Ground source heat pump tube embedment method based on piling process Download PDFInfo
- Publication number
- CN103103985A CN103103985A CN2013100331368A CN201310033136A CN103103985A CN 103103985 A CN103103985 A CN 103103985A CN 2013100331368 A CN2013100331368 A CN 2013100331368A CN 201310033136 A CN201310033136 A CN 201310033136A CN 103103985 A CN103103985 A CN 103103985A
- Authority
- CN
- China
- Prior art keywords
- heat pump
- source heat
- ground source
- pile
- pump line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24T—GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
- F24T10/00—Geothermal collectors
- F24T10/10—Geothermal collectors with circulation of working fluids through underground channels, the working fluids not coming into direct contact with the ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24T—GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
- F24T10/00—Geothermal collectors
- F24T2010/50—Component parts, details or accessories
- F24T2010/53—Methods for installation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/10—Geothermal energy
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310033136.8A CN103103985B (en) | 2013-01-25 | 2013-01-25 | A kind of ground source heat pump line method of installation based on planting a process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310033136.8A CN103103985B (en) | 2013-01-25 | 2013-01-25 | A kind of ground source heat pump line method of installation based on planting a process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103103985A true CN103103985A (en) | 2013-05-15 |
CN103103985B CN103103985B (en) | 2015-09-23 |
Family
ID=48312159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310033136.8A Active CN103103985B (en) | 2013-01-25 | 2013-01-25 | A kind of ground source heat pump line method of installation based on planting a process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103103985B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107435760A (en) * | 2017-09-15 | 2017-12-05 | 陈风春 | Ground source heat pump line down tube draw-gear |
CN113373922A (en) * | 2021-07-02 | 2021-09-10 | 宁波中淳高科股份有限公司 | Geothermal energy pile construction equipment and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101122130A (en) * | 2007-07-04 | 2008-02-13 | 广州市建筑科学研究院 | Construction method of drilling follow casting pile used for building or bridge foundation |
JP2009041894A (en) * | 2007-08-07 | 2009-02-26 | Yoshihiro Tatemoto | Underground heat exchange method by pulling out rotary leading steel pipe |
CN101713602A (en) * | 2009-09-15 | 2010-05-26 | 邹立春 | Method for embedding ground heat exchanger of ground source heat pump by high-pressure jet grouting |
CA2670917A1 (en) * | 2009-07-03 | 2011-01-03 | Pretech | Soil penetrating plate assembly to position geothermal conduit loops in soil |
CN102002949A (en) * | 2010-11-16 | 2011-04-06 | 江苏科技大学 | Pipe burying device and method for ground source heat pump |
-
2013
- 2013-01-25 CN CN201310033136.8A patent/CN103103985B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101122130A (en) * | 2007-07-04 | 2008-02-13 | 广州市建筑科学研究院 | Construction method of drilling follow casting pile used for building or bridge foundation |
JP2009041894A (en) * | 2007-08-07 | 2009-02-26 | Yoshihiro Tatemoto | Underground heat exchange method by pulling out rotary leading steel pipe |
CA2670917A1 (en) * | 2009-07-03 | 2011-01-03 | Pretech | Soil penetrating plate assembly to position geothermal conduit loops in soil |
CN101713602A (en) * | 2009-09-15 | 2010-05-26 | 邹立春 | Method for embedding ground heat exchanger of ground source heat pump by high-pressure jet grouting |
CN102002949A (en) * | 2010-11-16 | 2011-04-06 | 江苏科技大学 | Pipe burying device and method for ground source heat pump |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107435760A (en) * | 2017-09-15 | 2017-12-05 | 陈风春 | Ground source heat pump line down tube draw-gear |
CN107435760B (en) * | 2017-09-15 | 2019-03-08 | 陈风春 | Ground source heat pump line down tube traction device |
CN113373922A (en) * | 2021-07-02 | 2021-09-10 | 宁波中淳高科股份有限公司 | Geothermal energy pile construction equipment and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103103985B (en) | 2015-09-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104234055B (en) | A kind of prefabricated pile post-grouting device and technique thereof | |
CN102383431B (en) | Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof | |
CN204370469U (en) | A kind of drilled pile long leg jacket offshore wind turbine foundation | |
JP2010236323A (en) | Foundation pile structure for on-site formation, and construction method of foundation pile | |
CN101550697A (en) | Pulling-out method of underground piles by sleeving, vibrating and punching | |
CN102704480B (en) | Construction method for processing ultra-thick quicksand layer of pile foundation by using front-end vibration steel casing | |
CN105780806A (en) | Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation | |
CN106906840A (en) | The method of offshore wind farm rock-socketed steel pipe piles and the outer grouting construction of stake | |
CN105421445A (en) | Construction method for non-prestressed centrifugal high-strength concrete pile planted pile | |
CN103953030B (en) | The compacted castinplace pile of screw thread supination joint bar | |
CN104988915A (en) | Prefabrication and installation method of detachable steel protection tube device and underwater connection beam | |
CN206956760U (en) | Offshore wind farm rock-socketed steel pipe piles | |
CN107653878A (en) | Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction | |
CN103572770B (en) | A kind of stake case hydraulic structures and construction method thereof | |
CN104975734B (en) | Casting machine casing installation method | |
CN103911993A (en) | PHA (preliminary hazard analysis) anchor rod and construction method thereof | |
CN103938641A (en) | Foundation construction technology of large-scale photovoltaic power station in desert | |
CN109930624A (en) | A kind of embedding petrographic province blower foundation of offshore wind farm and construction method | |
CN103103985B (en) | A kind of ground source heat pump line method of installation based on planting a process | |
CN205444192U (en) | Bridge stake is towards pile driving construction system | |
CN102418348A (en) | Construction technology of using occlusive pile to form underground continuous wall | |
JP5665980B2 (en) | Pile construction method using buried jig and buried jig for pile construction | |
CN103938619A (en) | Construction process of tubular pile and special hole opener of construction process | |
CN203808055U (en) | Screw post-reinforced compacted pile | |
KR20160150538A (en) | Ground Foundation Structure of Offshore Structures and Construction Method Thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: HUANG JIYONG Free format text: FORMER OWNER: ZHENHAI CONSTRUCTION GROUP CO., LTD. Effective date: 20150403 |
|
CB02 | Change of applicant information |
Address after: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor Applicant after: ZHENHAI CONSTRUCTION GROUP Co.,Ltd. Address before: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor Applicant before: Ningbo Zhenhai Construction Group Co.,Ltd. Address after: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor Applicant after: Ningbo Zhenhai Construction Group Co.,Ltd. Address before: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor Applicant before: Ningbo Zhenhai Construction Co.,Ltd. Address after: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor Applicant after: Ningbo Zhenhai Construction Co.,Ltd. Address before: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor Applicant before: Ningbo Zhenhai Construction Engineering Co.,Ltd. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: NINGBO ZHENHAI CONSTRUCTION CO., LTD. TO: NINGBO ZHENHAI CONSTRUCTION GROUP CO., LTD. Free format text: CORRECT: APPLICANT; FROM: NINGBO ZHENHAI CONSTRUCTION ENGINEERING CO., LTD. TO: NINGBO ZHENHAI CONSTRUCTION CO., LTD. |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20150403 Address after: 315040, room 15, No. 222, 201 drive drive road, Jiangdong Road, Jiangdong District, Zhejiang, Ningbo Applicant after: Huang Jiyong Address before: Brahma No. 1156 building, high tech Zone in Zhejiang province Ningbo City Heqing road 315040 23 floor Applicant before: ZHENHAI CONSTRUCTION GROUP Co.,Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |