CN203656527U - 一种钢拱架应变计固定装置 - Google Patents
一种钢拱架应变计固定装置 Download PDFInfo
- Publication number
- CN203656527U CN203656527U CN201420008198.3U CN201420008198U CN203656527U CN 203656527 U CN203656527 U CN 203656527U CN 201420008198 U CN201420008198 U CN 201420008198U CN 203656527 U CN203656527 U CN 203656527U
- Authority
- CN
- China
- Prior art keywords
- steel arch
- installation
- strain gauge
- resistance strain
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Measurement Of Length, Angles, Or The Like Using Electric Or Magnetic Means (AREA)
Abstract
一种钢拱架应变计固定装置,包括柱式应变计和分别安装在柱式应变计两端的安装支座,安装支座由安装部和固定部构成,固定部上设有一用于装卡柱式应变计的安装预留孔,安装部为由竖直部分和水平部分构成的直角结构,且安装部通过其竖直部分与固定部构成一体结构,安装部的水平部分与固定部之间形成一个用于容纳钢拱架的卡槽。本实用新型结构简单、设计合理、操作方便,能够将柱式应变计稳固可靠的固定在钢拱架上,避免了电焊焊接对柱式应变计造成的破坏,大大提高了柱式应变计的安装效率和安装成功率。同时,装置整体组装方便,成本低廉,实用性强。
Description
技术领域
本实用新型涉及一种钢拱架应变计固定装置,特别适用于地下工程支护中型钢应变计的固定,具体的说是一种钢拱架应变计固定装置。
背景技术
在隧道与地下工程施工时,通常需要对开挖围岩进行支护。目前,常用的支护方法有锚喷支护、钢拱架加钢筋网喷射混凝土支护等。支护完成后,为了保证隧道和地下工程的安全,需要监测钢拱架在支护状态下的变形,现在常用的方法是将柱式应变计固定在钢拱架上进行监测,其固定方式主要为焊接。然而,焊接时产生的热量很容易破坏应变计内的电桥,导致其不能正常工作。因此,设计一种钢拱架应变计固定装置,避免电焊对其造成的破坏是十分必要的。
实用新型内容
本实用新型所要解决的技术问题是克服现有技术中钢拱架应变计在焊接过程中易被破坏的缺点,提供一种钢拱架应变计固定装置。同时该固定装置具有结构简单、使用方便和成本低廉的特点。
本实用新型为解决上述问题所采用的技术方案为:一种钢拱架应变计固定装置,包括柱式应变计和分别安装在柱式应变计两端的安装支座,所述的安装支座由安装部和固定部构成,所述的固定部上设有一用于装卡柱式应变计的安装预留孔,所述的安装部为由竖直部分和水平部分构成的直角结构,且安装部通过其竖直部分与固定部构成一体结构,所述安装部的水平部分与固定部之间形成一个用于容纳钢拱架的卡槽。
所述安装部的水平部分上设置有用于固定钢拱架2的旋紧螺栓Ⅰ。
所述安装预留孔的下方还设置有用于紧固柱式应变计的旋紧螺栓Ⅱ。
本实用新型的有益效果:
本实用新型的钢拱架应变计固定装置结构简单、设计合理、操作方便,通过安装支座及安装支座顶端配置的两组旋紧螺栓,将柱式应变计稳固可靠的固定在钢拱架上,避免了电焊焊接对柱式应变计造成的破坏,大大提高了柱式应变计的安装效率和安装成功率。安装支座上的安装预留孔和安装预留孔下方旋紧螺栓的设置,便于对安装好的柱式应变计进行调整和固定,可使柱式应变计精确定位,确保了安装质量。同时,装置整体组装方便,成本低廉,实用性强。
附图说明
图1为本实用新型的结构示意图;
图2为本实用新型中安装支座的结构示意图;
附图标记:1、柱式应变计,2、钢拱架,3、安装支座,301、安装部,302、固定部,4、安装预留孔,5、旋紧螺栓Ⅰ,6、旋紧螺栓Ⅱ。
具体实施方式
下面结合附图说明本实用新型的具体实施方式:
一种钢拱架应变计固定装置,包括柱式应变计1和分别安装在柱式应变计1两端的安装支座3,所述的安装支座3由安装部301和固定部302构成,所述的固定部302上设有一用于装卡柱式应变计1的安装预留孔4,所述的安装部301为由竖直部分和水平部分构成的直角结构,且安装部301通过其竖直部分与固定部302构成一体结构,所述安装部301的水平部分与固定部302之间形成一个用于容纳钢拱架2的卡槽。
所述安装部301的水平部分上设置有用于固定钢拱架2的旋紧螺栓Ⅰ5。
所述安装预留孔4的下方还设置有用于紧固柱式应变计1的旋紧螺栓Ⅱ6。
在本实用新型中,钢拱架应变计在安装时,首先,分别将两个安装支座的安装预留孔圈套在柱式应变计的两端,并使两个安装支座左右对称,安装旋紧螺栓Ⅱ;其次,通过安装支座中安装部与固定部构成的用于容纳钢拱架的卡槽将安装支座固定安装在钢拱架上,再安装旋紧螺栓Ⅰ;最后,调整安装支座与钢拱架的相对位置,旋紧旋紧螺栓Ⅱ和旋紧螺栓Ⅰ,完成钢拱架应变计的安装。该装置具有结构简单、使用方便和成本低廉的特点,可安全、高效、可靠的实现钢拱架变形的监测。
Claims (3)
1.一种钢拱架应变计固定装置,包括柱式应变计(1)和分别安装在柱式应变计(1)两端的安装支座(3),其特征在于:所述的安装支座(3)由安装部(301)和固定部(302)构成,所述的固定部(302)上设有一用于装卡柱式应变计(1)的安装预留孔(4),所述的安装部(301)为由竖直部分和水平部分构成的直角结构,且安装部(301)通过其竖直部分与固定部(302)构成一体结构,所述安装部(301)的水平部分与固定部(302)之间形成一个用于容纳钢拱架(2)的卡槽。
2.根据权利要求1所述的一种钢拱架应变计固定装置,其特征在于:所述安装部(301)的水平部分上设置有用于固定钢拱架(2)的旋紧螺栓Ⅰ(5)。
3.根据权利要求1所述的一种钢拱架应变计固定装置,其特征在于:所述安装预留孔(4)的下方还设置有用于紧固柱式应变计(1)的旋紧螺栓Ⅱ(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420008198.3U CN203656527U (zh) | 2014-01-07 | 2014-01-07 | 一种钢拱架应变计固定装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420008198.3U CN203656527U (zh) | 2014-01-07 | 2014-01-07 | 一种钢拱架应变计固定装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203656527U true CN203656527U (zh) | 2014-06-18 |
Family
ID=50922912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420008198.3U Expired - Fee Related CN203656527U (zh) | 2014-01-07 | 2014-01-07 | 一种钢拱架应变计固定装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203656527U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103759109A (zh) * | 2014-01-07 | 2014-04-30 | 洛阳理工学院 | 一种钢拱架应变计固定装置 |
CN108333049A (zh) * | 2018-05-07 | 2018-07-27 | 洛阳理工学院 | 一种深埋硐室先加载后开挖的试验模型及试验方法 |
-
2014
- 2014-01-07 CN CN201420008198.3U patent/CN203656527U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103759109A (zh) * | 2014-01-07 | 2014-04-30 | 洛阳理工学院 | 一种钢拱架应变计固定装置 |
CN103759109B (zh) * | 2014-01-07 | 2015-11-18 | 洛阳理工学院 | 一种钢拱架应变计固定装置 |
CN108333049A (zh) * | 2018-05-07 | 2018-07-27 | 洛阳理工学院 | 一种深埋硐室先加载后开挖的试验模型及试验方法 |
CN108333049B (zh) * | 2018-05-07 | 2024-01-26 | 洛阳理工学院 | 一种深埋硐室先加载后开挖的试验模型及试验方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202645026U (zh) | 钢结构的钢柱柱脚校正装置 | |
CN203656527U (zh) | 一种钢拱架应变计固定装置 | |
CN204326259U (zh) | 一种钢柱连接件 | |
CN212670952U (zh) | 一种无横梁高性能背栓石材幕墙 | |
CN103759109B (zh) | 一种钢拱架应变计固定装置 | |
CN203394941U (zh) | 一种地脚螺栓固定装置 | |
CN204168211U (zh) | 太阳能光伏支架及其构成的支架组件和车棚 | |
CN103114731B (zh) | 钢结构厂房地脚螺栓的快速安装方法 | |
CN203066607U (zh) | 一种新型围挡 | |
CN206237081U (zh) | 一种带伸缩节的自承式电缆隧道支架 | |
CN204057560U (zh) | 附着于异形断面的升降装置中附墙连接结构 | |
CN204692772U (zh) | 一种用于石油管道的组合式支撑装置 | |
CN203822340U (zh) | 一种门式支撑架设备 | |
CN203021881U (zh) | 一种煤矿井下行车的可调节导轨 | |
CN203784472U (zh) | 一种石油管道固定支架 | |
CN102251682A (zh) | 临边防护栏杆 | |
CN203247718U (zh) | 一种钢柱对接安装装置 | |
CN205804988U (zh) | 预制保温结构墙板安装专用卡具 | |
CN202165696U (zh) | 工字钢的电缆桥架固定架夹紧装置 | |
CN205776325U (zh) | 可拆卸的电气设备钢支架埋件装置 | |
CN104251014A (zh) | 一种混凝土排架柱与屋面钢梁的连接结构 | |
CN203834959U (zh) | 一种建筑施工用的安全防护栏 | |
CN204942985U (zh) | 视频监控摄像头安装支架 | |
CN205070881U (zh) | 太阳能支架 | |
CN203488177U (zh) | 用于掘进机第一运输机的喷雾装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140618 Termination date: 20150107 |
|
EXPY | Termination of patent right or utility model |