CN103062501A - 高空管道安装安全提升支架 - Google Patents
高空管道安装安全提升支架 Download PDFInfo
- Publication number
- CN103062501A CN103062501A CN2013100026399A CN201310002639A CN103062501A CN 103062501 A CN103062501 A CN 103062501A CN 2013100026399 A CN2013100026399 A CN 2013100026399A CN 201310002639 A CN201310002639 A CN 201310002639A CN 103062501 A CN103062501 A CN 103062501A
- Authority
- CN
- China
- Prior art keywords
- loop bar
- safe
- welded
- fixed sleeving
- push rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
本发明涉及一种高空管道安装安全提升支架,由安全底板、斜撑支杆、固定套杆、活动顶杆、限位栓、防滚支架限位器构成,固定套杆的一端垂直焊接在安全底板中央,斜撑支杆一端焊接在安全底板上,另一端焊接在固定套杆的外壁,在固定套杆和活动顶杆的杆身凿出数对等距等径的孔,限位栓外径与固定套杆和活动顶杆上的孔内径匹配,限位栓两端设有套丝,活动顶杆插入固定套杆内并通过限位栓和螺母固定在一起,防滚支架限位器安装在活动顶杆顶端。本发明的高度可根据实际情况制作,解决现场大管径管道一次提升高度过高而存在的安全隐患和施工效率底下的问题,大大减少大管径管道的提升难度,并免去顶板葫芦等设备的安装,大大提高现场的施工效率。
Description
技术领域
本发明涉及一种高空管道安装安全提升支架,应用于建筑工程高空管道吊装时的管道提升的施工过程中,用于协助管道的安全提升与临时放置。
背景技术
在建筑工程中,建筑给排水、暖通、消防等专业施工过程中,很多情况由于施工现场条件的限制,大型的移动平台等设备无法通行,而在很多情况下需要在楼板顶部安装起吊葫芦逐根起吊提升管道,安装工艺繁琐且施工效率极低。因此,研制一种对场地要求不高又能方便高空的管道提升固定支架。
发明内容
本发明的目的为了克服上述现有技术存在的问题,而提供一种高空管道安装安全提升支架,本发明适用于给排水暖通消防各个专业的管道的提升固定的协助工具。
本发明专利的技术方案为:
高空管道安装安全提升支架,由安全底板、斜撑支杆、固定套杆、活动顶杆、限位栓、防滚支架限位器构成,其特征在于:固定套杆的一端垂直焊接在安全底板中央,斜撑支杆一端焊接在安全底板上,另一端焊接在固定套杆的外壁,在固定套杆和活动顶杆的杆身凿出数对等距等径的孔,限位栓外径与固定套杆和活动顶杆上的孔内径匹配,限位栓两端设有套丝,活动顶杆插入固定套杆内并通过限位栓和螺母固定在一起,防滚支架限位器安装在活动顶杆顶端。限位栓两端设有套丝,以便安装螺母将其固定,防止限位栓从孔中脱落。
所述的斜撑支杆为三根或四根,三根或四根斜撑支杆均匀分布。
当在使用时,可以三个或者四个高空管道安装安全提升支架一组,通过提升活动顶杆的位置,并通过限位栓穿过相应位置的限位孔后安装螺母固定,即可改变管道的提升高度。本发明的高度可根据实际情况制作,解决现场大管径管道一次提升高度过高而存在的安全隐患和施工效率底下的问题,大大减少大管径管道的提升难度,并免去顶板葫芦等设备的安装,大大提高现场的施工效率。
附图说明
图1为本发明的结构示意图。
具体实施方式
结合附图对本发明作进一步的描述。
如图1所示,本发明。
如图1所示,本发明由安全底板1、四根斜撑支杆2、固定套杆3、活动顶杆6、限位栓4、螺母5、防滚支架限位器7构成,固定套杆3的一端垂直焊接在安全底板1中央,四根斜撑支杆2均匀分布,四根斜撑支杆2一端焊接在安全底板1上,另一端焊接在固定套杆3的外壁,在固定套杆3和活动顶杆6的杆身出数对等距等径的孔,限位栓4外径与固定套杆3和活动顶杆6上的孔内径匹配,限位栓4两端设有套丝,活动顶杆6插入固定套杆3内并通过限位栓4和螺母5固定在一起,防滚支架限位器7安装在活动顶杆6顶端。限位栓4两端设有套丝,以便安装螺母5将其固定,防止限位栓4从孔中脱落。
本实用新具体制作步骤如下:步骤1:制作安全底板,并在其中心位置标记出固定套杆的焊接位置;步骤2:截取规定长度的DN150和DN120的钢管分别作为固定套杆、活动顶杆,并在管身均匀凿孔,保证二者的孔径一致;步骤3:将固定套杆垂直焊接在安全底板其中心已标记的位置,再用四根等长的DN15的镀锌钢管对固定套杆和安全底板进行加固;步骤4:将两根与固定套杆、活动顶杆孔径匹配的钢条套丝,以保证螺母能顺利与之匹配;步骤5,选取一段DN600的钢管,切割一部分加工成图1中所示形状,并将其沿外壁方向与活动顶杆焊接。最后只需将活动顶杆插入固定套杆内,提升到预计高度,将两根限位栓插入孔内,两端安装螺母固定之后即可。
Claims (2)
1.高空管道安装安全提升支架,由安全底板、斜撑支杆、固定套杆、活动顶杆、限位栓、防滚支架限位器构成,其特征在于:固定套杆的一端垂直焊接在安全底板中央,斜撑支杆一端焊接在安全底板上,另一端焊接在固定套杆的外壁,在固定套杆和活动顶杆的杆身凿出数对等距等径的孔,限位栓外径与固定套杆和活动顶杆上的孔内径匹配,限位栓两端设有套丝,活动顶杆插入固定套杆内并通过限位栓和螺母固定在一起,防滚支架限位器安装在活动顶杆顶端。
2.根据权利要求1所述的高空管道安装安全提升支架,其特征在于:所述的斜撑支杆为三根或四根,三根或四根斜撑支杆均匀分布。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100026399A CN103062501A (zh) | 2013-01-06 | 2013-01-06 | 高空管道安装安全提升支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100026399A CN103062501A (zh) | 2013-01-06 | 2013-01-06 | 高空管道安装安全提升支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103062501A true CN103062501A (zh) | 2013-04-24 |
Family
ID=48105274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100026399A Pending CN103062501A (zh) | 2013-01-06 | 2013-01-06 | 高空管道安装安全提升支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103062501A (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3809348A (en) * | 1972-03-14 | 1974-05-07 | E Dilaura | External waste pipe support stand for trailers |
DE3047973A1 (de) * | 1980-04-25 | 1981-10-29 | Werner R. 8645 Jona Wunderli | "laengenverstellbarer halter" |
CA1183115A (en) * | 1982-05-28 | 1985-02-26 | Edward A. Frisk | Pipe stand |
CN2310124Y (zh) * | 1997-10-28 | 1999-03-10 | 北京建安泰建筑脚手架有限公司 | 立柱式可调模板支撑 |
CN201152029Y (zh) * | 2007-12-28 | 2008-11-19 | 王雄文 | 一种铝合金建筑用支柱 |
CN201561189U (zh) * | 2009-11-06 | 2010-08-25 | 贵阳铝镁设计研究院 | 一种简易水平管道支架 |
CN203067936U (zh) * | 2013-01-06 | 2013-07-17 | 中建三局第二建设工程有限责任公司 | 高空管道安装安全提升支架 |
-
2013
- 2013-01-06 CN CN2013100026399A patent/CN103062501A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3809348A (en) * | 1972-03-14 | 1974-05-07 | E Dilaura | External waste pipe support stand for trailers |
DE3047973A1 (de) * | 1980-04-25 | 1981-10-29 | Werner R. 8645 Jona Wunderli | "laengenverstellbarer halter" |
CA1183115A (en) * | 1982-05-28 | 1985-02-26 | Edward A. Frisk | Pipe stand |
CN2310124Y (zh) * | 1997-10-28 | 1999-03-10 | 北京建安泰建筑脚手架有限公司 | 立柱式可调模板支撑 |
CN201152029Y (zh) * | 2007-12-28 | 2008-11-19 | 王雄文 | 一种铝合金建筑用支柱 |
CN201561189U (zh) * | 2009-11-06 | 2010-08-25 | 贵阳铝镁设计研究院 | 一种简易水平管道支架 |
CN203067936U (zh) * | 2013-01-06 | 2013-07-17 | 中建三局第二建设工程有限责任公司 | 高空管道安装安全提升支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104453197B (zh) | 高空大悬挑砼结构型钢支撑平台 | |
CN103061506B (zh) | 一种钢结构穹顶的施工方法 | |
CN110512719B (zh) | 一种高层住宅大跨度间隔式连廊高空支模钢平台施工工法 | |
CN206016260U (zh) | 一种用于混凝土结构屋面飘板的支撑架 | |
CN206289945U (zh) | 一种装配式便捷安全操作架 | |
CN106499201A (zh) | 一种可拆卸的安全绳工具式固定卡具及其使用方法 | |
CN202430994U (zh) | 模板限位卡 | |
CN203067936U (zh) | 高空管道安装安全提升支架 | |
CN102926554A (zh) | 钢挂座模板支撑及其施工方法 | |
CN202611223U (zh) | 可循环使用的螺栓式脚手架连墙件 | |
CN204139622U (zh) | 可调节柱钢筋定位卡具 | |
CN204001802U (zh) | 一种护栏组件及采用该护栏组件而形成的施工防护栏杆 | |
CN104164889A (zh) | 可拆卸式塔吊基础 | |
CN206174481U (zh) | 风管及悬挂式安装的风机吊装用起重工具 | |
CN103062501A (zh) | 高空管道安装安全提升支架 | |
CN209874434U (zh) | 一种建筑物高空简易外挑脚手架 | |
CN212773587U (zh) | 一种新型可拆卸式水平洞口防护工具 | |
CN104818675B (zh) | 钢筋节段的组拼方法 | |
CN204475349U (zh) | 模块式支撑装置 | |
CN203603490U (zh) | 一种预制梁上用于架设支模桁架的支撑结构 | |
CN203797264U (zh) | 一种用于通信工程安装室外设备的配重底座 | |
CN102720353A (zh) | 用于塔楼沉降缝处后施工一侧剪力墙模板及实施方法 | |
CN207048291U (zh) | 一种便于装拆的施工脚手架 | |
CN107524292A (zh) | 一种模板支撑架立杆接长方法 | |
CN206408528U (zh) | 预制t梁可调便携式支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130424 |