CN103104191B - 超大孔径桩基钻孔机 - Google Patents

超大孔径桩基钻孔机 Download PDF

Info

Publication number
CN103104191B
CN103104191B CN201310070445.2A CN201310070445A CN103104191B CN 103104191 B CN103104191 B CN 103104191B CN 201310070445 A CN201310070445 A CN 201310070445A CN 103104191 B CN103104191 B CN 103104191B
Authority
CN
China
Prior art keywords
pile foundation
gear
ultra
boring machine
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310070445.2A
Other languages
English (en)
Other versions
CN103104191A (zh
Inventor
李付星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou University of Technology
Original Assignee
Xuzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou University of Technology filed Critical Xuzhou University of Technology
Priority to CN201310070445.2A priority Critical patent/CN103104191B/zh
Publication of CN103104191A publication Critical patent/CN103104191A/zh
Application granted granted Critical
Publication of CN103104191B publication Critical patent/CN103104191B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种超大孔径桩基钻孔机,该超大孔径桩基钻孔机包括轨道架、旋转支撑架、钻机和风机,钻机的下部为钻盘,钻盘上分布有钻头,钻盘的中部向上设有钻轴,钻轴上套装有输入齿轮,所述旋转支撑架上固定有调速电机,调速电机的转子轴与主动齿轮相连,主动齿轮、输入齿轮及过桥齿轮依次啮合传动,过桥齿轮同轴连接有行走齿轮,行走齿轮与轨道架啮合,所述风机的下部为吸头,吸头的下部连接有滑翘板,吸头的上部向上设有风力室及风力输送管,风力室中设有风轮。该超大孔径桩基钻孔机能够一次性钻出超大的孔径,打入的桩基牢固不易坏,而且钻孔效率高,成本低,适于大范围内普及使用。<b/><b/>

Description

超大孔径桩基钻孔机
技术领域
本发明涉及一种桩基钻孔机,尤其是适用于大型桩基工程的超大孔径桩基钻孔机
背景技术
目前,公知的在建造房屋、高塔或桥梁之前,需要建造桩基,而现有的桩基钻孔机能够钻取的孔径很小,效率不高,不能满足大型建筑工程的要求,另外,现有的桩基钻孔机结构复杂,成本高,不便于普及使用
发明内容
为了克服现有的桩基钻孔机不能钻取较大孔径的问题,本发明提供一种超大孔径桩基钻孔机,该超大孔径桩基钻孔机能够一次性钻出超大的孔径,打入的桩基牢固不易坏,而且钻孔效率高,成本低,适于大范围内普及使用。
本发明解决其技术问题所采用的技术方案是:该超大孔径桩基钻孔机包括轨道架、旋转支撑架、钻机和风机;所述钻机的下部为盘状的钻盘,钻盘上均匀分布有向下的钻头,钻盘的中部向上设有带花键的钻轴,钻轴滑配合垂直安装在旋转支撑架上的滑套中,钻轴上套装有输入齿轮,所述旋转支撑架上固定有调速电机,调速电机的转子轴与主动齿轮相连,主动齿轮、输入齿轮及过桥齿轮依次啮合传动,过桥齿轮同轴连接有行走齿轮,行走齿轮与轨道架啮合,带动旋转支撑架转动,所述风机的下部为吸头,吸头与钻轴及钻盘对称安装在旋转支撑架的两侧,吸头的下部连接有滑翘板,吸头的上部向上设有风力室及风力输送管,风力室中设有风轮,风轮与风力电机相连,风力电机安装在旋转支撑架上,旋转支撑架通过行走轮设置在轨道架上,轨道架架设在水泥沉井圈上;该桩基钻孔机的中心轴线上安装有电路滑动接触盘,通过该滑动接触盘接收外部供应的电力,再进行钻孔机内分配用电。
所述钻轴为圆钻钻轴或花钻钻轴。
钻孔时,首先在地面上固定水泥沉井圈的位置,在水泥沉井圈上顺序安放好轨道架及旋转支撑架,调整好钻头及吸头的接地位置,然后开启调速电机和风力电机,调速电机通过主动齿轮带动输入齿轮,继而带动钻轴转动,同时输入齿轮通过过桥齿轮带动行走齿轮运转,从而实现钻机边钻孔边旋转行走;风力电机带动风轮旋转,形成高负压,从而将钻出的泥沙吸入风力输送管,进而排出管外,当钻孔钻到一定深度后,可继续向上增加新的水泥沉井圈,但第二个水泥沉井圈需要留出轨道架支撑部分的缺口,钻机即可反复一直向下深挖,当完成需要深度后,用吊车逐级把钻机拆除即可。
本发明的有益效果是,该超大孔径桩基钻孔机能够一次性钻出超大的孔径,打入的桩基牢固不易坏,而且钻孔效率高,成本低,适于大范围内普及使用。
附图说明
下面结合附图和实施例对本发明作进一步说明。
图1是本发明的结构原理示意图。
图1中,1.过桥齿轮,2.钻轴,3.调速电机,4.旋转支撑架,5.风力输送管,6.风轮,7.风力室,8.风力电机,9.轨道架,10.吸头,11.滑翘板,12.主动齿轮,13.输入齿轮,14.钻盘,15.行走齿轮,16.地面,17.钻头,18.水泥沉井圈,19.行走轮,20.电路通道,21.滑动接触盘。
具体实施方式
在图中,该超大孔径桩基钻孔机包括轨道架9、旋转支撑架4、钻机和风机;所述钻机的下部为盘状的钻盘14,钻盘14上均匀分布有向下的钻头17,钻盘14的中部向上设有带花键的钻轴2,钻轴2滑配合垂直安装在旋转支撑架4上的滑套中,钻轴2上套装有输入齿轮13,所述旋转支撑架4上固定有调速电机3,调速电机3的转子轴与主动齿轮12相连,主动齿轮12、输入齿轮13及过桥齿轮1依次啮合传动,过桥齿轮1同轴连接有行走齿轮15,行走齿轮15与轨道架9啮合,带动旋转支撑架4转动,所述风机的下部为吸头10,吸头10与钻轴2及钻盘14对称安装在旋转支撑架4的两侧,吸头10的下部连接有滑翘板11,吸头10的上部向上设有风力室7及风力输送管5,风力室7中设有风轮6,风轮6与风力电机8相连,风力电机8安装在旋转支撑架4上,旋转支撑架4通过行走轮19设置在轨道架9上,轨道架9架设在水泥沉井圈18上;该桩基钻孔机的中心轴线上安装有电路滑动接触盘21,通过该滑动接触盘21接收外部供应的电力,再进行钻孔机内分配用电。
所述钻轴2为圆钻钻轴或花钻钻轴。
钻孔时,首先在地面上固定水泥沉井圈18的位置,在水泥沉井圈18上顺序安放好轨道架9及旋转支撑架4,调整好钻头17及吸头10的接地位置,然后开启调速电机3和风力电机8,调速电机3通过主动齿轮12带动输入齿轮13,继而带动钻轴2转动,同时输入齿轮13通过过桥齿轮1带动行走齿轮15运转,从而实现钻机边钻孔边旋转行走;风力电机8带动风轮6旋转,形成高负压,从而将钻出的泥沙吸入风力输送管5,进而排出管外,当钻孔钻到一定深度后,可继续向上增加新的水泥沉井圈,但第二个水泥沉井圈18需要留出轨道架9支撑部分的缺口,钻机即可一直反复向下深挖,当完成需要深度后,用吊车逐级把钻机拆除即可

Claims (4)

1.超大孔径桩基钻孔机,该超大孔径桩基钻孔机包括轨道架(9)、旋转支撑架(4)、钻机和风机,其特征在于,所述钻机的下部为盘状的钻盘(14),钻盘(14)上均匀分布有向下的钻头(17),钻盘(14)的中部向上设有带花键的钻轴(2),钻轴(2)滑配合垂直安装在旋转支撑架(4)上的滑套中,钻轴(2)上套装有输入齿轮(13),所述旋转支撑架(4)上固定有调速电机(3),调速电机(3)的转子轴与主动齿轮(12)相连,主动齿轮(12)、输入齿轮(13)及过桥齿轮(1)依次啮合传动,过桥齿轮(1)同轴连接有行走齿轮(15),行走齿轮(15)与轨道架(9)啮合,带动旋转支撑架(4)转动,所述风机的下部为吸头(10),吸头(10)与钻轴(2)及钻盘(14)对称安装在旋转支撑架(4)的两侧,吸头(10)的下部连接有滑翘板(11),吸头(10)的上部向上设有风力室(7)及风力输送管(5),该超大孔径桩基钻孔机的中心轴线上安装有电路滑动接触盘(21),通过该滑动接触盘(21)接收外部供应的电力,再进行超大孔径桩基钻孔机内分配用电。
2.根据权利要求1所述的超大孔径桩基钻孔机,其特征在于,所述风力室(7)中设有风轮(6),风轮(6)与风力电机(8)相连。
3.根据权利要求2所述的超大孔径桩基钻孔机,其特征在于,所述风力电机(8)安装在旋转支撑架(4)上,旋转支撑架(4)通过行走轮(19)设置在轨道架(9)上,轨道架(9)架设在水泥沉井圈(18)上。
4.根据权利要求1所述的超大孔径桩基钻孔机,其特征在于,所述钻轴(2)为圆钻钻轴或花钻钻轴。
CN201310070445.2A 2013-03-06 2013-03-06 超大孔径桩基钻孔机 Expired - Fee Related CN103104191B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310070445.2A CN103104191B (zh) 2013-03-06 2013-03-06 超大孔径桩基钻孔机

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310070445.2A CN103104191B (zh) 2013-03-06 2013-03-06 超大孔径桩基钻孔机

Publications (2)

Publication Number Publication Date
CN103104191A CN103104191A (zh) 2013-05-15
CN103104191B true CN103104191B (zh) 2015-02-04

Family

ID=48312357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310070445.2A Expired - Fee Related CN103104191B (zh) 2013-03-06 2013-03-06 超大孔径桩基钻孔机

Country Status (1)

Country Link
CN (1) CN103104191B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104190A (zh) * 2013-03-06 2013-05-15 中国矿业大学 超大孔径桩基钻孔机
CN104074460B (zh) * 2014-07-16 2016-05-11 徐州工程学院 超大口径钻机钻掘头结构
CN104074464B (zh) * 2014-07-17 2016-09-07 徐州工程学院 超大口径钻机吸排机头结构

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07150566A (ja) * 1993-11-29 1995-06-13 Shinei Tec Kk 多軸掘削装置用アダプタ
WO1996028630A1 (de) * 1995-03-15 1996-09-19 Theo Fromme Hydraulische verrohrungsmaschine als anbaugerät für eine mobile drehbohranlage
CN2240605Y (zh) * 1994-12-30 1996-11-20 湖南省公路设计公司 行星式大直径工程钻机
CN2329756Y (zh) * 1998-03-24 1999-07-21 铁道建筑研究设计院 一种大直径多钻头组合钻具
CN1382896A (zh) * 2002-04-26 2002-12-04 张昌平 一种星形运动的大直径桩基础工程成孔钻具
CN102362045A (zh) * 2009-03-26 2012-02-22 长年Tm公司 螺旋钻孔装置、系统和方法
CN103104190A (zh) * 2013-03-06 2013-05-15 中国矿业大学 超大孔径桩基钻孔机
CN203145825U (zh) * 2013-03-06 2013-08-21 中国矿业大学 超大孔径桩基钻孔机
CN203161076U (zh) * 2013-03-06 2013-08-28 朱开蒙 超大孔径桩基钻孔机

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07150566A (ja) * 1993-11-29 1995-06-13 Shinei Tec Kk 多軸掘削装置用アダプタ
CN2240605Y (zh) * 1994-12-30 1996-11-20 湖南省公路设计公司 行星式大直径工程钻机
WO1996028630A1 (de) * 1995-03-15 1996-09-19 Theo Fromme Hydraulische verrohrungsmaschine als anbaugerät für eine mobile drehbohranlage
CN2329756Y (zh) * 1998-03-24 1999-07-21 铁道建筑研究设计院 一种大直径多钻头组合钻具
CN1382896A (zh) * 2002-04-26 2002-12-04 张昌平 一种星形运动的大直径桩基础工程成孔钻具
CN102362045A (zh) * 2009-03-26 2012-02-22 长年Tm公司 螺旋钻孔装置、系统和方法
CN103104190A (zh) * 2013-03-06 2013-05-15 中国矿业大学 超大孔径桩基钻孔机
CN203145825U (zh) * 2013-03-06 2013-08-21 中国矿业大学 超大孔径桩基钻孔机
CN203161076U (zh) * 2013-03-06 2013-08-28 朱开蒙 超大孔径桩基钻孔机

Also Published As

Publication number Publication date
CN103104191A (zh) 2013-05-15

Similar Documents

Publication Publication Date Title
CN103104191B (zh) 超大孔径桩基钻孔机
CN103104190A (zh) 超大孔径桩基钻孔机
CN205927183U (zh) 一种可调的卧式三面孔位多孔钻
CN203145825U (zh) 超大孔径桩基钻孔机
CN105201430A (zh) 涡轮驱动岩屑床清除装置
CN203161076U (zh) 超大孔径桩基钻孔机
CN205743692U (zh) 一种矿山钻井机
CN204887932U (zh) 一种家用种植用多钻头钻土装置
CN205063870U (zh) 涡轮驱动岩屑床清除装置
CN106120713B (zh) 一种水泥土搅拌装置
CN204609761U (zh) 多钻头钻井机
CN201660916U (zh) 锯槽机
CN206070511U (zh) 一种水泥土搅拌装置
CN202809599U (zh) 一种正反水泥土搅拌桩机
CN203129953U (zh) 垂直钻井装置
CN111778956A (zh) 一种建筑场地平整装置
CN202273810U (zh) 护栏式楼顶风力发电系统
CN205961757U (zh) 一种植树挖坑机
CN205154000U (zh) 一种可以钻异型孔的钻机
CN110607816A (zh) 一种挖坑机机械臂
CN203547772U (zh) 一种高效抗拔锚杆机
CN204532061U (zh) 一种作业于山地的推进式园盘打深孔机
CN203626597U (zh) 复杂地质用变频式钻机结构
CN204691674U (zh) 一种可移动式钻孔机
CN214466008U (zh) 长螺旋动力头灌注桩全浮动行星架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150204

Termination date: 20160306

CF01 Termination of patent right due to non-payment of annual fee