Pipeline mounting machine and construction method thereof Download PDFInfo
- Publication number
- CN103016843A CN103016843A CN2012105557826A CN201210555782A CN103016843A CN 103016843 A CN103016843 A CN 103016843A CN 2012105557826 A CN2012105557826 A CN 2012105557826A CN 201210555782 A CN201210555782 A CN 201210555782A CN 103016843 A CN103016843 A CN 103016843A
- Authority
- CN
- China
- Prior art keywords
- operating table
- base plate
- fitting machine
- pipeline fitting
- basic platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
The invention discloses a pipeline mounting machine, which comprises a foundation platform, an operation platform, a hoisting rack and a hoisting device, wherein the operation platform is arranged above the foundation platform, the hoisting rack is arranged on the operation platform, the hoisting device is arranged on the hoisting rack, the bottom of the foundation platform is provided with wheels for stabilizing and moving, both sides of the foundation platform are respectively provided with an outward ladder, both sides of each outward ladder are respectively provided with an outward ladder rod, support rods of the operation platform are arranged under the operation platform, and the support rods of the operation platform are in sliding fit with the outward ladder rods. The pipeline mounting machine has the advantages that the structure is simple and convenient, the transportation and the movement are convenient, the installation of equipment or materials within certain height range is more convenient and rapid, the construction cost and the construction difficulty are reduced, the safety is improved, and the equipment or the materials are well protected.
Description
Technical field
The present invention relates to the technical field that the building pipe in the daily necessities is installed, especially a kind of pipeline fitting machine and method of construction thereof.
Background technique
In the present building, the equipment such as plumbing, fire protection pipeline, ventilation duct are a lot, and these pipelines generally are installed in below the floor plates, often have 3 to 5 meters high from flooring ground.The process sequences of installing is: fix first pipe support, then pipe, Valves and Fittings etc. is delivered to high vacancy, penetrate on the pipe support, carry out connection.Because pipe is generally several meters long, after penetrating pipe support, eminence also wants horizontal motion so lift.In order to finish these operations, the workman will set up the eminence operating platform first temporarily, and manages pipe fitting etc. is praised eminence.A lot of conduit component weight are at tens kilograms to 200 kilograms, although on the ground can be by the manpower transport, praise by manpower that installation is very difficult on 3 to 5 meters height.So the main method of at present pipeline installation is that in the place that needs the lifting pipeline, with EXPANSION ANCHOR BOLTS fixed manual/electric wire hoist, the pipe piece that needs are installed hangs on below floor plates (perhaps beam).And the horizontal motion pipe also mainly send by manpower, when taking a lot of work, also easily damages the corrosion-inhibiting coating of pipe.Because the service working time that the operating platform of temporary erection and Hoisting Machinery need is long.And when changing local an installation, because the aspect ratio of operating platform is higher, often can not by beam and the pipe-line equipment of having installed, more can not transport by machinery integrals such as building hoists, reinstall so it can only be pulled down new place, make installment work when flower, effort.
Existing product such as hydraulic lifting operating platform, although the height that can be raised to is large, initial weight is large, equipment is large, price is high, seldom uses in the installation of reality.So need a kind of simple to operate, cheap, preferably can be without the equipment mountion plate of electrical actuation power, to satisfy the needs of this class installment work.The machinery that patent CN200420002120.7, CN200410003060.5 provide a kind of pipeline that usefulness is installed, it arrives the method for eminence with hand-operated winch band running block riser subassembly, mechanism's more complicated, and also the velocity ratio of lifting workpieces is lower.
Summary of the invention
Technical problem to be solved by this invention is for improving the above-mentioned state of the art, can be by manpower movement and provide, above operating table can lifting, and can allow people's safety operation in the above, and a kind of pipeline fitting machine and the method for construction thereof of small-sized hoisting device are arranged on the platform.
The present invention solves the problems of the technologies described above the technological scheme that adopts:
A kind of pipeline fitting machine, comprise basic platform, be located at the operating table of basic platform top, be located at the crane boom on the operating table and be located at hoisting apparatus on the crane boom, platform bottom, basis is provided with for stable mobile wheel, and the both sides of basic platform are provided with outer cat ladder, and outer cat ladder both sides are provided with outer cat ladder bar, the operating table below is provided with operating table strut, set operating table strut and outer cat ladder bar slidable fit.
For optimizing technique scheme, the concrete measure of taking also comprises:
The basis platform is provided with the basic platform base plate that can supply the people to stand, and wheel is connected with basic platform base plate, and outer cat ladder is fixedly connected with basic platform base plate.
Operating table is provided with the operating table base plate that can supply the people to stand, and the operating table strut is fixedly connected with the operating table base plate, and the operating table both sides are provided with interior cat ladder, and interior cat ladder is fixedly connected with the operating table base plate.
Crane boom cooperates with the operating table base plate hinged, and crane boom is connected with the crane boom hound, and the operating table base plate is provided with hinge last, and crane boom hound and operating table base plate are by the hinge last pin joint, and the crane boom hound cooperates with crane boom is hinged; The operating table base plate is provided with guardrail, and guardrail cooperates with the operating table base plate hinged, and guardrail is connected with the guardrail hound, and guardrail hound and operating table base plate are by the hinge last pin joint, and the guardrail hound cooperates with guardrail is hinged.
Basis platform base plate is provided with folding pin, and folding pin cooperates with basic platform base plate hinged.
Hoisting apparatus is chain hois or electric hoist, and crane boom is provided with hook, and hoisting apparatus hangs on the hook.
Be equipped with the fixed hole that at least one can insert latch on outer cat ladder bar and the operating table strut, in the outer cat ladder bar update platform strut and the two be fixedly connected with by fixed hole.
An end is provided with handgrip on the platform base plate of basis, and handgrip cooperates with basic platform base plate hinged; Basis platform base plate is provided with the fixed feet that is fixedly connected with basic platform base plate at the end near handgrip.
Wheel is provided with three at least, and wheel has at least one to be universal wheels or the omni-directional wheel that turns in order to control.
Method of construction may further comprise the steps:
After step 5, the installation, the operating table contracting is fallen, pack up folding pin, utilize wheel that the pipeline fitting machine is moved to next job position.
When using a kind of pipeline fitting machine of the present invention, first folding pin is packed up, that uses the job site moves to the present invention the below, position that need to carry out installation such as the haulage device such as lift and wheel, again folding pin is propped, so that invention keeps stable, again crane boom and guardrail are installed together with crane boom hound and guardrail hound, by the lifting that operating table can be made progress of cat ladder in the lifting upwards, when being lifted to the height that needs, by in fixed hole, inserting latch so that outside cat ladder bar and operating table strut fix, so that operating table is fixed with respect to basic platform, the user by outer cat ladder and interior cat ladder climb on the operating table hoisting apparatus hung after, the user just can use hoisting apparatus equipment or the material that needs to install of slinging to carry out installation at operating table.Use handle and wheel can be with the promotion of the present invention as wheelbarrow.And handle can upwards be packed up obsolete the time, reduces the convenient transportation of overall dimensions of mechanism.
A kind of pipeline fitting machine of the present invention is simple and light; be convenient to transportation mobile; energy is more convenient and quicker so that the installation of the equipment in the certain altitude scope or material becomes, and reducing construction cost and difficulty have improved Security and can protect better equipment or material.
Description of drawings
Fig. 1 is the structural representation of the first embodiment of the present invention;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the structural representation of the second embodiment of the present invention;
Fig. 4 is the structural representation of the guardrail among Fig. 1 and Fig. 3;
Fig. 5 is the structural representation of the crane boom among Fig. 1 and Fig. 3;
Fig. 6 is strut among Fig. 1 and Fig. 3 and the structural representation of outer cat ladder bar joint;
Fig. 7 is the side-looking structural representation of Fig. 6;
Fig. 8 is the structural representation of the folding pin among Fig. 1 and Fig. 3.
Embodiment
Below in conjunction with accompanying drawing embodiments of the invention are described in further detail.
Fig. 1 is to Figure 8 shows that structural representation of the present invention.
Reference character wherein is: operating table 1, operating table base plate 1A, basic platform 2, basic platform base plate 2A, crane boom 3, crane boom hound 3A, hook 3B, hoisting apparatus 4, wheel 5, outer cat ladder 6, outer cat ladder bar 6A, interior cat ladder 7, operating table strut 8, fixed hole 9, guardrail 10, guardrail hound 10A, hinge last 11, folding pin 12, handgrip 13, fixed feet 14.
The first embodiment:
Such as Fig. 1, Fig. 2, Fig. 4 to shown in Figure 8, a kind of pipeline fitting machine of the present invention, comprise basic platform 2, be located at the operating table 1 of basic platform 2 tops, be located at the crane boom 3 on the operating table 1 and be located at hoisting apparatus 4 on the crane boom 3, basic platform 2 bottoms are provided with for stable mobile wheel 5, and the both sides of basic platform 2 are provided with outer cat ladder 6, outer cat ladder 6 both sides are provided with outer cat ladder bar 6A, and operating table 1 below is provided with operating table strut 8, set operating table strut 8 and outer cat ladder bar 6A slidable fit.
Operating table 1 is provided with the operating table base plate 1A that can supply the people to stand, and operating table strut 8 is fixedly connected with operating table base plate 1A, and operating table 1 both sides are provided with interior cat ladder 7, and interior cat ladder 7 is fixedly connected with operating table base plate 1A.
Basis platform base plate 2A is provided with folding pin 12, folding pin 12 and basic hinged cooperation of platform base plate 2A.
Hoisting apparatus 4 is chain hois or electric hoist, and crane boom 3 is provided with hook 3B, and hoisting apparatus 4 hangs on the hook 3B.
Be equipped with at least one fixed hole that can insert latch 9 on outer cat ladder bar 6A and the operating table strut 8, in the outer cat ladder bar 6A update platform strut 8 and the two be fixedly connected with by fixed hole 9.
A platform base plate 2A upper end in basis is provided with handgrip 13, handgrip 13 and basic hinged cooperation of platform base plate 2A; Basis platform base plate 2A is provided with the fixed feet 14 that is fixedly connected with basic platform base plate 2A at the end near handgrip 13.
Method of construction may further comprise the steps:
After step 5, the installation, operating table 1 contracting is fallen, pack up folding pin 12, utilize wheel 5 that the pipeline fitting machine is moved to next job position.
When obsolete the time, because hoisting apparatus 4 is suspended on the hook 3B, can disassemble.The latch of fixed frame hound 3A and guardrail hound 10A is extracted, crane boom 3 and guardrail 10 can be fallen together with crane boom hound 3A and guardrail hound 10A, dwindle the convenient transportation of overall dimensions of mechanism.
When using a kind of pipeline fitting machine of the present invention, first folding pin 12 is packed up, that uses the job site moves to the present invention the below, position that need to carry out installation such as the haulage device such as lift and wheel 5, again folding pin 12 is propped, so that invention keeps stable, again crane boom 3 and guardrail 10 are installed together with crane boom hound 3A and guardrail hound 10A, can be with operating table 1 upwards lifting by cat ladder 7 in the lifting that makes progress, when being lifted to the height that needs, by to fixed hole 9 interior insertion latches so that outside cat ladder bar 6A and operating table strut 8 fixing, so that operating table 1 is fixed with respect to basic platform 2, the user by outer cat ladder 6 and interior cat ladder 7 climb on the operating table 1 with hoisting apparatus 4 hang good after, the user just can use hoisting apparatus 4 sling at operating table 2 needs equipment or the material of installation to carry out installation.
Use handle 13 and wheel 5 can be with the promotion of the present invention as wheelbarrow.And handle 13 can upwards be packed up obsolete the time, reduces the convenient transportation of overall dimensions of mechanism.
The second embodiment:
Extremely shown in Figure 8 such as Fig. 3, a kind of pipeline fitting machine of the present invention, wheel 5 is provided with three at least, and wheel 5 has at least one to be universal wheels or the omni-directional wheel that turns in order to control.
When using a kind of pipeline fitting machine of the present invention, the state of packing up at folding pin 12 only need to be according to the mobile demand driving pipeline fitting machine of transportation, just can so that the pipeline fitting machine move.
Do not state part identical with the first embodiment.
In sum; a kind of pipeline fitting machine of the present invention is simple and light, is convenient to transportation mobile, and energy is more convenient and quicker so that the installation of the equipment in the certain altitude scope or material becomes; reducing construction cost and difficulty have improved Security and can protect better equipment or material.
Claims (10)
1. pipeline fitting machine, comprise basic platform (2), be located at the operating table (1) of basic platform (2) top, be located at the crane boom (3) on the operating table (1) and be located at hoisting apparatus (4) on the crane boom (3), it is characterized in that: described basic platform (2) bottom is provided with for stable mobile wheel (5), and the both sides of basic platform (2) are provided with outer cat ladder (6), described outer cat ladder (6) both sides are provided with outer cat ladder bar (6A), described operating table (1) below is provided with operating table strut (8), set operating table strut (8) and outer cat ladder bar (6A) slidable fit.
2. a kind of pipeline fitting machine according to claim 1, it is characterized in that: described basic platform (2) is provided with the basic platform base plate (2A) that can supply the people to stand, described wheel (5) is connected with basic platform base plate (2A), and described outer cat ladder (6) is fixedly connected with basic platform base plate (2A).
3. a kind of pipeline fitting machine according to claim 2, it is characterized in that: described operating table (1) is provided with the operating table base plate (1A) that can supply the people to stand, described operating table strut (8) is fixedly connected with operating table base plate (1A), described operating table (1) both sides are provided with interior cat ladder (7), and described interior cat ladder (7) is fixedly connected with operating table base plate (1A).
4. a kind of pipeline fitting machine according to claim 3, it is characterized in that: described crane boom (3) and hinged cooperation of operating table base plate (1A), described crane boom (3) is connected with crane boom hound (3A), described operating table base plate (1A) is provided with hinge last (11), described crane boom hound (3A) passes through hinge last (11) pin joint with operating table base plate (1A), and crane boom hound (3A) and hinged cooperation of crane boom (3); Described operating table base plate (1A) is provided with guardrail (10), described guardrail (10) and hinged cooperation of operating table base plate (1A), described guardrail (10) is connected with guardrail hound (10A), described guardrail hound (10A) passes through described hinge last (11) pin joint with operating table base plate (1A), and guardrail hound (10A) and hinged cooperation of guardrail (10).
5. a kind of pipeline fitting machine according to claim 4, it is characterized in that: described basic platform base plate (2A) is provided with folding pin (12), described folding pin (12) and hinged cooperation of basic platform base plate (2A).
6. a kind of pipeline fitting machine according to claim 5, it is characterized in that: described hoisting apparatus (4) is chain hois or electric hoist, described crane boom (3) is provided with hook (3B), and described hoisting apparatus (4) hangs on the hook (3B).
7. a kind of pipeline fitting machine according to claim 6, it is characterized in that: be equipped with at least one fixed hole that can insert latch (9) on described outer cat ladder bar (6A) and the operating table strut (8), in described outer cat ladder bar (6A) the update platform strut (8) and the two be fixedly connected with by fixed hole (9).
8. a kind of pipeline fitting machine according to claim 7, it is characterized in that: the upper end of described basic platform base plate (2A) is provided with handgrip (13), handgrip (13) and hinged cooperation of basic platform base plate (2A); Described basic platform base plate (2A) is provided with the fixed feet (14) that is fixedly connected with basic platform base plate (2A) at the end near handgrip (13).
9. a kind of pipeline fitting machine according to claim 7, it is characterized in that: described wheel (5) is provided with three at least, and described wheel (5) has at least one to be universal wheels or the omni-directional wheel that turns in order to control.
10. method of construction such as the described pipeline fitting machine of the arbitrary claim of claim 1 to 9 is characterized in that: may further comprise the steps:
Step 1, the pipeline fitting machine that will fold attitude are transported to the installation exercise floor, with manually utilizing wheel (5) the pipeline fitting machine to be moved to the position that needs operation;
Step 2, put down on the pipeline fitting machine folding pin (12) that is used for the fixation machine body position, and bear pipeline fitting machine weight with folding pin (12);
Step 3, operating table (1) is lifted to the height that needs with manpower, and is fixed;
Step 4, hoisting apparatus (4) is suspended on the crane boom (3), and will parts rise to setting height(from bottom) with hoisting apparatus (4), install;
After step 5, the installation, operating table (1) contracting is fallen, pack up folding pin (12), utilize wheel (5) that the pipeline fitting machine is moved to next job position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210555782.6A CN103016843B (en) | 2012-12-20 | 2012-12-20 | Pipeline mounting machine and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210555782.6A CN103016843B (en) | 2012-12-20 | 2012-12-20 | Pipeline mounting machine and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103016843A true CN103016843A (en) | 2013-04-03 |
CN103016843B CN103016843B (en) | 2015-03-25 |
Family
ID=47965771
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210555782.6A Expired - Fee Related CN103016843B (en) | 2012-12-20 | 2012-12-20 | Pipeline mounting machine and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103016843B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104627849A (en) * | 2015-02-03 | 2015-05-20 | 中建五局工业设备安装有限公司 | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline |
CN104747799A (en) * | 2015-03-24 | 2015-07-01 | 上海市安装工程集团有限公司 | Installing device and method for spiral air hoses in ultra high and large space truss |
CN107387867A (en) * | 2017-06-20 | 2017-11-24 | 五冶集团上海有限公司 | A kind of construction method and Mobile operating platform for being used to install silo roof fire protection pipeline |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11131791A (en) * | 1997-10-31 | 1999-05-18 | Nkk Corp | Working frame for overhead pipe laying |
CN2383905Y (en) * | 1998-09-17 | 2000-06-21 | 宋永军 | Portable combined lift scaffold |
KR200365820Y1 (en) * | 2004-07-26 | 2004-10-25 | 재단법인 한국재난연구원 | Assembly scaffolding fixing apparatus for safety measurement of construction's bottom part |
EP1647512A1 (en) * | 2003-07-22 | 2006-04-19 | Mitsubishi Denki Kabushiki Kaisha | Working scaffold system of elevator |
CN101905840A (en) * | 2010-07-07 | 2010-12-08 | 大连大矿冶金起重机有限公司 | Underground coal mine crane |
CN202465191U (en) * | 2012-03-03 | 2012-10-03 | 汪明霞 | Hoisting and carrying handcart |
CN202946764U (en) * | 2012-12-20 | 2013-05-22 | 甬港现代工程有限公司 | Pipe installation machine |
-
2012
- 2012-12-20 CN CN201210555782.6A patent/CN103016843B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11131791A (en) * | 1997-10-31 | 1999-05-18 | Nkk Corp | Working frame for overhead pipe laying |
CN2383905Y (en) * | 1998-09-17 | 2000-06-21 | 宋永军 | Portable combined lift scaffold |
EP1647512A1 (en) * | 2003-07-22 | 2006-04-19 | Mitsubishi Denki Kabushiki Kaisha | Working scaffold system of elevator |
KR200365820Y1 (en) * | 2004-07-26 | 2004-10-25 | 재단법인 한국재난연구원 | Assembly scaffolding fixing apparatus for safety measurement of construction's bottom part |
CN101905840A (en) * | 2010-07-07 | 2010-12-08 | 大连大矿冶金起重机有限公司 | Underground coal mine crane |
CN202465191U (en) * | 2012-03-03 | 2012-10-03 | 汪明霞 | Hoisting and carrying handcart |
CN202946764U (en) * | 2012-12-20 | 2013-05-22 | 甬港现代工程有限公司 | Pipe installation machine |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104627849A (en) * | 2015-02-03 | 2015-05-20 | 中建五局工业设备安装有限公司 | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline |
CN104627849B (en) * | 2015-02-03 | 2017-05-10 | 中建五局工业设备安装有限公司 | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline |
CN104747799A (en) * | 2015-03-24 | 2015-07-01 | 上海市安装工程集团有限公司 | Installing device and method for spiral air hoses in ultra high and large space truss |
CN107387867A (en) * | 2017-06-20 | 2017-11-24 | 五冶集团上海有限公司 | A kind of construction method and Mobile operating platform for being used to install silo roof fire protection pipeline |
Also Published As
Publication number | Publication date |
---|---|
CN103016843B (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202946764U (en) | Pipe installation machine | |
CN105236276A (en) | Foldable gantry crane capable of ascending and descending | |
CN203922518U (en) | A kind of portable high-building hoisting machine | |
CN201417657Y (en) | Installation device of indoor transformer | |
CN105003082A (en) | Glass curtain wall mounting equipment and glass curtain mounting method | |
CN102877637A (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
CN105271011A (en) | Multifunctional micro hoister | |
CN201024048Y (en) | Automatic material-feeding machine | |
CN103016843B (en) | Pipeline mounting machine and construction method thereof | |
CN204454401U (en) | A kind of high-rise material small hoist assembling device | |
CN205773024U (en) | Convenient pipeline promotes auxiliary device | |
CN211255042U (en) | Hoisting device with cantilever rotating in all directions | |
CN202193564U (en) | Simple and convenient bridge crane | |
CN206346500U (en) | Compact simplified arm extending type straddle truck | |
CN204401999U (en) | Climbing scaffold with unloading platform | |
CN103264978B (en) | Hanging Operation Van | |
CN203382467U (en) | Hanging operation vehicle | |
CN209038882U (en) | A kind of moveable suspended bracket for lifting pipeline in piping lane | |
CN203865929U (en) | Portable crane | |
JP2014047479A (en) | Method for lifting demolishing heavy machine to building to be demolished | |
CN211286535U (en) | A remove operation platform for indoor building by laying bricks or stones, plastering construction | |
CN201544355U (en) | Small-sized concrete mixer with high-level feeding mechanism | |
CN212769534U (en) | Rotatable simple and easy hoist device | |
CN108100896B (en) | Pipeline lifting and conveying device and method | |
CN205314588U (en) | Building building material lift system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |