CN103001693B - 光模块测试方法 - Google Patents
光模块测试方法 Download PDFInfo
- Publication number
- CN103001693B CN103001693B CN201210569911.7A CN201210569911A CN103001693B CN 103001693 B CN103001693 B CN 103001693B CN 201210569911 A CN201210569911 A CN 201210569911A CN 103001693 B CN103001693 B CN 103001693B
- Authority
- CN
- China
- Prior art keywords
- test
- measured
- optical module
- ambient temperature
- item
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing Of Optical Devices Or Fibers (AREA)
Abstract
本发明公开了一种光模块测试方法,包括如下步骤:在多个不同环境温度下对至少一个具有唯一序列号的待测光模块进行至少一个测试项的测试;将当前测试时的环境温度、待测光模块序列号和每个测试项的测试数据相关联以索引表方式存储在本地数据库中,所述每个测试项的测试数据以待测光模块序列号为索引,所述待测光模块序列号以环境温度为索引;当测试中断重新测试时,根据本地数据库中存储的索引表查找判断每个环境温度下哪些待测光模块未完成所有测试项,对未完成所有测试项的待测光模块继续进行测试。本发明方法不需要对已经完成所有测试的光模块重新进行测试,避免了重复测试,测试效率提高。
Description
技术领域
本发明涉及光通信技术领域,特别涉及一种光模块测试方法。
背景技术
在生产通信光模块的过程中,需要对光模块进行各种性能参数测试,例如对光模块发射光功率、接收光功率、光眼图等的测试。测试前将多个待测光模块安装在测试板上,位于测试板上的光模块通过多路光开关与各种光路测试仪器连接,测试主机与连接测试板,控制测试板对多个光模块进行测试。目前在测试过程中,如果遇到停电等故障,工人需要对所有光模块重新进行测试,浪费人力物力,生产成本增加,光模块测试效率大大降低。
发明内容
本发明的目的在于克服现有技术中所存在的上述不足,提供一种提高测试效率、节省人力物力财力的光模块测试方法。
为了实现上述发明目的,本发明提供了以下技术方案:
一种光模块测试方法,该方法包括如下步骤:
a)在多个不同环境温度下对至少一个具有唯一序列号的待测光模块进行至少一个测试项的测试;
b)将当前测试时的环境温度、待测光模块序列号和每个测试项的测试数据相关联以索引表方式存储在本地数据库中,所述每个测试项的测试数据以待测光模块序列号为索引,所述待测光模块序列号以环境温度为索引;其中,每个环境温度对应至少一个待测光模块序列号,每个待测光模块序列号再对应至少一个测试项的测试数据;
c)当测试中断重新测试时,将本地数据库中存储的索引表查找判断每个环境温度下哪些待测光模块未完成所有测试项,对未完成所有测试项的待测光模块继续进行测试。
其中,所述步骤a)和步骤c)中,当一个环境温度下所有待测光模块的测试项都测试完后,再进行下一环境温度下所有待测光模块的测试。
进一步的,当一个待测光模块的所有测试项都完成后,再测试下一个待测光模块;若一个待测光模块的所有测试项未完成,则下次重新测试该待测光模块。
所述测试项为光功率测试、光眼图测试,消光比测试、灵敏度测试中的至少一个。
根据本发明实施例,当完成一轮测试后将本地数据库中存储的测试数据上传到服务器存储。
根据本发明实施例,当将本地数据库中存储的测试数据上传至服务器失败后,由人工手动将本地数据库中存储的测试数据导入服务器。
与现有技术相比,本发明的有益效果:
本发明的光模块测试方法在多个不同环境温度下对至少一个具有唯一序列号的待测光模块进行至少一个测试项的测试;将当前测试时的环境温度、待测光模块序列号和每个测试项的测试数据相关联以索引表方式存储在本地数据库中,当测试中断重新测试时,可以根据本地数据库中存储的索引表查找判断每个环境温度下哪些待测光模块未完成所有测试项,对未完成所有测试项的待测光模块继续进行测试,不需要对已经完成所有测试的光模块重新进行测试,避免了重复测试,测试效率提高,节省人力物力财力,降低生产成本。
附图说明:
图1为本发明测试方法流程图。
具体实施方式
下面结合试验例及具体实施方式对本发明作进一步的详细描述。但不应将此理解为本发明上述主题的范围仅限于以下的实施例,凡基于本发明内容所实现的技术均属于本发明的范围。
本发明测试前将多个待测光模块安装在测试板上,多个待测光模块通过测试板与各种测试仪器连接,例如光功率计(测试光功率)、示波器(测试光眼图),衰减器(测试灵敏度,过载,光功率差损等)等。测试主机与测试板总线连接,将安装有多个待测光模块的测试板放置在温箱中,测试主机控制温箱温度,同时控制测试板对多个待测光模块进行测试。以上这些都是现有成熟技术,不再详述。
参考图1,本发明的光模块测试方法包括如下步骤:
a)在多个不同环境温度下对至少一个具有唯一序列号的待测光模块进行至少一个测试项的测试。测试主机控制调节温箱温度,在每一个测试环境温度下,对光模块进行至少一个测试项的测试。测试主机通过下发指令到测试板扫描读取光模块序列号并保存在测试主机内备用。测试数据以环境温度、光模块序列号为索引保存,一一对应。
b)测试主机将当前测试时的环境温度、待测光模块序列号和每个测试项的测试数据相关联以索引表方式存储在本地数据库中,所述每个测试项的测试数据以待测光模块序列号为索引,所述待测光模块序列号以环境温度为索引;其中,每个环境温度对应至少一个待测光模块序列号,每个待测光模块序列号再对应至少一个测试项的测试数据。其中所述本地数据库可以位于测试主机内,也可以是单独的与测试主机连接的本地数据库。
c)当测试中断重新测试时,测试主机从本地数据库中读取与每个环境温度下各待测光模块对应的测试项及该项测试数据,判断每个环境温度下哪些待测光模块未完成所有测试项,对未完成所有测试项的待测光模块继续进行测试。完成本次所有光模块测试后取下所有光模块,在测试板上安装下一批光模块进行测试。测试时可根据情况选择需要重新测试的光模块和温度点,对未完成待测温度点测试的光模块及未完成该温度点对应的所有测试项的光模块继续进行测试,而不需要重新对已完成多温度点测试的光模块进行重复测试,测试效率提高。
其中,所述步骤a)和步骤c)中,当一个环境温度下所有待测光模块的测试项都测试完后,再进行下一环境温度下所有待测光模块的测试。当一个待测光模块的所有测试项都完成后,再测试下一个待测光模块;若一个待测光模块的所有测试项未完成,则下次重新测试该待测光模块。所述测试项为光功率测试、光眼图测试,消光比测试,灵敏度测试中的至少一个,但不限于以上几种,还可以包括过载测试,光功率差损测试等常用测试项,这里不一一列出。
为了保证数据存储的安全可靠性,所述本地数据库(位于测试主机内)还连接有服务器,当完成一轮测试后将本地数据库中存储的测试数据上传到服务器存储。进一步的,当由于网络或其他原因将本地数据库中存储的测试数据上传至服务器失败后,由人工手动将本地数据库中存储的测试数据导入服务器,不丢失数据,增强数据存储安全可靠性。
本发明的光模块测试方法通过软硬件的结合实现,在多个不同环境温度下对至少一个具有唯一序列号的待测光模块进行至少一个测试项的测试;将当前测试时的环境温度、待测光模块序列号和每个测试项的测试数据相关联以索引表方式存储在本地数据库中,每个环境温度下对应所有待测光模块序列号,每个待测光模块序列号再对应多个测试项及相应的测试数据,当测试中断重新测试时,可以根据本地数据库中存储的索引表查找判断每个环境温度下哪些待测光模块未完成所有测试项,对未完成所有测试项的待测光模块继续进行测试,不需要对已经完成所有测试的光模块重新进行测试,避免了重复测试,测试效率提高,节省人力物力财力,降低生产成本。
Claims (4)
1.一种光模块测试方法,其特征在于,该方法包括如下步骤:
a)在多个不同环境温度下对至少一个具有唯一序列号的待测光模块进行至少一个测试项的测试;
b)将当前测试时的环境温度、待测光模块序列号和每个测试项的测试数据相关联以索引表方式存储在本地数据库中,所述每个测试项的测试数据以待测光模块序列号为索引,所述待测光模块序列号以环境温度为索引;其中,每个环境温度对应至少一个待测光模块序列号,每个待测光模块序列号再对应至少一个测试项的测试数据;
c)当测试中断重新测试时,根据本地数据库中存储的索引表查找判断每个环境温度下哪些待测光模块未完成所有测试项,对未完成所有测试项的待测光模块继续进行测试;
所述步骤a)和步骤c)中,当一个环境温度下所有待测光模块的测试项都测试完后,再进行下一环境温度下所有待测光模块的测试;
当一个待测光模块的所有测试项都完成后,再测试下一个待测光模块;若一个待测光模块的所有测试项未完成,则下次重新测试该待测光模块。
2.根据权利要求1所述光模块测试方法,其特征在于,所述测试项为光功率测试、光眼图测试,消光比测试、灵敏度测试中的至少一个。
3.根据权利要求1所述光模块测试方法,其特征在于,当完成一轮测试后将本地数据库中存储的测试数据上传到服务器存储。
4.根据权利要求3所述光模块测试方法,其特征在于,当本地数据库中存储的测试数据上传至服务器失败后,由人工手动将本地数据库中存储的测试数据导入服务器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210569911.7A CN103001693B (zh) | 2012-12-25 | 2012-12-25 | 光模块测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210569911.7A CN103001693B (zh) | 2012-12-25 | 2012-12-25 | 光模块测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103001693A CN103001693A (zh) | 2013-03-27 |
CN103001693B true CN103001693B (zh) | 2016-09-21 |
Family
ID=47929871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210569911.7A Active CN103001693B (zh) | 2012-12-25 | 2012-12-25 | 光模块测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103001693B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103500112A (zh) * | 2013-10-11 | 2014-01-08 | 索尔思光电(成都)有限公司 | 软件版本控制方法 |
CN108170109A (zh) * | 2017-12-19 | 2018-06-15 | 武汉恒泰通技术有限公司 | 一种光发射器调试装置及其调试方法 |
CN108259085A (zh) * | 2017-12-30 | 2018-07-06 | 武汉凌科通光电科技有限公司 | 光电子器件良品检测方法及系统 |
CN110457187B (zh) * | 2019-06-28 | 2023-05-12 | 武汉迎风聚智科技有限公司 | 基于备份测试数据可便捷运行的tpc-e测试方法及测试服务器 |
CN111181632A (zh) * | 2020-01-02 | 2020-05-19 | 武汉思博源科技有限公司 | 一种sfp光模块的自动化测试系统 |
CN111722655B (zh) * | 2020-08-04 | 2022-02-25 | 国家电网有限公司信息通信分公司 | 一种光模块调测系统、光模块调测方法及上位机 |
CN112187356B (zh) * | 2020-10-13 | 2021-11-30 | 速博通讯(山东)有限公司 | 一种sfp光模块的自动化测试系统 |
CN113866530A (zh) * | 2021-08-17 | 2021-12-31 | 广西电网有限责任公司防城港供电局 | 一种识别测试仪自动测试生成测试报告系统 |
CN115235737A (zh) * | 2022-09-08 | 2022-10-25 | 成都思科瑞微电子股份有限公司 | 一种光电子器件测试方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1369802A (zh) * | 2001-02-14 | 2002-09-18 | 英业达股份有限公司 | 记录并自动恢复流程状态的方法 |
CN102546012A (zh) * | 2012-02-13 | 2012-07-04 | 中兴通讯股份有限公司 | 一种光模块测试装置及光模块测试方法 |
-
2012
- 2012-12-25 CN CN201210569911.7A patent/CN103001693B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1369802A (zh) * | 2001-02-14 | 2002-09-18 | 英业达股份有限公司 | 记录并自动恢复流程状态的方法 |
CN102546012A (zh) * | 2012-02-13 | 2012-07-04 | 中兴通讯股份有限公司 | 一种光模块测试装置及光模块测试方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103001693A (zh) | 2013-03-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103001693B (zh) | 光模块测试方法 | |
CN104333415B (zh) | 一种用于测试光模块的多通道自动测试方法及系统 | |
EP3506495A1 (en) | Method and system for testing weather resistance of photovoltaic module | |
CN106936495B (zh) | 一种光收发芯片的自动测试装置及方法 | |
CN104065528A (zh) | 用于分析和检验多个网络设备的功能性的方法和装置 | |
CN102185664B (zh) | 射频无源器件自动测试系统 | |
CN104539250B (zh) | 功率放大器的调试方法、装置和系统 | |
CN101210952A (zh) | 多测试埠半导体测试机台的自动化设定方法 | |
CN103906091A (zh) | 一种wifi中无线ap性能检测方法及检测系统 | |
CN102546012A (zh) | 一种光模块测试装置及光模块测试方法 | |
CN108037444A (zh) | Gnss pcba自动化测试系统及其应用方法 | |
CN110058147A (zh) | 基于fpga的芯片测试系统及方法 | |
CN103023561A (zh) | 一种光模块测试中光纤自动耦合配对系统 | |
CN106227616A (zh) | 一种批量实现rmt自动测试的方法 | |
CN108802517A (zh) | 一种就地化保护装置的测试方法及系统 | |
CN110518990A (zh) | 多天线WiFi产品的校准方法、系统及计算机可读存储介质 | |
CN106452962A (zh) | 一种WiFi耦合测试系统及方法 | |
JP7106597B2 (ja) | 移動端末試験装置及び移動端末試験方法 | |
US20190199284A1 (en) | Method and system for testing mechanical tolerance of photovoltaic module | |
CN206193124U (zh) | 一种变电设备带电检测系统 | |
CN107943635A (zh) | 一种存储设备的测试方法、装置及介质 | |
US20190199285A1 (en) | Method and system for testing weather resistance of photovoltaic module | |
CN103245859A (zh) | 一种改进的焦平面探测器芯片测试系统及测试方法 | |
CN104459480A (zh) | 多芯电源线耐压性能测试的方法及系统 | |
US8412180B2 (en) | Method for generating a signal train which can be played back on a tester for testing a mobile radio |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |