CN103103985B - A kind of ground source heat pump line method of installation based on planting a process - Google Patents

A kind of ground source heat pump line method of installation based on planting a process Download PDF

Info

Publication number
CN103103985B
CN103103985B CN201310033136.8A CN201310033136A CN103103985B CN 103103985 B CN103103985 B CN 103103985B CN 201310033136 A CN201310033136 A CN 201310033136A CN 103103985 B CN103103985 B CN 103103985B
Authority
CN
China
Prior art keywords
heat pump
source heat
pile
ground source
pump line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310033136.8A
Other languages
Chinese (zh)
Other versions
CN103103985A (en
Inventor
黄吉永
郑荣跃
黄楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huang Jiyong
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310033136.8A priority Critical patent/CN103103985B/en
Publication of CN103103985A publication Critical patent/CN103103985A/en
Application granted granted Critical
Publication of CN103103985B publication Critical patent/CN103103985B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24TGEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
    • F24T10/00Geothermal collectors
    • F24T10/10Geothermal collectors with circulation of working fluids through underground channels, the working fluids not coming into direct contact with the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24TGEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
    • F24T10/00Geothermal collectors
    • F24T2010/50Component parts, details or accessories
    • F24T2010/53Methods for installation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of ground source heat pump line method of installation based on planting a process, feature comprises the following steps: 1): plant stake holes with pile driver boring formation, the internal diameter of planting stake holes is greater than the external diameter of pile tube; 2): fixedly mount at least one hook at the external surface of pile tube near bottom place, prepare earth source heat pump pipe by predetermined length and quantity, ground source heat pump line is fixed on hook, ground source heat pump line is fixed on the tube wall of pile tube; 3): pile tube is vertically suspended to and plants directly over stake holes; 4): pile tube is put into and plants stake holes and utilize the deadweight of pile tube to sink, ground source heat pump line is embedded in underground by hook traction, advantage is that rear heat exchange performance of having constructed is good, avoid the trouble of artificial intubate simultaneously, process of burying underground the construction cost of ground source heat pump line is low, and the risk that fracture occurs ground source heat pump line embedding buried part is low, to pile tube to plant a process interference little, can embedding many ground source heat pump lines simultaneously under the condition that engineering design allows.

Description

A kind of ground source heat pump line method of installation based on planting a process
Technical field
The present invention relates to a kind of ground source heat pump line method of installation, especially a kind of ground source heat pump line method of installation based on planting a process.
Background technology
Ground source heat pump technology utilizes deep layer constant temperature underground heat as a kind of means of the energy, needs the embedding ground source heat pump line to ground depths.The conventional construction method of embedding ground source heat pump line can be summarized as following three classes up to now:
The first, again insert ground source heat pump line to ground deep layer soil layer by projected depth boring with rig.Ground source heat pump line is flexible pipe body, conduct oneself with dignity relatively light, intubate work progress is subject to the buoyancy of mud or underground water, therefore the artificial intubate of general employing, but artificial intubate is difficult to the degree of depth being accurately embedded into design, speed of application is comparatively slow, also needs to pay the expenses such as rig advance and retreat field expense and working day cost, so not only can produce the defects such as the high and efficiency of cost is low, while construction quality can not be guaranteed.
The second, ground source heat pump line is embedded in concrete drilling bored concrete pile and pouring concrete one.By the colligation of ground source heat pump line in the reinforcing cage of concrete drilling bored concrete pile, imbed together with reinforcing cage in stake holes; But reinforcing cage adopts segmented to install, and the part of ground source heat pump line in underground can not have joint, therefore can not segmentation install, and must bury underground, so there is larger construction interference by the entire length of design; Require that concrete drilling bored concrete pile must be provided with the concrete super perfusion section of certain length on the absolute altitude on design stake top according to job specfication; therefore the operation that there is cutter pile crown is also needed; the ground source heat pump line being difficult to available protecting pre-buried is not in the process destroyed; once there is fracture; ground source heat pump line is just scrapped because repairing; need to take boring supplement ground source heat pump line to make up, so not only schedule delays but also increase cost and drop into.This construction method complicated operation and to be constructed into power lower, the earth source heat pump tube heat exchange performance be simultaneously cast in concrete also can affect adversely.
3rd, ground source heat pump line is embedded in the stake holes of prefabricated concrete pipe pile.After pile sinking completes, then ground source heat pump line is inserted in stake holes.Adopting the ground source heat pump line of this method of installation and the earth, soil layer is insufficient contacts, and heat exchange performance is more weak; Because stake top will embed certain length in concrete foundation, ground source heat pump line can not be crossed in the soil layer that stake top bends towards at the bottom of concrete foundation again, therefore will cut a hole poling pile lining makes ground source heat pump line bend towards in the soil layer at the end, basis, so not only to construct trouble, also can destroy pile tube roof construction, affect the bearing capacity of pile tube.
Summary of the invention
Technical problem to be solved by this invention be to provide a kind of easy construction based on the ground source heat pump line method of installation of planting a process, buried underground rear ground source heat pump line with the earth soil layer heat exchange performance good.
The present invention solves the problems of the technologies described above adopted technical scheme: a kind of ground source heat pump line method of installation based on planting a process, comprises the following steps:
1): plant stake holes with pile driver boring formation, the described internal diameter of planting stake holes is greater than the external diameter of pile tube;
2): fixedly mount at least one hook at the external surface of described pile tube near bottom place, earth source heat pump pipe is prepared by predetermined length and quantity, described ground source heat pump line is fixed on described hook, described ground source heat pump line is fixed on the tube wall of described pile tube;
3): described pile tube is vertically suspended to and described plants directly over stake holes;
4): described pile tube is put into described stake holes of planting and utilize the deadweight of pile tube to sink, described ground source heat pump line is embedded in underground by the traction of described hook.
The external surface of described pile tube is near bottom place around being provided with steel hoop, and described hook is fixedly installed on described steel hoop.Adopt this structure installment ground source heat pump line very convenient.
Described steel hoop is doughnut-shaped steel plate, and described welding hook is on described doughnut-shaped steel plate, and the two ends bolt tightening of described doughnut-shaped steel plate is fixed.Not only save the material of steel hoop, reduce costs; Earth source heat pump pipe can be close to the external surface of pile tube simultaneously, reduces the resistance be subject in ground source heat pump line embedded process.
Described ground source heat pump line curves " U " font and is articulated on described hook, the top of described hook is provided with at least two soft grommets around described pile tube, and the external surface of described ground source heat pump line and described pile tube firmly fetters by described soft grommet.Ground source heat pump line is fixed on the external surface of pile tube, and fully contact with the earth soil layer, heat exchange performance is better.
Described pile tube forms by being fixedly linked according at least two joint unit pile cutoff head and the tail of designing requirement, and the installation step of described pile tube is as follows:
1) steadily place pile extension fixed mount planting ground, stake holes place, described pile extension fixed mount is provided with the through hole that internal diameter is greater than the stake footpath of described unit pile cutoff, and described through hole aligns with described stake holes of planting;
2), when the top of first unit pile cutoff is close to ground, admittedly overlaps with hawser and first unit pile cutoff is fixed on described pile extension fixed mount through described through hole, second unit pile cutoff is vertically suspended in directly over first unit pile cutoff;
3) by first unit pile cutoff and second unit pile cutoff by weld or machinery is fixedly connected with fixing, connecting place formation internode joint.
Compared with prior art, the invention has the advantages that to plant stake holes larger than the stake footpath of pile tube, pile tube and plant between stake holes and form mud-filled space, therefore planting pile tube in a process relies on deadweight to sink, by the tractive force of hook ground source heat pump line imbedded the degree of depth at place bottom pile tube, ground source heat pump line is fully contacted with the earth soil layer, and heat exchange performance is good, avoids the trouble of artificial intubate simultaneously; The process of burying underground of ground source heat pump line with plant a course synchronization and carry out, without the need to extra punch device, reduce construction cost, and ground source heat pump line embedding time without the need to merogenesis, reduce ground source heat pump line and imbed the risk that fracture occurs under ground portion, to pile tube to plant the interference of process little, can embedding many ground source heat pump lines simultaneously under the condition that engineering design allows.
Accompanying drawing explanation
Fig. 1 is the constructing structure schematic diagram burying a joint unit pile cutoff underground;
The enlarged drawing of expression structure that Fig. 2 is A place in Fig. 1;
Fig. 3 is the constructing structure schematic diagram burying two joint unit pile cutofves underground.
Detailed description of the invention
Below in conjunction with accompanying drawing embodiment, the present invention is described in further detail.
Embodiment one: a kind of ground source heat pump line method of installation based on planting a process, comprises the following steps:
1): enter in the soil body to smash soil structures with spiral Special drill machine drill, after the soil body loosens, inject water under high pressure and with spiral Special drill machine, soil block stirred into mud, boring arrives the cement paste stirring with spiral Special drill machine of reinjecting after projected depth, after packing up spiral Special drill machine, stake holes 1 is planted in formation, and the internal diameter of planting stake holes 1 is greater than the external diameter of pile tube;
2): pile tube external surface near bottom place retainer ring around installation steel hoop, steel hoop is doughnut-shaped steel plate 2, hook 22 is welded on doughnut-shaped steel plate 2, the two ends bolt 21 of doughnut-shaped steel plate 2 is tightened fixing, doughnut-shaped steel plate 2 fixedly mounts two hooks 22, prepare earth source heat pump pipe 3, as two or three by predetermined length and quantity, ground source heat pump line 3 being curved " U " font is articulated on hook 22, and the external surface of ground source heat pump line 3 with pile tube firmly fetters by soft grommet 31;
3): pile tube is vertically suspended to and plants directly over stake holes 1;
4): put into by pile tube and plant stake holes 1, utilize the deadweight of pile tube to sink, ground source heat pump line 3 is embedded in underground by the traction of hook 22.
Pile tube forms by being fixedly linked according to two joint unit pile cutoff 4 head and the tail of designing requirement.
The installation step of pile tube is as follows:
1) steadily place pile extension fixed mount 5 planting ground, stake holes 1 place, pile extension fixed mount 5 is provided with the through hole that internal diameter is greater than the stake footpath of unit pile cutoff 4, through hole with plant stake holes 1 and align;
2), when the top of first unit pile cutoff 4 is close to ground, admittedly overlaps 51 with hawser and first unit pile cutoff 4 is fixed on pile extension fixed mount 5 through through hole, second unit pile cutoff 4 is vertically suspended in directly over first unit pile cutoff 4;
3) first unit pile cutoff 4 and second unit pile cutoff 4 are fixedly connected by welding, connecting place forms internode joint 41.
Embodiment two: remainder is identical with embodiment one, its difference is that internode joint 41 is that adjacent two joint unit pile cutofves 4 are mechanically anchored in the connecting portion formed together.

Claims (4)

1., based on a ground source heat pump line method of installation of planting a process, it is characterized in that comprising the following steps:
1): plant stake holes with pile driver boring formation, the described internal diameter of planting stake holes is greater than the external diameter of pile tube, at pile tube with plant between stake holes and form mud-filled space;
2): fixedly mount at least one hook at the external surface of described pile tube near bottom place, earth source heat pump pipe is prepared by predetermined length and quantity, described ground source heat pump line being curved the mounting of " U " font is fixed on described hook, the top of described hook is provided with at least two soft grommets around described pile tube, the external surface of described ground source heat pump line and described pile tube firmly fetters by described soft grommet, is fixed on the tube wall of described pile tube by described ground source heat pump line;
3): described pile tube is vertically suspended to and described plants directly over stake holes;
4): described pile tube is put into described stake holes of planting and utilize the deadweight of pile tube to sink, described ground source heat pump line is embedded in underground by the traction of described hook.
2. a kind of ground source heat pump line method of installation based on planting a process according to claim 1, it is characterized in that the external surface of described pile tube near bottom place around being provided with steel hoop, described hook is fixedly installed on described steel hoop.
3. a kind of ground source heat pump line method of installation based on planting a process according to claim 2, it is characterized in that described steel hoop is doughnut-shaped steel plate, described welding hook is on described doughnut-shaped steel plate, and the two ends bolt tightening of described doughnut-shaped steel plate is fixed.
4. a kind of ground source heat pump line method of installation based on planting a process any one of claims 1 to 3 described in claim, it is characterized in that described pile tube forms by being fixedly linked according at least two joint unit pile cutoff head and the tail of designing requirement, the installation step of described pile tube is as follows:
1) steadily place pile extension fixed mount planting ground, stake holes place, described pile extension fixed mount is provided with the through hole that internal diameter is greater than the stake footpath of described unit pile cutoff, and described through hole aligns with described stake holes of planting;
2), when the top of first unit pile cutoff is close to ground, admittedly overlaps with hawser and first unit pile cutoff is fixed on described pile extension fixed mount through described through hole, second unit pile cutoff is vertically suspended in directly over first unit pile cutoff;
3) by first unit pile cutoff and second unit pile cutoff by weld or machinery is fixedly connected with fixing, connecting place formation internode joint.
CN201310033136.8A 2013-01-25 2013-01-25 A kind of ground source heat pump line method of installation based on planting a process Active CN103103985B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310033136.8A CN103103985B (en) 2013-01-25 2013-01-25 A kind of ground source heat pump line method of installation based on planting a process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310033136.8A CN103103985B (en) 2013-01-25 2013-01-25 A kind of ground source heat pump line method of installation based on planting a process

Publications (2)

Publication Number Publication Date
CN103103985A CN103103985A (en) 2013-05-15
CN103103985B true CN103103985B (en) 2015-09-23

Family

ID=48312159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310033136.8A Active CN103103985B (en) 2013-01-25 2013-01-25 A kind of ground source heat pump line method of installation based on planting a process

Country Status (1)

Country Link
CN (1) CN103103985B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107435760B (en) * 2017-09-15 2019-03-08 陈风春 Ground source heat pump line down tube traction device
CN113373922A (en) * 2021-07-02 2021-09-10 宁波中淳高科股份有限公司 Geothermal energy pile construction equipment and construction method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122130B (en) * 2007-07-04 2010-05-19 广州市建筑科学研究院 Construction method of drilling follow casting pile used for building or bridge foundation
JP2009041894A (en) * 2007-08-07 2009-02-26 Yoshihiro Tatemoto Underground heat exchange method by pulling out rotary leading steel pipe
US8221032B2 (en) * 2009-07-03 2012-07-17 Pretech Soil penetrating plate assembly to position geothermal conduit loops in soil
CN101713602A (en) * 2009-09-15 2010-05-26 邹立春 Method for embedding ground heat exchanger of ground source heat pump by high-pressure jet grouting
CN102002949B (en) * 2010-11-16 2012-08-29 江苏科技大学 Pipe burying device and method for ground source heat pump

Also Published As

Publication number Publication date
CN103103985A (en) 2013-05-15

Similar Documents

Publication Publication Date Title
KR100957573B1 (en) Helical-pile for direct-boring grouting and using methods thereof
KR100894988B1 (en) Reinforcing method using helical-pile for direct-boring grouting
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
JP2010236323A (en) Foundation pile structure for on-site formation, and construction method of foundation pile
CN101550697A (en) Pulling-out method of underground piles by sleeving, vibrating and punching
KR101358985B1 (en) Pillar settling structure and construction method of the same with improved stability and workability
CN102704480B (en) Construction method for processing ultra-thick quicksand layer of pile foundation by using front-end vibration steel casing
CN105780806A (en) Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN208793021U (en) A kind of shield tunnel anti-floating control structure
CN103134236A (en) Construction method of tilted burying of underground heat exchanger of ground source heat pump
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN103103985B (en) A kind of ground source heat pump line method of installation based on planting a process
CN203654309U (en) Pile-caisson hydraulic structure
CN101575859A (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN103938641A (en) Foundation construction technology of large-scale photovoltaic power station in desert
CN103911993A (en) PHA (preliminary hazard analysis) anchor rod and construction method thereof
CN102619521A (en) Construction method for vertical shaft bedrock section wall structure
CN102418348A (en) Construction technology of using occlusive pile to form underground continuous wall
CN104532836A (en) Anchor cable construction device combining hole forming, mounting and grouting into one
CN205444192U (en) Bridge stake is towards pile driving construction system
CN103938619A (en) Construction process of tubular pile and special hole opener of construction process
CN203782694U (en) Easy-positioning blind plate for connecting building static drill pile foundation rooting piles
CN108979690A (en) A kind of shield tunnel anti-floating control structure and application method
KR20160150538A (en) Ground Foundation Structure of Offshore Structures and Construction Method Thereof
CN101476444A (en) Horizontal radiation pipe construction equipment for vibration-impact type radiation well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HUANG JIYONG

Free format text: FORMER OWNER: ZHENHAI CONSTRUCTION GROUP CO., LTD.

Effective date: 20150403

CB02 Change of applicant information

Address after: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor

Applicant after: ZHENHAI CONSTRUCTION GROUP Co.,Ltd.

Address before: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor

Applicant before: Ningbo Zhenhai Construction Group Co.,Ltd.

Address after: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor

Applicant after: Ningbo Zhenhai Construction Group Co.,Ltd.

Address before: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor

Applicant before: Ningbo Zhenhai Construction Co.,Ltd.

Address after: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor

Applicant after: Ningbo Zhenhai Construction Co.,Ltd.

Address before: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor

Applicant before: Ningbo Zhenhai Construction Engineering Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: NINGBO ZHENHAI CONSTRUCTION CO., LTD. TO: NINGBO ZHENHAI CONSTRUCTION GROUP CO., LTD.

Free format text: CORRECT: APPLICANT; FROM: NINGBO ZHENHAI CONSTRUCTION ENGINEERING CO., LTD. TO: NINGBO ZHENHAI CONSTRUCTION CO., LTD.

TA01 Transfer of patent application right

Effective date of registration: 20150403

Address after: 315040, room 15, No. 222, 201 drive drive road, Jiangdong Road, Jiangdong District, Zhejiang, Ningbo

Applicant after: Huang Jiyong

Address before: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor

Applicant before: ZHENHAI CONSTRUCTION GROUP Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant