-05-09 2010-03-01 Yang Yuan Chen The method of liquid nitrogen ground freezing for underground sewer jack-piping
CN101634148A (zh) * 2009-08-05 2010-01-27 朱奎 一种土钉墙基坑支护及施工方法
CN104120712A (zh) * 2013-04-28 2014-10-29 杨哲 一种地下连续墙的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
丛竺: "《强透水砂层运营地铁隧道正上方基坑施工关键技术》", 《施工技术》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603966A (zh) * 2016-02-29 2016-05-25 中建三局集团有限公司 一种用于逆作法的变截面墙式竖向支承结构及其施工方法
CN105780780A (zh) * 2016-04-15 2016-07-20 肖锐 一种桩墙结合支护结构
CN105926636A (zh) * 2016-05-13 2016-09-07 中国矿业大学 深基坑冻结封底施工方法
CN105887936A (zh) * 2016-05-13 2016-08-24 中国矿业大学 一种预埋冻结管的槽壁接头封水方法
CN105926636B (zh) * 2016-05-13 2018-03-20 中国矿业大学 深基坑冻结封底施工方法
CN106121686A (zh) * 2016-06-16 2016-11-16 山东省地矿工程勘察院 用于保护地下水环境的暗挖隧道止水结构及其施工方法
CN105909260B (zh) * 2016-06-16 2019-01-01 山东省地矿工程勘察院 用于保护地下水环境的地铁车站止水结构及其施工方法
CN105909260A (zh) * 2016-06-16 2016-08-31 山东省地矿工程勘察院 用于保护地下水环境的地铁车站止水结构及其施工方法
CN105908765B (zh) * 2016-06-16 2018-11-30 中铁工程设计咨询集团有限公司 用于保护地下水环境的明挖隧道止水结构及施工方法
CN105908765A (zh) * 2016-06-16 2016-08-31 中铁工程设计咨询集团有限公司 用于保护地下水环境的明挖隧道止水结构及施工方法
CN106121686B (zh) * 2016-06-16 2018-11-30 山东省地矿工程勘察院 用于保护地下水环境的暗挖隧道止水结构及其施工方法
CN106088104A (zh) * 2016-06-27 2016-11-09 中国矿业大学 人工冻结联合地下连续墙支护超深基坑的施工方法
CN107059841A (zh) * 2017-05-05 2017-08-18 李延川 地下空间支护结构及施工方法
CN109505295A (zh) * 2018-11-19 2019-03-22 上海市基础工程集团有限公司 地下连续墙接缝止水冷冻施工工艺

Similar Documents

Publication Publication Date Title
CN104196034B (zh) 一种利用钢板桩作为支护围堰的基坑施工方法
CN104675403B (zh) 一种地下空间施工方法及支护结构
CN106400782B (zh) 一种利用旋挖钻机施工基坑围护钻孔咬合桩的施工方法
CN105134284A (zh) 一种基于水平定向钻孔液氮循环冻融增透抽采瓦斯方法
CN102454167B (zh) 大型超深沉井的施工方法
CN105464686B (zh) 既有设施下多层地下空间幕架式暗挖施工方法及支护结构
CN103031836B (zh) 一种在新吹填淤泥地基上快速修筑道路的方法
CN107676097A (zh) 一种高水压软土地层hfe组合式盾构始发方法
CN105672348A (zh) 一种深水区砂卵石地层截除桥梁桩基的施工方法
CN104074525A (zh) 全断面注浆、矩形水平冻结与管棚联合加固结构及方法
CN104963334B (zh) 用注浆冻结管加固冻结联络通道抑制冻胀融沉的施工方法
CN104711994A (zh) 基坑深井降水及封堵施工方法
CN105908765B (zh) 用于保护地下水环境的明挖隧道止水结构及施工方法
CN104631475A (zh) 一种下穿河流浅埋暗挖隧道的安全快速施工方法
CN109707444B (zh) 一种自动启动式隧道排水系统
CN105909260B (zh) 用于保护地下水环境的地铁车站止水结构及其施工方法
CN103015402B (zh) 一种用水泥土加固法抑制水平冻结冻胀融沉的施工方法
CN109208637A (zh) 在既有隧道基础上新增明挖车站的施工方法
CN105155541B (zh) 一种集水坑的双液浆封闭施工方法
CN104120710B (zh) 一种真空预压联合吹填泥浆的软基加固处理方法
CN103046565B (zh) 超深岩基深基坑降排水方法
CN101387202B (zh) 隧道内已成初支软弱围岩地段扩挖管棚工作室的方法
CN104806253B (zh) 一种矩形顶管通道之间开洞的施工方法
CN104878739B (zh) 可横向连接塑料排水板的排水体组件及其施工方法
CN103277103B (zh) 一种立井开凿穿越巨厚富水基岩非全深冻结方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203

RJ01 Rejection of invention patent application after publication