CN202351435U - Urban rail transit earthquake disaster response system - Google Patents

Urban rail transit earthquake disaster response system Download PDF

Info

Publication number
CN202351435U
CN202351435U CN 201120502487 CN201120502487U CN202351435U CN 202351435 U CN202351435 U CN 202351435U CN 201120502487 CN201120502487 CN 201120502487 CN 201120502487 U CN201120502487 U CN 201120502487U CN 202351435 U CN202351435 U CN 202351435U
Authority
CN
China
Prior art keywords
earthquake
sensor
module
data
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120502487
Other languages
Chinese (zh)
Inventor
向生建
方白
王冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Fornew Technologies Co Ltd
Original Assignee
Sichuan Fornew Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Fornew Technologies Co Ltd filed Critical Sichuan Fornew Technologies Co Ltd
Priority to CN 201120502487 priority Critical patent/CN202351435U/en
Application granted granted Critical
Publication of CN202351435U publication Critical patent/CN202351435U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)
  • Alarm Systems (AREA)

Abstract

The utility model discloses an urban rail transit earthquake disaster response system, which comprise a management center, one or more clients and one or more earthquake detecting devices, wherein the management center comprises a server and a data base which are connected to each other, the earthquake detecting devices are mounted in all monitoring points, the earthquake detecting devices and the clients are both connected with the server through a transmitting network, the earthquake detecting devices are comprises at least one set or more sets of sensors, and the clients also are connected with a display, a player, an alarm and a buzzer electrically. According to the urban rail transit earthquake disaster response system, the earthquake detecting devices collect and transmit earthquake data in real time, the management center receives, analyzes and records data in real time, the clients inquire data collected by a certain monitoring point during a certain period of time, associate the earthquake magnitude with a pre-arranged plan, perform corresponding treatment to different earthquake intensities, respond in advance, and reserve emergency escape time in advance, and casualties and damages are reduced.

Description

Urban track traffic earthquake disaster answering system
Technical field
The utility model relates to a kind of urban track traffic earthquake disaster answering system.
Background technology
Earthquake is a kind of spontaneous phenomenon of bringing huge disaster, and its most outstanding characteristic is sudden and huge destructivenesses, if can accurately dope time, place and the intensity of following violent earthquake; Can reduce the disaster that earthquake brings greatly undoubtedly, since the sixties in last century, in the earthquake particularly, long-term forecasting obtained some significant progress; Aspect long-term forecasting; The most outstanding progress is the affirmation of violent earthquake dead zone, plate boundary, yet short-term and prediction about imminent earthquakes progress are little; Some preceding microscopic premonitories take place from the observation earthquake; Like diastrophe, WATER LEVEL CHANGES, earth magnetism and telluric current anomaly, underground fluid chemical change etc., unusual to earthquake macroscopic view, like well water up-down significantly, dulling, variable color, ANOMALOUS VARIATIONS such as spoiled and some animal anomaly etc.; The seismologist is striving to find always but is failing to confirm " deterministic earthquake precursors " always for many years; Upward defective is bigger with reply to have earthquake disaster prediction, can not give warning in advance, and can not in time make shortcomings such as corresponding processing.
The utility model content
The purpose of the utility model promptly is to overcome the deficiency of prior art, provides a kind of and gathers in real time and the transmission geological data through one or more earthquake detection equipment, receives data in real time through server; Carry out analyzing and processing, record; Through the data that certain monitoring point in the client query period collects, data can derive through form, are associated earthquake sum of series prediction scheme; Different earthquake intensity is taked different prediction schemes, and the urban track traffic earthquake disaster answering system of handling it.
The purpose of the utility model is to realize through following technical scheme: urban track traffic earthquake disaster answering system; It comprises administrative center, one or more client; And one or more earthquake detection equipment; Administrative center comprises interconnective server and database; Earthquake detection equipment is installed in each monitoring point; Earthquake detection equipment, client all are connected with server through transmission network; Earthquake detection equipment comprises one or more groups sensor at least, described sensor be seismic event sensor, displacement transducer, rain sensor, water sensor, geology sensor, temperature sensor, humidity sensor, water wave sensor, pressure transducer, vibration transducer, flow sensor, liquid level sensor any one or multiple, client also is electrically connected with display, player, alarm, hummer.
Described client comprises information manager, data acquisition unit, data-analyzing machine, statistical report form generation and transmitter, prediction scheme generation and transmitter, warning generation and transmitter; Described information manager comprises earthquake detection device management module, program management module, user management module, alert management module, Clock management module; Described statistical report form generates and transmitter comprises data of monitoring point report generation and sending module, earthquake magnitude report tabulation generation and sending module, monitoring point raw data report generation and sending module, systematic parameter adjustment complete list generation and sending module.
Described earthquake detection device management module comprises equipment list module, device talk address module, device type module, equipment installation table module; Described program management module comprises prediction scheme table module, unit table module, earthquake magnitude table module; Described user management module comprises that personal information table module, bundle of permissions module, operating personnel show module; Described alert management module comprises alert table module, reply processing list module; Described statistical report form generates and transmitter comprises data of monitoring point report generation and sending module, earthquake magnitude report tabulation generation and sending module, monitoring point raw data report generation and sending module, systematic parameter adjustment complete list generation and sending module; Described Clock management module comprises module terminal time; Described data-analyzing machine comprises data analysis table module.
Described server comprises and module is set, stops thread/beginning thread module, withdraws from module, describedly is provided with that module comprises that seismograph is selected module, GPS locating module, drawn oscillogram mode module, mail reception is provided with module, mail management module, server be provided with module.
The beneficial effect of the utility model is:
(1) the utility model is employed in the monitoring point one or more earthquake detection equipment is set, and through the accurate Information Monitoring of one or more groups sensor, and transmits geological data in real time, avoids the earthquake detection leak, and earthquake detection equipment can be set as the case may be;
(2) the utility model adopts server, receives the data of earthquake detection device transmission in real time, carries out analyzing and processing and records database;
(3) the utility model adopts one or more clients; Can inquire about selected date and selected monitoring point; Can inquire about the data that certain monitoring point collects in certain period, the data that collect comprise date, earthquake magnitude, east axle, north axle, go up axle, earthquake intensity etc., can adopt form to derive; Conveniently check convenient management;
(4) the utility model adopts the program management module that the scheme of reply disaster is managed; Can monitor the geological condition of earthquake monitoring point; And make earthquake and come interim counter-measure, can be associated earthquake sum of series prediction scheme, different earthquake strengties is taked different prediction schemes;
(5) the utility model adopts the alert management module, and different earthquake grades is taked different prediction schemes and different warning modes, is convenient to different earthquake grades is in time made corresponding processing;
(6) the utility model provides a kind of urban track traffic earthquake disaster answering system; Can select module, GPS locating module through seismograph, draw oscillogram mode module, mail reception is provided with module, mail management module, server are provided with module and carry out relative set; Through stopping thread/beginning thread module; Can stop or opening certain or a plurality of server as the case may be and receive or send data, save resource.
Description of drawings
Fig. 1 is the structured flowchart of the utility model;
Fig. 2 is the structured flowchart of the utility model client;
Fig. 3 is the structured flowchart of the utility model server.
Embodiment
Below in conjunction with accompanying drawing the utility model is done further description, but the protection domain of the utility model is not limited to the following stated.
As shown in Figure 1; Urban track traffic earthquake disaster answering system; It comprises administrative center, one or more client; And one or more earthquake detection equipment, administrative center comprises interconnective server and database, earthquake detection equipment is installed in each monitoring point; Earthquake detection equipment, client all are connected with server through transmission network; Earthquake detection equipment comprises one or more groups sensor at least, described sensor be seismic event sensor, displacement transducer, rain sensor, water sensor, geology sensor, temperature sensor, humidity sensor, water wave sensor, pressure transducer, vibration transducer, flow sensor, liquid level sensor any one or multiple, client also is electrically connected with display, player, alarm, hummer.
When the earthquake checkout equipment detects disaster; Detected information in time is delivered to administrative center, after administrative center carries out information filtering fast, analysis, affirmation, if earthquake strength reaches predefined rank; Warning device starts immediately; Do handled through corresponding client, reserved the emergency escape time, avoid more injures and deaths and loss.
As shown in Figure 2, described client comprises information manager, data acquisition unit, data-analyzing machine, statistical report form generation and transmitter, prediction scheme generation and transmitter, warning generation and transmitter; Described information manager comprises earthquake detection device management module, program management module, user management module, alert management module, Clock management module; The data message that data acquisition unit collects according to selected date and selected inquiry monitoring point during this period of time, monitoring point; Data message comprises date, earthquake magnitude, east axle, north axle, goes up axle, earthquake intensity etc.; But derived data when image data, limits the date of image data to the excel form earlier; Select test point again, inquire about again.
Operations such as device management module can add equipment, editor, deletion, it comprises equipment list module, device talk address module, device type module, equipment installation table module; The equipment list module can be added, deletion, editing equipment, input numbering, managerial personnel's name, device type, mailing address, erecting equipment information etc., wherein, the numbering of input not with existing numbering repetition, add operation after the input completion; The device talk address module to the device talk address edit, delete, interpolation etc., through editing operation, the address of updating the equipment, information such as port through adding operation, are added the device talk address table, numbering not with existing numbering repetition; The device type module comprises interpolation, deletion, editing equipment, when adding equipment, and the input equipment numbering, device type, the equipment brief introduction is accomplished and is added; The time that equipment installation table module is installed equipment, place etc. are managed, and can the existing device mount message be upgraded, and also can add the equipment mount message.
The program management module comprises prediction scheme table module, unit table module, earthquake magnitude table module, through prediction scheme table module, can delete or add prediction scheme, prediction scheme download, and wherein, the prediction scheme content can oneself be imported, and also can click to browse to import local file; The unit of unit table module management prediction scheme proposition can edit, deletes and add unit operation, can the unit that propose prediction scheme be upgraded, and can add proposing prediction scheme unit, and the unit numbering can not be numbered repetition with existing unit; Operation can be deleted, edited, add to earthquake magnitude table module to the earthquake magnitude number table related with taking corresponding prediction scheme.
User management module comprises that personal information table module, bundle of permissions module, operating personnel show module, and personal information table module management user's essential information and interpolation user can edit, delete, insert operation to the user; The bundle of permissions module is to the classification of the operating right of system, for example sets authority and is numbered 1 user and can operates data collection and program management, and other operations to system do not have authority; Operating personnel show that module can be added, editor, deletion action personnel, give different administration authorities to the different operation personnel.
The alert management module comprises alert table module, reply processing list module, and alert type can be added, edited, delete to the alert table module; Reply processing list module associates warning and corresponding coping style.
Statistical report form generates and transmitter comprises data of monitoring point report generation and sending module, earthquake magnitude report tabulation generation and sending module, monitoring point raw data report generation and sending module, systematic parameter adjustment complete list generation and sending module, and data of monitoring point report generation and sending module can be inquired about through importing the corresponding time; Earthquake magnitude report tabulation generation and sending module are to the earthquake magnitude of the earthquake of monitoring point detection and the statistics of number of times; Systematic parameter adjustment complete list generates and sending module comprises the relevant information that the testing apparatus of test point is managed.
The Clock management module comprises module terminal time, and each, module showed seismograph time and server time respectively terminal time, can select identical time, different time, all modes such as demonstrations are inquired about.
As shown in Figure 3, described server comprises and module is set, stops thread/beginning thread module, withdraws from module; Be provided with that module comprises that seismograph is selected module, GPS locating module, drawn oscillogram mode module, mail reception is provided with module, mail management module, server be provided with module; Through oscillogram judge whether shake under the current state excessive; Amplitude of vibration is bigger, explains that vibrations are bigger; Select module through seismograph, select whether to launch seismograph; Through the GPS locating module, launch or do not launch the GPS positioning system, to confirm current seismographic exact position, make things convenient for keeper's managing apparatus, selecting finishes all must preserve Set For Current, otherwise invalid; Through drawing oscillogram mode module; The mode of oscillogram is set, and continous way is the data of the maximum of p.s. of showing, and what see through the interface is exactly a continuous line; The per second formula then is to be unit with the second; Show all data one second, on the interface, shows very flicker, can see all data; Through mail reception module is set, editor receives the address of mail, and the information of different earthquake earthquake intensity sends to different addresses of items of mail; Through the mail management module, the address of sending mail is set, sending addresses of items of mail is the server that sends mail, mail server Netease or Tengxun or company oneself all can, all seismic intensity information are the mailbox transmissions through being provided with here; Through server module is set, the port numbers of server is set, can revise port numbers as required; Stop the data that book server receives the seismograph transmission through stopping the thread module, but seismograph does not stop to send data to book server always, begin to receive the data that seismograph sends through beginning thread module; Through withdrawing from module, directly withdraw from server system.

Claims (2)

1. urban track traffic earthquake disaster answering system; It is characterized in that: it comprises administrative center, one or more client; And one or more earthquake detection equipment; Administrative center comprises interconnective server and database; Earthquake detection equipment is installed in each monitoring point, and earthquake detection equipment, client all are connected with server through transmission network, and earthquake detection equipment comprises one or more groups sensor at least; Described sensor be seismic event sensor, displacement transducer, rain sensor, water sensor, geology sensor, temperature sensor, humidity sensor, water wave sensor, pressure transducer, vibration transducer, flow sensor and liquid level sensor any one or multiple, client also is connected with display, player, alarm, hummer.
2. urban track traffic earthquake disaster answering system according to claim 1 is characterized in that: described client comprises information manager, data acquisition unit, data-analyzing machine, statistical report form generation and transmitter, prediction scheme generation and transmitter, warning generation and transmitter.
CN 201120502487 2011-12-06 2011-12-06 Urban rail transit earthquake disaster response system Expired - Fee Related CN202351435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120502487 CN202351435U (en) 2011-12-06 2011-12-06 Urban rail transit earthquake disaster response system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120502487 CN202351435U (en) 2011-12-06 2011-12-06 Urban rail transit earthquake disaster response system

Publications (1)

Publication Number Publication Date
CN202351435U true CN202351435U (en) 2012-07-25

Family

ID=46540431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120502487 Expired - Fee Related CN202351435U (en) 2011-12-06 2011-12-06 Urban rail transit earthquake disaster response system

Country Status (1)

Country Link
CN (1) CN202351435U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103064104A (en) * 2012-12-12 2013-04-24 中国地震局地震研究所 High-rise building earthquake monitoring and early warning system and method thereof
CN106951838A (en) * 2017-03-07 2017-07-14 四川省建筑设计研究院 A kind of overboard warning system based on image water wave
CN111045075A (en) * 2019-12-10 2020-04-21 苏州智科晶菱机电科技有限公司 Escalator earthquake detection controller network management system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103064104A (en) * 2012-12-12 2013-04-24 中国地震局地震研究所 High-rise building earthquake monitoring and early warning system and method thereof
CN106951838A (en) * 2017-03-07 2017-07-14 四川省建筑设计研究院 A kind of overboard warning system based on image water wave
CN106951838B (en) * 2017-03-07 2019-09-06 四川省建筑设计研究院 A kind of overboard alarm system and its method based on image water wave
CN111045075A (en) * 2019-12-10 2020-04-21 苏州智科晶菱机电科技有限公司 Escalator earthquake detection controller network management system

Similar Documents

Publication Publication Date Title
CN104808237B (en) Radioactive source on-line monitoring system based on technology of Internet of things
CN107817744B (en) Communal facility safety monitoring system
Kanamori et al. Real-time seismology and earthquake hazard mitigation
CN108952685B (en) Horizontal directional drilling area network and method
CN110687865A (en) Wisdom water utilities management platform
US20140195454A1 (en) System, method, and apparatus for managing fluid transportation
CN103186963A (en) Electronic fence based on real-time geographic position
CN107454172A (en) Environmental monitoring system based on Internet of Things
CN108612137A (en) A kind of foundation pit synthesis on-line monitoring cloud platform system based on Internet of Things big data
CN202351435U (en) Urban rail transit earthquake disaster response system
CN110764834A (en) Automatic safety monitoring platform, management method and storage medium
CN207472722U (en) Constructing metro tunnel security information comprehensive management system
CN103499831A (en) Seismic data monitoring system
CN104190034A (en) Fire safety standard management system
CN103824339A (en) Integrated routing inspection system for power plant
Lund et al. The Modern Swedish National Seismic Network: two decades of intraplate microseismic observation
CN204319601U (en) A kind of security against fire standard information management system
CN106324660A (en) Device and method for dynamic dam safety monitoring under seismic condition
CN114022306A (en) Underground water information application service system
CN201774553U (en) Monitoring device and system comprehensively detecting train detection equipment at high speed
CN113392500A (en) Geological disaster monitoring and early warning system
CN203376845U (en) Disaster monitoring and early warning system based on 3G network and LED display technology
KR20100030283A (en) System for disaster prevention management using mobile phone
CN202075832U (en) House safe monitoring early warning system
CN111698645A (en) Position information acquisition method and device, computer equipment and storage medium

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20151206

EXPY Termination of patent right or utility model