CN102992210A - Assembly-available tower crane platform base attached to wall body - Google Patents

Assembly-available tower crane platform base attached to wall body Download PDF

Info

Publication number
CN102992210A
CN102992210A CN2012105653486A CN201210565348A CN102992210A CN 102992210 A CN102992210 A CN 102992210A CN 2012105653486 A CN2012105653486 A CN 2012105653486A CN 201210565348 A CN201210565348 A CN 201210565348A CN 102992210 A CN102992210 A CN 102992210A
Authority
CN
China
Prior art keywords
pedestal
wall
tower machine
tower crane
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105653486A
Other languages
Chinese (zh)
Inventor
从卫民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU XINTA CONSTRUCTION NEW TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
JIANGSU XINTA CONSTRUCTION NEW TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU XINTA CONSTRUCTION NEW TECHNOLOGY DEVELOPMENT Co Ltd filed Critical JIANGSU XINTA CONSTRUCTION NEW TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN2012105653486A priority Critical patent/CN102992210A/en
Publication of CN102992210A publication Critical patent/CN102992210A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses an assembly-available tower crane platform base attached to a wall body, which comprises a base perpendicularly fixed to one side surface of the wall body and tower crane installation beams symmetrically fixed to the upper surface of the base. When the tower crane platform base is used in construction, one end of the base is placed at a boss top of the wall body, while the other end of the base is fixed to the wall body through an inclined support beam; one end of the base, which is positioned at the boss top, is fixed to the wall body through a bolt E; then the tower crane installation beams are fixed at the top of the base; and a tower crane is installed above the tower crane platform base through the tower crane installation beams. Therefore, the construction of the assembly-available tower crane platform base is free from limit by a construction site, a prefabricated part is directly assembled on the construction site and convenience and rapidness are achieved; after use is finished, the tower crane and the assembly-available tower crane platform base are dismantled for use in future; and the construction cost is saved, the pollution caused by building rubbish is reduced and the construction efficiency is improved.

Description

But be attached to the assembly unit tower machine platform pedestal of body of wall
Technical field
The present invention relates to building field, but be specifically related to a kind of assembly unit tower machine platform pedestal that is attached to body of wall.
Background technology
In the at present building operation, traditional tower machine base is formed by reinforced concrete whole-casting, and construction period is long, and be merely able to use once, just must must remove after being finished, need to consume a large amount of human and material resources and time, also produce simultaneously a large amount of building wastes.
For above-mentioned situation, " the multiplex foundation for tower crane of concrete precast assembly " patent of application has solved the problems referred to above well before the applicant.But,,, the platform base of the multiplex foundation for tower crane of concrete precast assembly can't be constructed to rational position because subterranean room waits the restriction of workyard more deeply especially in the camp site of skyscraper in some camp sites.
Summary of the invention
The object of the invention is to: overcome the deficiencies in the prior art, but a kind of assembly unit tower machine platform pedestal that is attached to body of wall is provided, reclines metope and establish, be not subjected to the restriction of workyard, by bolt associated components of the present invention and body of wall are installed and fixed during use, and the tower machine is installed in the present invention; After use finishing, remove the tower machine, and the present invention is removed, continue later on to use, convenient and swift, not affect body of wall attractive in appearance, saved simultaneously executive cost, improved operating efficiency.
The technical solution used in the present invention is:
But be attached to the assembly unit tower machine platform pedestal of body of wall, it is characterized in that: comprise the pedestal that vertically is fixed in the body of wall side, also comprise the tower machine installation crossbeam that is fixed in pedestal upper surface.
The further improvement project of the present invention is that described body of wall is provided with boss below the pedestal fixed connection place, described boss top and base bottom applying.
The present invention further improvement project is that described pedestal is fixed by bolt E and body of wall.
The present invention further improvement project is that symmetry is fixed with raker beam between the described pedestal other end and the body of wall.
The present invention further improvement project is, described raker beam is connected and fixed with the set support B in support A, the pedestal other end bottom of body of wall side respectively.
The present invention further improvement project is that raker beam is connected and fixed by bolt C, bolt D with support A, support B respectively.
The present invention further improvement project is, described tower machine is installed the crossbeam top and is distributed with the through hole of captiveing joint with the tower machine, and the tower machine is installed beam side wall and is respectively equipped with notch corresponding with through hole, that be used for fitting operation.
The present invention further improvement project is that described tower machine is installed between crossbeam and the pedestal and is provided with pad, and by bolt F the tower machine is installed crossbeam and fix.
Beneficial effect of the present invention is:
When building with the present invention, pedestal one end is positioned over the boss top, the other end is fixed by raker beam and body of wall; By bolt E an end and body of wall that pedestal is positioned at the boss top are fixed again; At pedestal top fixed tower machine crossbeam is installed afterwards, by the tower machine crossbeam is installed the tower machine is installed on the present invention top.Hence one can see that, carries out the construction of tower machine platform pedestal with the present invention, reclines metope and establish, and is not subjected to the restriction of workyard, by bolt associated components of the present invention and body of wall installed and fixed during use, and the tower machine is installed in the present invention; After use finishing, remove the tower machine, and the present invention is removed, continue later on to use, convenient and swift, not affect body of wall attractive in appearance, saved simultaneously executive cost, improved operating efficiency.
Description of drawings
Fig. 1 is that structure master of the present invention looks cross-sectional schematic.
Fig. 2 is that partial schematic sectional view is looked on the structure of the present invention right side.
The specific embodiment
In conjunction with illustrated in figures 1 and 2, the present invention includes and comprise that pedestal 2 is reinforced concrete structure in the pedestal 2(the implementation case that vertically is fixed in body of wall 1 side), also comprise in the tower machine installation crossbeam 4(the implementation case that is fixed in pedestal 2 upper surfaces, crossbeam 4 is girder steel, and quantity is 2); Described body of wall 1 is provided with boss 5 below pedestal 2 fixed connection places, fit in described boss 5 tops and pedestal 2 bottoms; Described pedestal 2 is fixing by bolt E10 and body of wall 1; Symmetry is fixed with in the raker beam 3(the implementation case between described pedestal 2 other ends and the body of wall 1, and raker beam 3 is girder steel, and quantity is 2); Described raker beam 3 is connected and fixed with the set support B7 of the support A6 of body of wall 1 side, pedestal 2 other ends bottom respectively; Raker beam 3 is connected and fixed by bolt C8, bolt D9 with support A6, support B8 respectively; Described tower machine is installed crossbeam 4 tops and is distributed with the through hole 11 of captiveing joint with the tower machine, and the tower machine is installed crossbeam 4 sidewalls and is respectively equipped with and through hole 11 notches 12 corresponding, that be used for fitting operation; Described tower machine is installed between crossbeam 4 and the pedestal 2 and is provided with pad 13, and it is fixing by bolt F the tower machine to be installed crossbeam 4.
When building with the present invention, pedestal 2 one ends are positioned over boss 5 tops, the other end of pedestal 2 is by support A6, support B7, and raker beam 3 is fixing with body of wall 1 and pedestal 2 respectively; An end that pedestal 2 is positioned at boss 5 tops by bolt E10 is again captiveed joint with body of wall 1; By bolt F fixed tower machine crossbeam 4 is installed at pedestal 2 tops afterwards, by the tower machine crossbeam 4 is installed the tower machine is installed on top of the present invention.After construction finishes, behind the dismounting tower machine, the present invention is directly removed, still can continue later on to use.

Claims (8)

1. but be attached to the assembly unit tower machine platform pedestal of body of wall, it is characterized in that: comprise the pedestal (2) that vertically is fixed in body of wall (1) side, also comprise the tower machine installation crossbeam (4) that is fixed in pedestal (2) upper surface.
2. but the assembly unit tower machine platform pedestal that is attached to body of wall as claimed in claim 1 is characterized in that: described body of wall (1) is provided with boss (5) in below, pedestal (2) fixed connection place, described boss (5) top and the applying of pedestal (2) bottom.
3. but the assembly unit tower machine platform pedestal that is attached to body of wall as claimed in claim 1 is characterized in that: described pedestal (2) is by bolt E(10) fixing with body of wall (1).
4. but the assembly unit tower machine platform pedestal that is attached to body of wall as claimed in claim 1 or 2, it is characterized in that: symmetry is fixed with raker beam (3) between described pedestal (2) other end and the body of wall (1).
5. but the assembly unit tower machine platform pedestal that is attached to body of wall as claimed in claim 4 is characterized in that: described raker beam (3) respectively with the support A(6 of body of wall (1) side), the set support B(7 in pedestal (2) other end bottom) be connected and fixed.
6. but the assembly unit tower machine platform pedestal that is attached to body of wall as claimed in claim 5 is characterized in that: raker beam (3) respectively with support A(6), support B(8) by bolt C(8), bolt D(9) be connected and fixed.
7. but the assembly unit tower machine platform pedestal that is attached to body of wall as claimed in claim 1, it is characterized in that: described tower machine is installed crossbeam (4) top and is distributed with the through hole (11) of captiveing joint with the tower machine, and the tower machine is installed crossbeam (4) sidewall and is respectively equipped with notch (12) corresponding with through hole (11), that be used for fitting operation.
8. but the assembly unit tower machine platform pedestal that is attached to body of wall as claimed in claim 1 is characterized in that: be provided with pad (13) between described tower machine installation crossbeam (4) and the pedestal (2), and it is fixing by bolt F the tower machine to be installed crossbeam (4).
CN2012105653486A 2012-12-24 2012-12-24 Assembly-available tower crane platform base attached to wall body Pending CN102992210A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105653486A CN102992210A (en) 2012-12-24 2012-12-24 Assembly-available tower crane platform base attached to wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105653486A CN102992210A (en) 2012-12-24 2012-12-24 Assembly-available tower crane platform base attached to wall body

Publications (1)

Publication Number Publication Date
CN102992210A true CN102992210A (en) 2013-03-27

Family

ID=47921422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105653486A Pending CN102992210A (en) 2012-12-24 2012-12-24 Assembly-available tower crane platform base attached to wall body

Country Status (1)

Country Link
CN (1) CN102992210A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106276640A (en) * 2015-05-29 2017-01-04 上海宝冶集团有限公司 The combination type support platform of high-building construction tower crane
CN111646363A (en) * 2020-05-19 2020-09-11 上海建工二建集团有限公司 Monorail hanger and application construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1058471A (en) * 1964-05-11 1967-02-08 Harry Gustavson Improvements in or relating to cranes used in mine adits
KR100665718B1 (en) * 2005-12-09 2007-01-09 주식회사 아이엘엔지니어링 Reinforcement device for tower crane
CN201351088Y (en) * 2009-02-16 2009-11-25 上海市机械施工有限公司 Tower crane external-stay climbing device
CN102071798A (en) * 2011-01-30 2011-05-25 中建三局建设工程股份有限公司 Hydraulic climbing system for wall-attached support frame
CN102079489A (en) * 2011-01-30 2011-06-01 沈阳建筑大学 Suspended-rising support system of tower crane
CN201865330U (en) * 2010-11-29 2011-06-15 南通四建集团有限公司 Device used for constructing cantilever scaffold bottom platform
CN102642784A (en) * 2012-04-28 2012-08-22 上海建工集团股份有限公司 Support structure of internal-climbing tower crane

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1058471A (en) * 1964-05-11 1967-02-08 Harry Gustavson Improvements in or relating to cranes used in mine adits
KR100665718B1 (en) * 2005-12-09 2007-01-09 주식회사 아이엘엔지니어링 Reinforcement device for tower crane
CN201351088Y (en) * 2009-02-16 2009-11-25 上海市机械施工有限公司 Tower crane external-stay climbing device
CN201865330U (en) * 2010-11-29 2011-06-15 南通四建集团有限公司 Device used for constructing cantilever scaffold bottom platform
CN102071798A (en) * 2011-01-30 2011-05-25 中建三局建设工程股份有限公司 Hydraulic climbing system for wall-attached support frame
CN102079489A (en) * 2011-01-30 2011-06-01 沈阳建筑大学 Suspended-rising support system of tower crane
CN102642784A (en) * 2012-04-28 2012-08-22 上海建工集团股份有限公司 Support structure of internal-climbing tower crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106276640A (en) * 2015-05-29 2017-01-04 上海宝冶集团有限公司 The combination type support platform of high-building construction tower crane
CN106276640B (en) * 2015-05-29 2017-12-29 上海宝冶集团有限公司 The combined type support platform of high-building construction tower crane
CN111646363A (en) * 2020-05-19 2020-09-11 上海建工二建集团有限公司 Monorail hanger and application construction method thereof

Similar Documents

Publication Publication Date Title
CN102612598A (en) Wind power plant for producing electric energy, and relative pylon construction method
CN201288328Y (en) Fixed foundation for beam and plate integrated prefabricated split mounting type tower crane
CN204531338U (en) The builder's jack assembly of ground construction can be shifted to an earlier date
CN204590364U (en) A kind of assembly type self-supporting mould of ribbed slab floor
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN201999656U (en) Detachable combined tower crane base
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
CN205677174U (en) Light prefabricated assembled scissor stair structure system
CN102992210A (en) Assembly-available tower crane platform base attached to wall body
CN203846523U (en) Combined tower crane foundation
CN102352690A (en) Construction method of anti-floating locating system of cast-in-place concrete hollow floorslab steel tube
CN201771075U (en) Reinforced concrete hollow floorslab
CN204418654U (en) For the aluminum alloy pattern plate between body of wall
CN204343166U (en) A kind of combined type gravity anchorage
CN202969897U (en) Ringlock type scaffold joist system
CN203846778U (en) Rear supporting structure of cantilever beam
CN204491953U (en) Floor slab structure between architecture pipe
CN203905181U (en) Shear wallboard with supporting frames and connection structure of shear wallboard and composite floor slabs
CN204186064U (en) U-shaped aluminum alloy mould plate
CN204040457U (en) Wooden frame plastic formwork system
CN202745081U (en) Large-size rubble concrete settlement joint template system
CN207847078U (en) Core Walls Structure shear wall converts boom device without wall without creeping formwork seat in the plane at beam
CN107806252B (en) Upper pier structure for seismic isolation and reinforcement of existing building and construction method thereof
CN203867025U (en) Novel joint connecting device for cable bridge and composite floor
CN106436907B (en) Tower crown steel and shear wall reinforced bar structure plug-in connection method and connection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130327