CN103114522A - 桥梁e2阶段抗震球型钢支座及其安装方法 - Google Patents

桥梁e2阶段抗震球型钢支座及其安装方法 Download PDF

Info

Publication number
CN103114522A
CN103114522A CN2013100858380A CN201310085838A CN103114522A CN 103114522 A CN103114522 A CN 103114522A CN 2013100858380 A CN2013100858380 A CN 2013100858380A CN 201310085838 A CN201310085838 A CN 201310085838A CN 103114522 A CN103114522 A CN 103114522A
Authority
CN
China
Prior art keywords
bearing
pressure
guide rail
bridge
lower support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100858380A
Other languages
English (en)
Inventor
张培基
冯克岩
徐瑞祥
王立志
李炯
张建宁
栾广扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fengze Engineering Rubber S&T Devel Opment Co., Ltd.
China Railway First Survey and Design Institute Group Ltd
Original Assignee
Fengze Engineering Rubber S&t Devel Opment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fengze Engineering Rubber S&t Devel Opment Co Ltd filed Critical Fengze Engineering Rubber S&t Devel Opment Co Ltd
Priority to CN2013100858380A priority Critical patent/CN103114522A/zh
Publication of CN103114522A publication Critical patent/CN103114522A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明属于钢支座技术领域,公开了一种桥梁E2阶段抗震球型钢支座及其安装方法。其主要技术特征为:包括上支座板、平面滑板、球芯、球面滑板和下支座板,在所述下支座板位于剪力挡条一侧的侧面通过固定销固定有外侧面为圆柱面的承压定位凸圆柱导轨,所述承压定位凸圆柱导轨与所述剪力挡条方向平行,在所述承压定位凸圆柱导轨外侧设置有承压转动凹圆柱导轨,所述承压转动凹圆柱导轨内侧面与所述承压定位凸圆柱导轨外侧面匹配,所述承压转动凹圆柱导轨的外侧面为平面,所述承压转动凹圆柱导轨的外侧面贴在所述剪力挡条的内侧面。这样,在水平载荷较大时,可以将承压定位凸圆柱导轨和承压转动凹圆柱导轨的截面加宽,其抗剪强度大大加强,而且还能保证在限位方向上几乎不动或少动的情况下还可以上支座板和下支座板相对转动。

Description

桥梁E2阶段抗震球型钢支座及其安装方法
技术领域
本发明属于桥梁工程或建筑工程支座技术领域,具体的讲涉及桥梁E2阶段抗震球型钢支座及其安装方法。
背景技术
目前,在地震烈度较大的地区以及不对称结构设计的桥梁工程和建筑工程,经常会出现很大的水平荷载,地震烈度大的地区经常采用减隔震装置设计,减隔震主要采用以下方法,其一,在下支座板的侧面设置有较薄的盆沿,盆沿侧面与剪力挡条之间带有很小的间隙,保证了结构的限位方向是不允许发生位移,而且上支座板对于下支座板发生相对转动,起到减隔震的作用,但在水平荷载较大的情况下,剪力挡条会将盆沿压坏;其二,在下支座板的侧面设置有较厚的盆沿,为了保证上支座板的转动,将盆沿侧面与剪力挡条之间的间隙的加大,虽然可以达到减隔震效果,但是无法保证在结构的限位方向是不允许发生位移。
发明内容
本发明解决的第一个技术问题就是提供一种高抗剪力、稳定传递高水平负荷的同时实现转动功能的桥梁E2阶段抗震球型钢支座。
为解决上述技术问题,本发明提出的技术方案为:包括从上至下依次排列的上支座板、平面滑板、球芯、球面滑板和下支座板,在所述上支座板下方设置有剪力挡条,在所述下支座板位于剪力挡条一侧的侧面通过固定销固定有外侧面为圆柱面的承压定位凸圆柱导轨,所述承压定位凸圆柱导轨与所述剪力挡条方向平行,在所述承压定位凸圆柱导轨外侧设置有承压转动凹圆柱导轨,所述承压转动凹圆柱导轨内侧面与所述承压定位凸圆柱导轨外侧面匹配,所述承压转动凹圆柱导轨的外侧面为平面,所述承压转动凹圆柱导轨的外侧面贴在所述剪力挡条的内侧面。
其附加技术特征为:
所述承压转动凹圆柱导轨的外侧面与所述剪力挡条内侧面带有间隙;
所述承压转动凹圆柱导轨的外侧面与所述剪力挡条内侧面之间的间隙为0.5——0.7毫米;
所述承压转动凹圆柱导轨的两端部与所述下支座板活动连接;
所述承压转动凹圆柱导轨的两端部通过第一转动销连接有活动链片,该活动链片的另一端与所述下支座板通过第二转动销活动连接;
所述第二转动销位于所述承压定位凸圆柱导轨的圆柱面的圆心轴位置。
本发明解决的第二个技术问题就是提供一种高抗剪力、稳定传递高水平负荷的同时实现转动功能的桥梁E2阶段抗震球型钢支座的安装方法。
为解决上述技术问题,本发明采用的技术方案为:该方法包括下列步骤:
第一步,组装
第(一)步将球面滑板组装到下支座板凹槽内,压紧使贴合面贴实;
第(二)步,将球芯组装到球面滑板的凹球面内,将平面滑板组装到球芯凹槽内,压紧使贴合面贴实;
第(三)步,将定位销逐个组装到下支座板侧面安装孔内,将承压定位凸圆柱导轨于定位销对准组装;
第(四)步,将承压转动凹圆柱导轨两侧的周向活动链片用第二转动销连接到下支座板连接孔内,将活动链片的另一端通过第一转动销与承压转动凹圆柱导轨活动连接,将上支座板进行组装并调平;
第二步,安装
将下支座板调平并与桥墩固定,将上支座板与梁体下表面固定。
本发明提供的桥梁E2阶段抗震球型钢支座,同现有技术相比较具有以下优点:其一,由于包括从上至下依次排列的上支座板、平面滑板、球芯、球面滑板和下支座板,在所述上支座板下方设置有剪力挡条,在所述下支座板位于剪力挡条一侧的侧面通过固定销固定有外侧面为圆柱面的承压定位凸圆柱导轨,所述承压定位凸圆柱导轨与所述剪力挡条方向平行,在所述承压定位凸圆柱导轨外侧设置有承压转动凹圆柱导轨,所述承压转动凹圆柱导轨内侧面与所述承压定位凸圆柱导轨外侧面匹配,所述承压转动凹圆柱导轨的外侧面为平面,所述承压转动凹圆柱导轨的外侧面贴在所述剪力挡条的内侧面,这样,在水平载荷较大时,可以将承压定位凸圆柱导轨和承压转动凹圆柱导轨的截面加宽,其抗剪强度大大加强,而且还能保证在限位方向上几乎不动或少动的情况下还可以上支座板和下支座板相对转动,提高了桥梁的使用寿命和抗剪强度;其二,由于所述承压转动凹圆柱导轨的外侧面与所述剪力挡条内侧面带有间隙,所述承压转动凹圆柱导轨的外侧面与所述剪力挡条内侧面之间的间隙为0.5——0.7毫米,既保证了支座非限位方向上的相对移动,又避免了限位方向上超范围移动;其三,由于所述承压转动凹圆柱导轨的两端部与所述下支座板活动连接,避免了上支座板在非限位方向滑动时造成承压转动凹圆柱导轨移动错位;其四,由于所述承压转动凹圆柱导轨的两端部通过第一转动销连接有活动链片,该活动链片的另一端与所述下支座板通过第二转动销活动连接,所述第二转动销位于所述承压定位凸圆柱导轨的圆柱面的圆心轴位置,在上支座板和下支座板发生相对转动时,活动链片不会阻碍承压转动凹圆柱导轨的转动。
附图说明
图1为桥梁E2阶段抗震球型钢支座的结构示意图;
图2为承压定位凸圆柱导轨和承压转动凹圆柱导轨的配合示意图;
图3为活动链片与承压转动凹圆柱导轨和下支座板连接示意图。
具体实施方式
下面结合附图对本发明所提出的桥梁E2阶段抗震球型钢支座的结构及其安装方法做进一步说明。
如图1图2和图3所示,为桥梁E2阶段抗震球型钢支座的结构示意图。其结构包括从上至下依次排列的上支座板3、平面滑板4、球芯5、球面滑板6和下支座板7,在上支座板3的下方设置有剪力挡条11,在下支座板7位于剪力挡条11一侧的侧面通过固定销10固定有外侧面为圆柱面的承压定位凸圆柱导轨2,承压定位凸圆柱导轨2与剪力挡条11方向平行,在承压定位凸圆柱导轨2外侧设置有承压转动凹圆柱导轨1,承压转动凹圆柱导轨1的内侧面与承压定位凸圆柱导轨2的外侧面匹配,承压转动凹圆柱导轨1的外侧面为平面,承压转动凹圆柱导轨1的外侧面贴在剪力挡条11的内侧面上。这样,在水平载荷较大时,可以将承压定位凸圆柱导轨2和承压转动凹圆柱导轨1的截面加宽,其抗剪强度大大加强,而且还能保证在限位方向上几乎不动或少动的情况下还可以上支座板和下支座板相对转动,提高了桥梁的使用寿命和抗剪强度。
承压转动凹圆柱导轨1的外侧面与剪力挡条11的内侧面带有间隙,间隙最好为0.5——0.7毫米,这样,既保证了支座非限位方向上的相对移动,又避免了限位方向上超范围移动。
承压转动凹圆柱导轨1的两端部与所述下支座板7活动连接,避免了上支座板3在非限位方向滑动时造成承压转动凹圆柱导轨1移动错位。
承压转动凹圆柱导轨1的两端部通过第一转动销9连接有活动链片8,该活动链片8的另一端与下支座板7通过第二转动销12活动连接,第二转动销12位于承压定位凸圆柱导轨2的圆柱面的圆心轴位置,在上支座板3和下支座板7发生相对转动时,活动链片8不会阻碍承压转动凹圆柱导轨的转动。
上述桥梁E2阶段抗震球型钢支座的安装方法,该方法包括下列步骤:
第一步,组装
第(一)步将球面滑板6组装到下支座板7的凹槽内,压紧使贴合面贴实;
第(二)步,将球芯5组装到球面滑板6的凹球面内,将平面滑板4组装到球芯5的凹槽内,压紧使贴合面贴实;
第(三)步,将定位销10逐个组装到下支座板7的侧面安装孔内,将承压定位凸圆柱导轨2于定位销10对准组装;
第(四)步,将承压转动凹圆柱导轨1两侧的周向活动链片8用第二转动销12连接到下支座板7的连接孔内,将活动链片8的另一端通过第一转动销9与承压转动凹圆柱导轨1活动连接,将上支座板3进行组装并调平;
第二步,安装
将下支座板7调平并与桥墩固定,将上支座板3与梁体下表面固定。
本发明的保护范围不仅仅局限于上述实施例,只要结构与本发明桥梁E2阶段抗震球型钢支座结构相同,就落在本发明保护的范围。

Claims (7)

1.桥梁E2阶段抗震球型钢支座,包括从上至下依次排列的上支座板、平面滑板、球芯、球面滑板和下支座板,在所述上支座板下方设置有剪力挡条,其特征在于:在所述下支座板位于剪力挡条一侧的侧面通过固定销固定有外侧面为圆柱面的承压定位凸圆柱导轨,所述承压定位凸圆柱导轨与所述剪力挡条方向平行,在所述承压定位凸圆柱导轨外侧设置有承压转动凹圆柱导轨,所述承压转动凹圆柱导轨内侧面与所述承压定位凸圆柱导轨外侧面匹配,所述承压转动凹圆柱导轨的外侧面为平面,所述承压转动凹圆柱导轨的外侧面贴在所述剪力挡条的内侧面。
2.根据权利要求1所述的桥梁E2阶段抗震球型钢支座,其特征在于:所述承压转动凹圆柱导轨的外侧面与所述剪力挡条内侧面带有间隙。
3.根据权利要求2所述的桥梁E2阶段抗震球型钢支座,其特征在于:所述承压转动凹圆柱导轨的外侧面与所述剪力挡条内侧面之间的间隙为0.5——0.7毫米。
4.根据权利要求1所述的桥梁E2阶段抗震球型钢支座,其特征在于:所述承压转动凹圆柱导轨的两端部与所述下支座板活动连接。
5.根据权利要求4所述的桥梁E2阶段抗震球型钢支座,其特征在于:所述承压转动凹圆柱导轨的两端部通过第一转动销连接有活动链片,该活动链片的另一端与所述下支座板通过第二转动销活动连接。
6.根据权利要求5所述的桥梁E2阶段抗震球型钢支座,其特征在于:所述第二转动销位于所述承压定位凸圆柱导轨的圆柱面的圆心轴位置。
7.权利要求1、2、3、4、5或6所述桥梁E2阶段抗震球型钢支座的安装方法,其特征在于:该方法包括下列步骤:
第一步,组装
第(一)步将球面滑板组装到下支座板凹槽内,压紧使贴合面贴实;
第(二)步,将球芯组装到球面滑板的凹球面内,将平面滑板组装到球芯凹槽内,压紧使贴合面贴实;
第(三)步,将定位销逐个组装到下支座板侧面安装孔内,将承压定位凸圆柱导轨于定位销对准组装;
第(四)步,将承压转动凹圆柱导轨两侧的周向活动链片用第二转动销连接到下支座板连接孔内,将活动链片的另一端通过第一转动销与承压转动凹圆柱导轨活动连接,将上支座板进行组装并调平;
第二步,安装
将下支座板调平并与桥墩固定,将上支座板与梁体下表面固定。
CN2013100858380A 2013-03-18 2013-03-18 桥梁e2阶段抗震球型钢支座及其安装方法 Pending CN103114522A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100858380A CN103114522A (zh) 2013-03-18 2013-03-18 桥梁e2阶段抗震球型钢支座及其安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100858380A CN103114522A (zh) 2013-03-18 2013-03-18 桥梁e2阶段抗震球型钢支座及其安装方法

Publications (1)

Publication Number Publication Date
CN103114522A true CN103114522A (zh) 2013-05-22

Family

ID=48412946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100858380A Pending CN103114522A (zh) 2013-03-18 2013-03-18 桥梁e2阶段抗震球型钢支座及其安装方法

Country Status (1)

Country Link
CN (1) CN103114522A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104233952A (zh) * 2014-09-17 2014-12-24 中国一冶集团有限公司 桥梁钢支座安装用垫石及安装方法
CN107605061A (zh) * 2017-09-04 2018-01-19 丰泽工程橡胶科技开发股份有限公司 斜面导向式减隔震自复位支座

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3921240A (en) * 1971-04-27 1975-11-25 Elastometal Ltd Structural bearings
CN2709510Y (zh) * 2004-03-16 2005-07-13 中国路桥(集团)新津筑路机械厂 控制侧向力的桥梁支座
US20070067929A1 (en) * 2005-08-01 2007-03-29 Ptak Keith R Bridge with minimized excited bridge vibrations
CN201485786U (zh) * 2009-08-18 2010-05-26 衡水宝力工程橡胶有限公司 铁路桥梁用转动套式球型钢支座
CN201495486U (zh) * 2009-08-11 2010-06-02 武汉鑫拓力工程技术有限公司 一种球型钢支座
CN201546168U (zh) * 2009-12-11 2010-08-11 中交第一公路勘察设计研究院有限公司 一种球形钢支座
CN201722600U (zh) * 2010-06-29 2011-01-26 张维国 旋转桥自闭合支座
CN201990937U (zh) * 2011-04-14 2011-09-28 衡水宝力工程橡胶有限公司 一种球型支座的导向结构
CN202175911U (zh) * 2011-08-26 2012-03-28 衡水宝力工程橡胶有限公司 球铰盆式支座
CN202265771U (zh) * 2011-10-13 2012-06-06 安徽鸿路钢结构(集团)股份有限公司 钢骨架的球形支座
CN202595619U (zh) * 2012-05-28 2012-12-12 衡水中铁建工程橡胶有限责任公司 一种具有弹性缓冲功能的球面转动支座
CN102839603A (zh) * 2012-09-26 2012-12-26 彭天波 一种高摩擦减隔震支座及其制备方法
CN203080407U (zh) * 2013-03-18 2013-07-24 丰泽工程橡胶科技开发股份有限公司 桥梁e2阶段抗震球型钢支座

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3921240A (en) * 1971-04-27 1975-11-25 Elastometal Ltd Structural bearings
CN2709510Y (zh) * 2004-03-16 2005-07-13 中国路桥(集团)新津筑路机械厂 控制侧向力的桥梁支座
US20070067929A1 (en) * 2005-08-01 2007-03-29 Ptak Keith R Bridge with minimized excited bridge vibrations
CN201495486U (zh) * 2009-08-11 2010-06-02 武汉鑫拓力工程技术有限公司 一种球型钢支座
CN201485786U (zh) * 2009-08-18 2010-05-26 衡水宝力工程橡胶有限公司 铁路桥梁用转动套式球型钢支座
CN201546168U (zh) * 2009-12-11 2010-08-11 中交第一公路勘察设计研究院有限公司 一种球形钢支座
CN201722600U (zh) * 2010-06-29 2011-01-26 张维国 旋转桥自闭合支座
CN201990937U (zh) * 2011-04-14 2011-09-28 衡水宝力工程橡胶有限公司 一种球型支座的导向结构
CN202175911U (zh) * 2011-08-26 2012-03-28 衡水宝力工程橡胶有限公司 球铰盆式支座
CN202265771U (zh) * 2011-10-13 2012-06-06 安徽鸿路钢结构(集团)股份有限公司 钢骨架的球形支座
CN202595619U (zh) * 2012-05-28 2012-12-12 衡水中铁建工程橡胶有限责任公司 一种具有弹性缓冲功能的球面转动支座
CN102839603A (zh) * 2012-09-26 2012-12-26 彭天波 一种高摩擦减隔震支座及其制备方法
CN203080407U (zh) * 2013-03-18 2013-07-24 丰泽工程橡胶科技开发股份有限公司 桥梁e2阶段抗震球型钢支座

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104233952A (zh) * 2014-09-17 2014-12-24 中国一冶集团有限公司 桥梁钢支座安装用垫石及安装方法
CN107605061A (zh) * 2017-09-04 2018-01-19 丰泽工程橡胶科技开发股份有限公司 斜面导向式减隔震自复位支座
CN107605061B (zh) * 2017-09-04 2023-05-05 丰泽智能装备股份有限公司 斜面导向式减隔震自复位支座

Similar Documents

Publication Publication Date Title
CN103147394A (zh) 抗拔双向滑动摩擦支座
CN105297903A (zh) 一种大震与小震刚度切换减震球型支座及其减震方法
CN201459597U (zh) 一种可实现类型转换的抗震阻尼球型钢支座
US20160319499A1 (en) Viscoelastic damping device
CN204530453U (zh) 用于桥梁施工的隔震减震装置
CN204343155U (zh) 桥梁减隔震支座
CN103114522A (zh) 桥梁e2阶段抗震球型钢支座及其安装方法
CN104328736A (zh) 桥梁减隔震支座
CN205134179U (zh) 一种曲面铰滑动摩擦-滚轴滚动摩擦组合隔震支座
CN109555009A (zh) 一种支撑及梁体减隔震结构体系及其应用
CN201362820Y (zh) 桥梁减隔震固定支座
CN203080407U (zh) 桥梁e2阶段抗震球型钢支座
CN203021916U (zh) 球型钢支座
CN102705353A (zh) 一种销轴组件及其定位方法和挖掘机
CN105178173B (zh) 具有减隔震功能的活动支撑
CN204530419U (zh) 防震减震式桥梁结构
KR101291685B1 (ko) 구면베어링을 이용한 교량받침
CN107881905A (zh) 防抬梁曲面球型减隔震支座
CN205000238U (zh) 一种盆式滑动摩擦-滚轴滚动摩擦组合隔震支座
CN209741653U (zh) 一种具有钢弹簧和阻尼装置的双曲面球型减隔震支座
CN105297618B (zh) 一种曲面铰滑动摩擦‑滚轴滚动摩擦组合隔震支座
CN103510464B (zh) 同球向双球面减隔震支座
CN203684079U (zh) 一种桥梁速度锁定支座
CN203383141U (zh) 地震e2阶段抗震盆式支座
CN205134538U (zh) 一种大震与小震刚度切换减震球型支座

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Peiji

Inventor after: Luan Guangyang

Inventor after: Feng Keyan

Inventor after: Cao Jing

Inventor after: Liu Wenjiang

Inventor after: Chen Minggui

Inventor after: Zhao Xingzhong

Inventor after: Xu Ruixiang

Inventor after: Li Jiong

Inventor after: Zhang Jianning

Inventor before: Zhang Peiji

Inventor before: Feng Keyan

Inventor before: Xu Ruixiang

Inventor before: Wang Lizhi

Inventor before: Li Jiong

Inventor before: Zhang Jianning

Inventor before: Luan Guangyang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG PEIJI FENG KEYAN XU RUIXIANG WANG LIZHI LI JIONG ZHANG JIANNING LUANGUANGYANG TO: ZHANG PEIJI FENG KEYAN CAO JING LIU WENJIANG CHEN MINGGUI ZHAO XINGZHONG XU RUIXIANG LI JIONG ZHANG JIANNING LUAN GUANGYANG

ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY FIRST SURVEY + DESIGN INSTITUTE GROU

Effective date: 20140106

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Dongmin

Inventor after: Xu Ruixiang

Inventor after: Zheng Donghai

Inventor after: Li Jiong

Inventor after: Zhang Jianning

Inventor after: Luan Guangyang

Inventor after: Song Guangen

Inventor after: Cai Wenyong

Inventor after: Sun Cheng

Inventor after: Yan Fei

Inventor after: Zhuang Yan

Inventor after: Zhang Peiji

Inventor after: Feng Keyan

Inventor after: Cao Jing

Inventor after: Liu Wenjiang

Inventor after: Chen Minggui

Inventor after: Zhao Xingzhong

Inventor before: Zhang Peiji

Inventor before: Luan Guangyang

Inventor before: Feng Keyan

Inventor before: Cao Jing

Inventor before: Liu Wenjiang

Inventor before: Chen Minggui

Inventor before: Zhao Xingzhong

Inventor before: Xu Ruixiang

Inventor before: Li Jiong

Inventor before: Zhang Jianning

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG PEIJI FENG KEYAN CAO JING LIU WENJIANG CHEN MINGGUI ZHAO XINGZHONG XU RUIXIANG LI JIONG ZHANG JIANNING LUAN GUANGYANG TO: WANG DONGMIN YAN FEI ZHUANG YAN ZHANG PEIJI FENG KEYAN CAO JING LIU WENJIANG CHEN MINGGUI ZHAO XINGZHONG XU RUIXIANG ZHENG DONGHAI LI JIONG ZHANG JIANNING LUAN GUANGYANG SONG GUANGEN CAI WENYONG SUN CHENG

TA01 Transfer of patent application right

Effective date of registration: 20140106

Address after: 053000 Yongxing West Road, Hengshui Development Zone, No. 2189, No.

Applicant after: Fengze Engineering Rubber S&T Devel Opment Co., Ltd.

Applicant after: China Railway First Survey & Design Institute Group Co., Ltd.

Address before: 053000 Yongxing West Road, Hengshui Development Zone, No. 2189, No.

Applicant before: Fengze Engineering Rubber S&T Devel Opment Co., Ltd.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130522