CN103072890A - 煤矿井下行车的可调节导轨 - Google Patents
煤矿井下行车的可调节导轨 Download PDFInfo
- Publication number
- CN103072890A CN103072890A CN2013100141217A CN201310014121A CN103072890A CN 103072890 A CN103072890 A CN 103072890A CN 2013100141217 A CN2013100141217 A CN 2013100141217A CN 201310014121 A CN201310014121 A CN 201310014121A CN 103072890 A CN103072890 A CN 103072890A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- connecting rods
- movable connecting
- coal mine
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
本发明属于机械吊装设备技术领域,提供了一种调试简单、能保证煤矿井下行车能运行平稳的可调节导轨,采用的技术方案为:两排立柱沿巷道两边对称设置,每个立柱的下端均通过多个水平调节器连接有支撑座,支撑座用多个地脚螺栓固定,每个立柱的上部均与锚固在侧壁上的第一锚杆固定连接,每排立柱的上端均设置有由多根工字钢首尾固定相连形成的机架,两个机架均与多个锚固在侧壁上的第二锚杆连接,两个机架与侧壁间还连接有多个横向调节器,两个机架上均固定设置有导轨,本发明主要用于煤矿井下。
Description
技术领域
本发明煤矿井下行车的可调节导轨,属于机械吊装设备技术领域。
背景技术
随着煤矿开采规模的扩大,煤矿井下设备的安装、运输也更为频繁,所以井下运输行车的运用也越来越广,现有的井下行车的导轨为固定式,调试费时费力,而且井下巷道结构复杂多变,易造成导轨变形,致使行车移动不畅。
发明内容
本发明克服了现有技术存在的不足,提供了一种调试简单、能保证煤矿井下行车能运行平稳的可调节导轨。
为了解决上述技术问题,本发明采用的技术方案为:煤矿井下行车的可调节导轨,包括立柱、机架和导轨,两排立柱沿巷道两边对称设置,每个立柱的下端均通过多个水平调节器连接有支撑座,支撑座用多个地脚螺栓固定,每个立柱的上部均与锚固在侧壁上的第一锚杆固定连接,每排立柱的上端均设置有由多根工字钢首尾固定相连形成的机架,两个机架均与多个锚固在侧壁上的第二锚杆连接,两个机架与侧壁间还连接有多个横向调节器,两个机架上均固定设置有导轨。
所述水平调节器为长螺栓,该长螺栓上设置有多个调节螺母,水平调节器的下端固定在支撑座上,水平调节器的上端穿过立柱下端的对应孔用调节螺母固定。
所述横向调节器的结构为:第二锚杆的一端固定在机架上,第二锚杆的另一端固定在侧壁上,第二锚杆的上、下两侧倾斜对称设置有两根活动连接杆,两根活动连接杆的一端铰接在机架上,两根活动连接杆的另一端铰接在锚固于侧壁的铰接座上,两个活动连接杆之间竖直设置有调节杆,调节杆为长圆柱,两端都开有螺纹,两个活动连接杆上均设置有一个螺母,调节杆的两端分别与两个活动连接杆上的螺母配合。
本发明与现有技术相比具有的有益效果为:本发明煤矿井下行车的可调节导轨,导轨位于立柱上方,立柱的下端与水平调节器连接,可调节导轨的水平位置,导轨又通过与巷道侧壁上的横向调节器连接,可以调节两根纵向导轨的横向距离,安装调试过程简单,解决了因巷道变形引起的导轨移位,保证了行车在轨道上的平稳运行。
附图说明
下面结合附图对本发明做进一步的说明。
图1为本发明的结构示意图。
图中:1为立柱、2为机架、3为导轨、4为水平调节器、5为支撑座、6为地脚螺栓、7为第一锚杆、8为第二锚杆、9为横向调节器、10为活动连接杆、11为调节杆。
具体实施方式
如图1所示,本发明煤矿井下行车的可调节导轨,包括立柱1、机架2和导轨3,两排立柱1沿巷道两边对称设置,每个立柱1的下端均通过多个水平调节器4连接有支撑座5,支撑座5用多个地脚螺栓6固定,每个立柱1的上部均与锚固在侧壁上的第一锚杆7固定连接,每排立柱1的上端均设置有由多根工字钢首尾固定相连形成的机架2,两个机架2均与多个锚固在侧壁上的第二锚杆8连接,两个机架2与侧壁间还连接有多个横向调节器9,两个机架2上均固定设置有导轨3。
所述水平调节器4为长螺栓,该长螺栓上设置有多个调节螺母,水平调节器4的下端固定在支撑座5上,水平调节器4的上端穿过立柱1下端的对应孔用调节螺母固定。
所述横向调节器9的结构为:第二锚杆8的一端固定在机架上,第二锚杆8的另一端固定在侧壁上,第二锚杆8的上、下两侧倾斜对称设置有两根活动连接杆10,两根活动连接杆10的一端铰接在机架2上,两根活动连接杆10的另一端铰接在锚固于侧壁的铰接座上,两个活动连接杆10之间竖直设置有调节杆11,调节杆11为长圆柱,两端都开有螺纹,两个活动连接杆13上均设置有一个螺母,调节杆14的两端分别与两个活动连接杆13上的螺母配合。
本发明中导轨3位于立柱1上方,立柱1的下端与水平调节器4连接,可调节导轨3的水平位置,导轨3又通过机架2与巷道侧壁上的横向调节器9连接,可以调节两根纵向导轨3的横向距离,安装调试过程简单,解决了因巷道变形引起的导轨3移位,保证了行车在轨道上的平稳运行。
上面结合附图对本发明的实施例作了详细说明,但是本发明并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。
Claims (3)
1.煤矿井下行车的可调节导轨,包括立柱(1)、机架(2)和导轨(3),其特征在于,两排立柱(1)沿巷道两边对称设置,每个立柱(1)的下端均通过多个水平调节器(4)连接有支撑座(5),支撑座(5)用多个地脚螺栓(6)固定,每个立柱(1)的上部均与锚固在侧壁上的第一锚杆(7)固定连接,每排立柱(1)的上端均设置有由多根工字钢首尾固定相连形成的机架(2),两个机架(2)均与多个锚固在侧壁上的第二锚杆(8)连接,两个机架(2)与侧壁间还连接有多个横向调节器(9),两个机架(2)上均固定设置有导轨(3)。
2.根据权利要求1所述的煤矿井下行车的可调节导轨,其特征在于,所述水平调节器(4)为长螺栓,该长螺栓上设置有多个调节螺母,水平调节器(4)的下端固定在支撑座(5)上,水平调节器(4)的上端穿过立柱(1)下端的对应孔用调节螺母固定。
3.根据权利要求1所述的煤矿井下行车的可调节导轨,其特征在于,所述横向调节器(9)的结构为:第二锚杆(8)的一端固定在机架上,第二锚杆(8)的另一端固定在侧壁上,第二锚杆(8)的上、下两侧倾斜对称设置有两根活动连接杆(10),两根活动连接杆(10)的一端铰接在机架(2)上,两根活动连接杆(10)的另一端铰接在锚固于侧壁的铰接座上,两个活动连接杆(10)之间竖直设置有调节杆(11),调节杆(11)为长圆柱,两端都开有螺纹,两个活动连接杆(13)上均设置有一个螺母,调节杆(14)的两端分别与两个活动连接杆(13)上的螺母配合。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310014121.7A CN103072890B (zh) | 2013-01-15 | 2013-01-15 | 煤矿井下行车的可调节导轨 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310014121.7A CN103072890B (zh) | 2013-01-15 | 2013-01-15 | 煤矿井下行车的可调节导轨 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103072890A true CN103072890A (zh) | 2013-05-01 |
CN103072890B CN103072890B (zh) | 2015-02-18 |
Family
ID=48149616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310014121.7A Expired - Fee Related CN103072890B (zh) | 2013-01-15 | 2013-01-15 | 煤矿井下行车的可调节导轨 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103072890B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104495614A (zh) * | 2015-01-06 | 2015-04-08 | 中国电建集团华东勘测设计研究院有限公司 | 一种大变形岩壁吊车梁轨道布置结构及其安装调试方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201473199U (zh) * | 2009-09-16 | 2010-05-19 | 曹小鹏 | 可调式组合轨道模锻双压板 |
CN202039851U (zh) * | 2011-05-09 | 2011-11-16 | 中煤邯郸第四十九矿山工程有限公司 | 井筒套内壁施工组装模板起吊装置 |
CN102344074A (zh) * | 2011-06-28 | 2012-02-08 | 苏州新达电扶梯部件有限公司 | 电梯轿厢的导轨支架 |
CN203021881U (zh) * | 2013-01-15 | 2013-06-26 | 山西东华机械有限公司 | 一种煤矿井下行车的可调节导轨 |
-
2013
- 2013-01-15 CN CN201310014121.7A patent/CN103072890B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201473199U (zh) * | 2009-09-16 | 2010-05-19 | 曹小鹏 | 可调式组合轨道模锻双压板 |
CN202039851U (zh) * | 2011-05-09 | 2011-11-16 | 中煤邯郸第四十九矿山工程有限公司 | 井筒套内壁施工组装模板起吊装置 |
CN102344074A (zh) * | 2011-06-28 | 2012-02-08 | 苏州新达电扶梯部件有限公司 | 电梯轿厢的导轨支架 |
CN203021881U (zh) * | 2013-01-15 | 2013-06-26 | 山西东华机械有限公司 | 一种煤矿井下行车的可调节导轨 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104495614A (zh) * | 2015-01-06 | 2015-04-08 | 中国电建集团华东勘测设计研究院有限公司 | 一种大变形岩壁吊车梁轨道布置结构及其安装调试方法 |
CN104495614B (zh) * | 2015-01-06 | 2016-08-31 | 中国电建集团华东勘测设计研究院有限公司 | 一种大变形岩壁吊车梁轨道布置结构及其安装调试方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103072890B (zh) | 2015-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203855866U (zh) | 工便梁大跨度框架桥架空顶 | |
CN202064536U (zh) | 一种用于荷载不足屋面的太阳能光伏组件安装支架 | |
CN102367653A (zh) | 大跨度连续梁施工支架结构 | |
CN205317460U (zh) | 一种大变形测试条件下防止框架梁平面外失稳的试验装置 | |
CN103072900A (zh) | 煤矿井下装物装架两用行车 | |
CN203021881U (zh) | 一种煤矿井下行车的可调节导轨 | |
CN209816668U (zh) | 一种超高索塔上横梁施工支架 | |
CN210134353U (zh) | 一种用于盖梁施工的牛腿式抱箍托架 | |
CN204676374U (zh) | 一种铁路线路的加固机构 | |
CN205243531U (zh) | 一种隧道横通道与主洞间交叉口施工结构 | |
CN103072890B (zh) | 煤矿井下行车的可调节导轨 | |
CN110130201A (zh) | 一种半漂浮桁架式桥塔的斜拉桥 | |
CN103806374B (zh) | 装配式公路钢桥整体轨道架设推送系统及架设推送工艺 | |
CN218492313U (zh) | 用于斜交框架桥的下穿施工装置 | |
CN202482766U (zh) | 大跨度连续梁施工支架结构 | |
CN203656527U (zh) | 一种钢拱架应变计固定装置 | |
CN102619171B (zh) | 一种套杆连接式拉杆千斤顶张拉系统及其张拉方法 | |
CN203033663U (zh) | 一种煤矿井下行车的固定支架 | |
CN203033681U (zh) | 一种煤矿井下装物装架两用行车 | |
CN202064535U (zh) | 一种用于安装太阳能光伏组件的支架 | |
CN203394541U (zh) | 平顶钢模台车 | |
CN205874986U (zh) | 一种组合吊装门架 | |
CN208917696U (zh) | 一种超高梁柱式支架 | |
CN206767512U (zh) | 一种高空预应力张拉吊具 | |
CN201671029U (zh) | 一种无砟道床道岔组装平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150218 Termination date: 20190115 |
|