CN103103443B - Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap - Google Patents

Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap Download PDF

Info

Publication number
CN103103443B
CN103103443B CN201210586597.3A CN201210586597A CN103103443B CN 103103443 B CN103103443 B CN 103103443B CN 201210586597 A CN201210586597 A CN 201210586597A CN 103103443 B CN103103443 B CN 103103443B
Authority
CN
China
Prior art keywords
continuous casting
slag
als
molten steel
water gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210586597.3A
Other languages
Chinese (zh)
Other versions
CN103103443A (en
Inventor
王朝阳
马立军
贺建哲
王智轶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Iron and Steel Group Co Ltd
Original Assignee
Tianjin Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Iron and Steel Group Co Ltd filed Critical Tianjin Iron and Steel Group Co Ltd
Priority to CN201210586597.3A priority Critical patent/CN103103443B/en
Publication of CN103103443A publication Critical patent/CN103103443A/en
Application granted granted Critical
Publication of CN103103443B publication Critical patent/CN103103443B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The invention relates to a bearing steel GCr15 production technology capable of preventing the plugging of a continuous casting water gap. The technology route comprises the steps of a top and bottom combined blow converter, an LF refining furnace, VD vacuum degassing and six-strand billet continuous casting of a Comcast six machine in sequence, the top and bottom combined blow converter conducts dephosphorization by adopting a double-slag method, the high catch carbon [C] at finishing point is more than or equal to 0.25%, final slag alkalinity before tapping is over 3.5, Als content in the molten steel in refining of the LF refining furnace is controlled to be over 0.05%, and Als/Alt is more than 95%; and argon blowing protection is conducted in the whole process of the continuous casting procedures, and low-pulling rate weak-cooling technology is adopted. Under the conditions of the technology, the cleanness of the molten steel can be improved, the non-metallic inclusion can be reduced, the plugging phenomenon of the continuous casting water gap can be prevented, the quality of the continuous casting blank can be improved, and the cost of the casting blank can be lowered, thereby finally improving the product quality.

Description

A kind of beating steel GCr15 production technique preventing continous casting sprue from blocking
Technical field
The invention belongs to metallurgical technology technical field, particularly a kind of beating steel GCr15 production technique preventing continous casting sprue from blocking.
Background technology
Bearing is " heart of industry ", and bearing steel is one of steel class that in special steel product, production difficulty is larger, and wherein the cleanliness factor of molten steel is the most important technical indicator affecting bearing steel performance.The bearing steel of high cleanliness, oxygen content in steel general control is 5 ~ 8 × 10 -6%, this just must control the content of oxygen in steel with aluminium deoxidation.
When production Aluminum steel kind, often can there is the phenomenon of nozzle clogging in continuous casting, especially for aluminium-deoxidized beating steel GCr15, finished product aluminium content about about 0.035%, often Submerged Nozzle Clogging Course phenomenon occurs in continuous casting is produced.When the blocking mouth of a river is serious, can cause that pulling rate reduces, mould liquid level fluctuation is large, to such an extent as to nozzle clogging, liquid steel temperature are low melts down, even can cause continuous caster stopping accident.Therefore, nozzle clogging both have impact on continuous casting billet quality, have impact on again normal Production Flow Chart, also limit many heats and even watered, add strand cost.
Generally the smelting technology of GCr15 is: converter procedure, the converter process of former smelting GCr15, terminal catch carbon >=0.09, finishing slag basicity > 3.0; LF refining procedure, originally LF refining procedure is when smelting GCr15, controls Alt content in molten steel and is greater than 0.050%, do not control for Als/Alt; VD operation, soft argon blowing time 5min; Continuous casting working procedure, M-EMS adopts electric current 400A, frequency 2.5Hz, adopts strong cold high pulling rate technique.
The major cause causing continuous casting to block the mouth of a river is Al in molten steel 2o 3inclusion is too high, or in casting process Al 2o 3further generation.
Summary of the invention
The present invention provides a kind of beating steel GCr15 production technique preventing continous casting sprue from blocking that can improve Cleanliness of Molten Steel, reduce non-metallic inclusion for solving in known technology the technical problem that exists.
The technical scheme that the present invention takes for the technical problem existed in solution known technology is:
A kind of beating steel GCr15 production technique preventing continous casting sprue from blocking, operational path comprises top and bottom combined blown converter → LF refining furnace → VD vacuum outgas → Comcast 6 machine 6 and flows billet continuous casting, it is characterized in that, described top and bottom combined blown converter adopts double slag dephosphorization, terminal highcasting speed [C] >=0.25%, and before tapping, finishing slag basicity is greater than 3.5, Tapping Temperature of Bof 1630 DEG C ~ 1650 DEG C, ladle temperature is higher than 800 DEG C, and strictly control converter slag, lower quantity of slag < 50mm is thick;
Described LF refining furnace refining time is greater than 50 minutes, control Als content > 0.05% in molten steel composition, Als/Alt > 95%, C:0.98 ~ 1.0%, Si:0.20 ~ 0.22%, Mn:0.34 ~ 0.36%, Cr:1.50 ~ 1.55%, P≤0.015%, S≤0.010%, Ti < 20ppm;
Adopt soft blow pattern in described VD vacuum outgas operation, soft blow argon 5 ~ 10min before VD departures, VD out-station temperature: open and water 1520 DEG C ± 3 DEG C, the first stove, connects and waters 1500 DEG C ± 3 DEG C, stove;
In described continuous casting working procedure, whole process carries out blowing argon, adopts the weak cold technique of low pulling rate, pulling rate 1.8m/min, cooling twice specific water 0.8L/kg;
M-EMS and end induction stirring is adopted in described continuous casting working procedure, described end induction stirring electric current 500A, frequency 12Hz, described M-EMS Current 350A, frequency 2Hz, during described M-EMS between mould liquid level undulated control ± 3%, do not comprise end points.
The advantage that the present invention has and positively effect are: the present invention is by the smelting of converter and LF refining furnace; control Als content > 0.05% in molten steel composition; Als/Alt > 95%; in continuous casting working procedure, whole process carries out blowing argon; avoid the secondary oxidation of molten steel; improve Cleanliness of Molten Steel; reduce non-metallic inclusion; continous casting sprue latch up phenomenon can be prevented; improve continuous casting billet quality; reduce strand cost, finally improve quality product.
Embodiment
For summary of the invention of the present invention, Characteristic can be understood further, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
The beating steel GCr15 production technique preventing continous casting sprue from blocking, operational path comprises top and bottom combined blown converter → LF refining furnace → VD vacuum outgas → Comcast 6 machine 6 and flows billet continuous casting, produce 6 stoves altogether.
(1) converter procedure
Converter adopts double slag dephosphorization, terminal highcasting speed [C] >=0.25%; Before tapping, require that finishing slag basicity is greater than 3.5, tapping temperature 1630 DEG C ~ 1650 DEG C, ladle temperature is higher than 800 DEG C, and strict control converter slag, lower quantity of slag < 50mm is thick.
Heat (batch) number End point carbon [C] % Tapping temperature DEG C Finishing slag basicity
3106738 0.25 1635 3.62
3106740 0.27 1633 3.81
2107267 0.31 1637 3.73
2107269 0.28 1643 3.65
3106747 0.29 1639 3.58
3106746 0.27 1641 3.70
(2) LF refining procedure
Refining adopts diffusive deoxidation, makes foaming white slag, notes arc-covering slag operation, and omnidistance control aluminium, requires Als > 0.050%, and refining cycle more than half forbidding feeds aluminium; Molten steel departures Als/Alt > 95%; Molten steel departures subject component: C:0.98 ~ 1.0%, Si:0.20 ~ 0.22%, Mn:0.34 ~ 0.36%, Cr:1.50 ~ 1.55%, P≤0.015%, S≤0.010%, Ti < 20ppm; Refining time is greater than 50 minutes, to promote inclusion floating, improves molten steel purity.
Heat (batch) number 3106738 3106740 2107267 2107269 3106747 3106746
C% 0.99 0.99 0.98 1.00 0.99 0.99
Si% 0.22 0.22 0.21 0.22 0.20 0.22
Mn% 0.35 0.35 0.34 0.35 0.35 0.35
Cr% 1.52 1.53 1.51 1.53 1.54 1.52
P% 0.009 0.009 0.010 0.008 0.010 0.010
S% 0.003 0.005 0.003 0.006 0.004 0.005
Ti(ppm) 1 0 0 0 1 0
Als% 0.071 0.053 0.06 0.062 0.059 0.064
Als/Alt 98.3% 99.1% 100.0% 99.7% 95.8% 98.0%
(3) VD vacuum outgas operation
Keep 67Pa high vacuum time 15min, in order to promote inclusion floating, improving Molten Steel Cleanliness, increasing Al in molten steel 2o 3floatation Rate, adopt soft blow pattern, soft blow argon 5 ~ 10min before VD departures, VD out-station temperature: open and water 1520 DEG C ± 3 DEG C, the first stove, 1500 DEG C ± 3 DEG C, stove waters in company.
(4) continuous casting working procedure
For avoiding the secondary oxidation of molten steel, whole process carries out blowing argon, tundish superheating temperature 30 DEG C; Use M-EMS (electric current 350A, frequency 2Hz), end induction stirring (electric current 500A, frequency 12Hz), between mould liquid level undulated control ± 3%, do not comprise end points, to reduce the impact of foreign impurity; Adopt the weak cold technique of low pulling rate, pulling rate 1.8m/min, cooling twice specific water 0.8L/kg.
The present invention is by adopting above production technique, process modifications under the appointed conditions such as arc square billet continuous casting machine and perfect is flowed using 120t top and bottom combined blown converter, 120tLF refining furnace, 120t vacuum refining furnace, Comcast 6 machine 6, finally determine the new production technique of GCr15, prevent the nozzle clogging phenomenon of GCr15 steel grade in casting cycle, improve Cleanliness of Molten Steel, reduce non-metallic inclusion, continous casting sprue latch up phenomenon can be prevented, improve continuous casting billet quality, reduce strand cost, finally improve quality product.

Claims (1)

1. the beating steel GCr15 production technique preventing continous casting sprue from blocking, operational path comprises top and bottom combined blown converter → LF refining furnace → VD vacuum outgas → Comcast 6 machine 6 and flows billet continuous casting, it is characterized in that, described top and bottom combined blown converter adopts double slag dephosphorization, terminal highcasting speed [C] >=0.25%, and before tapping, finishing slag basicity is greater than 3.5, Tapping Temperature of Bof 1630 DEG C ~ 1650 DEG C, ladle temperature is higher than 800 DEG C, and strictly control converter slag, lower quantity of slag < 50mm is thick;
Described LF refining furnace refining time is greater than 50 minutes, control Als content > 0.05% in molten steel composition, Als/Alt > 95%, C:0.98 ~ 1.0%, Si:0.20 ~ 0.22%, Mn:0.34 ~ 0.36%, Cr:1.50 ~ 1.55%, P≤0.015%, S≤0.010%, Ti < 20ppm;
Adopt soft blow pattern in described VD vacuum outgas operation, soft blow argon 5 ~ 10min before VD departures, VD out-station temperature: open and water 1520 DEG C ± 3 DEG C, the first stove, connects and waters 1500 DEG C ± 3 DEG C, stove;
In described continuous casting working procedure, whole process carries out blowing argon, adopts the weak cold technique of low pulling rate, pulling rate 1.8m/min, cooling twice specific water 0.8L/kg;
M-EMS and end induction stirring is adopted in described continuous casting working procedure, described end induction stirring electric current 500A, frequency 12Hz, described M-EMS Current 350A, frequency 2Hz, during described M-EMS between mould liquid level undulated control ± 3%, do not comprise end points.
CN201210586597.3A 2012-12-28 2012-12-28 Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap Active CN103103443B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210586597.3A CN103103443B (en) 2012-12-28 2012-12-28 Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210586597.3A CN103103443B (en) 2012-12-28 2012-12-28 Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap

Publications (2)

Publication Number Publication Date
CN103103443A CN103103443A (en) 2013-05-15
CN103103443B true CN103103443B (en) 2015-05-20

Family

ID=48311631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210586597.3A Active CN103103443B (en) 2012-12-28 2012-12-28 Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap

Country Status (1)

Country Link
CN (1) CN103103443B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104057051B (en) * 2013-09-13 2016-07-06 攀钢集团攀枝花钢铁研究院有限公司 A kind of production method of small square billet continuous casting bearing steel
CN104561730B (en) * 2014-12-22 2016-09-07 天津钢铁集团有限公司 A kind of production method of GCr15 Bearing Steel Billet
CN105369013B (en) * 2015-12-09 2018-06-19 武汉钢铁有限公司 The method for controlling N content in GCr15 bearing steels
CN108796348B (en) * 2018-06-08 2020-07-28 河钢股份有限公司 Smelting method of high-carbon aluminum killed steel
CN110125356A (en) * 2019-04-26 2019-08-16 首钢集团有限公司 A kind of continuous small-billet casting production method of drilling tool cored steel
CN110527909A (en) * 2019-09-11 2019-12-03 本钢板材股份有限公司 A kind of preparation method of the beating steel GCr15 of ultralow titanium containing Cu-J
CN110665970B (en) * 2019-10-08 2020-12-25 宝武集团鄂城钢铁有限公司 Production method of GCr15 hot rolled strip steel for spinning
CN112267058B (en) * 2020-09-09 2021-11-19 邯郸钢铁集团有限责任公司 Method for increasing number of continuous-drawing bearing steel furnaces of 8-machine 8-strand continuous casting machine
CN113092712B (en) * 2021-02-26 2023-05-09 邯郸钢铁集团有限责任公司 Method for evaluating quality of casting blank of outer plate exposed part for high-end automobile

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418041B (en) * 2011-12-09 2013-03-13 内蒙古包钢钢联股份有限公司 Production method for bearing steel
CN102517419A (en) * 2011-12-21 2012-06-27 天津钢铁集团有限公司 Smelting continuous casting method for high carbon steel

Also Published As

Publication number Publication date
CN103103443A (en) 2013-05-15

Similar Documents

Publication Publication Date Title
CN103103443B (en) Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap
CN102719593B (en) Method for smelting ultra-low carbon steel
CN111575446B (en) RH vacuum furnace calcium treatment process method
JP5833767B2 (en) Smelting method of high aluminum low silicon ultra pure ferritic stainless steel
CN102719600A (en) Production method of ultra-low carbon steel
CN103882303B (en) Smelting method of steel for gas shielded welding wire
CN104561730A (en) Method for producing GCr15 bearing steel billets
CN103215410B (en) A kind of method improved containing Nb, Ti steel cleanness
CN106011639B (en) A kind of method of conventional plate blank conticaster production low-alloy peritectic steel
CN104278197A (en) Smelting method of steel for low-silicon high-titanium welding wire
CN105483501A (en) Smelting method of phosphorus-containing ultra-low carbon steel
CN115595397B (en) Accurate nitrogen control method for nitrogen-containing high-strength steel
CN107012282A (en) Method for improving purity of high-quality ultra-low carbon steel
CN106191375B (en) Seamless steel pipe titanium-containing austenitic stainless steel circular pipe blank continuous casting producing method
CN108893682B (en) Die steel billet and preparation method thereof
CN103173588A (en) RH treatment method of low-silicon aluminum killed steel
CN113564308B (en) Control method for liquid level fluctuation of low-aluminum non-oriented silicon steel crystallizer
CN112626312B (en) Low-carbon aluminum killed steel Al for reducing RH single process 2 O 3 Method of inclusion
CN109022661B (en) Method for reducing heavy rail steel rail damage rate
CN113652511A (en) Smelting method for controlling nitrogen content in silicon-aluminum killed steel to be less than or equal to 0.0013%
CN107058867A (en) A kind of energy saving transformer iron core high Si pure iron and its production method
CN111411189A (en) Method for producing hydrogen-induced crack resistant steel grade by using ultra-wide thin-ratio slab continuous casting machine
CN113584259B (en) Method for washing RH furnace
CN111647720A (en) Control method for N content of high-aluminum high-vanadium plate blank
CN117773411B (en) Submerged arc welding wire and production method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant