CN103022386B - Equipment and method for assembling power lithium battery cap - Google Patents

Equipment and method for assembling power lithium battery cap Download PDF

Info

Publication number
CN103022386B
CN103022386B CN201210490931.5A CN201210490931A CN103022386B CN 103022386 B CN103022386 B CN 103022386B CN 201210490931 A CN201210490931 A CN 201210490931A CN 103022386 B CN103022386 B CN 103022386B
Authority
CN
China
Prior art keywords
rotating disk
station
cylinder
inductive head
vibrating bunker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210490931.5A
Other languages
Chinese (zh)
Other versions
CN103022386A (en
Inventor
鲁强临
吴述全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan origin Amperex Technology Limited
Original Assignee
WUHU GENYUAN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHU GENYUAN TECHNOLOGY Co Ltd filed Critical WUHU GENYUAN TECHNOLOGY Co Ltd
Priority to CN201210490931.5A priority Critical patent/CN103022386B/en
Publication of CN103022386A publication Critical patent/CN103022386A/en
Application granted granted Critical
Publication of CN103022386B publication Critical patent/CN103022386B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Sealing Battery Cases Or Jackets (AREA)

Abstract

The invention discloses equipment for assembling a power lithium battery cap. The equipment is provided with a turntable I (11), a turntable II (12), a nickel-plated top cap vibration hopper (13), a flanged aluminum material vibration hopper (14), a plastic sealing ring vibration hopper (15), air cylinders (I to IX), induction heads (I to X) and separate induction heads. According to the equipment and the method, an integrated side closing and assembling manner is adopted, so that the production procedures are simplified, the automation of assembling production is realized, the production efficiency is increased, the labor intensity is reduced, and personal injury accidents caused by faulty operations are reduced; and meanwhile, the pollution to products caused by dust and pollutants on the hands of operating staff in multiple production processes is avoided, so that the corrosion resistance of the products is improved.

Description

A kind of power lithium battery cap mounting equipment and assemble method thereof
Technical field
The invention belongs to the technical field that lithium battery manufactures, relate to lithium ion battery cover production equipment, more particularly, the present invention relates to a kind of power lithium battery cap mounting equipment.In addition, the invention still further relates to the assemble method of this equipment.
Background technology
Lithium-ion-power cell is applied on the electric tools such as the battery pack of battery vehicle, electronic drill gun.One of lithium-ion-power cell important safety accessory is explosion-proof combined block.
At present, if combination cover cap factory owner adopts segmentation manual manipulation method to process combination cover cap.Its method is:
First with manually nickel plating top cover being put into aluminium flange explosion-proof cap, then proceeding to punch press pressure processing, carrying out receipts limit to aluminium flange explosion-proof valve, receiving limit needs to carry out twice punching press, to reach the object reducing aluminium flange limit mouth;
With punch press, the product behind receipts limit is clapped again afterwards, proceed to next procedure and assemble;
Sealing ring put into by aluminium explosion-proof valve block after clapping.
In sum, prior art Problems existing is: operation is many, recruitment is many, production efficiency is low, and in stamping procedure, operative employee is easily injured.
Summary of the invention
The invention provides a kind of power lithium battery cap mounting equipment, its objective is and enhance productivity, reduce labour intensity.
To achieve these goals, the technical scheme that the present invention takes is:
Power lithium battery cap mounting equipment provided by the present invention, described assembling is that nickel plating top cover, aluminium flange explosion-proof valve, plastic seal ring are assembled into power lithium battery cap;
Described mounting equipment is provided with rotating disk one, rotating disk two, nickel plating top cover vibrating bunker, flange aluminium material vibrating bunker, plastic seal ring vibrating bunker;
Described nickel plating top cover vibrating bunker, flange aluminium material vibrating bunker are located at by rotating disk one edge, and are connected with rotating disk one respectively by nickel plating top cover vibrating bunker blanking slideway, flange aluminium material vibrating bunker blanking slideway; Described plastic seal ring vibrating bunker is located at by rotating disk two edge, and is connected with rotating disk two by plastic seal ring vibrating bunker blanking slideway;
The first station is circumferentially provided with in order to the 6th station at described rotating disk one;
First station arranges cylinder one, and the feed opening of described flange aluminium material vibrating bunker blanking slideway is located on the first described station;
Second station arranges cylinder two, and the feed opening of described nickel plating top cover vibrating bunker blanking slideway is located on the second described station;
The 3rd described station is respectively equipped with cylinder three, cylinder four, cylinder five to the 5th station;
Described rotating disk one is connected slideway with rotating disk two by rotating disk one rotating disk two and connects;
6th station arranges cylinder six, and the charging aperture that the 6th described station is connected slideway with described rotating disk one rotating disk two connects;
At described rotating disk 2, the 7th station is circumferentially set in the following order to the 9th station;
The feed opening of described plastic seal ring vibrating bunker blanking slideway is located on the 7th station;
The discharging opening that described rotating disk one rotating disk two connects slideway is the 8th station, and the 8th described station arranges cylinder seven, cylinder eight;
9th station arranges cylinder nine, and the 9th described station is connected with finished product blanking slideway.
Induction is set on described nickel plating top cover vibrating bunker blanking slideway side first;
On described flange aluminium material vibrating bunker blanking slideway side, inductive head two is set;
On described plastic seal ring vibrating bunker blanking slideway side, inductive head three is set;
Connect slideway side at described rotating disk one rotating disk two and inductive head four is set;
At the feed opening of described nickel plating top cover vibrating bunker blanking slideway, inductive head five is set;
At the feed opening in described flange aluminium material vibrating bunker Zhi Liao road, inductive head six is set;
At the 3rd described station, inductive head seven is set;
At the 4th described station, inductive head eight is set;
At the 5th described station, inductive head nine is set;
At the 8th described station, inductive head ten is set;
Described power lithium battery cap mounting equipment is provided with PLC, and described induction is first to be all connected with described PLC by signal line to inductive head ten.
The below of described rotating disk one is provided with protractor one; The below of described rotating disk two is provided with protractor two; Described protractor one and protractor two are equipped with separation head; Described protractor one and protractor two are respectively equipped with separation inductive head;
Described separation inductive head is connected with described PLC by signal line.
In order to realize the goal of the invention identical with technique scheme, present invention also offers the assemble method of above-described power lithium battery cap mounting equipment, its technical scheme is:
Technical process and the technique content thereof of this assemble method are:
In nickel plating top cover vibrating bunker described in respectively nickel plating top cover, aluminium flange explosion-proof valve, plastic seal ring raw material being dropped into, aluminium flange explosion-proof valve vibrating bunker, plastic seal ring vibrating bunker;
Start the program switch in PLC, above-mentioned vibrating bunker starts to vibrate work;
When responding to first and inductive head two and having output signal, rotating disk is once starting to rotate, and cylinder one moved ahead before this, and pusher is to the first station, and then cylinder one returns original position;
When inductive head six has detected that workpiece falls into the first station, rotating disk one has carried out rotary index;
When rotating disk one rotates lattice, cylinder is once throwing one defective material;
At the workpiece of the first station with rotating disk-rotate to the second station, the inductive head five on the second station often detects a supplied materials, and just export a signal, cylinder two travels forward, and once feeds intake;
At the 3rd station, cylinder three completes first cissing; Inductive head seven sends corresponding signal;
At the 4th station, cylinder four completes second cissing; Inductive head eight sends corresponding signal;
At the 5th station, cylinder five completes the 3rd road and flattens; Inductive head nine sends corresponding signal;
At the 6th station, cylinder six rotating disk once every calibration once after action once, realize, by the workpiece after combining, sending into rotating disk one rotating disk two and connecting slideway;
If when inductive head four detects workpiece, then send a signal, stop the rotation of rotating disk one; When inductive head four does not have signal, rotating disk one recovers to rotate;
At the 7th station, the workpiece in plastic seal ring vibrating bunker is delivered to rotating disk two by plastic seal ring vibrating bunker blanking slideway; And realize monitoring by the blanking situation of inductive head three pairs of plastic seal rings;
When inductive head ten detects workpiece, action is once successively for cylinder eight and cylinder seven; Cylinder seven completes binder work;
When inductive head ten does not detect workpiece, rotating disk two just stops the rotation; Now, cylinder eight and cylinder seven are failure to actuate;
The workpiece machined with regard to action once, is pushed finished product blanking slideway when rotating disk two calibration rotates one time by cylinder nine;
Separate inductive head and ask for the angle that signal source is the separation head calibration on protractor one, realize electric motor clutch brake, thus ensure the separation precision of rotating disk one;
Separate inductive head and ask for the angle that signal source is the separation head calibration on protractor two, realize electric motor clutch brake, thus ensure the separation precision of rotating disk two.
The present invention adopts technique scheme, adopts receipts limit and the assembling mode of integration, simplifies production routine, realize the automation that assembling is produced, enhance productivity, reduce labour intensity, reduce the personal injury accident because operate miss causes; Avoid product pollution by dust, pollutant that operating personnel are be with on hand in multiple tracks production process simultaneously, improve the antiseptic property of product.
Accompanying drawing explanation
Below the content expressed by each width accompanying drawing of this specification and the mark in figure are briefly described:
Fig. 1 is structural representation of the present invention;
Be labeled as in figure:
1, cylinder one, 2, cylinder two, 3, cylinder three, 4, cylinder four, 5, cylinder five, 6, cylinder six, 7, cylinder seven, 8, cylinder eight, 9, cylinder nine; 10, finished product blanking slideway, 11, rotating disk one, 12, rotating disk two, 13, nickel plating top cover vibrating bunker; 14, flange aluminium material vibrating bunker, 15, plastic seal ring vibrating bunker, 16, protractor one, 17, protractor two, 18, separate head, 19, separate inductive head, 20, separate inductive head, 21, respond to first, 22, inductive head two, 23, inductive head three, 24, inductive head four, 25, inductive head five, 26, inductive head six, 27, inductive head seven, 28, inductive head eight, 29, inductive head nine, 30, inductive head ten.
Embodiment
Contrast accompanying drawing below, by the description to embodiment, the specific embodiment of the present invention is described in further detail, have more complete, accurate and deep understanding to help those skilled in the art to inventive concept of the present invention, technical scheme.
Structure of the present invention is as shown in Figure 1 a kind of power lithium battery cap mounting equipment, and described assembling is that nickel plating top cover, aluminium flange explosion-proof valve, plastic seal ring are assembled into power lithium battery cap.
In order to solve prior art Problems existing and overcome its defect, realize enhancing productivity, reduce the goal of the invention of labour intensity, the technical scheme that the present invention takes is:
As shown in Figure 1, power lithium battery cap mounting equipment provided by the present invention is provided with rotating disk 1, rotating disk 2 12, nickel plating top cover vibrating bunker 13, flange aluminium material vibrating bunker 14, plastic seal ring vibrating bunker 15;
Described nickel plating top cover vibrating bunker 13, flange aluminium material vibrating bunker 14 are located at by rotating disk 1 edge, and are connected with rotating disk 1 respectively by nickel plating top cover vibrating bunker blanking slideway, flange aluminium material vibrating bunker blanking slideway; Described plastic seal ring vibrating bunker 15 is located at by rotating disk 2 12 edge, and is connected with rotating disk 2 12 by plastic seal ring vibrating bunker blanking slideway;
The first station is circumferentially provided with in order to the 6th station at described rotating disk 1;
First station arranges cylinder 1, and the feed opening of described flange aluminium material vibrating bunker blanking slideway is located on the first described station;
Second station arranges cylinder 22, and the feed opening of described nickel plating top cover vibrating bunker blanking slideway is located on the second described station;
The 3rd described station is respectively equipped with cylinder 33, cylinder 44, cylinder 55 to the 5th station;
Described rotating disk 1 is connected slideway with rotating disk 2 12 by rotating disk one rotating disk two and connects;
6th station arranges cylinder 66, and the charging aperture that the 6th described station is connected slideway with described rotating disk one rotating disk two connects;
At described rotating disk 2 12, the 7th station is circumferentially set in the following order to the 9th station;
The feed opening of described plastic seal ring vibrating bunker blanking slideway is located on the 7th station;
The discharging opening that described rotating disk one rotating disk two connects slideway is the 8th station, and the 8th described station arranges cylinder 77, cylinder 88;
9th station arranges cylinder 99, and the 9th described station is connected with finished product blanking slideway 10.
Wherein, cylinder 1, cylinder 22 are the cylinder to pusher on station; Cylinder 33, cylinder 44, cylinder 55 and cylinder 88 are the cylinder realizing flattening, press-fiting; Cylinder 66, cylinder 77 and cylinder 99 is by the cylinder of workpiece release from station.
First 21 are responded to other setting of described nickel plating top cover vibrating bunker blanking slideway;
On described flange aluminium material vibrating bunker blanking slideway side, inductive head 2 22 is set;
On described plastic seal ring vibrating bunker blanking slideway side, inductive head 3 23 is set;
Connect slideway side at described rotating disk one rotating disk two and inductive head 4 24 is set;
At the feed opening of described nickel plating top cover vibrating bunker blanking slideway, inductive head 5 25 is set;
At the feed opening in described flange aluminium material vibrating bunker Zhi Liao road, inductive head 6 26 is set;
At the 3rd described station, inductive head 7 27 is set;
At the 4th described station, inductive head 8 28 is set;
At the 5th described station, inductive head 9 29 is set;
At the 8th described station, inductive head 10 is set;
Described power lithium battery cap mounting equipment is provided with PLC, and described induction is first to be all connected with described PLC by signal line to inductive head ten.
Respond to the first signal obtained to inductive head ten in production process, then to PLC conveying, send control signal by PLC, realize the Automated condtrol of production process.
The below of described rotating disk 1 is provided with protractor 1; The below of described rotating disk 2 12 is provided with protractor 2 17; Described protractor 1 and protractor 2 17 are equipped with separation head; Described protractor 1 and protractor 2 17 are respectively equipped with separation inductive head 19, inductive head 20;
Described separation inductive head 19, inductive head 20 are connected with described PLC by signal line.
In order to realize the goal of the invention identical with technique scheme, present invention also offers the assemble method of above-described power lithium battery cap mounting equipment, its technical scheme is:
Technical process and the technique content thereof of this assemble method are:
In nickel plating top cover vibrating bunker 13 described in respectively nickel plating top cover, aluminium flange explosion-proof valve, plastic seal ring raw material being dropped into, aluminium flange explosion-proof valve vibrating bunker 14, plastic seal ring vibrating bunker 15;
Start the program switch in PLC, above-mentioned vibrating bunker starts to vibrate work;
When induction first 21 and inductive head 2 22 have output signal, rotating disk 1 just starts to rotate, and cylinder 1 moved ahead before this, and pusher is to the first station, and then cylinder 1 returns original position;
When inductive head 6 26 has detected that workpiece falls into the first station, rotating disk 1 has carried out rotary index;
When rotating disk 1 rotates lattice, cylinder 1 just throws a defective material;
Rotate to the second station with rotating disk-11 at the workpiece of the first station, the inductive head 5 25 on the second station often detects a supplied materials, and just export a signal, cylinder 22 travels forward, and once feeds intake;
At the 3rd station, cylinder 33 completes first cissing; Inductive head 7 27 sends corresponding signal;
At the 4th station, cylinder 44 completes second cissing; Inductive head 8 28 sends corresponding signal;
At the 5th station, cylinder 55 completes the 3rd road and flattens; Inductive head 9 29 sends corresponding signal;
At the 6th station, cylinder 66 the every calibration of rotating disk 1 once after with regard to action once, realize, by the workpiece after combining, sending into rotating disk one rotating disk two and connecting slideway;
If when inductive head 4 24 detects workpiece, then send a signal, stop the rotation of rotating disk 1; When inductive head 4 24 does not have signal, rotating disk 1 recovers to rotate;
At the 7th station, the workpiece in plastic seal ring vibrating bunker 15 is delivered to rotating disk 2 12 by plastic seal ring vibrating bunker blanking slideway; And realize monitoring by the blanking situation of inductive head 3 23 pairs of plastic seal rings;
When inductive head 10 detects workpiece, action is once successively for cylinder 88 and cylinder 77; Cylinder 77 completes binder work;
When inductive head 10 does not detect workpiece, rotating disk 2 12 just stops the rotation; Now, cylinder 88 and cylinder 77 are failure to actuate;
The workpiece machined with regard to action once, is pushed finished product blanking slideway 10 when rotating disk 2 12 calibration rotates one time by cylinder 99;
Separate inductive head 19 and ask for the angle that signal source is separation 18 calibration on protractor 1, realize electric motor clutch brake, thus reach the separation precision of rotating disk 1;
Separate inductive head 20 and ask for the angle that signal source is separation 18 calibration on protractor 2 17, realize electric motor clutch brake, thus reach the separation precision of rotating disk 2 12.
Above by reference to the accompanying drawings to invention has been exemplary description; obvious specific implementation of the present invention is not subject to the restrictions described above; as long as have employed the improvement of the various unsubstantialities that method of the present invention is conceived and technical scheme is carried out; or design of the present invention and technical scheme directly applied to other occasion, all within protection scope of the present invention without to improve.

Claims (4)

1. a power lithium battery cap mounting equipment, described assembling is that nickel plating top cover, aluminium flange explosion-proof valve, plastic seal ring are assembled into power lithium battery cap, it is characterized in that:
Described mounting equipment is provided with rotating disk one (11), rotating disk two (12), nickel plating top cover vibrating bunker (13), flange aluminium material vibrating bunker (14), plastic seal ring vibrating bunker (15);
Described nickel plating top cover vibrating bunker (13), flange aluminium material vibrating bunker (14) are located at by rotating disk one (11) edge, and are connected with rotating disk one (11) respectively by nickel plating top cover vibrating bunker blanking slideway, flange aluminium material vibrating bunker blanking slideway; Described plastic seal ring vibrating bunker (15) is located at by rotating disk two (12) edge, and is connected with rotating disk two (12) by plastic seal ring vibrating bunker blanking slideway;
The first station is circumferentially provided with in order to the 6th station at described rotating disk one (11);
First station arranges cylinder one (1), and the feed opening of described flange aluminium material vibrating bunker blanking slideway is located on the first described station;
Second station arranges cylinder two (2), and the feed opening of described nickel plating top cover vibrating bunker blanking slideway is located on the second described station;
The 3rd described station to the 5th station is respectively equipped with cylinder three (3), cylinder four (4), cylinder five (5);
Described rotating disk one (11) is connected slideway with rotating disk two (12) by rotating disk one rotating disk two and connects;
6th station arranges cylinder six (6), and the charging aperture that the 6th described station is connected slideway with described rotating disk one rotating disk two connects;
At described rotating disk two (12), the 7th station is circumferentially set in the following order to the 9th station;
The feed opening of described plastic seal ring vibrating bunker blanking slideway is located on the 7th station;
The discharging opening that described rotating disk one rotating disk two connects slideway is the 8th station, and the 8th described station arranges cylinder seven (7), cylinder eight (8);
9th station arranges cylinder nine (9), and the 9th described station is connected with finished product blanking slideway (10).
2., according to power lithium battery cap mounting equipment according to claim 1, it is characterized in that:
First (21) are responded to other setting of described nickel plating top cover vibrating bunker blanking slideway;
On described flange aluminium material vibrating bunker blanking slideway side, inductive head two (22) is set;
On described plastic seal ring vibrating bunker blanking slideway side, inductive head three (23) is set;
Connect slideway side at described rotating disk one rotating disk two and inductive head four (24) is set;
At the feed opening of described nickel plating top cover vibrating bunker blanking slideway, inductive head five (25) is set;
At the feed opening in described flange aluminium material vibrating bunker Zhi Liao road, inductive head six (26) is set;
At the 3rd described station, inductive head seven (27) is set;
At the 4th described station, inductive head eight (28) is set;
At the 5th described station, inductive head nine (29) is set;
At the 8th described station, inductive head ten (30) is set;
Described power lithium battery cap mounting equipment is provided with PLC, and described induction is first to be all connected with described PLC by signal line to inductive head ten.
3. according to power lithium battery cap mounting equipment according to claim 2, it is characterized in that: the below of described rotating disk one (11) is provided with protractor one (16); The below of described rotating disk two (12) is provided with protractor two (17); Described protractor one (16) and protractor two (17) are equipped with separation head; Described protractor one (16) and protractor two (17) are respectively equipped with separation inductive head (19,20);
Described separation inductive head (19,20) is connected with described PLC by signal line.
4., according to the assemble method of power lithium battery cap mounting equipment according to claim 3, it is characterized in that:
Technical process and the technique content thereof of this assemble method are:
In nickel plating top cover vibrating bunker (13) described in respectively nickel plating top cover, aluminium flange explosion-proof valve, plastic seal ring raw material being dropped into, aluminium flange explosion-proof valve vibrating bunker (14), plastic seal ring vibrating bunker (15);
Start the program switch in PLC, described nickel plating top cover vibrating bunker (13), aluminium flange explosion-proof valve vibrating bunker (14), plastic seal ring vibrating bunker (15) start to vibrate work;
When induction first (21) and inductive head two (22) have output signal, rotating disk starts to rotate once (11), cylinder one (1) moved ahead before this, and pusher is to the first station, and then cylinder one (1) returns original position;
When inductive head six (26) has detected that workpiece falls into the first station, rotating disk one (11) has carried out rotary index;
When rotating disk one (11) rotates lattice, cylinder throws a defective material once (1);
Rotate to the second station with rotating disk-(11) at the workpiece of the first station, the inductive head five (25) on the second station often detects a supplied materials, and just export a signal, cylinder two (2) travels forward, and once feeds intake;
At the 3rd station, cylinder three (3) completes first cissing; Inductive head seven (27) sends corresponding signal;
At the 4th station, cylinder four (4) completes second cissing; Inductive head eight (28) sends corresponding signal;
At the 5th station, cylinder five (5) completes the 3rd road and flattens; Inductive head nine (29) sends corresponding signal;
At the 6th station, cylinder six (6) rotating disk once (11) every calibration once after action once, realize, by the workpiece after combining, sending into rotating disk one rotating disk two and connecting slideway;
Inductive head four (24) if when workpiece being detected, then sends a signal, stops the rotation of rotating disk one (11); When inductive head four (24) does not have signal, rotating disk one (11) recovers to rotate;
At the 7th station, the workpiece in plastic seal ring vibrating bunker (15) is delivered to rotating disk two (12) by plastic seal ring vibrating bunker blanking slideway; And by inductive head three (23), monitoring is realized to the blanking situation of plastic seal ring;
When inductive head ten (30) detects workpiece, action is once successively for cylinder eight (8) and cylinder seven (7); Cylinder seven (7) completes binder work;
When inductive head ten (30) does not detect workpiece, rotating disk two (12) just stops the rotation; Now, cylinder eight (8) and cylinder seven (7) are failure to actuate;
The workpiece machined with regard to action once, is pushed finished product blanking slideway (10) when rotating disk two (12) calibration rotates one time by cylinder nine (9);
Separate inductive head (19) and ask for the angle that signal source is separation head (18) calibration on protractor one (16), realize electric motor clutch brake, thus ensure the separation precision of rotating disk one (11);
Separate inductive head (20) and ask for the angle that signal source is separation head (18) calibration on protractor two (17), realize electric motor clutch brake, thus ensure the separation precision of rotating disk two (12).
CN201210490931.5A 2012-11-27 2012-11-27 Equipment and method for assembling power lithium battery cap Expired - Fee Related CN103022386B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210490931.5A CN103022386B (en) 2012-11-27 2012-11-27 Equipment and method for assembling power lithium battery cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210490931.5A CN103022386B (en) 2012-11-27 2012-11-27 Equipment and method for assembling power lithium battery cap

Publications (2)

Publication Number Publication Date
CN103022386A CN103022386A (en) 2013-04-03
CN103022386B true CN103022386B (en) 2015-04-29

Family

ID=47970719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210490931.5A Expired - Fee Related CN103022386B (en) 2012-11-27 2012-11-27 Equipment and method for assembling power lithium battery cap

Country Status (1)

Country Link
CN (1) CN103022386B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103746136B (en) * 2013-12-10 2016-01-27 周俊雄 Battery cap cover plate Semi-automatic assembler
CN105261717B (en) * 2015-11-06 2017-10-03 无锡市金杨新型电源有限公司 A kind of automatic assembling machine of battery cap
CN105355808B (en) * 2015-11-12 2018-01-23 惠州金源精密自动化设备有限公司 Battery cap package system
CN108296763B (en) * 2017-12-25 2019-09-20 惠州金源精密自动化设备有限公司 Nut cap kludge
CN110369890B (en) * 2018-05-11 2021-05-18 深圳市通则新能源科技有限公司 Automatic assembling and welding equipment for battery cap
CN113067039B (en) * 2021-03-23 2022-03-22 安徽工程大学 Lithium battery pack discharging device and method for new energy automobile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4373129A (en) * 1978-07-03 1983-02-08 General Electric Company Apparatus for assembling and welding vented cell covers
CN201508863U (en) * 2009-08-21 2010-06-16 刘永通 Assembly machine for fully-automatic lithium ion battery cap
CN102082243A (en) * 2009-11-28 2011-06-01 比亚迪股份有限公司 Full-automatic cap combining device
CN102376904A (en) * 2010-08-12 2012-03-14 中山天贸电池有限公司 Automatic assembling machine of battery cover and assembling method therefor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4373129A (en) * 1978-07-03 1983-02-08 General Electric Company Apparatus for assembling and welding vented cell covers
CN201508863U (en) * 2009-08-21 2010-06-16 刘永通 Assembly machine for fully-automatic lithium ion battery cap
CN102082243A (en) * 2009-11-28 2011-06-01 比亚迪股份有限公司 Full-automatic cap combining device
CN102376904A (en) * 2010-08-12 2012-03-14 中山天贸电池有限公司 Automatic assembling machine of battery cover and assembling method therefor

Also Published As

Publication number Publication date
CN103022386A (en) 2013-04-03

Similar Documents

Publication Publication Date Title
CN103022386B (en) Equipment and method for assembling power lithium battery cap
CN204913254U (en) Full -automatic kludge of encoder
CN101954586B (en) Full-automatic screw assembling device
CN107662105A (en) A kind of tubing flexible manufacturing system (FMS)
CN103730694A (en) Lithium battery welding/detecting/marking integrated machine
CN104015047A (en) Automatic assembling machine for screws and gaskets
CN104440082A (en) Full-automatic assembly and riveting machine
CN206952167U (en) Powder metallurgy annular workpieces automatic immersion oil, machining, rewinding production line
CN202556133U (en) Multi-station automated rotary tool system
CN205790196U (en) Battery pack packaging production line
CN107196009B (en) Automatic disassembly machine for lithium battery gaskets
CN203944993U (en) The metal shell laser welding apparatus of battery core
CN103401022A (en) Multi-purpose cylindrical lithium battery cap packaging machine
CN201833170U (en) Full automatic screw assembly equipment
CN205363053U (en) Spot welding equipment for B-column outer plate assembly of automobile door plate
CN204093781U (en) A kind of sweep-up pipe of the band automatic valve for machining equipment
CN203076637U (en) Automatic machining equipment for automotive limiter shell
CN201376040Y (en) Rotary die device of CNC turret punching machine
CN202752822U (en) Automatic assembly device of core sleeve adapter connector
CN203667526U (en) Rotary disc type feeding mechanism for cylindrical workpieces
CN210729954U (en) Automobile bumper spraying machine arm convenient to maintain and replace
CN202878753U (en) Automatic waste removing device of die-cutting machine
CN202622463U (en) Machine tool chip removal device
CN104647018A (en) Workpiece picking-placing and fastening module for fastening robot
CN102139449B (en) Assembling production line of vertical dust collector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160527

Address after: 523857 Guangdong Province, Dongguan city Changan town people usha Community Road No. 3 one or two floor

Patentee after: Dongguan origin Amperex Technology Limited

Address before: 241000 No. 1 Zhangjiang Road, Yijiang hi tech Development Zone, Anhui, Wuhu

Patentee before: Wuhu Genyuan Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20191127

CF01 Termination of patent right due to non-payment of annual fee