CN102995608B - 一种土质心墙堆石坝及其施工方法 - Google Patents

一种土质心墙堆石坝及其施工方法 Download PDF

Info

Publication number
CN102995608B
CN102995608B CN201210543750.4A CN201210543750A CN102995608B CN 102995608 B CN102995608 B CN 102995608B CN 201210543750 A CN201210543750 A CN 201210543750A CN 102995608 B CN102995608 B CN 102995608B
Authority
CN
China
Prior art keywords
wall
concrete
dam
core
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210543750.4A
Other languages
English (en)
Other versions
CN102995608A (zh
Inventor
王仁坤
陈万涛
张志伟
张冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201210543750.4A priority Critical patent/CN102995608B/zh
Publication of CN102995608A publication Critical patent/CN102995608A/zh
Application granted granted Critical
Publication of CN102995608B publication Critical patent/CN102995608B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种抗溃能力较好的土质心墙堆石坝及其施工方法。该土质心墙堆石坝,包括土质心墙,土质心墙的上游一侧沿水流方向依次设置有上游堆石料区、上游过渡料区、上游反滤料区,土质心墙的下游一侧沿水流方向依次设置有下游反滤料区、下游过渡料区、下游堆石料区,所述下游堆石料区内设置有混凝土抗溃墙。通过在下游堆石料区内设置混凝土抗溃墙,能够大大提高坝体的抗溃能力,即使发生洪水漫顶或因外力因素使坝顶开缺至库水下泄,由于混凝土抗溃墙的存在也不会造成大坝的整体溃决。适合在堆石坝领域推广应用。

Description

一种土质心墙堆石坝及其施工方法
技术领域
本发明涉及堆石坝领域,特别是一种土质心墙堆石坝及其施工方法。
背景技术
土质心墙堆石坝是一种利用当地材料建设的坝型,具有较强的适用性,是一种应用普遍的常见坝型。土质心墙堆石坝包括直心墙堆石坝和斜心墙堆石坝,直心墙堆石坝的心墙位于坝体中部,斜心墙堆石坝的心墙位于坝体上游部位。现有的土质心墙堆石坝包括土质心墙,土质心墙的上游一侧沿水流方向依次设置有上游堆石料区、上游过渡料区、上游反滤料区,土质心墙的下游一侧沿水流方向依次设置有下游反滤料区、下游过渡料区、下游堆石料区,反滤料、过渡料和堆石料对土质心墙起保护支撑作用,土质心墙堆石坝的坝坡视坝料和基础条件而定。
由于现有的土质心墙堆石坝是由散粒体材料堆筑而成,其抗溃能力较差,洪水漫顶或因外力因素使坝顶开缺至库水下泄,将造成大坝的整体溃决,据不完全统计,截止目前发生的堆石坝溃坝事故大部分都是由于洪水漫顶导致。
发明内容
本发明所要解决的技术问题是提供一种抗溃能力较好的土质心墙堆石坝。
本发明解决其技术问题所采用的技术方案是:该土质心墙堆石坝,包括土质心墙,土质心墙的上游一侧沿水流方向依次设置有上游堆石料区、上游过渡料区、上游反滤料区,土质心墙的下游一侧沿水流方向依次设置有下游反滤料区、下游过渡料区、下游堆石料区,所述下游堆石料区内设置有混凝土抗溃墙。
进一步的是,所述土质心墙堆石坝的轴线为圆弧拱形。
进一步的是,所述混凝土抗溃墙为重力型墙体。
进一步的是,所述混凝土抗溃墙内设置有排水管,所述排水管贯穿于混凝土抗溃墙。
进一步的是,所述混凝土抗溃墙由沿坝体轴向分布的多个墙段组成。
本发明还提供了一种修建上述土质心墙堆石坝的施工方法,即在土质心墙堆石坝填筑的同时,采用分段分期浇筑的方式浇筑混凝土抗溃墙,最后将各个墙段连接形成整体的混凝土抗溃墙。
进一步的是,当坝体的基础为岩基时,混凝土抗溃墙相邻的两个墙段,其中一个墙段在大坝填筑的同时,采用堆石混凝土浇筑成形并且在浇筑的同时埋设排水管,另一个墙段采用自密实混凝土,自密实混凝土的堆石骨料在大坝填筑的同时进行堆筑,在自密实混凝土的堆石骨料堆筑的同时埋设排水管,在采用自密实混凝土堆筑的墙段上下游侧预埋土工布,作为后期自密实混凝土注浆的分隔边界,待堆石体沉降变形完成后,灌注胶凝材料并与相邻的采用堆石混凝土浇筑成形的墙段连接,形成整体的混凝土抗溃墙。
进一步的是,当坝体的基础为软基时,混凝土抗溃墙整体采用自密实混凝土浇筑,自密实混凝土的混凝土骨料在大坝填筑的同时进行填筑,在自密实混凝土的堆石骨料堆筑的同时埋设排水管并在其上下游侧及分段界面预埋土工布,在基础和堆石体的沉降变形完成后,分段分期灌注胶凝材料,形成整体的混凝土抗溃墙。
本发明的有益效果是:通过在下游堆石料区内设置混凝土抗溃墙,能够大大提高坝体的抗溃能力,即使发生洪水漫顶或因外力因素使坝顶开缺至库水下泄,由于混凝土抗溃墙的存在也不会造成大坝的整体溃决。
附图说明
图1是本发明土质心墙堆石坝的截面示意图;
图2是本发明土质心墙堆石坝的俯视图;
图中标记说明:土质心墙1、上游堆石料区2、上游过渡料区3、上游反滤料区4、下游反滤料区5、下游过渡料区6、下游堆石料区7、混凝土抗溃墙8、排水管9。
具体实施方式
下面结合附图对本发明作进一步说明。
如图1所示,该土质心墙堆石坝,包括土质心墙1,土质心墙1的上游一侧沿水流方向依次设置有上游堆石料区2、上游过渡料区3、上游反滤料区4,土质心墙1的下游一侧沿水流方向依次设置有下游反滤料区5、下游过渡料区6、下游堆石料区7,所述下游堆石料区7内设置有混凝土抗溃墙8。通过在下游堆石料区7内设置混凝土抗溃墙8,能够大大提高坝体的抗溃能力,即使发生洪水漫顶或因外力因素使坝顶开缺至库水下泄,由于混凝土抗溃墙8的存在也不会造成大坝的整体溃决。
为了提高土质心墙堆石坝的结构强度,所述土质心墙堆石坝的轴线为圆弧拱形,从俯视角度看,所述混凝土抗溃墙8也为圆弧拱形结构,如图2所示,这种结构的混凝土抗溃墙8可以承受更大的外力冲击,使用寿命较长。
所述混凝土抗溃墙8的墙体类型可以采用现有的各种墙体类型,作为优选的方式是:所述混凝土抗溃墙8的墙体类型采用重力型墙体,重力型的混凝土抗溃墙8与堆石体的变形较为协调,施工简单,能够适应不同的基础条件。
为了提高大坝下游堆石料的排水能力,一般将所述混凝土抗溃墙8设置在靠近土质心墙1的位置,与土质心墙1连接在一起。同时,在混凝土抗溃墙8内设置有排水管9,所述排水管9贯穿于混凝土抗溃墙8,这就使得渗透进入坝体内的水能及时通过排水管9排到下游堆石料区7然后再渗透出去。
进一步的,为了适应堆石体及基础的沉降,混凝土抗溃墙8由沿坝体轴向分布的多个墙段组成并分期施工,根据大坝的基础条件,堆石料填筑时,在混凝土抗溃墙8上下游两侧、左右岸两侧布设土工布进行灌注分区,如图2所示。
本发明还提供了一种修建上述土质心墙堆石坝的施工方法,除混凝土抗溃墙8外,坝体其它部分的修建方式与现有的土质心墙堆石坝施工步骤相同,混凝土抗溃墙8的修建是在土质心墙堆石坝填筑的同时,采用分段分期浇筑的方式浇筑混凝土抗溃墙8,最后将各个墙段连接形成整体的混凝土抗溃墙8。
当坝体的基础为岩基时,由于基础不会发生沉陷,因此,当坝体的基础为岩基时,混凝土抗溃墙8相邻的两个墙段,其中一个墙段在大坝填筑的同时,采用堆石混凝土浇筑成形并且在浇筑的同时埋设排水管9,另一个墙段采用自密实混凝土,自密实混凝土的堆石骨料在大坝填筑的同时进行堆筑,在自密实混凝土的堆石骨料堆筑的同时埋设排水管9并在采用自密实混凝土堆筑的墙段上下游侧预埋土工布,作为后期自密实混凝土注浆的分隔边界,待堆石体沉降变形完成后,灌注胶凝材料并与相邻的采用堆石混凝土浇筑成形的墙段连接,形成整体的混凝土抗溃墙8。
当坝体的基础为软基时,混凝土抗溃墙8整体采用自密实混凝土浇筑,自密实混凝土的混凝土骨料在大坝填筑的同时进行填筑,在自密实混凝土的堆石骨料堆筑的同时埋设排水管9并在其上下游侧及分段界面预埋土工布,在基础和堆石体的沉降变形完成后,分段分期灌注胶凝材料,形成整体的混凝土抗溃墙8。

Claims (8)

1.一种土质心墙堆石坝,包括土质心墙(1),土质心墙(1)的上游一侧沿水流方向依次设置有上游堆石料区(2)、上游过渡料区(3)、上游反滤料区(4),土质心墙(1)的下游一侧沿水流方向依次设置有下游反滤料区(5)、下游过渡料区(6)、下游堆石料区(7),其特征在于:所述下游堆石料区(7)内设置有混凝土抗溃墙(8)。
2.如权利要求1所述的土质心墙堆石坝,其特征在于:所述土质心墙堆石坝的轴线为圆弧拱形。
3.如权利要求2所述的土质心墙堆石坝,其特征在于:所述混凝土抗溃墙(8)为重力型墙体。
4.如权利要求1、2或3所述的土质心墙堆石坝,其特征在于:所述混凝土抗溃墙(8)内设置有排水管(9),所述排水管(9)贯穿于混凝土抗溃墙(8)。
5.如权利要求4所述的土质心墙堆石坝,其特征在于:所述混凝土抗溃墙(8)由沿坝体轴向分布的多个墙段组成。
6.修建如权利要求1所述的土质心墙堆石坝的施工方法,其特征在于:在土质心墙堆石坝填筑的同时,采用分段分期浇筑的方式浇筑混凝土抗溃墙(8),最后将各个墙段连接形成整体的混凝土抗溃墙(8)。
7.如权利要求6所述的土质心墙堆石坝施工方法,其特征在于:当坝体的基础为岩基时,混凝土抗溃墙(8)相邻的两个墙段,其中一个墙段在大坝填筑的同时,采用堆石混凝土浇筑成形并且在浇筑的同时埋设排水管(9),另一个墙段采用自密实混凝土,自密实混凝土的堆石骨料在大坝填筑的同时进行堆筑,在自密实混凝土的堆石骨料堆筑的同时埋设排水管(9),在采用自密实混凝土堆筑的墙段上下游侧预埋土工布,作为后期自密实混凝土注浆的分隔边界,待堆石体沉降变形完成后,灌注胶凝材料并与相邻的采用堆石混凝土浇筑成形的墙段连接,形成整体的混凝土抗溃墙(8)。
8.如权利要求6所述的土质心墙堆石坝施工方法,其特征在于:当坝体的基础为软基时,混凝土抗溃墙(8)整体采用自密实混凝土浇筑,自密实混凝土的混凝土骨料在大坝填筑的同时进行填筑,在自密实混凝土的堆石骨料堆筑的同时埋设排水管(9)并在其上下游侧及分段界面预埋土工布,在基础和堆石体的沉降变形完成后,分段分期灌注胶凝材料,形成整体的混凝土抗溃墙(8)。
CN201210543750.4A 2012-12-14 2012-12-14 一种土质心墙堆石坝及其施工方法 Active CN102995608B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210543750.4A CN102995608B (zh) 2012-12-14 2012-12-14 一种土质心墙堆石坝及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210543750.4A CN102995608B (zh) 2012-12-14 2012-12-14 一种土质心墙堆石坝及其施工方法

Publications (2)

Publication Number Publication Date
CN102995608A CN102995608A (zh) 2013-03-27
CN102995608B true CN102995608B (zh) 2015-09-30

Family

ID=47924665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210543750.4A Active CN102995608B (zh) 2012-12-14 2012-12-14 一种土质心墙堆石坝及其施工方法

Country Status (1)

Country Link
CN (1) CN102995608B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410123B (zh) * 2013-08-13 2016-03-02 中国电建集团成都勘测设计研究院有限公司 一种用于水利水电工程的挡水坝
CN103741694B (zh) * 2013-12-25 2016-03-30 长江勘测规划设计研究有限责任公司 控制灌浆处理垂直型沥青混凝土心墙土石坝渗漏的方法
CN104099903B (zh) * 2014-07-10 2016-05-25 中国电建集团西北勘测设计研究院有限公司 高底座沥青混凝土心墙坝
CN104213543B (zh) * 2014-09-24 2016-05-18 中国水利水电第五工程局有限公司 一种用于土石坝底部两墙间的粘土填筑施工方法
CN104846777A (zh) * 2015-04-24 2015-08-19 中山弘博企业管理咨询有限公司 抗渗水利防洪堤
CN105926543A (zh) * 2016-05-18 2016-09-07 王燏斌 一种大坝施工法
CN105887769A (zh) * 2016-05-18 2016-08-24 王燏斌 一种大坝施工法
CN107700435B (zh) * 2017-09-30 2019-11-22 清华大学 堆石混凝土心墙胶结堆石坝及其施工方法
CN112064590B (zh) * 2020-08-31 2023-01-06 中国电建集团华东勘测设计研究院有限公司 一种高地震区粘土心墙堆石坝的抗震结构及施工方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1211384A1 (ru) * 1984-08-01 1986-02-15 Ленинградское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука Плотина
JP2003020631A (ja) * 2001-07-06 2003-01-24 Shimizu Corp フィルダムの遮水構造および築造方法
CN2767501Y (zh) * 2004-12-28 2006-03-29 伊春市水利水电勘测设计研究院 扶臂式钢筋混凝土墙面板土坝
JP2007247201A (ja) * 2006-03-15 2007-09-27 Fujita Corp 築堤土の製造方法及びフィルダムの堤体改修方法
CN101672026A (zh) * 2009-09-18 2010-03-17 中国水电顾问集团华东勘测设计研究院 合理利用砂砾石料的面板堆石坝结构及其施工方法
CN101718086A (zh) * 2009-11-05 2010-06-02 河海大学 一种混凝土-堆石混合坝及其施工方法
CN101974894A (zh) * 2010-08-23 2011-02-16 清华大学 一种组合坝
CN102322041A (zh) * 2011-07-27 2012-01-18 罗富强 一种建于峡谷中的防溃坝防渗漏水电站大坝及其建设方法
CN202954345U (zh) * 2012-12-14 2013-05-29 中国水电顾问集团成都勘测设计研究院 土质心墙堆石坝

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100524A (ja) * 1995-10-06 1997-04-15 Fujita Corp フィルダムの造成方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1211384A1 (ru) * 1984-08-01 1986-02-15 Ленинградское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука Плотина
JP2003020631A (ja) * 2001-07-06 2003-01-24 Shimizu Corp フィルダムの遮水構造および築造方法
CN2767501Y (zh) * 2004-12-28 2006-03-29 伊春市水利水电勘测设计研究院 扶臂式钢筋混凝土墙面板土坝
JP2007247201A (ja) * 2006-03-15 2007-09-27 Fujita Corp 築堤土の製造方法及びフィルダムの堤体改修方法
CN101672026A (zh) * 2009-09-18 2010-03-17 中国水电顾问集团华东勘测设计研究院 合理利用砂砾石料的面板堆石坝结构及其施工方法
CN101718086A (zh) * 2009-11-05 2010-06-02 河海大学 一种混凝土-堆石混合坝及其施工方法
CN101974894A (zh) * 2010-08-23 2011-02-16 清华大学 一种组合坝
CN102322041A (zh) * 2011-07-27 2012-01-18 罗富强 一种建于峡谷中的防溃坝防渗漏水电站大坝及其建设方法
CN202954345U (zh) * 2012-12-14 2013-05-29 中国水电顾问集团成都勘测设计研究院 土质心墙堆石坝

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
300m级高土石坝心墙直-斜轴线布置型式选择中的渗流和静动力计算分析;田景元等;《水电站设计》;20100630(第2期);第1页第1章第1-4段及图1-2 *
特殊地形地质条件下筑坝方案比较;陈生水等;《水利水运科学研究》;20001231(第4期);第20页第1段、第23页第2章第1段-第25页第2.2.2节末段及附图1 *

Also Published As

Publication number Publication date
CN102995608A (zh) 2013-03-27

Similar Documents

Publication Publication Date Title
CN102995608B (zh) 一种土质心墙堆石坝及其施工方法
CN203066103U (zh) 一种预应力式桩基托换结构
CN205776339U (zh) 双臂装配式挡土墙
CN207331674U (zh) 一种梯形预制地下连续墙
CN204572002U (zh) 用于瓦斯隧道的隧道结构
CN202954345U (zh) 土质心墙堆石坝
CN103924581B (zh) 预制钢管混凝土组合结构地下连续墙及其施工方法
CN202559382U (zh) 一种阶梯式锥形承插口混凝土预制共同沟
CN108149711A (zh) 预制整体箱涵及连接方法
CN202440787U (zh) 一种河道导流装置
CN205152917U (zh) 一种水工隧洞混凝土衬砌段与钢管连接段结构
CN103669878A (zh) 一种核心筒钢筋接驳方法
CN103966981B (zh) 风化卸荷岩体上修建拱坝的传力结构及其施工方法
CN203530990U (zh) 一种深基坑支护挡墙钢管混凝土支撑结构
CN202247914U (zh) 一种岩质边坡贴坡基础结构
CN101705690A (zh) 一种塑料土工格室
CN202989763U (zh) 采用不抗拔-抗剪限位的节段式钢管混凝土桥墩
CN206015619U (zh) 一种降低面板应力应变水平的面板堆石坝
CN213952130U (zh) 混凝土面板堆石坝分区填筑隔离支挡装置
CN203866819U (zh) 一种钢管桩锁口结构
CN109837871A (zh) 土质心墙堆石坝
CN105133664B (zh) 一种组合框架式隔离保护体系及其施工方法
CN202925605U (zh) 预制装配式钢筋混凝土方涵
CN107268617A (zh) 一种抗浮锚杆后施工工艺及装置
CN203081467U (zh) 有压隧洞拱形封堵结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant