CN103009475A - 一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置 - Google Patents

一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置 Download PDF

Info

Publication number
CN103009475A
CN103009475A CN2012105732628A CN201210573262A CN103009475A CN 103009475 A CN103009475 A CN 103009475A CN 2012105732628 A CN2012105732628 A CN 2012105732628A CN 201210573262 A CN201210573262 A CN 201210573262A CN 103009475 A CN103009475 A CN 103009475A
Authority
CN
China
Prior art keywords
wall structure
shear wall
reserving
sleeve pipe
magnetic bases
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105732628A
Other languages
English (en)
Inventor
蔡宏平
沈亮
张�林
周小军
陈海东
梅九虎
李小鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd
Zhongnan Construction (shenyang) Construction Industry Co Ltd
Original Assignee
NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd
Zhongnan Construction (shenyang) Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd, Zhongnan Construction (shenyang) Construction Industry Co Ltd filed Critical NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd
Priority to CN2012105732628A priority Critical patent/CN103009475A/zh
Publication of CN103009475A publication Critical patent/CN103009475A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置,包括磁性底座、螺杆、压板和螺栓,所述螺杆竖直固定在磁性底座上,当所述磁性底座吸附固定在台模上,套管可穿过螺杆其底端套装固定在所述磁性底座的四周,所述压板穿过螺杆通过螺栓压合固定在套管的上端口上;本发明所述的在预制装配整体式剪力墙结构的叠合板上预留套管的装置,结构简单,使用方便,能够防止混凝土振捣时套管发生位移。

Description

一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置
技术领域
本发明涉及一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置,属于建筑领域。
背景技术
预制装配整体式剪力墙结构的叠合板上,需要预留给排水的套管,常有用于厨房、卫生间以及阳台、空调板等的地漏、排水管、给水管等。因为在工厂自动流水生产线的台模上固定困难,台模是全钢不锈铁的面板,厚度为10mm,且为确保预制构件的品质,台模上严禁钻研,因此预埋套管的传统固定方法只能是依靠铁丝等工具绑扎在骨架的钢筋上。这种固定方案在混凝土振捣时往往发生位移,造成后期安装时重新开洞,不仅费工费时对质量也造成一定影响。
发明内容
发明目的:本发明的目的在于针对现有技术的不足,提供一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置,操作简单,能够防止混凝土振捣时套管发生位移。
技术方案:本发明所述的一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置,包括磁性底座、螺杆、压板和螺栓,所述螺杆竖直固定在磁性底座上,当所述磁性底座吸附固定在台模上,套管可穿过螺杆其底端套装固定在所述磁性底座的四周,所述压板穿过螺杆通过螺栓压合固定在套管的上端口上。
进一步地,所述磁性底座的吸附力大于或等于176.4N,确保叠合板在振动台上震动时磁性底座不移位,保证预留的精度。
进一步地,所述磁性底座呈圆台形。
进一步地,所述螺杆位于所述磁性底座的中心位置。
本发明与现有技术相比,其有益效果是:本发明所述的在预制装配整体式剪力墙结构的叠合板上预留套管的装置,结构简单,使用方便,能够防止混凝土振捣时套管发生位移。
附图说明
图1为本发明的剖面示意图。
具体实施方式
下面对本发明技术方案进行详细说明,但是本发明的保护范围不局限于所述实施例。
如图1所示,一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置,包括圆台形磁性底座1、螺杆2、压板3和螺栓4,所述螺杆2竖直固定在磁性底座1的中心位置处,当所述磁性底座1吸附固定在台模5上,套管6可穿过螺杆2其底端套装固定在所述磁性底座1的四周,所述压板3穿过螺杆2通过螺栓4压合固定在套管6的上端口上,所述磁性底座1的吸附力大于或等于176.4N。
上述装置结构简单,使用方便,在预制装配整体式剪力墙结构的叠合板时可将套管6精确地固定在叠合板7上。
 如上所述,尽管参照特定的优选实施例已经表示和表述了本发明,但其不得解释为对本发明自身的限制。在不脱离所附权利要求定义的本发明的精神和范围前提下,可对其在形式上和细节上作出各种变化。

Claims (4)

1.一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置,其特征在于,包括磁性底座、螺杆、压板和螺栓,所述螺杆竖直固定在磁性底座上,当所述磁性底座吸附固定在台模上,套管可穿过螺杆其底端套装固定在所述磁性底座的四周,所述压板穿过螺杆通过螺栓压合固定在套管的上端口上。
2.根据权利要求1所述的在预制装配整体式剪力墙结构的叠合板上预留套管的装置,其特征在于,所述磁性底座的吸附力大于或等于176.4N。
3.根据权利要求1所述的在预制装配整体式剪力墙结构的叠合板上预留套管的装置,其特征在于,所述磁性底座呈圆台形。
4.根据权利要求3所述的在预制装配整体式剪力墙结构的叠合板上预留套管的装置,其特征在于,所述螺杆位于所述磁性底座的中心位置。
CN2012105732628A 2012-12-26 2012-12-26 一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置 Pending CN103009475A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105732628A CN103009475A (zh) 2012-12-26 2012-12-26 一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105732628A CN103009475A (zh) 2012-12-26 2012-12-26 一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置

Publications (1)

Publication Number Publication Date
CN103009475A true CN103009475A (zh) 2013-04-03

Family

ID=47958854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105732628A Pending CN103009475A (zh) 2012-12-26 2012-12-26 一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置

Country Status (1)

Country Link
CN (1) CN103009475A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290968A (zh) * 2013-05-17 2013-09-11 南通建筑工程总承包有限公司 一种pvc排水套管与叠合板复合结构
CN109514724A (zh) * 2018-12-05 2019-03-26 中建科技湖南有限公司 一种预制构件生产预埋定位装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19814026A1 (de) * 1998-03-30 1999-10-07 Reymann Technik Gmbh Vorrichtung zum Setzen von Magnetkörpern auf einer Schalungsplatte
CN101514588A (zh) * 2009-03-31 2009-08-26 湖南西城华兴科技发展有限公司 一种建筑预埋件
CN202227696U (zh) * 2011-10-14 2012-05-23 中国二十二冶集团有限公司 装配式混凝土结构套管固定器
CN202985765U (zh) * 2012-12-26 2013-06-12 中南建设(沈阳)建筑产业有限公司 一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19814026A1 (de) * 1998-03-30 1999-10-07 Reymann Technik Gmbh Vorrichtung zum Setzen von Magnetkörpern auf einer Schalungsplatte
CN101514588A (zh) * 2009-03-31 2009-08-26 湖南西城华兴科技发展有限公司 一种建筑预埋件
CN202227696U (zh) * 2011-10-14 2012-05-23 中国二十二冶集团有限公司 装配式混凝土结构套管固定器
CN202985765U (zh) * 2012-12-26 2013-06-12 中南建设(沈阳)建筑产业有限公司 一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290968A (zh) * 2013-05-17 2013-09-11 南通建筑工程总承包有限公司 一种pvc排水套管与叠合板复合结构
CN103290968B (zh) * 2013-05-17 2016-03-23 南通建筑工程总承包有限公司 一种pvc排水套管与叠合板复合结构
CN109514724A (zh) * 2018-12-05 2019-03-26 中建科技湖南有限公司 一种预制构件生产预埋定位装置

Similar Documents

Publication Publication Date Title
CN106869489A (zh) 超高层核心筒水平与竖向同步施工顶模系统及施工方法
CN204163115U (zh) 一种后浇带吊模板施工装置
EP2261430A3 (en) Constructing an overhang
NZ602866A (en) False formwork for moulding concrete panels
CN211114798U (zh) 厨卫间降板定型模具
CN103009475A (zh) 一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置
CN102505839A (zh) 工业厂房弧形剪力墙浇筑用弧形模板及其制作方法
CN202985765U (zh) 一种在预制装配整体式剪力墙结构的叠合板上预留套管的装置
CN205617732U (zh) 一种施工现场管道式楼层垃圾清理系统
CN102425271B (zh) 建筑楼板用马凳
CN103321405A (zh) 剪力墙、筒体混凝土结构大模板提升式施工方法
CN204126264U (zh) 穿板预埋套管固定工具
KR20120061423A (ko) 가설지지기둥을 이용한 슬래브 및 코어월 콘크리트 동시 타설공법
CN103161311B (zh) 大口径钢筋混凝土管道横穿桥台的施工方法
CN207892083U (zh) 装配式剪力墙板底有高差连接处支撑系统
CN109016093A (zh) 一种装配式墙板立模浇筑平台
CN205804949U (zh) 一种止水反梁模板安装固定装置
CN204185062U (zh) U型电梯导轨支架
CN104960076A (zh) 预制装配式楼梯模具
CN203924713U (zh) 一种混凝土楼板上孔洞的预留装置
CN210263989U (zh) 一种房建墙体支撑结构
CN207739656U (zh) 一种洞口边悬空预制墙现场临时支撑装置
CN209194876U (zh) 一种新型的吊装、锚固一体化pc构件吊具
CN205100571U (zh) 一种预制整体卫生间快速安装就位装置
EP2130992A3 (en) Device, formwork, equipment and method for the production of horizontal flat structures, such as bearing floors, floors or similar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130403