CN103065225A - 物资采购计划审查方法 - Google Patents

物资采购计划审查方法 Download PDF

Info

Publication number
CN103065225A
CN103065225A CN2012105888373A CN201210588837A CN103065225A CN 103065225 A CN103065225 A CN 103065225A CN 2012105888373 A CN2012105888373 A CN 2012105888373A CN 201210588837 A CN201210588837 A CN 201210588837A CN 103065225 A CN103065225 A CN 103065225A
Authority
CN
China
Prior art keywords
materials
purchasing plan
equipment
plan
checking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105888373A
Other languages
English (en)
Inventor
张建国
杨苏利
张永力
董玉红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI ELECTRIC POWER BIDDING CONSULTING CO Ltd
HEBEI ELECTRIC POWER Corp SUPPLY BRANCH
State Grid Corp of China SGCC
Original Assignee
HEBEI ELECTRIC POWER BIDDING CONSULTING CO Ltd
HEBEI ELECTRIC POWER Corp SUPPLY BRANCH
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI ELECTRIC POWER BIDDING CONSULTING CO Ltd, HEBEI ELECTRIC POWER Corp SUPPLY BRANCH, State Grid Corp of China SGCC filed Critical HEBEI ELECTRIC POWER BIDDING CONSULTING CO Ltd
Priority to CN2012105888373A priority Critical patent/CN103065225A/zh
Publication of CN103065225A publication Critical patent/CN103065225A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种物资采购计划审查方法,该方法具体包括以下步骤:a.首先在审核端服务器中预置审查模板;b.审核服务器在ERP系统中接收基层客户端发送的物资采购计划请求;c.生成物资采购计划待审表;d.在审核服务器中调用审查模板对物资采购计划待审表进行逐行扫描审查;e.将步骤d生成的物资采购计划错误统计表返回至基层客户端,基层客户端修改完成后重复步骤b至d;f.将无误的物资采购计划待审表,采用数据链技术转换至ERP系统中发送至上级审核服务器。通过本发明所述的方法对物资采购计划进行审查,不仅能够提高工作效率、缩短审查周期、提高审查准确率,而且还能够对物资采购计划中出现的错误发出预警信息,提醒基层单位及时进行修改。

Description

物资采购计划审查方法
技术领域
本发明涉及一种审查方法,特别是一种用于审查计划报表的方法。
背景技术
无论是在生产现场还是在施工现场,在生产或施工前需要进行物资的采购,物资采购计划的编写、审查是必经过程。目前对于物资采购计划的审查仅停留在人为审查阶段,对于审查量较大的部门来说不仅工作量较大,对审查结果统计较为繁琐,而且容易出现审查错误。例如国家电网公司的物资采购计划需要逐级审批是否满足国网标准的要求,物资采购计划通常由各项目单位在ERP系统中编写并申报,由地市级电网物资分公司组织预审,然后上报至省级电网物资分公司进行集中审查,最后交由物资部复审后上报国家电网。物资采购计划通常包括年度物资需求计划、批次采购计划、批次外采购计划以及协议库计划等等,国网考核指标要求物资采购计划编写的准确率为100%,省电网公司每批次上报的物资采购计划条数少则数千条,多则数万条,每条计划都包含了38个字段的内容,省电网物资公司重点把控项目电压等级、需求数量、估算单价、交货时间、交货地点与方式等字段相关内容的审查,审核项目多达到几十万项,物资采购计划审核工作量很大。另外对于项目申报单位来说由于审查周期较长可能耽误施工周期。
发明内容
本发明主要解决的技术问题是提供一种物资采购计划的审查方法,用于解决目前审查工作量、审查周期长、审查准确率低的缺点,进一步保证生产或施工的如期进行。
为解决上述技术问题,本发明所采取的技术方案如下。
物资采购计划审查方法,该方法具体包括以下步骤:
a.首先在审核端服务器中预置审查模板,所述审查模板中包括审查项目以及审查过程中所依据的计算公式、匹配查找条件和边界值;
b.审核服务器在ERP系统中接收基层客户端发送的物资采购计划请求;
c.利用数据链技术将ERP系统中的物资采购计划请求转换至EXCEL表格中生成物资采购计划待审表;
d.在审核服务器中调用审查模板对物资采购计划待审表进行逐行扫描审查;当审查过程中发现错误信息,则将错误的采购计划请求导出到EXCEL表格中生成物资采购计划错误统计表,并对该条采购计划请求的错误项发出预警;当审查过程中没有发现错误信息,转至步骤f;
e.将步骤d生成的物资采购计划错误统计表返回至基层客户端,基层客户端修改完成后重复步骤b至d;
f.将无误的物资采购计划待审表,采用数据链技术转换至ERP系统中发送至上级审核服务器。
本发明所述步骤d中审查过程具体包括以下步骤:
d1.在审核服务器对物资采购计划待审表审查过程中,首先以国标为标准对审查项目进行第一层审查;
d2.对步骤d1审查后遗留的物资采购计划以行业标准为标准对审查项目进行第二层审查;
d3. 对步骤d2审查后遗留的物资采购计划采用同物料比对法进行第三层审查;
d4. 对步骤d3审查后遗留的物资采购计划进行单独审查。
由于采用了上述技术方案,本发明所取得的技术进步如下。
通过本发明所述的方法对物资采购计划进行审查,不仅能够提高工作效率、缩短审查周期、提高审查准确率,而且还能够对物资采购计划中出现的错误发出预警信息,提醒基层单位及时进行修改。通过本发明所述的方法编写的物资采购计划审查软件应用数据链技术、ERP系统以及EXCEL技术实现对基层单位申报的物资采购计划进行逐行扫描审查,并自动生成错误统计表,方便快捷,从根本上保证了生产或施工的如期进行。
具体实施方式
下面结合具体实施例对本发明做进一步详细说明。
物资采购计划审查方法应用在省级电网物资分公司,用于对项目单位编写经地市级电网物资分公司预审合格的物资采购计划进行集中审查,主要用于审查物资采购计划中关于申购物料的电压等级、需求数量、预算价格、交货时间、完工日期、供货周期等项目。审查的具体过程包括以下步骤:
a.首先在审核端服务器中预置审查模板,审查模板在excel表格中进行设置,审查模板中包括审查项目以及审查过程中所依据的评价价格计算公式、供货周期计算公式、匹配查找条件和交货时间的边界值;应用数据链接技术,将国家电网的物料标准、行业物料标准链接在审查模板中,并调试数据链路的正确性。
b.审核服务器在ERP系统中接收各地市级电网物资分公司发送的预审合格的物资采购计划请求。
c.利用数据链技术将ERP系统中的物资采购计划请求转换至EXCEL表格中,以各项目单位申报的物资采购计划为单位生成各自的物资采购计划待审表。
d.在审核服务器中调用审查模板对物资采购计划待审表进行逐行扫描审查。具体审查过程为:
d1.在审核服务器对物资采购计划待审表审查过程中,首先以国标为标准对审查项目进行第一层审查,对于符合国标要求的物料采购计划予以通过,对于不符合国标要求的物料采购计划导出到EXCEL表格中生成物资采购计划错误统计表,并对该条采购计划请求的错误项发出预警。
d2.对步骤d1审查后遗留的在国标中没有规定的物资采购计划以行业标准为标准对审查项目进行第二层审查;同上,对于符合行业标准要求的采购计划予以通过,对于不符合行业标准要求的物料采购计划导出到步骤b1生成的物资采购计划错误统计表中,并对该条采购计划请求的错误项发出预警。
d3. 对步骤d2审查后遗留的在行业标准中没有规定的物资采购计划采用同物料比对法进行第三层审查;对于相差较为悬殊的物料采购计划导出到步骤b1生成的物资采购计划错误统计表中,并对该条采购计划请求的错误项发出预警。
d4. 对步骤d3审查后遗留的单独申购的物资采购计划进行单独审查。
物资采购计划错误统计表统计完成后,执行步骤e;当审查过程中没有发现错误信息,转至步骤f。
e.将步骤d生成的物资采购计划错误统计表返回至相应的地市级电网物资分公司;地市级电网物资分公司对物资采购计划进行修改,修改完成后再次发送物资采购计划请求,重复步骤b到d。
f.将无误的物资采购计划待审表,采用数据链技术转换至ERP系统中发送至物资部进行复审。
当然物资部审核时也可采用本发明所述的审核方法对省级电网物资分公司提请的物资采购计划请求进行审核。本发明应用在省级电网物资分公司中对物资采购计划进行审核时,只用半天时间即可扫描量即可达到八万多条,发出预警提醒达一万多条。如果单独采用ERP系统进行人工审核上述工作量至少需要十天时间才能完成,并且还有可能出现漏判、误判、统计错误等问题出现的可能。

Claims (2)

1.物资采购计划审查方法,其特征在于该方法具体包括以下步骤:
a.首先在审核端服务器中预置审查模板,所述审查模板中包括审查项目以及审查过程中所依据的计算公式、匹配查找条件和边界值;
b.审核服务器在ERP系统中接收基层客户端发送的物资采购计划请求;
c.利用数据链技术将ERP系统中的物资采购计划请求转换至EXCEL表格中生成物资采购计划待审表;
d.在审核服务器中调用审查模板对物资采购计划待审表进行逐行扫描审查;当审查过程中发现错误信息,则将错误的采购计划请求导出到EXCEL表格中生成物资采购计划错误统计表,并对该条采购计划请求的错误项发出预警;当审查过程中没有发现错误信息,转至步骤f;
e.将步骤d生成的物资采购计划错误统计表返回至基层客户端,基层客户端修改完成后重复步骤b至d;
f.将无误的物资采购计划待审表,采用数据链技术转换至ERP系统中发送至上级审核服务器。
2.根据权利要求1所述的物资采购计划审查方法,其特征在于步骤d中所述审查过程具体包括以下步骤:
d1.在审核服务器对物资采购计划待审表审查过程中,首先以国标为标准对审查项目进行第一层审查;
d2.对步骤d1审查后遗留的物资采购计划以行业标准为标准对审查项目进行第二层审查;
d3. 对步骤d2审查后遗留的物资采购计划采用同物料比对法进行第三层审查;
d4. 对步骤d3审查后遗留的物资采购计划进行单独审查。
CN2012105888373A 2012-12-31 2012-12-31 物资采购计划审查方法 Pending CN103065225A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105888373A CN103065225A (zh) 2012-12-31 2012-12-31 物资采购计划审查方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105888373A CN103065225A (zh) 2012-12-31 2012-12-31 物资采购计划审查方法

Publications (1)

Publication Number Publication Date
CN103065225A true CN103065225A (zh) 2013-04-24

Family

ID=48107846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105888373A Pending CN103065225A (zh) 2012-12-31 2012-12-31 物资采购计划审查方法

Country Status (1)

Country Link
CN (1) CN103065225A (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104537452A (zh) * 2014-11-04 2015-04-22 无锡鹰智科技有限公司 一种电力工程工程项目计算机管理系统
CN104866987A (zh) * 2015-05-11 2015-08-26 国家电网公司 一种电力设备物资采购数据的处理方法
CN108133307A (zh) * 2017-12-01 2018-06-08 国家电网公司 物资计划审查方法、系统及终端设备
CN109087074A (zh) * 2018-08-15 2018-12-25 国网湖北省电力有限公司武汉供电公司 一种计划申报自查方法及系统
CN109359842A (zh) * 2018-09-30 2019-02-19 国网山东省电力公司物资公司 一种单次多元数据审查处理方法、装置及终端设备
CN110008258A (zh) * 2019-01-28 2019-07-12 国网山东省电力公司物资公司 一种基于业务驱动的全信息可视化数据处理方法
CN111626675A (zh) * 2020-05-26 2020-09-04 北京金山云网络技术有限公司 信息处理方法、装置、电子设备及计算机可读存储介质
CN112381496A (zh) * 2020-09-29 2021-02-19 国网冀北电力有限公司物资分公司 一种采购计划线上自动审查的方法及电子设备
CN112446649A (zh) * 2019-08-27 2021-03-05 国网山西省电力公司运城供电公司 物资采购计划的审查方法和装置
CN114004599A (zh) * 2021-11-05 2022-02-01 国网山东省电力公司 基于人工智能的物资需求计划审查系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030229530A1 (en) * 2002-06-06 2003-12-11 Chih-Chung Lai Methods for production forecasting and ordering
CN1635531A (zh) * 2004-12-31 2005-07-06 陈树歆 高校物资竞价采购系统
CN102509181A (zh) * 2011-09-29 2012-06-20 芜湖新兴铸管有限责任公司 企业采购管理计算机网络系统

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030229530A1 (en) * 2002-06-06 2003-12-11 Chih-Chung Lai Methods for production forecasting and ordering
CN1635531A (zh) * 2004-12-31 2005-07-06 陈树歆 高校物资竞价采购系统
CN102509181A (zh) * 2011-09-29 2012-06-20 芜湖新兴铸管有限责任公司 企业采购管理计算机网络系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李凌燕: "基于ERP的房地产企业预算管理系统的设计与实现", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》, no. 04, 15 April 2012 (2012-04-15), pages 17 - 43 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104537452A (zh) * 2014-11-04 2015-04-22 无锡鹰智科技有限公司 一种电力工程工程项目计算机管理系统
CN104866987A (zh) * 2015-05-11 2015-08-26 国家电网公司 一种电力设备物资采购数据的处理方法
CN108133307A (zh) * 2017-12-01 2018-06-08 国家电网公司 物资计划审查方法、系统及终端设备
CN109087074A (zh) * 2018-08-15 2018-12-25 国网湖北省电力有限公司武汉供电公司 一种计划申报自查方法及系统
CN109359842A (zh) * 2018-09-30 2019-02-19 国网山东省电力公司物资公司 一种单次多元数据审查处理方法、装置及终端设备
CN110008258A (zh) * 2019-01-28 2019-07-12 国网山东省电力公司物资公司 一种基于业务驱动的全信息可视化数据处理方法
CN112446649A (zh) * 2019-08-27 2021-03-05 国网山西省电力公司运城供电公司 物资采购计划的审查方法和装置
CN111626675A (zh) * 2020-05-26 2020-09-04 北京金山云网络技术有限公司 信息处理方法、装置、电子设备及计算机可读存储介质
CN112381496A (zh) * 2020-09-29 2021-02-19 国网冀北电力有限公司物资分公司 一种采购计划线上自动审查的方法及电子设备
CN114004599A (zh) * 2021-11-05 2022-02-01 国网山东省电力公司 基于人工智能的物资需求计划审查系统

Similar Documents

Publication Publication Date Title
CN103065225A (zh) 物资采购计划审查方法
CN110009172B (zh) 基于sg-cim模型的资产全生命周期数据建模方法
Tukker et al. Towards a global multi-regional environmentally extended input–output database
CN105426300B (zh) 一种电力系统cim/e模型的标准符合性测试系统和方法
CN103020873B (zh) 一种用于电力系统的自动转资方法和系统
CN102486748B (zh) 一种性能测试的方法及装置
CN106408319A (zh) 一种分销数据管理系统和方法
CN107067138A (zh) 电力物资招评标电子化辅助系统
CN107798488A (zh) 一种电网检修工程储备管理系统
CN101447067A (zh) 一种用于电力系统转资的控制方法
CN103473654A (zh) 一种用于电力erp系统的资产数据清理辅助方法及系统
CN110070249A (zh) 一种数字化工厂智能平台
Ren et al. Research of software size estimation method
Cao et al. Improved metrics for encapsulation based on information hiding
CN113269437A (zh) 一种电网物资申报系统
Zhao et al. Research on ERP and PLM integration based on R&D project management
Ma et al. Extended common information model for distribution network production repair platform
Guo et al. Development of bulk material management system and research on material balance applications based on business intelligence
CN106846007A (zh) 一种供应商后评价负反馈控制系统
CN214896673U (zh) 一种基于物资储备库的需求计划智能编报系统
Siregar et al. Indicators coefficient calculation using technoware, humanware, organware and infoware
CN115983940A (zh) 零星采购的管理方法、装置、设备及存储介质
CN117333119A (zh) 一种电网设备的技术规范审查方法及系统
Ding et al. One Management Scheme For Software Testing Based On Testcenter
CN106650056A (zh) 基于三维设计平台的变电站通用设备应用方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130424