CN103063091B - Deep-buried tunnel full-section millisecond blasting method - Google Patents

Deep-buried tunnel full-section millisecond blasting method Download PDF

Info

Publication number
CN103063091B
CN103063091B CN201210299907.3A CN201210299907A CN103063091B CN 103063091 B CN103063091 B CN 103063091B CN 201210299907 A CN201210299907 A CN 201210299907A CN 103063091 B CN103063091 B CN 103063091B
Authority
CN
China
Prior art keywords
strain energy
big gun
deep
gun hole
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210299907.3A
Other languages
Chinese (zh)
Other versions
CN103063091A (en
Inventor
杨建华
卢文波
严鹏
陈明
胡英国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University WHU
Original Assignee
Wuhan University WHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU filed Critical Wuhan University WHU
Priority to CN201210299907.3A priority Critical patent/CN103063091B/en
Publication of CN103063091A publication Critical patent/CN103063091A/en
Application granted granted Critical
Publication of CN103063091B publication Critical patent/CN103063091B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Abstract

Provided is a deep-buried tunnel full-section millisecond blasting method. According to density distribution positions of elastic strain energy on a tunnel face, a millisecond electric detonator is adopted to divide cutting blast holes into two sections to perform detonation, spallation blast holes, buffer blast holes and light exposure blast holes are respectively divided into four sections to perform detonation, the number of the blast holes of each section is approximate, and blasting is performed from inside to outside and from low strain energy intensity to high strain energy intensity in each circle. The releasing rate and strength of the elastic strain energy are controlled by changing blast hole priming circuits, and surrounding rock power disturbance caused by quick releasing of strain energy is further weakened. By means of the deep-buried tunnel full-section millisecond blasting method, the peak value mass point vibration velocity caused by quick releasing of strain energy on an excavation face is only 40-50% velocity by means of a conventional blasting method. The deep-buried tunnel full-section millisecond blasting method can be widely applied to deep-buried tunnel blasting excavation in the fields of water and electricity, traffic, mines and the like.

Description

A kind of deep-lying tunnel tunneling boring millisecond blasting method
Technical field
The present invention relates to Geotechnical Engineering field, specifically a kind of deep-lying tunnel tunneling boring millisecond blasting method.
Background technology
Along with the increase day by day of the deeply further and mining mineral resource degree of depth of the regional construction of hydropower facilities of Southwestern China, the Blasting Excavation of deep-lying tunnel is more prevalent in engineering construction.Because buried depth is comparatively large or tectonic movement is strong, the crustal stress level of tunnel rock mass is often higher, have accumulated huge elastic strain energy.Along with explosive charge in Blasting Excavation process, by the unexpected removal of crustal stress in the moment fragmentation of excavation rock mass, excavation face, the elastic strain energy be stored in rock mass discharges fast to free face, causes the surrouding rock stress near face to adjust rapidly.Because a rate of advance is fast, the unexpected release of this Large strain energy may cause country rock burst large deformation, and brings out violent rock burst further, affects construction speed and cavern's Stability Analysis of Structures, and the safety of serious threat workmen and equipment.
Rock mass produces distortion under three-dimensional compressive stress effect, supposes that this physical process and the external world do not have heat exchange, and in the principal stress space, rock mass elastic strain energy density e is:
e = 1 2 E [ σ 1 2 + σ 2 2 + σ 3 2 - 2 μ ( σ 1 σ 2 + σ 2 σ 3 + σ 1 σ 3 ) ] - - - ( 1 )
In formula: σ jfor principal stress, j=1,2,3; E is Modulus of Elasticity of Rock Mass; μ is rock mass Poisson's ratio.
The rock mass of certain volume contains n rock element, and the strain energy U comprised is:
U = Σ k = 1 n e k · V k - - - ( 2 )
In formula: V kfor the volume of a kth rock element.
By excavation rock mass because stress removal discharges its all elastic strain energy, excavation causes the change retaining rock stress field around simultaneously, and because distortion and Stress relief are also by energy certain for release, this two parts energy sum is exactly the energy of excavation release:
ΔU=U 1+U 2-U 2′ (3)
In formula: U 1, U 2the elastic strain energy of rock mass and surrounding rock body is excavated before being respectively excavation; U 2' for excavating the elastic strain energy of rear surrounding rock body.
Therefore, the tunnel blasting excavation of High Ground Stress Areas will control to excavate the country rock energetic disturbance caused from blast and strain energy release two aspect.And current blasting excavation is often only for blast itself, the methods such as reduced charge, short drilling depth and partial excavation are adopted to control from explosive quantity in a sound the country rock energetic disturbance caused that explodes.Although shortening drilling depth and partial excavation also reduce the strain energy of single explosion release, can reach certain effect, this is a kind of simple to sacrifice the control method that drivage efficiency is cost.
Summary of the invention
The present invention is directed to the existing construction technology situation of deep-lying tunnel Blasting Excavation, the country rock energetic disturbance caused is discharged fast for weakening elastic strain energy, there is provided a kind of deep-lying tunnel tunneling boring millisecond blasting method of optimization, to reach accelerating construction progress, to ensure the object of cavern's Stability Analysis of Structures and staff's personal safety.
Principle of the present invention is: by changing big gun hole blasting circuit, controls rate of release and the intensity of elastic strain energy, and then weakens strain energy and discharge the country rock energetic disturbance caused fast.Under deep-lying tunnel is often in non-hydrostatic condition, after slotting district is formed, strain energy density non-uniform Distribution on face; If according to the extreme value distribution position of strain energy density, avalanche big gun hole, buffering big gun hole and the equal segmentation in light quick-fried big gun hole are detonated, each section of big gun hole number is roughly equal, and the rock mass of first explosion strain energy density lower position, after detonating such early stage, due to Stress relief, reduce the energy of the strain energy density higher part position rock mass of ensuing blast, thus control strain energy rate of release and intensity, strain energy more evenly discharges when ensure that each section of explosion; Simultaneously because the rock mass stress of strain energy density lower position is lower, first detonate be conducive to rock mass cracking, crackle is through, to reach good crushing effect.
A kind of deep-lying tunnel tunneling boring of the present invention millisecond blasting method, its step is as follows:
(1) tunnel blasting excavation is front according to geology survey data or numerical computations, determines principal stress level and the direction for the treatment of tunnel excavation rock mass;
(2) on excavation face, arrange undercut blast hole, avalanche big gun hole, buffering big gun hole and the quick-fried big gun hole of light according to existing boring and data of explosive filled from inside to outside successively, carry out blast hole projectile filling;
(3) according to principal stress level and direction, to be taken up an official post tangent stress by face after the secondary stress state computation formula of deep-lying tunnel elasticity distribution or numerical computations determination slotting, and in conjunction with the elastic modelling quantity of rock mass and Poisson's ratio, by the elastic strain energy Density Distribution on face after elastic strain energy density calculation formula or numerical computations determination slotting;
(4) undercut blast hole divides two sections of explosions, according to the extreme value distribution position of elastic strain energy density on face after slotting, four sections of explosions are divided in avalanche big gun hole, buffering big gun hole and the quick-fried big gun hole of light, carry out explosion according to from inside to outside, respectively enclosing internal strain energy density order from low to high.
Described undercut blast hole, avalanche big gun hole, buffering big gun hole and the quick-fried big gun hole of light adopt millisecond electric detonator segment blast, and each section of big gun hole number is close.
The advantage of a kind of deep-lying tunnel tunneling boring of the present invention millisecond blasting method is:
(1), in existing boring layout and data of explosive filled basis, in conjunction with the elastic strain energy Density Distribution on face, control rate of release and the intensity of elastic strain energy by changing big gun hole blasting circuit, operation is simple;
(2), after detonating early stage, due to Stress relief, reduce the energy of the strain energy density higher part position rock mass of ensuing blast, thus control strain energy rate of release and intensity, strain energy more evenly discharges when ensure that each section of explosion; Simultaneously because the rock mass stress of strain energy density lower position is lower, first detonate be conducive to rock mass cracking, crackle is through, to reach good crushing effect;
(3) compare with conventional blasting method method, obviously can reduce elastic strain energy and discharge the country rock energetic disturbance caused fast, in excavation face, strain energy discharges the 40-50% that the peak particle velocity caused is only conventional blasting method method fast; The industry deep-lying tunnel Blasting Excavation such as water power, traffic, mine can be widely used in.
Accompanying drawing explanation
Fig. 1 is tunnel principal direction of stress schematic diagram.
Fig. 2 is steel for shot and conventional blasting sequence schematic diagram in prior art.
Fig. 3 is that slotting district forms elastic strain energy Density Distribution schematic diagram on rear face.
Fig. 4 is the blasting sequence schematic diagram of blasting method of the present invention.
Fig. 5 discharges according to the elastic strain energy of FEM calculation the country rock particle vibration sum velocity contrast schematic diagram brought out fast.
Mark in figure: 1 is tunnel, and 2 is maximum principal stress on face, and 3 is minimum principal stress on face, and 4 is big gun hole, and 5 is elastic strain energy density curve, numeral represent each segment number of each circle.
Detailed description of the invention
In certain massif, drill-blast tunnelling diameter is the circular tunnel 1 of 10m, and as shown in Figure 1, adopt tunneling boring millisecond blasting excavation, conventional blasting sequence is each circle big gun hole homogeneous section explosion from inside to outside, as shown in Figure 2.Tunnel buried depth is large, and for there is the possibility of large deformation and rock burst when alleviating Blasting Excavation, the present invention optimizes this blasting construction method in original explosion design basis, specific as follows:
1., before tunnel 1 Blasting Excavation, according to geology survey data or numerical computations, determine level and the direction of minimum principal stress 3 on maximum principal stress 2, face on tunnel rock mass face, assuming that σ 1=40MPa, σ 3=20.0MPa, principal direction of stress as shown in Figure 1.
2. on excavation face, arrange big gun hole 4 and powder charge according to original explosion design parameter, arrange 2 circle undercut blast hole, 3 circle avalanche big gun holes, 1 circle buffering big gun hole and the 1 circle quick-fried big gun hole of light from inside to outside successively, cutting method adopts the parallel, straight slotting of band emptying aperture, as shown in Figure 2.
3. according to principal stress level and the direction of tunnel rock mass, after slotting district is formed, to be taken up an official post tangent stress by the secondary stress state computation formula of buried circular tunnel elasticity distribution or numerical computations determination face, to substitute in (1) formula and in conjunction with the elastic modelling quantity of rock mass and Poisson's ratio, to calculate the elastic strain energy density of any point.If the elastic modelling quantity of rock mass equals 40GPa, Poisson's ratio equals 0.22, for the rock mass at light quick-fried big gun hole place, elastic strain energy Density Distribution as shown in Figure 3, there is maximum in minimum principal stress 3 direction strain energy density on face, and on face, on maximum principal stress 2 direction, minimum appears in strain energy density.
4. undercut blast hole adopts millisecond electric detonator to divide 2 sections to detonate.According to the extreme value distribution position of strain energy density after slotting, avalanche big gun hole, buffering big gun hole and the quick-fried big gun hole of light all adopt millisecond electric detonator to divide 4 sections to detonate, and each section of big gun hole number is roughly equal, the rock mass of first explosion strain energy density lower position, as shown in Figure 4.For the quick-fried shot hole blasting of light, according to 21-22-23-24 sequence blasting, after being in the 21st section of strain energy density lower position and 22 sections of explosions, due to Stress relief, release the elastic strain energy of closing on not quick-fried rock mass, make originally to be in the 23rd section of Large strain energy position and the strain energy of the 24th section reduces, thus when controlling the rate of release of strain energy and intensity, guarantee each section of explosion, strain energy more evenly discharges, and has reached the object weakening country rock energetic disturbance.It should be noted that, its blasting sequence of position that described strain energy density is identical is adjustable, in shot hole blasting as quick-fried in light, except according to except said sequence, also can according to the order of 22-21-24-23, can also according to the order of 21-22-24-23, or according to the order of 22-21-23-24, circle internal strain energy density order from low to high all can be met.
On face, on minimum principal stress 3 direction, the strain energy density of rock mass is higher, at this place, deep-lying tunnel tunneling boring millisecond blasting method of the present invention to country rock energetic disturbance to weaken effect the most obvious.During shot hole blasting quick-fried for light, elastic strain energy discharges the country rock particle vibration brought out fast, before and after employing blasting method of the present invention, be positioned at the peak vibration sum velocity of the particle on face on minimum principal stress 3 direction as shown in Figure 5 (according to FEM calculation).After adopting blasting method of the present invention, apart within the 3.0m of outline excavation face, elastic strain energy discharges fast brings out the country rock energetic disturbance caused and obviously reduces, and on outline excavation face, peak particle vibration sum velocity is 45% of conventional blasting method method.
Above-described specific embodiment; further detailed description has been carried out to object of the present invention, technical scheme and beneficial outcomes; be understood that; the foregoing is only specific embodiments of the invention; be not limited to the present invention; all in the spirit and principles in the present invention and so on, any amendment made, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (2)

1. a deep-lying tunnel tunneling boring millisecond blasting method, is characterized in that comprising the steps:
(1) tunnel blasting excavation is front according to geology survey data, determines principal stress level and the direction for the treatment of tunnel excavation rock mass;
(2) on excavation face, arrange undercut blast hole, avalanche big gun hole, buffering big gun hole and the quick-fried big gun hole of light according to existing boring and data of explosive filled from inside to outside successively, carry out blast hole projectile filling;
(3) according to principal stress level and direction, to be taken up an official post tangent stress by face after the secondary stress state computation formula determination slotting of deep-lying tunnel elasticity distribution, and in conjunction with the elastic modelling quantity of rock mass and Poisson's ratio, by the elastic strain energy Density Distribution on face after elastic strain energy density calculation formula determination slotting;
(4) undercut blast hole divides two sections of explosions, according to the extreme value distribution position of elastic strain energy density on face after slotting, four sections of explosions are divided in avalanche big gun hole, buffering big gun hole and the quick-fried big gun hole of light, carry out explosion according to from inside to outside, respectively enclosing internal strain energy density order from low to high.
2. deep-lying tunnel tunneling boring millisecond blasting method as claimed in claim 1, is characterized in that: described undercut blast hole, avalanche big gun hole, buffering big gun hole and the quick-fried big gun hole of light adopt millisecond electric detonator segment blast, and each section of big gun hole number is close.
CN201210299907.3A 2012-08-22 2012-08-22 Deep-buried tunnel full-section millisecond blasting method Active CN103063091B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210299907.3A CN103063091B (en) 2012-08-22 2012-08-22 Deep-buried tunnel full-section millisecond blasting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210299907.3A CN103063091B (en) 2012-08-22 2012-08-22 Deep-buried tunnel full-section millisecond blasting method

Publications (2)

Publication Number Publication Date
CN103063091A CN103063091A (en) 2013-04-24
CN103063091B true CN103063091B (en) 2015-03-04

Family

ID=48105823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210299907.3A Active CN103063091B (en) 2012-08-22 2012-08-22 Deep-buried tunnel full-section millisecond blasting method

Country Status (1)

Country Link
CN (1) CN103063091B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104457465B (en) * 2014-11-26 2016-06-08 武汉大学 A kind of deep-lying tunnel Blasting Excavation effect control method
CN108180798A (en) * 2017-12-29 2018-06-19 中南林业科技大学 The molding construction method of water-conveyance tunnel full face blasting
CN116822311B (en) * 2023-08-30 2023-11-07 昆明理工大学 Method and system for predicting surrounding stress of explosion instant blast hole

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050087513A (en) * 2004-02-27 2005-08-31 주식회사 현대발파엔지니어링 Controlled rock blasting method utilizing electric detonator and non electric detonator
KR20110034715A (en) * 2009-09-29 2011-04-06 전남대학교산학협력단 Tunnel blasting method of using non-electric detonator for dividing contour holes in multiple parts
CN102607352A (en) * 2012-02-27 2012-07-25 薛世忠 Tunnel full-section excavation blasting method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050087513A (en) * 2004-02-27 2005-08-31 주식회사 현대발파엔지니어링 Controlled rock blasting method utilizing electric detonator and non electric detonator
KR20110034715A (en) * 2009-09-29 2011-04-06 전남대학교산학협력단 Tunnel blasting method of using non-electric detonator for dividing contour holes in multiple parts
CN102607352A (en) * 2012-02-27 2012-07-25 薛世忠 Tunnel full-section excavation blasting method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于动力学机理的施工期岩爆主动防治初探;严鹏等;《煤炭学报》;20090831;第34卷(第8期);第1058页第30-31行,第1059页第11-15行,第1060页第26-28行,第1061页21-33行、图4 *
基于能量原理的岩爆机理及应力状态分析;祝启虎等;《武汉大学学报》;20070430;第40卷(第4期);第84-87页 *

Also Published As

Publication number Publication date
CN103063091A (en) 2013-04-24

Similar Documents

Publication Publication Date Title
CN108007285B (en) A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation
CN107631669B (en) A kind of Cut Blasting optimum design method under large ground pressure
CN102937398B (en) Rockburst active control method based on blasting excavation disturbance control
CN103940309B (en) A kind of method of underground blasting Cheng Jing
CN103615941B (en) The blasting method of modernized railway shallow-buried sector
CN102829899B (en) Quick surrounding rock stress measuring method applicable to buried circular tunnels
CN103267455B (en) Dam foundation one-step forming drilling blasting method by combining energy dissipation and energy collection of blast hole bottom
CN101864961B (en) Method for actively preventing and controlling rock burst
CN102937399B (en) Stress relief blasting method based on ground stress transient release
CN102927866B (en) Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN101441055A (en) Presplit blasting method
CN103063094A (en) Channeling method in rapid roadway explosion
CN102607353B (en) A kind of perron Delay between holes controlled blasting method
CN102878876A (en) Mine roadway advancing and undermining method and main blasting parameters
CN108204775B (en) A kind of deep-lying tunnel instant type rock burst active preventing control method
CN103528444B (en) A kind of stope rockburst pressure relief prevention method
CN106895751A (en) A kind of medium-length hole blasting calculating method
CN101419040A (en) Deep hole blasting method in large aperture composite undermine
CN104457465A (en) Deep-buried tunnel blasting excavation effect control method
CN104819670B (en) Pre-drilling mesopore shaft excavation blasting method
CN104482817B (en) A kind of deep-lying tunnel stress relieving presplit blasting method
CN104406470A (en) Deep-hole slotting blasting method for large-diameter freezing shaft in west cretaceous system soft rock area
CN104390538A (en) Stress relief blasting method based on tunnel face notching
CN105823387A (en) Rapid construction method for deep hole blasting of vertical shaft frozen bedrock
CN103063091B (en) Deep-buried tunnel full-section millisecond blasting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant