CN103064104A CN2012105391479A CN201210539147A CN103064104A CN 103064104 A CN103064104 A CN 103064104A CN 2012105391479 A CN2012105391479 A CN 2012105391479A CN 201210539147 A CN201210539147 A CN 201210539147A CN 103064104 A CN103064104 A CN 103064104A
Authority
CN
China
Prior art keywords
data
skyscraper
sensing
record cell
earthquake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105391479A
Other languages
Chinese (zh)
Inventor
陈志高
郑水明
郭唐永
杨江
王秋良
蒋冰莉
邹彤
黄�俊
夏界宁
项大鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Earthquake of China Earthquake Administration
Original Assignee
Institute of Earthquake of China Earthquake Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Earthquake of China Earthquake Administration filed Critical Institute of Earthquake of China Earthquake Administration
Priority to CN2012105391479A priority Critical patent/CN103064104A/en
Publication of CN103064104A publication Critical patent/CN103064104A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses a high-rise building earthquake monitoring and early warning system and a method of the high-rise building earthquake monitoring and early warning system and relates to the technology of earthquake observation. The system is composed of a sensing and recording element group, an industrial control computer and an alarm box, wherein the sensing and recording element group, the industrial control computer and the alarm box are sequentially connected. System analysis and control software is embedded in the industrial control computer. The method includes the steps of (1) collecting and storing shock signals through a three-axial acceleration sensor and a data collection and recording element, (2) sending the collected data to the industrial control computer through a network, (3) analyzing the data through the computer, (4) sending out an alarm signal when influence on a high-rise building caused by an earthquake is analyzed to reach an alarm value, (5) estimating degree of damage to the high-rise building. The high-rise building earthquake monitoring and early warning system and the method of the high-rise building earthquake monitoring and early warning system is capable of not only collecting the shock signals, but also setting the alarm value according to an earthquake damage defense rule. The high-rise building earthquake monitoring and early warning system and the method of the high-rise building earthquake monitoring and early warning system not only gives an alarm for the earthquake, but also simultaneously gives a floor alarm for high-rise building shock caused by natural disasters such as gale.

Description

Skyscraper seismic monitoring early warning system and method thereof
Technical field
The present invention relates to Observation Technology of Earthquakes, relate in particular to a kind of skyscraper seismic monitoring early warning system and method thereof.
Background technology
Urban construction is in the high speed development stage, and skyscraper is also more and more intensive.High-rise building design not only needs larger load-bearing capacity, and needs larger rigidity, and the lateral deformation that horizontal loading is produced is limited within certain scope.Excessive lateral deformation meeting makes infilled wall or construction and decoration crack or damage occur, also can make the elevator rail distortion.Under the natural force effects such as earthquake, strong wind, the damage of unstructuredness can make rehabilitation expense very high, and the life and the device security that collapse and also can threaten the people such as infilled wall.Excessive lateral deformation meeting makes agent structure the crack occur, even damages.Limit lateral is out of shape namely fracture width and the destructiveness of limiting structure.Excessive lateral deformation meeting makes the structure generation additional internal force, even causes and collapse.Therefore, also to be limited the lateral deformation that produces under earthquake, the wind effect.
Because the difference of epicentral distance and the difference of buildings rigidity make earthquake obviously different.The flexible building that is in violent earthquake, epicentral distance far away is more serious than the earthquake of medium and small earthquake magnitude, nearly epicentral distance.In view of the skyscraper characteristics, cause its flexibility relatively relatively poor, namely descending is appearred in the surge capability of vibrations, distant shock is far longer than near earthquake to the harm of skyscraper.The peak accelerator value of top layer is high than ground peak accelerator value, can reach more than three times of ground peak accelerator value, so that higher.Thereby the performance of building and possible infringement must be assessed at such design level.This effect is serious at the soft string of deposits ratio sill that bassets.Therefore distant shock, large shake never can be ignored the impact of skyscraper.
" Hubei Province's seismic monitoring management implementation way " the 6th clear, the skyscraper that highly surpasses 160 meters should arrange special-purpose strong motion monitoring facilities.
At present, earthquake monitoring system has been installed in national a plurality of buildings, but only does the data collection, does not participate in building body control.
Summary of the invention
Purpose of the present invention just is to overcome the shortcoming and defect that prior art exists, and a kind of skyscraper seismic monitoring and early warning system and method thereof are provided.
Skyscraper seismic monitoring and early warning system are not only monitored earthquake and are carried out data acquisition, simultaneously the vibrations response spectrum in building are analyzed, and are carried out earthquake assessment and earthquake pre-warning.
The monitoring of skyscraper macroseism is by monitoring and Real-time Collection to the macroseism signal, analyzes earthquake to the impact of structural safety, the rationality of checking seismic design and the reliability of existing high-rise construction earthquake resistance theory and scientific payoffs.
The object of the present invention is achieved like this:
One, skyscraper seismic monitoring and early warning system (abbreviation system)
Native system is comprised of the sensing and record tuple, industrial control computer and the warning box that connect successively, and systematic analysis is implanted in the industrial control computer with control software;
Sole plate at skyscraper is laid the 1st, 2,3 sensing and record cells, is mainly used in seismic monitoring;
On the middle layer of skyscraper and top layer, lay respectively the 4th, 5 sensings and record cell unit, be used for the vibration information of record skyscraper; Power supply and the signal of 5 sensings and record cell are connected on the industrial computer by preformed hole;
Sensing and record tuple are installed in the skyscraper, Real-Time Monitoring is carried out in vibrations to skyscraper, and be sent in real time the data that collect in the industrial control computer, by systematic analysis with control software to data analysis, when detecting the signal that meets alarm rule, then the trigger alarm case sends warning by warning box.
Two, skyscraper seismic monitoring method for early warning (abbreviation method)
This method comprises the following steps:
1. by three-axis acceleration sensor, data acquisition and record cell vibration signal is gathered and stores;
2. by network the data that gather are sent to industrial control computer;
3. by industrial control computer to data analysis;
4. analyze to find that earthquake exerts an influence when reaching warning value to high building, then sends alerting signal;
5. the destructiveness of high building is assessed.
The present invention has following advantages and good effect:
1, the present invention not only gathers vibration signal, and can set alarm threshold value according to earthquake defence regulation, when having realized earthquake on the basis of data accumulation floor response spectrum analysis to the warning function of the different floor heights of skyscraper;
2, the present invention not only reports to the police to earthquake, can also carry out floor to the building vibrations that the disasteies such as strong wind cause simultaneously and report to the police;
3, the present invention analyzes comparison with the response spectrum of measuring point and the floor design spectrum of skyscraper, after the disasteies such as earthquake, strong wind occur, can assess the infringement of skyscraper rapidly.
4, the present invention has great importance to the structural design of skyscraper and the reduction of the secondary disaster such as earthquake, strong wind.
Description of drawings
Fig. 1 is the scheme of installation of skyscraper seismic monitoring early warning system;
Fig. 2 is skyscraper seismic monitoring early warning system block diagram;
Among Fig. 1,2:
D-ground;
L-skyscraper;
F1-sole plate;
F2-middle layer;
The F3-top layer;
100-sensing and record tuple;
110-the 1st sensing and record cell;
The 111-1 three-axis acceleration sensor;
The 112-1 number gathers and record cell;
120-the 2nd sensing and record cell;
The 121-2 three-axis acceleration sensor;
The 122-2 number gathers and record cell;
130-the 3rd sensing and record cell;
131-No. 3 three-axis acceleration sensor;
132-3 number collection and record cells;
The 140-the 4 sensing and record cell;
141-No. 4 three-axis acceleration sensor;
142-4 number collection and record cells;
The 150-the 5 sensing and record cell;
151-No. 5 three-axis acceleration sensor;
152-5 number collection and record cells;
200-industrial control computer;
300-systematic analysis and control software;
400-warning box.
Fig. 3 is native system analysis and control software flow pattern.
Among Fig. 3:
1-vibration data g[i];
2-fifo queue; FIFO(First Input First Output wherein) be First Input First Output;
3-g[i] in arbitrary value;
4-tentatively judge whether to meet alarm rule;
5-whether meet the earthquake alarm rule;
6-whether meet the floor alarm rule;
The 7-earthquake alarm;
8-floor is reported to the police;
7-gets g[i] front 10 seconds to rear 10 seconds vibration data;
8-carries out the response spectrum analysis;
9-and floor design spectrum comparative assessment building damage situations;
The storage of 10-file;
The output of 11-data analysis report.
Embodiment
Describe in detail below in conjunction with drawings and Examples:
One, system architecture
1, overall
Such as Fig. 1,2, native system is comprised of the sensing and record tuple 100, industrial control computer 200 and the warning box 400 that connect successively, and systematic analysis is implanted in the industrial control computer 200 with control software 300;
Sole plate F1 at skyscraper L lays the 1st, 2,3 sensings and record cell 110,120,130, is mainly used in seismic monitoring;
On the middle layer of skyscraper L F2 and top layer F3, lay respectively the 4th, 5 sensings and record cell unit 140,150, be used for the vibration information (strong wind, earthquake) of record skyscraper; Power supply and the signal of 5 sensings and record cell are connected on the industrial computer 200 by preformed hole;
Sensing and record tuple 100 are installed in the skyscraper, Real-Time Monitoring is carried out in vibrations to skyscraper, and the data that collect are sent in the industrial control computer 200 in real time, by 300 pairs of data analysis of systematic analysis and control software, when detecting the signal that meets alarm rule, then the trigger alarm case 400, send warning by warning box 400.
2, functional block
1) sensing and record tuple 100
Sensing and record tuple 100 comprise the 1st sensing and record cell 110, the 2nd sensing and record cell 120, the 3rd sensing and record cell 130, the 4th sensing and record cell 140 and the 5th sensing and record cell 150, to vibrations Real-Time Monitoring and the data recording of skyscraper L.
(1) the 1st sensing and record cell 110
The 1st sensing and record cell 110 are comprised of front latter linked No. 1 three-axis acceleration sensor 111 and 1 number collection and record cell 112, and the 1st sensing and record cell 110 are installed on the sole plate F1, have realized the Real-Time Monitoring to earthquake.
A, No. 1 three-axis acceleration sensor 111
No. 1 three-axis acceleration sensor 111 is selected the AC-23 type accelerometer of Switzerland GeoSIG company or is reached the sensor of equivalent technology index, has realized the Real-Time Monitoring to vibration signal.
B, 1 number collection and record cell 112
1 number collection and record cell 112 are selected the GSR-18 type register of Switzerland GeoSIG company or are reached the register of equivalent technology index, 1 number collection is connected with No. 1 three-axis acceleration sensor 111 with record cell 112, and the signal that No. 1 three-axis acceleration sensor 111 is sent carries out record.
(2) the 2nd, 3 sensings and record cell 120,130
2nd, 3 sensings and record cell 120,130 its 26S Proteasome Structure and Functions are identical with the 1st sensing and record cell 110, are installed on the sole plate F1 of skyscraper L.
(3) the 4th, 5 sensings and record cell 140,150
4th, 5 sensings and record cell 140,150 its structures are identical with the 1st sensing and record cell 110, are installed in respectively on middle layer F2, the top layer F3 of skyscraper L, and its function is the vibration information of record skyscraper.
2) industrial control computer 200
Industrial control computer 200 is industrial control computers of commonly using, is installed in the pulpit of skyscraper.Industrial control computer 200 is connected with sensing and record tuple 100 by network, receive and process the Real-time Monitoring Data that sensing and record tuple 100 are sent, analyze by 300 pairs of Real-time Monitoring Datas that receive of systematic analysis and control software, real-time vibration monitoring to skyscraper, if need to report to the police, then the trigger alarm case 400.
3) systematic analysis and control software 300
Systematic analysis is the application software that are implanted in the industrial control computer 200 with control software 300, during to the disasteies such as analysis, earthquake or strong wind of real-time demonstration, the storage of shock event data and the analytical calculation of vibration data, floor response spectrum infringement assessment and the floor of skyscraper report to the police, the output of data analysis report.
4) warning box 400
Warning box 400 is a kind of alarms commonly used.Warning box 400 is connected with industrial control computer 200, and function is to receive the alarm command that industrial control computer 200 sends, and initiates earthquake and reports to the police and the floor warning.
3, principle of work
Each sensor passage of skyscraper seismic monitoring early warning system has independently, and the global function register carries out data recording and collection to it, reach regularly unified and triggering by mutual contact mode between each register, also interconnected by data communication mode and industrial control computer, be a kind of modular design.The major function that wherein is installed in the three-axis acceleration sensor of Tall Building Foundation base plate is the monitor earthquake signal, and the function that is installed in two acceleration transducers of the middle layer of skyscraper and top layer is the vibration signal of monitoring skyscraper.300 pairs of data analysis that transmit in real time of systematic analysis in being installed in industrial control computer 200 and control software detect, when the signal that detects above threshold value, then advance to judge according to rule, then send alerting signal by warning box 400 when needing to report to the police, and the damage of skyscraper is assessed.
Three, systematic analysis and control software flow
Systematic analysis and control software 300 are based on the application software of wxWidgets platform development, and therefore, this software has the advantage of wxWidgets platform, can cross-platformly move, and guarantees Systems balanth and expandability.When systematic analysis and control software 300 are mainly finished the disasteies such as analysis, earthquake or strong wind of real-time demonstration, floor response spectrum of vibration data of real-time demonstration, the storage of shock event data and analytical calculation, skyscraper measuring point of vibration data infringement assessment and the floor of skyscraper report to the police, the output of data analysis report.Fig. 3 is systematic analysis and the process flow diagram of controlling software.
Such as Fig. 3, for sake of convenience, g is accekeration, g[i] represent respectively the accekeration of each sensor, i=1,2,3,4,5.
The native system software flow is:
1. vibration data g[i] 1;
2. fifo queue 2: with g[i] arrange according to fifo queue;
For the whole shock event of complete documentation, system software adopts the mode of fifo queue stack data to be recorded temporary, set up the formation of 1 minute data sampling quantity in calculator memory, the data that register are sent to computing machine are arranged storage according to the order of sequence; Vibration data did not surpass setting threshold in one minute, software will abandon the old packet in a minute, fills with new data packets.
3. judge g[i] in arbitrary value whether 〉=threshold value 3, be then to enter next step, otherwise turn back to step 2.;
4. tentatively judge whether to meet alarm rule 4, be then to enter next step, otherwise turn back to step 2.;
5. judge whether to meet earthquake alarm rule 5, be then to enter step 7., otherwise enter step 6.;
6. judge whether to meet floor alarm rule 6, be then to enter step 8., otherwise turn back to step 2.;
7. carry out seismic events and report to the police 7;
8. floor reports to the police 8, then enters next step;
9. get g[i] front 10 seconds to rear 10 seconds vibration data 9;
10. be followed successively by:
Carry out response spectrum and analyze 10;
Compare with the floor design spectrum, the building damage situations is assessed 11;
File storage 12; System software stores the data of 10s before this moment point into buffer zone immediately, after data value falls back to below the setting threshold, system software will continue the storage shock event after the 10s data; Data analysis report output 13, flow process finishes.

Claims (4)

1. skyscraper seismic monitoring early warning system is characterized in that:
Be comprised of the sensing and record tuple (100), industrial control computer (200) and the warning box (400) that connect successively, systematic analysis is implanted in the industrial control computer (200) with control software (300);
Sole plate (F1) at skyscraper (L) is laid the 1st, 2,3 sensings and record cell (110,120,130), is mainly used in seismic monitoring;
On the middle layer of skyscraper (L) (F2) and top layer (F3), lay respectively the 4th, 5 sensings and record cell unit (140,150), be used for the vibration information of record skyscraper; Power supply and the signal of 5 sensings and record cell are connected on the industrial computer (200) by preformed hole;
Sensing and record tuple (100) are installed in the skyscraper, Real-Time Monitoring is carried out in vibrations to skyscraper, and the data that collect are sent to industrial control computer (in 200) in real time, by systematic analysis with control software (300) to data analysis, when detecting the signal that meets alarm rule, then trigger alarm case (400) sends warning by warning box (400).
2. by a kind of skyscraper seismic monitoring early warning system claimed in claim 1, it is characterized in that:
Described sensing and record tuple (100) comprise the 1st sensing and record cell (110), the 2nd sensing and record cell (120), the 3rd sensing and record cell (130), the 4th sensing and record cell (140) and the 5th sensing and record cell (150), to real-time vibration monitoring and the data recording of skyscraper L;
The 1st sensing and record cell (110) are comprised of front latter linked No. 1 three-axis acceleration sensor (111) and 1 number collection and record cell (112).
3. based on the monitoring and pre-alarming method of a kind of skyscraper seismic monitoring early warning system claimed in claim 1, it is characterized in that comprising the following steps:
1. by three-axis acceleration sensor, data acquisition and record cell vibration signal is gathered and stores;
2. by network the data that gather are sent to industrial control computer;
3. by industrial control computer to data analysis;
4. analyze to find that earthquake exerts an influence when reaching warning value to high building, then sends alerting signal;
5. the destructiveness of high building is assessed.
4. by monitoring and pre-alarming method claimed in claim 1, it is characterized in that step 3. by industrial control computer to data analysis:
1. vibration data g[i] (1);
2. fifo queue (2): with g[i] arrange according to fifo queue;
3. judge g[i] in arbitrary value whether 〉=threshold value (3), be then to enter next step, otherwise turn back to step 2.;
4. tentatively judge whether to meet alarm rule (4), be then to enter next step, otherwise turn back to step 2.;
5. judge whether to meet earthquake alarm rule (5), be then to enter step 7., otherwise enter step 6.;
6. judge whether to meet floor alarm rule (6), be then to enter step 8., otherwise turn back to step 2.;
7. carry out seismic events warning (7);
8. floor is reported to the police (8), then enters next step;
9. get g[i] front 10 seconds to rear 10 seconds vibration data (9);
10. be followed successively by:
Carry out response spectrum analysis (10);
Compare with the floor design spectrum, the building damage situations is assessed (11);
File storage (12); System software stores the data of 10s before this moment point into buffer zone immediately, after data value falls back to below the setting threshold, system software will continue the storage shock event after the 10s data;
Data analysis report output (13), flow process finishes.
CN2012105391479A 2012-12-12 2012-12-12 High-rise building earthquake monitoring and early warning system and method thereof Pending CN103064104A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105391479A CN103064104A (en) 2012-12-12 2012-12-12 High-rise building earthquake monitoring and early warning system and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105391479A CN103064104A (en) 2012-12-12 2012-12-12 High-rise building earthquake monitoring and early warning system and method thereof

Publications (1)

Publication Number Publication Date
CN103064104A true CN103064104A (en) 2013-04-24

Family

ID=48106807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105391479A Pending CN103064104A (en) 2012-12-12 2012-12-12 High-rise building earthquake monitoring and early warning system and method thereof

Country Status (1)

Country Link
CN (1) CN103064104A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105987660A (en) * 2016-03-29 2016-10-05 中国地震局地震研究所 Earth tide observation device based on electrostatic force balance feedback control
CN106324660A (en) * 2016-09-29 2017-01-11 南京南瑞集团公司 Device and method for dynamic dam safety monitoring under seismic condition
CN106453632A (en) * 2016-11-23 2017-02-22 中国建筑股份有限公司 Networked building structure anti-seismic system and method based on distributed perception
TWI676967B (en) * 2018-06-19 2019-11-11 三聯科技股份有限公司 Earthquake instant warning method
CN111985847A (en) * 2020-09-02 2020-11-24 四川省地震局减灾救助研究所 Earthquake disaster risk assessment and countermeasure analysis system
CN112085922A (en) * 2020-09-01 2020-12-15 东莞理工学院 Intelligent early warning and monitoring method for earthquake damage of building
CN113031055A (en) * 2021-03-25 2021-06-25 浙江大学 Space steel structure vibration response capturing and monitoring system based on earthquake early warning
CN116403386A (en) * 2023-06-07 2023-07-07 深圳市微星物联科技有限公司 Earthquake early warning analysis system based on intelligent equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001083257A (en) * 1999-09-10 2001-03-30 Railway Technical Res Inst Earthquake early detection, alarm and control system
CN101625416A (en) * 2008-07-08 2010-01-13 中冶赛迪工程技术股份有限公司 Earthquake early warning system for buildings
CN101995586A (en) * 2010-09-02 2011-03-30 成都林海电子有限责任公司 Large building safety monitoring system based on wireless network and realization method
CN201853322U (en) * 2010-11-29 2011-06-01 福建师范大学 Building earthquake forecasting device based on wireless sensor network
CN102385787A (en) * 2010-09-30 2012-03-21 秦皇岛开发区前景电子科技有限公司 Early warning method for regional earthquake monitoring net
CN202351435U (en) * 2011-12-06 2012-07-25 四川久远新方向智能科技有限公司 Urban rail transit earthquake disaster response system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001083257A (en) * 1999-09-10 2001-03-30 Railway Technical Res Inst Earthquake early detection, alarm and control system
JP3433144B2 (en) * 1999-09-10 2003-08-04 財団法人鉄道総合技術研究所 Earthquake early detection warning and control system
CN101625416A (en) * 2008-07-08 2010-01-13 中冶赛迪工程技术股份有限公司 Earthquake early warning system for buildings
CN101995586A (en) * 2010-09-02 2011-03-30 成都林海电子有限责任公司 Large building safety monitoring system based on wireless network and realization method
CN102385787A (en) * 2010-09-30 2012-03-21 秦皇岛开发区前景电子科技有限公司 Early warning method for regional earthquake monitoring net
CN201853322U (en) * 2010-11-29 2011-06-01 福建师范大学 Building earthquake forecasting device based on wireless sensor network
CN202351435U (en) * 2011-12-06 2012-07-25 四川久远新方向智能科技有限公司 Urban rail transit earthquake disaster response system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105987660A (en) * 2016-03-29 2016-10-05 中国地震局地震研究所 Earth tide observation device based on electrostatic force balance feedback control
CN106324660A (en) * 2016-09-29 2017-01-11 南京南瑞集团公司 Device and method for dynamic dam safety monitoring under seismic condition
CN106324660B (en) * 2016-09-29 2018-06-05 南京南瑞集团公司 Dam safety dynamic monitor and monitoring method under a kind of seismic condition
CN106453632A (en) * 2016-11-23 2017-02-22 中国建筑股份有限公司 Networked building structure anti-seismic system and method based on distributed perception
CN106453632B (en) * 2016-11-23 2019-06-07 中国建筑股份有限公司 A kind of networking building structure aseismatic system and method based on distribution perception
TWI676967B (en) * 2018-06-19 2019-11-11 三聯科技股份有限公司 Earthquake instant warning method
CN112085922A (en) * 2020-09-01 2020-12-15 东莞理工学院 Intelligent early warning and monitoring method for earthquake damage of building
CN111985847A (en) * 2020-09-02 2020-11-24 四川省地震局减灾救助研究所 Earthquake disaster risk assessment and countermeasure analysis system
CN113031055A (en) * 2021-03-25 2021-06-25 浙江大学 Space steel structure vibration response capturing and monitoring system based on earthquake early warning
CN116403386A (en) * 2023-06-07 2023-07-07 深圳市微星物联科技有限公司 Earthquake early warning analysis system based on intelligent equipment
CN116403386B (en) * 2023-06-07 2023-08-08 深圳市微星物联科技有限公司 Earthquake early warning analysis system based on intelligent equipment

Similar Documents

Publication Publication Date Title
CN103064104A (en) High-rise building earthquake monitoring and early warning system and method thereof
CN102507121B (en) Building structure seismic damage assessment system and method based on wireless sensor network
CN201794617U (en) System for predicting outburst risk of coal and gas in mine in real time
CN108510112A (en) A kind of mine disaster prediction and warning method that field monitoring is combined with numerical simulation
Anastasi et al. WSNs for structural health monitoring of historical buildings
CN101625416A (en) Earthquake early warning system for buildings
CN107194830A (en) A kind of high-rise building integrated health management design method
CN203350459U (en) A quick reporting instrument for ground motion parameters
CN104181580A (en) Nuclear power station earthquake monitoring method and system
CN204594499U (en) A kind of structural healthy monitoring system
CN109001810A (en) Gravity dam crack in dam body advanced early warning method based on micro seismic monitoring
CN113031055A (en) Space steel structure vibration response capturing and monitoring system based on earthquake early warning
CN201445722U (en) Automatic alarming and extinguishing system for fire disaster of large building
CN102951516B (en) Elevator operation monitoring system
CN203038429U (en) Earthquake-monitoring early-warning apparatus for high-rise building
Cho et al. Structural health monitoring system of a cable-stayed bridge using a dense array of scalable smart sensor network
CN102080945A (en) Safety evaluation method and system of blasting vibration based on energy input
CN113536433A (en) BIM platform-based dynamic escape route optimization system for evacuation after disaster of building
Krawinkler et al. Development of damage fragility functions for URM chimneys and parapets
CN112215476A (en) Space-time intensity online early warning method and system
CN111896048A (en) Building structure health real-time monitoring system
CN109458924B (en) Resistance smart grid deformation testing system and method based on ten-axis sensor
CN107369299A (en) Seismic monitoring and warning system for track traffic
CN106781289A (en) Blow out monitoring device of the construction to the motion of massif talus in a kind of tunnel
CN102706442A (en) Field cultural relic monitoring system and monitoring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130424