CN103057973B - Multipoint jacking method suitable for changing pivotal bearing of material taking machine - Google Patents
Multipoint jacking method suitable for changing pivotal bearing of material taking machine Download PDFInfo
- Publication number
- CN103057973B CN103057973B CN201210213976.8A CN201210213976A CN103057973B CN 103057973 B CN103057973 B CN 103057973B CN 201210213976 A CN201210213976 A CN 201210213976A CN 103057973 B CN103057973 B CN 103057973B
- Authority
- CN
- China
- Prior art keywords
- reclaimer
- jacking
- cantilever
- jack
- pylon
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The invention discloses a multipoint jacking method suitable for changing a pivotal bearing of a material taking machine. A center adjustment of the material taking machine is achieved by utilizing a support tower frame and a jack set which is operated synchronously and adjusting the size of a weight which is arranged on a cantilever, and difficulty and risk of jacking operation are reduced. Due to the fact that a plurality of supporting points are arranged on the material taking machine in a jacking operation, the multipoint jacking method suitable for changing the pivotal bearing of the material taking machine improves stability of a center of gravity of the material taking machine in a changing operation, fully and effectively reduces changing difficulty of the pivotal bearing of the material taking machine, reduces the risk of the changing operation and improves changing efficiency.
Description
Technical field
The present invention relates to the method for a kind of reclaimer axis of revolution replacement operation, particularly a kind of method being applicable to the multiple spot jacking that reclaimer swing bearing is changed.
Background technology
Reclaimer is the high-efficiency appliance that modern chemical industry sparetime university ancestor bulk material loads and unloads continuously, is widely used in the stacking and taking operation that the bulk cargos such as harbour, harbour, metallurgy, cement, steel plant, coke-oven plant, coal storage plant, power plant (ore, coal, coke, sandstone etc.) store stock ground at present.In production, the radius of turn of reclaimer and the setting height(from bottom) of upper structure part generally all reach tens of rice, if adopt jack-block to change the swing bearing of wearing and tearing, need the upper structure part of reclaimer entirety to be raised to suitable height, and the upper structure part of reclaimer is all at about 240 tons.As can be seen here, lifting operation is a high risk operation, in order to reduce operating risk, the greateset risk of lifting operation is controlled in the scope that can regulate and control, generally need the height of gravitational center reducing reclaimer upper structure part, and center of gravity will be avoided to exceed within the scope of the support of reclaimer.Also need the load reducing each resting point, to improve the safety factor of reclaimer jacking operation simultaneously.
Summary of the invention
For solving the problem, the invention discloses a kind of method being applicable to the multiple spot jacking that reclaimer swing bearing is changed, by adjusting the center-of-gravity position of reclaimer and arranging multi-point support, improve the balance of reclaimer in jacking operation, reduce the difficulty that axis of revolution changed by reclaimer.
The method being applicable to the multiple spot jacking that reclaimer swing bearing is changed disclosed by the invention, comprise the steps: that (1) installs two support tower respectively immediately below the cantilever two ends of reclaimer, the support tower of cantilever front end is front end pylon, and the support tower of cantilevered trailing end is middle pylon; (2) below each support tower, jack is laid; Below the turn table of reclaimer, around swing bearing, lay jack; (3) dismantle the counterweight of the reclaimer on cantilever, make the center of gravity of reclaimer upper structure part to cantilever front end, be i.e. the direction skew of bucket wheel, ensure the centre that the turn table place two of front end pylon and door frame that center of gravity is in cantilever supports greatly; (4), during jacking operation, in the middle of synchronous operation, pylon and each jack in turn table place carry out jacking, and the jack below the pylon of front end is followed and carried out jacking operation; (5) jacking has operated, and change swing bearing, when doing decline operation, first the jack below the pylon of front end does step-down operation, and then in the middle of synchronous operation, pylon and each jack in turn table place decline.The method being applicable to the multiple spot jacking that reclaimer swing bearing is changed disclosed by the invention, by arranging support tower and arrange jack below support tower and turn table in jacking operation, achieve reclaimer multipoint operation when lifting operation, reduce the load of each strong point, improve the stability that in lifting operation, reclaimer upper structure part supports, reduce the risk of lifting operation, adopt the mode of multiple spot jacking to also help avoids upper structure part to be out of shape because load is excessive simultaneously, reduce the impact of environmental factor on lifting operation, improve the safe reliability of lifting operation.
The one being applicable to the method for the multiple spot jacking that reclaimer swing bearing is changed disclosed by the invention is improved, and step lays at least 3 jacks in (2) below each support tower; Below the turn table of reclaimer, around swing bearing, lay at least 3 jacks.This improvement by all arranging at least 3 jacks below support tower and turn table, and supporting construction is stablized, easy for installation, with low cost, easy to operate, practical.
Another being applicable to the method for the multiple spot jacking that reclaimer swing bearing is changed disclosed by the invention is improved, the counterweight of all or part of reclaimer in step (3) on dismounting cantilever.This improvement, by the counterweight on adjustment cantilever, achieves and controls the adjustment of reclaimer center of gravity, ensures reclaimer steadily of centre of gravity in lifting operation, reduces the difficulty that reclaimer axis of revolution changes operation, reduces the risk of installation, improve the safety of production operation.
The method being applicable to the multiple spot jacking that reclaimer swing bearing is changed disclosed by the invention, by changing in operation at reclaimer axis of revolution, adopt the operational method of multiple spot jacking, multiple resting point is jointly formed by the support tower and turn table that are arranged on cantilever two ends, with the load disperseing each point to bear, improve the balanced capacity in reclaimer jacking operation.Simultaneously by counterweight on adjustment cantilever, realize the adjustment to reclaimer center of gravity and control, improve the balance of reclaimer in jacking operation, reduce the difficulty that axis of revolution changed by reclaimer.
Accompanying drawing explanation
The apparatus structure schematic diagram of Fig. 1, reclaimer multiple spot lifting operation of the present invention;
Fig. 2, reclaimer of the present invention stressed schematic diagram in lifting operation;
Fig. 3, the reclaimer of the present invention schematic diagram that under support tower, jack is arranged in lifting operation;
The structural representation of lifting device under the turn table of Fig. 4, reclaimer of the present invention.
Reference numerals list:
1, bucket wheel; 2, cantilever; 3, counterweight;
4, turn table; 5, swing bearing; 6, door frame;
7, support tower; 8, jack
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, illustrate the present invention further, following detailed description of the invention should be understood and be only not used in for illustration of the present invention and limit the scope of the invention.
As shown in Figures 1 to 4, the method being applicable to the multiple spot jacking that reclaimer swing bearing is changed disclosed by the invention, comprise the steps: that (1) installs two support tower 7 respectively immediately below cantilever 2 two ends of reclaimer, the support tower 7 of cantilever 2 front end is front end pylon, and the support tower 7 of cantilever 2 tail end is middle pylon; (2) below each support tower 7, jack 8 is laid; Below the turn table 4 of reclaimer, around swing bearing 5, lay jack 8; (3) dismantle the counterweight 3 of the reclaimer on cantilever 2, make the center of gravity of reclaimer upper structure part to cantilever 2 front end, be i.e. the direction skew of bucket wheel 1, ensure the centre that turn table 4 place two of front end pylon and door frame 6 that center of gravity is in cantilever 2 supports greatly; (4), during jacking operation, in the middle of synchronous operation, pylon and each jack 8 in turn table 4 place carry out jacking, and the jack 8 below the pylon of front end is followed and carried out jacking operation; (5) jacking has operated, and change swing bearing 5, when doing decline operation, first the jack 8 below the pylon of front end does step-down operation, and then in the middle of synchronous operation, pylon and each jack 8 in turn table 4 place decline.The method being applicable to the multiple spot jacking that reclaimer axis of revolution is changed disclosed by the invention, by arranging support tower and arrange jack below support tower and turn table in jacking operation, achieve reclaimer multipoint operation when lifting operation, reduce the load of each strong point, improve the stability that in lifting operation, reclaimer upper structure part supports, reduce the risk of lifting operation, adopt the mode of multiple spot jacking to also help avoids upper structure part to be out of shape because load is excessive simultaneously, reduce the impact of environmental factor on lifting operation, improve the safe reliability of lifting operation.
Preferred as one, below each support tower 7, lay at least 3 jacks 8 in step (2); Below the turn table 4 of reclaimer, around swing bearing 5, lay at least 3 jacks 8.By all arranging at least 3 jacks below support tower and turn table, supporting construction is stablized, easy for installation, with low cost, easy to operate, practical.Jack in jack group is with rock-steady structure scattering device on each strong point, and such as, the jack group be made up of three jacks 8 is arranged on the bottom of support tower in the mode of equicrural triangle; Four are then arranged with the form of quadrangle; Five can be then that pentagon or center of area form are arranged; Six then can with parallelly-arranged double-row structure etc.
Preferred as one, the counterweight 3 of all or part of reclaimer in step (3) on dismounting cantilever 2.By the counterweight on adjustment cantilever, achieve and the adjustment of reclaimer center of gravity is controlled, ensure reclaimer steadily of centre of gravity in lifting operation, reduce the difficulty that reclaimer axis of revolution changes operation, reduce the risk of installation, improve the safety of production operation.
In lifting operation, all or part of counterweight 3 of dismounting reclaimer, makes the center of gravity of reclaimer upper structure part to cantilever 2 front end, and namely the direction skew of bucket wheel 1, ensures between the turn table 4 that center of gravity is on the support tower 7 of cantilever 2 front end and door frame 6.
During jacking operation, the support tower 7 in the middle of synchronous operation and each jack 8 at turn table 4 place carry out jacking, and the jack 8 below the support tower 7 of front end is followed and carried out jacking operation.
Jacking has operated, and during decline operation, first the some jacks 8 below the support tower 7 of front end do step-down operation, and each jack 8 of support tower 7 and turn table 4 place then in the middle of synchronous operation declines.
Jack 8 in each lifting device is installed and after pre-jacking, disengaging section or whole counterweights 3, ensure that the center of gravity of reclaimer upper structure part is between the support tower 7 and turn table 4 of front end.Also be provided with fixing supporting leg bottom support tower 7, the height of supporting leg a little more than the height needing the jack 8 laid so that the installing/dismounting of jack 8.The basis rest of support tower 7 has backing plate, to improve stability and the reliability of support.Below turn table 4, some jacks 8 turn around swing bearing 5 and arrange, jack 8 is placed between turn table 4 and door frame 6, because the center of gravity of upper structure part moves forward in lifting operation, diminish with the load that door frame 6 bears, each jack 8 load of bearing herein is also corresponding greatly to be reduced, thus the difficulty changing swing bearing 5 operation after jacking also correspondingly reduces.
The method being applicable to the multiple spot jacking that reclaimer swing bearing is changed disclosed by the invention, by changing in operation at reclaimer axis of revolution, adopt the operational method of multiple spot jacking, multiple resting point is jointly formed by the support tower and turn table that are arranged on cantilever two ends, with the load disperseing each point to bear, improve the balanced capacity in reclaimer jacking operation.Simultaneously by counterweight on adjustment cantilever, realize the adjustment to reclaimer center of gravity and control, improve the balance of reclaimer in jacking operation, reduce the difficulty that axis of revolution changed by reclaimer.
Technological means disclosed in the present invention program is not limited only to the technological means disclosed in above-mentioned technological means, also comprises the technical scheme be made up of above technical characteristic combination in any.
Claims (2)
1. one kind is applicable to the method for the multiple spot jacking that reclaimer swing bearing is changed, it is characterized in that: the described method being applicable to the multiple spot jacking that reclaimer swing bearing is changed comprises the steps: that (1) installs two support tower respectively immediately below the cantilever two ends of reclaimer, the support tower of cantilever front end is front end pylon, and the support tower of cantilevered trailing end is middle pylon; (2) below each support tower, jack is laid; Below the turn table of reclaimer, around swing bearing, lay jack; (3) dismantle the counterweight of the reclaimer on cantilever, make the center of gravity of reclaimer upper structure part to cantilever front end, be i.e. the direction skew of bucket wheel, ensure the centre that the turn table place two of front end pylon and door frame that center of gravity is in cantilever supports greatly; (4), during jacking operation, in the middle of synchronous operation, pylon and each jack in turn table place carry out jacking, and the jack below the pylon of front end is followed and carried out jacking operation; (5) jacking has operated, and change swing bearing, when doing industry do decline, first the jack below the pylon of front end does step-down operation, and then in the middle of synchronous operation, pylon and each jack in turn table place decline.
2. the method being applicable to the multiple spot jacking that reclaimer swing bearing is changed according to claim 1, is characterized in that: step lays at least 3 jacks in (2) below each support tower; Below the turn table of reclaimer, around swing bearing, lay at least 3 jacks.
3
.the method being applicable to the multiple spot jacking that reclaimer swing bearing is changed according to claim 1, is characterized in that: the counterweight of the whole reclaimers in step (3) on dismounting cantilever.
4
.the method being applicable to the multiple spot jacking that reclaimer swing bearing is changed according to claim 1, is characterized in that: the counterweight of the part reclaimer in step (3) on dismounting cantilever.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210213976.8A CN103057973B (en) | 2012-06-27 | 2012-06-27 | Multipoint jacking method suitable for changing pivotal bearing of material taking machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210213976.8A CN103057973B (en) | 2012-06-27 | 2012-06-27 | Multipoint jacking method suitable for changing pivotal bearing of material taking machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103057973A CN103057973A (en) | 2013-04-24 |
CN103057973B true CN103057973B (en) | 2014-12-24 |
Family
ID=48100923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210213976.8A Expired - Fee Related CN103057973B (en) | 2012-06-27 | 2012-06-27 | Multipoint jacking method suitable for changing pivotal bearing of material taking machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103057973B (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103449194B (en) * | 2013-08-31 | 2016-08-10 | 南京梅山冶金发展有限公司 | A kind of method utilizing the pitching oil cylinder release floating jacking to expecting the replacing of machine floating bearing |
CN103831577B (en) * | 2014-02-28 | 2016-06-01 | 中国神华能源股份有限公司 | The replacing options of shiploader pitching hinge bearing |
CN103817507B (en) * | 2014-03-07 | 2017-02-01 | 中国神华能源股份有限公司 | Replacement method for pitching hinged point bearing of reclaimer |
CN104259738B (en) * | 2014-07-30 | 2017-01-11 | 东北大学 | Replacement method of revolving bearing of material taking machine |
CN106542344B (en) * | 2015-09-16 | 2018-12-25 | 中冶宝钢技术服务有限公司 | The replacing options of stacker-reclaimer pivoting support |
CN105417196A (en) * | 2015-12-10 | 2016-03-23 | 大连华锐重工集团股份有限公司 | Hinged column type double-pull-rod cantilever stacker |
CN105621114B (en) * | 2016-03-24 | 2017-10-24 | 华电重工股份有限公司 | Stacker-reclaimer and its revolving dial |
CN106144651A (en) * | 2016-08-23 | 2016-11-23 | 大连奇重机电成套设备有限公司 | Hanging arm type bucket wheel stacker-reclaimer luffing mechanism balance detecting device |
CN108608197B (en) * | 2018-07-23 | 2019-11-12 | 大连天重散装机械设备有限公司 | A kind of bucket wheel machine main body steel construction oscillating bearing replacing options |
CN112343054B (en) * | 2019-08-27 | 2022-02-01 | 内蒙古自治区水利水电勘测设计院 | Quick concrete warehousing system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201109020Y (en) * | 2007-08-27 | 2008-09-03 | 上海梅山钢铁股份有限公司 | Revolving bearing replacing mechanism for disk bale traverse platform |
CN101269462A (en) * | 2008-05-09 | 2008-09-24 | 中国第二冶金建设有限责任公司 | Method for quickly replacing pivotal bearing of bale panoramic tables |
-
2012
- 2012-06-27 CN CN201210213976.8A patent/CN103057973B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201109020Y (en) * | 2007-08-27 | 2008-09-03 | 上海梅山钢铁股份有限公司 | Revolving bearing replacing mechanism for disk bale traverse platform |
CN101269462A (en) * | 2008-05-09 | 2008-09-24 | 中国第二冶金建设有限责任公司 | Method for quickly replacing pivotal bearing of bale panoramic tables |
Non-Patent Citations (3)
Title |
---|
DQ3025轮斗机直径为3.2m轴承的更换;曹万华等;《华北电力技术》;20060225(第5期);第45页第1栏第1段至第47页最后1段 * |
斗轮堆取料机回转大轴承的检修与更换;黄强;《起重运输机械》;20050620(第6期);第50页第1栏第1段至第52页第2栏第2段 * |
斗轮堆取料机回转轴承整体更换法;秦化宇等;《机械工程师》;19970310(第3期);第50页第1栏第1段至第2栏第2段 * |
Also Published As
Publication number | Publication date |
---|---|
CN103057973A (en) | 2013-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103057973B (en) | Multipoint jacking method suitable for changing pivotal bearing of material taking machine | |
CN2923609Y (en) | Circular material field with door-frame type material piling-taking material | |
CN101300189B (en) | Large mobile crane | |
CN103140430B (en) | Method for replacing a transformer in a wind energy installation | |
CN103449194B (en) | A kind of method utilizing the pitching oil cylinder release floating jacking to expecting the replacing of machine floating bearing | |
CN103281892A (en) | Mobile sizing station | |
CN108946515A (en) | A kind of lifting equipment | |
CN101823632A (en) | Integral pitch stacker | |
CN202298606U (en) | Descending frame for mounting reinforcement cage of pile foundation | |
CN203021250U (en) | Jacking device for changing swinging bearing of material machine | |
CN203682634U (en) | Tipping bucket type high-position automatic feeding device | |
CN105862079B (en) | Mechanism and technique are raised in jacking to aluminum electrolysis cell upper part structure online | |
CN103862251A (en) | Hoisting method of large device constrained by three-dimensional space and an auxiliary device of large device | |
CN104878146B (en) | Construction method for replacing ripple compensator on top of gravitational dust collector | |
CN202188515U (en) | Multi-side detachable bound overhead torch | |
CN208883351U (en) | A kind of lifting equipment | |
CN208236001U (en) | Hoistable platform for the disassembly of foundation pit supporting beam | |
CN204532376U (en) | Split type lifting construction trolley | |
CN103322826A (en) | Movable furnace hearth | |
CN103193152A (en) | Hoisting device and method of chain bucket ship unloader | |
CN103541574B (en) | Steel-making diffusing tower installation construction in narrow regions | |
CN102515030A (en) | Construction process for replacement for steam pocket in narrow condition | |
CN202240339U (en) | Two-sided overturning jig frame | |
CN204508570U (en) | Medium-speed pulverizer mill hoisting mechanism | |
CN204148500U (en) | A kind of walk by table frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210810 Address after: 3520 Tongji Road, Baoshan District, Shanghai 201900 Patentee after: Baowu equipment Intelligent Technology Co.,Ltd. Address before: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing Patentee before: NANJING MEISHAN METALLURGY DEVELOPMENT Co.,Ltd. Patentee before: Shanghai Meishan Iron & steel Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |