CN103069109A - 全长注浆钢丝绳锚杆 - Google Patents

全长注浆钢丝绳锚杆 Download PDF

Info

Publication number
CN103069109A
CN103069109A CN2011800388238A CN201180038823A CN103069109A CN 103069109 A CN103069109 A CN 103069109A CN 2011800388238 A CN2011800388238 A CN 2011800388238A CN 201180038823 A CN201180038823 A CN 201180038823A CN 103069109 A CN103069109 A CN 103069109A
Authority
CN
China
Prior art keywords
rope
wedge assembly
bolt
nut
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011800388238A
Other languages
English (en)
Other versions
CN103069109B (zh
Inventor
詹姆斯·D·小霍尔
弗雷德·斯塔福德
约翰·G·奥尔德森
达科塔·福克纳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FCI Holdings Delaware Inc
Original Assignee
FCI Holdings Delaware Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FCI Holdings Delaware Inc filed Critical FCI Holdings Delaware Inc
Publication of CN103069109A publication Critical patent/CN103069109A/zh
Application granted granted Critical
Publication of CN103069109B publication Critical patent/CN103069109B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • E21D21/006Anchoring-bolts made of cables or wires
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/008Anchoring or tensioning means

Abstract

一种全长注浆钢丝绳锚杆,包括:钢丝绳,其具有第一端和第二端;和筒楔组件,其在与所述钢丝绳的第一端相邻的位置处与所述钢丝绳连接。所述筒楔组件具有第一端和第二端。所述钢丝绳锚杆还包括螺母,所述螺母位于与所述筒楔组件的第一端相邻的位置处,并限定所述螺母与所述筒楔组件的第一端之间的密封界面。所述螺母限定与所述钢丝绳流体连通的通道。

Description

全长注浆钢丝绳锚杆
相关申请的交叉引用
本申请要求2010年8月10日提交的美国临时申请No.61/372,210的优先权,该美国临时申请的全文通过引用并入本文。
技术领域
本发明涉及一种全长注浆钢丝绳锚杆,特别是适于通过钢丝绳接收浆液并且锚定在矿顶钻孔内的钢丝绳锚杆。
背景技术
在采矿业里使用钢丝绳锚杆是因为钢丝绳锚杆便于搬运和安装。与常规的钢筋锚杆系统里的细长钢筋相比,钢丝绳锚杆更容易装入钻孔内。不管矿井里存在什么样的高度限制,钢丝绳锚杆由于其柔性都能适用于任何长度的钻孔。钢丝绳的强度性能超过常规的钢筋锚杆的强度性能,因此,钢丝绳是某些矿顶条件下的优选加固件。
钢丝绳锚杆通常是这样安装的:将包括催化剂和粘合剂材料的树脂筒放到钻孔的封闭端,将钢丝绳锚杆插入到钻孔中以便用钢丝绳锚杆的上端撕开树脂筒,树脂流入钻孔和钢丝绳锚杆之间的环带,旋转钢丝绳锚杆以混合树脂催化剂和粘合剂,使树脂围绕钢丝绳锚杆凝固。在这种钢丝绳锚杆中,树脂通常凝固在位于钻孔封闭端的钢丝绳锚杆的上部。
在安装矿顶锚杆时,有时可能希望将接收在钻孔内的锚杆的整个长度全部注浆,以便提供更好的防腐蚀保护和/或使锚杆更好地锚定到周围的岩层里。
发明内容
在一个实施例中,钢丝绳锚杆包括:钢丝绳,其具有第一端和第二端;和筒楔组件,其在与钢丝绳的第一端相邻的位置处与钢丝绳连接。所述筒楔组件具有第一端和第二端。所述钢丝绳锚杆还包括螺母,所述螺母位于与所述筒楔组件的第一端相邻的位置处,并限定所述螺母与所述筒楔组件的第一端之间的密封界面。所述螺母限定与所述钢丝绳流体连通的通道。
所述钢丝绳锚杆还可以包括:加强件,其具有第一端和第二端,所述加强件接收所述钢丝绳的一部分,所述加强件位于与所述筒楔组件的第二端相邻的位置处,并限定所述加强件与所述筒楔组件的第二端之间的密封界面。所述钢丝绳可以是多股钢丝绳,所述多股钢丝绳的股线可以限定多个间隙。第一o形环可位于所述螺母和所述筒楔组件的第一端之间,第二o形环可位于所述加强件和所述筒楔组件的第二端之间。所述螺母与所述筒楔组件的第一端通过围绕所述螺母的周向延伸的焊接固定。所述筒楔组件可包括限定通道的壳体和位于所述通道内的多个楔块,所述加强件可具有由所述壳体的相应螺纹部分接收的螺纹部分。所述筒楔组件的壳体的外表面可限定环形槽。所述螺母可包括主体,所述主体具有从所述主体径向向外延伸的凸缘,所述螺母的通道可延伸穿过所述主体。所述螺母可包括位于所述螺母的通道内的螺纹部分。
所述钢丝绳锚杆也可包括:环,其套在所述加强件和钢丝绳上,所述环固定到所述筒楔组件的第二端并且限定环形槽。所述环的环形槽接收与所述加强件接合的o形环。垫圈和管可套在所述加强件和所述钢丝绳上,所述垫圈和管构造为在安装时限制浆液在钻孔内的流动。所述钢丝绳锚杆还可包括具有膨胀锚和膨胀塞的膨胀组件,所述膨胀组件安装在所述加强件的螺纹部分上。支承板可位于所述筒楔组件和所述管之间。
在另一个实施例中,一种安装钢丝绳锚杆的方法包括:将钢丝绳锚杆插入钻孔内。所述钢丝绳锚杆包括多股钢丝绳、筒楔组件和限定了通道的螺母。所述多股钢丝绳限定了各股钢丝绳之间的多个间隙。所述方法还包括:将浆液输送到所述螺母的通道,使浆液穿过各股钢丝绳之间的多个间隙并进入钻孔。
所述方法还可以包括:旋转钢丝绳锚杆以使设置在所述钢丝绳锚杆上的膨胀组件膨胀,从而使所述膨胀组件与钻孔附近的岩层接合。浆液可以是聚氨酯树脂。所述方法还可包括:将浆液注入到与钻孔相邻的岩层中的裂缝中。可以至少约4000psi的压力输送浆液。
附图说明
图1是根据本发明的一个实施例的钢丝绳锚杆的侧视图。
图2是图1中的钢丝绳锚杆的第一端的局部剖视图。
图3是图1中的钢丝绳锚杆的第一端的俯视图。
图4是根据本发明的另一个实施例的钢丝绳锚杆的第一端的局部剖视图。
图5是根据本发明的另一个实施例的钢丝绳锚杆的第一端的局部剖视图。
图6是根据本发明的另一个实施例的钢丝绳锚杆的第一端的局部剖视图。
图7是图1中的钢丝绳锚杆的侧视图,示出了钢丝绳锚杆的安装。
图8是根据本发明的另一个实施例的钢丝绳锚杆的立体图。
图9是图8中的钢丝绳锚杆的侧视图。
图10是图8中的钢丝绳锚杆的侧视图,示出了钢丝绳锚杆的安装。
图11是根据本发明的另一个实施例的钢丝绳锚杆的立体图。
图12是图11中的钢丝绳锚杆的侧视图。
具体实施方式
在下面的描述中,术语“上”、“下”、“右”、“左”、“竖直”、“水平”、“顶部”、“底部”及其派生词,应根据本发明在附图中的取向来理解。然而,应该理解,除非另有明确相反的说明,本发明可以采用各种可选变型和步骤顺序。还应该理解,在附图中示出和在下面的说明书中描述的具体装置和方法仅仅是本发明的示例性实施例。因此,与本文公开的实施例有关的具体尺寸和其他物理特性不被认为是限制性的。
参考图1-3,作为一个实施例的钢丝绳锚杆10包括:多股钢丝绳12,筒楔组件14,螺母16,和加强件18。钢丝绳12包括第一端20和第二端22,并可以是七股类型的钢丝绳,其具有中心股线和包围中心股线的以相同螺距螺旋缠绕的六个外层股线,所述螺距为钢丝绳的公称直径的12倍和16倍之间,可以为0.7英寸。多股钢丝绳12的股线24限定多个间隙26。此外,还限定了位于钢丝绳12外部与螺母16、筒楔组件14和加强件18之间的间隙28。筒楔组件14在与钢丝绳12的第一端20相邻的位置处与钢丝绳12连接。筒楔组件14具有第一端30和第二端32,并包括大致圆柱形的壳体34。筒楔组件14的壳体34限定通道36,通道36接收多个楔块38。筒楔组件14是用于承受钢丝绳锚杆的负荷要求的公知装置。多个楔块38
可以是两件或三件式的结构。在安装之前,楔块38至少最初可以用接收在槽40内的带(未示出)保持在一起。
螺母16位于与筒楔组件14的第一端30相邻的位置,并限定了螺母16和筒楔组件14之间的密封界面42。螺母16包括主体44,主体44具有从主体44径向向外延伸的凸缘46。螺母16的主体44限定通道48,通道48沿主体44的纵向延伸穿过主体44。螺母16的通道48接收钢丝绳12的第一端20,并与间隙26、28流体连通。可以通过将螺母16压接在钢丝绳12上或通过任何其它合适的紧固装置,来将螺母16固定到钢丝绳12的第一端20。螺母16还包括内螺纹部分50。具体地说,内螺纹部分50设置在螺母16的主体44的通道48内,并适于接收用于引入浆液的配件的对应螺纹部分(未示出)。螺母16的外表面可以是多边形(四边形或六边形)或类似形状,以便能够被常规的矿顶锚杆安装设备(未示出)接收。此外,可在螺母16和筒楔组件14的第一端30之间的52处设置o形环(未示出),或者螺母16可焊接到筒楔组件14上,以便提供螺母16和筒楔组件14的壳体34之间的密封界面42。o形环可设置在由壳体34或螺母16限定的槽内,作为另外一种选择,也可以夹在螺母16和壳体34之间。
再次参考图1-3,加强件18大致是管状,并具有第一端56和第二端58。加强件18套在钢丝绳12上并接收钢丝绳12的一部分。加强件18的第一端56位于与筒楔组件14的第二端32相邻的位置处,在加强件18的第一端56与筒楔组件14的第二端32之间限定了的密封界面60。加强件18可以沿其长度在一个或多个位置压接到钢丝绳12上。如图2所示,可在加强件18的第一端56和筒楔组件14的第二端32之间的62处设置o形环(未示出),以提供加强件18与筒楔组件14的壳体34之间的密封界面60。o形环可设置在由壳体34或加强件18限定的槽内,作为另外一种选择,也可以夹在加强件18和壳体34之间。也可以不提供o形环,而是将加强件18的第一端56焊接到筒楔组件14的壳体34上,以提供加强件18的第一端56与筒楔组件14的壳体34之间的密封界面60。
参考图1,如在本领域中已公知的,钢丝绳锚杆10还包括:端块66,其固定钢丝绳12的多个股线24的自由端;鸟笼状构件68,其带有接收在中心股线上的螺母或小块70。钢丝绳锚杆10还可以包括沿着钢丝绳12的长度在不同位置包围钢丝绳12且与钢丝绳12连接的多个小块(未示出)。设置鸟笼状构件68或其他混合设备在安装过程中改善了浆液的混合,也增加了浆液与钢丝绳锚杆10的粘结强度。但是,钢丝绳锚杆10可以没有任何混合设备,并且钢丝绳12沿其长度可以没有突起或表面变形。
参考图4,其中示出了作为另一个实施例的钢丝绳锚杆80。钢丝绳锚杆80与上述的图1-3所示的钢丝绳锚杆10类似。钢丝绳锚杆80包括套在加强件18和钢丝绳12上的环82。环82包围加强件18,并且限定了用于接收o形环86环形槽84,o形环86使环82与加强件18接合和密封。在环82和壳体34之间的界面上设置有焊道88。在安装过程中,这种布置还防止在壳体34和加强件18之间发生浆液泄漏,还防止在钢丝绳12的第一端20和第二端22产生气穴。另外,螺母16也可以利用围绕螺母16周向延伸的焊道90焊接到筒楔组件14的第一端30上,以提供螺母16和筒楔组件14之间的密封界面42。当螺母16焊接到筒楔组件14上时,可以省略位于52处的o形环。
参考图5,其中示出了作为另一个实施例的钢丝绳锚杆100。钢丝绳锚杆100与上述的图4所示的钢丝绳锚杆80类似。但是,本实施例的筒楔组件14的壳体34包括外表面102,外表面102限定环形槽104,环形槽104用于接收与浆液源连接的凸轮凹槽软管接头的凸轮锁紧配件(未示出)。壳体34通常可以具有比图1-4所示的壳体34更大的外径和更大的壁厚。
参考图6,其示出了筒楔组件34和加强件18的可选实施例。不是将筒楔组件14的壳体34焊接到加强件18上或在壳体34与加强件18之间的62处提供o形环,而是在壳体34上设置有位于通道36内的螺纹部分110,并且在加强件18上与加强件18的第一端56相邻的位置设置对应的螺纹部分112。加强件18拧入壳体34内,从而提供加强件18和筒楔组件14之间的密封界面60。可以在各个螺纹部分110、112上设置螺纹密封剂(未示出)。
参考图7,在安装时,将图1-3中所示的钢丝绳锚杆10插入到岩层122的钻孔120中以支撑岩层122(如矿顶或矿壁)。钢丝绳锚杆10安装有支承板124,支承板124例如是火山形板、平板、通道板或任何其它合适的板。浆液126从螺母16的通道48输送到钢丝绳12的底侧。浆液126流经钢丝绳12的股线24之间的多个间隙26、以及在钢丝绳12的外侧与筒楔组件14的壳体34、螺母16的主体44和加强件18之间延伸的间隙28。螺母16与筒楔组件14之间的密封界面42和加强件18与筒楔组件14之间的密封界面60防止浆液126从螺母16和筒楔组件14之间以及从加强件18和筒楔组件14之间流出。随着浆液126被继续输送进入螺母16并到达钢丝绳12的底侧,浆液126穿过钢丝绳12并沿钢丝绳12的外表面向上流动,以基本上填充钢丝绳12内的所有间隙26、28,并且填充钻孔120。浆液126可通过具有压力表的泵(未示出)输送。当达到泵的峰值压力时,则认为所有的间隙26、28和钻孔120都基本上充满浆液,并且可以停止输送浆液。浆液126固化或硬化,形成包围并填充锚定在钻孔120内的钢丝绳锚杆10的浆液柱。
本发明中使用的合适的浆液126是聚氨酯树脂,它是用多元醇组分和异氰酸盐组分现场制造的。如Weber Mining(韦伯矿业)提供的这种双组分聚氨酯在地下矿井中用于密封裂缝等。各组分在使用前保持在单独的容器中,并且可以通过液体连续搅拌机输送到单一的浆液流中,以便输送进入螺母。当这些组分在钢丝绳内和沿钢丝绳流动时,可以被还混合。
图4-6所示的钢丝绳锚杆80、100可用与前面参考图1-3所示的钢丝绳锚杆10所述的方式类似的方式安装。本发明的钢丝绳锚杆10、80、100特别适合用于长期安装,例如,主矿巷道。钢丝绳锚杆10、80、100是“全长注浆”的锚杆,这意味着在钻孔中完成安装后,钢丝绳锚杆10、80、100的整个长度基本上都包围在浆液126中。围绕钢丝绳锚杆的完整浆液柱提供了恶劣地下环境中的防腐蚀保护。与未全长注浆的钢丝绳锚杆相比,全长注浆钢丝绳锚杆10、80、100还提高了锚定性能。围绕钢丝绳锚杆10、80、100的浆液柱还加固了岩层122。
参考图8和图9,其中示出了作为另一个实施例的钢丝绳锚杆140。钢丝绳锚杆140与图1-7所示的钢丝绳锚杆10、80、100类似。但是,本实施例的钢丝绳锚杆140还包括套在加强件18和钢丝绳12上的垫圈142和管144。加强件18和钢丝绳12延伸穿过垫圈142和管144,垫圈142和管144沿周向包围加强件18。垫圈142可以由橡胶制成,但也可以用任何其他合适的材料制成。管144可以由塑料制成,但也可以用任何其他合适的材料制成。垫圈142和管144位于钢丝绳12的第一端20和第二端22的中间。另外,支承板146位于筒楔组件14和管144之间。在安装钢丝绳锚杆140时,垫圈142和管144构造为限制浆液在钻孔内的流动。
参考图10,钢丝绳锚杆140用与上面参考图1-3所示的钢丝绳锚杆10所述的方式相同的方式安装。但是,通过在更高的压力下输送浆液126来使浆液126注入到与钻孔120相邻的岩层122中。具体地说,以至少约4000psi以上的压力(即等于或大于约4000psi的压力)输送浆液126。在这样的压力下输送浆液126,使浆液126被注入或被挤入到与钻孔120相邻的岩层122里的裂缝或缝隙148中,这使岩层122加固成一个实体。如上所述,垫圈142和管144减慢浆液126的流动,一旦浆液126凝固,垫圈142和管144就会在加强件18和与钻孔120相邻的岩层122之间形成锚塞。垫圈142和管144使得在安装过程中能够获得高压。
参考图11和12,其中示出了作为另一个实施例的钢丝绳锚杆170。钢丝绳锚杆170与图8-10所示的钢丝绳锚杆140类似。但是,本实施例中的钢丝绳锚杆170还包括具有膨胀锚174和膨胀塞176的膨胀组件172。如本领域中通常已公知的,膨胀组件172可以是吊桶型(bail-type)膨胀组件。膨胀组件172安装在加强件18的螺纹部分178上。具体地说,膨胀塞176可拧到加强件18上。膨胀锚174构造为在将钢丝绳锚杆170插入钻孔并且随后旋转钢丝绳锚杆170时膨胀。钢丝绳锚杆170可用与上面参考图8-10所示的钢丝绳锚杆140所述的方式相同的方式安装。但是,在输送浆液126之前,旋转钢丝绳锚杆170以使膨胀锚174膨胀,以使膨胀锚174与钻孔120附近的岩层122接合。可通过螺母16旋转钢丝绳锚杆170。
虽然为了说明的目的已经基于目前认为是最实用和首选的实施例详细描述了本发明,但应该理解的是,这些细节仅用于说明的目的,并且本发明并不限于所公开的实施例,相反地,本发明意在包括落入说明书的教导和范围内的所有修改和等同方案。例如,应该理解的是,本发明设想,任何实施例中的一个或多个特征可以在可能的范围内与任何其他实施例中的一个或多个特征相结合。

Claims (20)

1.一种钢丝绳锚杆,包括:
钢丝绳,其具有第一端和第二端;
筒楔组件,其在与所述钢丝绳的第一端相邻的位置处与所述钢丝绳连接,所述筒楔组件具有第一端和第二端;以及
螺母,其位于与所述筒楔组件的第一端相邻的位置处,并限定所述螺母与所述筒楔组件的第一端之间的密封界面,所述螺母限定与所述钢丝绳流体连通的通道。
2.如权利要求1所述的钢丝绳锚杆,还包括:
加强件,其具有第一端和第二端,所述加强件接收所述钢丝绳的一部分,所述加强件位于与所述筒楔组件的第二端相邻的位置处,并且限定所述加强件与所述筒楔组件的第二端之间的密封界面。
3.如权利要求1所述的钢丝绳锚杆,其中,
所述钢丝绳包括多股钢丝绳,所述多股钢丝绳的股线限定多个间隙。
4.如权利要求2所述的钢丝绳锚杆,其中,
第一o形环位于所述螺母和所述筒楔组件的第一端之间,第二o形环位于所述加强件和所述筒楔组件的第二端之间。
5.如权利要求1所述的钢丝绳锚杆,其中,
所述螺母与所述筒楔组件的第一端通过围绕所述螺母的周向延伸的焊接固定。
6.如权利要求2所述的钢丝绳锚杆,其中,
所述筒楔组件包括:
壳体,其限定通道;以及
多个楔块,其位于所述壳体的通道内,
其中,所述加强件具有螺纹部分,所述螺纹部分由所述壳体的相应螺纹部分接收。
7.如权利要求1所述的钢丝绳锚杆,其中,
所述筒楔组件包括:
壳体,其限定通道;以及
多个楔块,其位于所述壳体的通道内,
其中,所述壳体的外表面限定环形槽。
8.如权利要求1所述的钢丝绳锚杆,其中,
所述螺母包括主体,所述主体具有从所述主体径向向外延伸的凸缘,所述螺母的通道延伸穿过所述主体。
9.如权利要求8所述的钢丝绳锚杆,其中,
所述螺母包括位于所述螺母的通道内的螺纹部分。
10.如权利要求2所述的钢丝绳锚杆,还包括:
环,其套在所述加强件和所述钢丝绳上,所述环固定到所述筒楔组件的第二端并且限定环形槽,所述环的环形槽接收o形环,所述o形环与所述加强件接合。
11.如权利要求2所述的钢丝绳锚杆,还包括:
垫圈和管,所述垫圈和管套在所述加强件和所述钢丝绳上,并且构造为在安装时限制浆液在钻孔内流动。
12.如权利要求2所述的钢丝绳锚杆,还包括:
膨胀组件,其具有膨胀锚和膨胀塞,所述膨胀组件安装在所述加强件的螺纹部分上。
13.如权利要求11所述的钢丝绳锚杆,还包括:
支承板,其位于所述筒楔组件和所述管之间。
14.如权利要求12所述的钢丝绳锚杆,还包括:
垫圈和管,所述垫圈和管套在所述加强件和所述钢丝绳上,并且构造为在安装时限制浆液在钻孔内的流动;以及
支承板,其位于所述筒楔组件和所述管之间。
15.一种安装钢丝绳锚杆的方法,包括如下步骤:
将钢丝绳锚杆插入钻孔内,所述钢丝绳锚杆包括多股钢丝绳、筒楔组件和限定了通道的螺母,所述多股钢丝绳限定了各股钢丝绳之间的多个间隙;以及
将浆液输送到所述螺母的通道,使浆液穿过各股钢丝绳之间的多个间隙并进入钻孔。
16.如权利要求15所述的方法,还包括:
旋转钢丝绳锚杆以使设置在所述钢丝绳锚杆上的膨胀组件膨胀,从而使所述膨胀组件与钻孔附近的岩层接合。
17.如权利要求15所述的方法,其中,
所述浆液包括聚氨酯树脂。
18.如权利要求15所述的方法,还包括:
将浆液注入到与钻孔相邻的岩层中的裂缝中。
19.如权利要求18所述的方法,其中,
以至少约4000psi的压力输送浆液。
20.如权利要求15所述的方法,其中,
所述浆液包括聚氨酯树脂。
CN201180038823.8A 2010-08-10 2011-08-10 全长注浆钢丝绳锚杆 Expired - Fee Related CN103069109B (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US37221010P 2010-08-10 2010-08-10
US61/372,210 2010-08-10
PCT/US2011/047198 WO2012021588A2 (en) 2010-08-10 2011-08-10 Fully grouted cable bolt

Publications (2)

Publication Number Publication Date
CN103069109A true CN103069109A (zh) 2013-04-24
CN103069109B CN103069109B (zh) 2016-04-27

Family

ID=45564924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201180038823.8A Expired - Fee Related CN103069109B (zh) 2010-08-10 2011-08-10 全长注浆钢丝绳锚杆

Country Status (8)

Country Link
US (1) US8757934B2 (zh)
EP (1) EP2603666B8 (zh)
CN (1) CN103069109B (zh)
AU (1) AU2011289463B2 (zh)
CA (1) CA2807061A1 (zh)
PL (1) PL2603666T3 (zh)
WO (1) WO2012021588A2 (zh)
ZA (1) ZA201300563B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268640A (zh) * 2016-04-09 2017-10-20 河南城建学院 一种复合锚固及其锚固方法
CN107268618A (zh) * 2016-04-09 2017-10-20 河南城建学院 一种扩大头复合锚固及其锚固方法
CN110593808A (zh) * 2019-09-26 2019-12-20 中国矿业大学 一种止浆封堵装置及注浆锚索封孔止浆方法
CN112431624A (zh) * 2020-11-16 2021-03-02 河南理工大学 一步式锚杆及其支护作业方法

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8967916B2 (en) 2011-05-05 2015-03-03 Earth Support Services, Inc. Mine roof support apparatus and system
PT2895691T (pt) 2012-09-14 2018-06-14 Dsi Underground Ip Holdings Luxembourg S A R L Parafuso de cabo
AU2013204003B2 (en) * 2012-11-19 2014-11-13 Sandvik Intellectual Property Ab A machine and method for installing rock bolts
JP6243648B2 (ja) * 2013-07-30 2017-12-06 株式会社熊谷組 地盤アンカーの施工方法
CN103410543A (zh) * 2013-08-13 2013-11-27 中国矿业大学 一种让压内注浆锚索
CN103590845B (zh) * 2013-11-28 2015-09-16 河南理工大学 一种防冲击间隔注浆锚索及其使用方法
CN103697167B (zh) * 2014-01-06 2017-01-18 上海金泰工程机械有限公司 回转式钢丝吊绳密封装置及其密封套的制作方法
CN103867222A (zh) * 2014-03-31 2014-06-18 晋城宏圣科威矿用材料有限公司 让压式玻璃钢锚杆
ES2727140T3 (es) * 2014-11-21 2019-10-14 Univ Danmarks Tekniske Un sistema de refuerzo y un método para reforzar una estructura con un tendón
WO2017023937A1 (en) * 2015-08-04 2017-02-09 Felix Sorkin Sheathing retention capsule
CN105298521B (zh) * 2015-11-17 2018-01-02 华北科技学院 一种软岩沿空巷道非对称支护装置
CA2957748C (en) 2017-02-13 2018-05-01 Lyle Kenneth Adams Rock bolt seal
JP6442104B1 (ja) * 2017-07-31 2018-12-19 東京製綱株式会社 連続繊維補強より線の定着具
EP3517688B1 (de) * 2018-01-29 2020-07-08 BAUER Spezialtiefbau GmbH Bodenankerelement
CN115182765B (zh) * 2022-09-14 2022-12-02 北京中矿创新联盟能源环境科学研究院 注浆npr锚索

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4158519A (en) * 1976-08-06 1979-06-19 Imperial Chemical Industries Limited Rock reinforcement
US5344195A (en) * 1992-07-29 1994-09-06 General Electric Company Biased fluid coupling
US6270290B1 (en) * 1997-02-14 2001-08-07 Jennmar Corporation Tensionable cable bolt
US6322290B1 (en) * 1996-01-11 2001-11-27 Jennmar Corporation Cable bolt head
US6428243B1 (en) * 1996-09-09 2002-08-06 Quantax Pty Ltd Cable bolt
US20020110426A1 (en) * 2001-02-09 2002-08-15 Jennmar Corporation Cable bolt with mixing delay device
US20070009330A1 (en) * 2005-06-17 2007-01-11 F. M. Locotos Co., Inc. Mine roof cable bolt and method
CN100482899C (zh) * 2001-03-23 2009-04-29 株式会社三友基础技术 地锚的拉伸构件去除型内部锚具用的楔组合件及内部锚具
US20090191007A1 (en) * 2008-01-29 2009-07-30 Seegmiller Ben L Resin Mixing and Cable Tensioning Device and Assembly for Cable Bolts
US7588394B1 (en) * 2008-03-28 2009-09-15 Dsi Ground Support Inc. Low profile mine roof support
WO2010072000A1 (en) * 2008-12-23 2010-07-01 Hani Sabri Mitri Sleeved cable bolt

Family Cites Families (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3820832A (en) * 1969-03-12 1974-06-28 A Brandestini Anchoring device for wire strands in prestressed concrete structures
DE3125166C3 (de) * 1981-06-26 1993-12-02 Dyckerhoff & Widmann Ag Verfahren zum Herstellen eines nachspannbaren Verpreßankers
CA1286129C (en) * 1986-06-24 1991-07-16 Inco Limited Hardened material supported rock bolt and apparatus for installing same
US5181800A (en) * 1988-08-08 1993-01-26 Jennmar Corporation Mine roof anchor having adjustable resin retaining washer
US5378087A (en) * 1991-09-25 1995-01-03 Locotos; Frank M. Mine roof support apparatus and method
GB2262970B (en) * 1991-12-19 1995-02-15 Bridon Plc Flexible roof bolt
CA2087923A1 (en) * 1992-01-23 1993-07-24 Johannes Jacobus Gouws Method of filling a borehole
US5375946A (en) * 1992-02-06 1994-12-27 F. M. Locotos Equipment & Design Co. Mine roof support apparatus and method
US5342149A (en) * 1992-08-31 1994-08-30 Mccabe Brothers, Inc. Long hole chemical grout injector system
DE9317336U1 (de) * 1993-11-12 1994-01-27 Johannes Radtke Injektionsseilanker
GB9403675D0 (en) * 1994-02-25 1994-04-13 Asw Ltd High tensile strand anchorages and methods of installation thereof
US5511909A (en) * 1994-06-07 1996-04-30 Jennmar Corporation Cable bolt and method of use in supporting a rock formation
US5525013A (en) * 1994-10-31 1996-06-11 Seegmiller; Ben L. Cable bolt structure and related components
US5785463A (en) 1996-01-11 1998-07-28 Jennmar Corporation Combination cable bolt system
US5919006A (en) 1997-02-14 1999-07-06 Jennmar Corporation Tensionable cable bolt with mixing assembly
CA2315468A1 (en) * 2000-08-10 2002-02-10 Thermax International Corp. Multi grouting system
US6684585B2 (en) * 2001-05-30 2004-02-03 Robert Campbell Method and apparatus for providing a visual indication of the tension applied to a tendon of a post-tension system
JP3898557B2 (ja) * 2002-04-22 2007-03-28 東日本高速道路株式会社 ケーブルボルトの定着装置
AUPS310702A0 (en) * 2002-06-21 2002-07-11 Industrial Rollformers Pty Limited Rock bolting system
WO2004013463A1 (en) * 2002-08-02 2004-02-12 Dywidag-Systems International Pty Limited Rock bolt post grouting apparatus
WO2005040556A1 (fr) * 2003-10-27 2005-05-06 Marcellin Bruneau Dispositif d'ancrage à gaine d'expansion élastique
US20050158127A1 (en) * 2004-01-21 2005-07-21 Fergusson Jeffrey R. Yielding strata bolt
US7896581B2 (en) * 2005-12-02 2011-03-01 Rhino Technologies Llc Re-tensionable cable bolt apparatus and related method
WO2008128301A1 (en) * 2007-04-23 2008-10-30 Onesteel Wire Pty Limited Reinforcing of formations
AU2009201044B2 (en) * 2008-03-20 2015-10-01 Dywidag - Systems International Pty Limited Cable bolt
CA2663099A1 (en) * 2008-04-17 2009-10-17 Jennmar Corporation Tension assembly
CA2733829C (en) * 2008-08-11 2013-11-19 Sandvik Mining And Construction Rsa (Pty) Ltd Rock anchor cable
CA2742253C (en) * 2008-11-24 2016-01-12 Fci Holdings Delaware, Inc. Sheathed cable

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4158519A (en) * 1976-08-06 1979-06-19 Imperial Chemical Industries Limited Rock reinforcement
US5344195A (en) * 1992-07-29 1994-09-06 General Electric Company Biased fluid coupling
US6322290B1 (en) * 1996-01-11 2001-11-27 Jennmar Corporation Cable bolt head
US6428243B1 (en) * 1996-09-09 2002-08-06 Quantax Pty Ltd Cable bolt
US6270290B1 (en) * 1997-02-14 2001-08-07 Jennmar Corporation Tensionable cable bolt
US20020110426A1 (en) * 2001-02-09 2002-08-15 Jennmar Corporation Cable bolt with mixing delay device
CN100482899C (zh) * 2001-03-23 2009-04-29 株式会社三友基础技术 地锚的拉伸构件去除型内部锚具用的楔组合件及内部锚具
US20070009330A1 (en) * 2005-06-17 2007-01-11 F. M. Locotos Co., Inc. Mine roof cable bolt and method
US20090191007A1 (en) * 2008-01-29 2009-07-30 Seegmiller Ben L Resin Mixing and Cable Tensioning Device and Assembly for Cable Bolts
US7588394B1 (en) * 2008-03-28 2009-09-15 Dsi Ground Support Inc. Low profile mine roof support
WO2010072000A1 (en) * 2008-12-23 2010-07-01 Hani Sabri Mitri Sleeved cable bolt

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268640A (zh) * 2016-04-09 2017-10-20 河南城建学院 一种复合锚固及其锚固方法
CN107268618A (zh) * 2016-04-09 2017-10-20 河南城建学院 一种扩大头复合锚固及其锚固方法
CN110593808A (zh) * 2019-09-26 2019-12-20 中国矿业大学 一种止浆封堵装置及注浆锚索封孔止浆方法
CN112431624A (zh) * 2020-11-16 2021-03-02 河南理工大学 一步式锚杆及其支护作业方法

Also Published As

Publication number Publication date
CA2807061A1 (en) 2012-02-16
CN103069109B (zh) 2016-04-27
US8757934B2 (en) 2014-06-24
AU2011289463B2 (en) 2015-12-03
AU2011289463A1 (en) 2013-02-21
EP2603666B1 (en) 2017-03-01
US20120039672A1 (en) 2012-02-16
WO2012021588A2 (en) 2012-02-16
EP2603666A2 (en) 2013-06-19
ZA201300563B (en) 2013-09-25
WO2012021588A3 (en) 2012-04-05
PL2603666T3 (pl) 2017-09-29
EP2603666B8 (en) 2017-05-24
EP2603666A4 (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN103069109B (zh) 全长注浆钢丝绳锚杆
CN101280686B (zh) 改进的锚索
US8967916B2 (en) Mine roof support apparatus and system
AU2013315240B2 (en) Cable bolt
CN109681249A (zh) 一种中排气矿用注浆锚索施工方法
AU2011274289B2 (en) An apparatus for post-grouting a cable bolt, cable bolt assembly and method of installing a cable bolt
EP2395198A1 (en) Cable bolt
RU2360123C1 (ru) Канатный анкер
CN109252881A (zh) 钢管水泥砂浆预应力锚索及其支护方法
CN111764384B (zh) 一种采用单层波纹管和树脂材料实现双层防腐的锚索结构
CN111764385B (zh) 一种采用双层波纹套管实现双层防腐的锚索结构
CN216866748U (zh) 高预紧力对拉式矿用锚索
CN114294034B (zh) 巷道支护系统及巷道支护方法
CN211472486U (zh) 一种采用双层波纹套管实现双层防腐的锚索结构
US11236613B2 (en) Encapsulation system and method of installing a rock bolt
RU2407895C1 (ru) Канатный анкер
CN115478898A (zh) 预隔断墙
CN114876543A (zh) 一种中空注浆锚索结构
AU2013204193B2 (en) A cable bolt assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160427

Termination date: 20170810