CN201771075U - Reinforced concrete hollow floorslab - Google Patents

Reinforced concrete hollow floorslab Download PDF

Info

Publication number
CN201771075U
CN201771075U CN2010202941064U CN201020294106U CN201771075U CN 201771075 U CN201771075 U CN 201771075U CN 2010202941064 U CN2010202941064 U CN 2010202941064U CN 201020294106 U CN201020294106 U CN 201020294106U CN 201771075 U CN201771075 U CN 201771075U
Authority
CN
China
Prior art keywords
prefabricated
cast
sidewall
reinforced concrete
prefabricated panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202941064U
Other languages
Chinese (zh)
Inventor
周绪红
吴方伯
徐静
黄海林
陈伟
Original Assignee
吴方伯
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 吴方伯 filed Critical 吴方伯
Priority to CN2010202941064U priority Critical patent/CN201771075U/en
Application granted granted Critical
Publication of CN201771075U publication Critical patent/CN201771075U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a reinforced concrete hollow floorslab, which comprises cast-in-place dense ribs (1), prefabricated side walls (2), a prefabricated bottom plate (3) and a cast-in-place top plate (4). A cavity (5) is formed by the prefabricated side walls (2), the prefabricated bottom plate (3) and the cast-in-place top plate (4). The manufacturing method of the hollow floorslab includes following steps: a formwork (11) is erected, rib beam steels (12) are bound, the prefabricated side walls (2) are placed, the prefabricated bottom plate (3) is placed on a shelving part (9) to be cast with concrete, the shelving part (9) is detached and the prefabricated bottom plate (3) is then placed on bottom bumps (7) of the prefabricated side walls (2) after the strength of concrete reaches a certain value, the prefabricated side walls (2), the prefabricated bottom plate (3) and the cast-in-place top plate (4) form the cavity (5), and mortar (15) is painted under the prefabricated bottom plate (3), so that the integral hollow floorslab is formed. The hollow floorslab is formed by cast-in-place concrete and prefabricated components, and is better in stress property and integrity, light in weight and low in manufacturing cost.

Description

A kind of reinforced concrete hollow floor
Technical field:
The utility model relates to the realm of building construction, specifically refers to a kind of reinforced concrete hollow floor.
Background technology:
Reinforced concrete cast-in-situ hollow floor plate than steel concrete solid floor feed consumption lack, floor is in light weight, the technology that existing reinforced concrete hollow floor (number of patent application 200420035588.6) adopts is with hollow prefabricated steel bar reinforced concrete, arrange in length and breadth and be placed on the bottom layer of the reinforcing steel concrete, filling out with steel concrete at the hollow prefabricated gap location of arranging in length and breadth becomes close rib, forms cassette ceiling.This cassette ceiling has following deficiency: reinforcing bar, concrete feed consumption are many, from great, increased the cost of floor, and the globality of floor are bad.
Summary of the invention:
The purpose of this utility model is to provide a kind of good integrity, the reinforced concrete hollow floor that feed consumption is few, floor is in light weight, cost is low.
The purpose of this utility model is achieved like this, and a kind of reinforced concrete hollow floor, this cassette ceiling comprise cast-in-place close rib, prefabricated sidewall, prefabricated panel, cast-in-place top board.Of the present utility modelly be characterised in that described cassette ceiling forms cavity by prefabricated sidewall, prefabricated panel, cast-in-place top board.During construction, the prefabricated sidewall that will have hold item earlier is placed on the template, then prefabricated panel is placed on the hold item, concreting and reach certain intensity after, remove hold item, prefabricated panel is placed on the bottom projection of sidewall, like this, just forms cavity between prefabricated sidewall, prefabricated panel, the cast-in-place top board.Prefabricated units and cast-in-situ concrete combination form common stressed structural system, make that the stress performance of cassette ceiling and globality are better.
Feature of the present utility model also is top projection or bottom projection are arranged on the described prefabricated sidewall or the top projection is arranged simultaneously and the bottom projection.The top projection can make prefabricated panel end and prefabricated sidewall side plate that certain distance is arranged, and like this, has guaranteed that prefabricated panel can not be stuck in the process that is placed into sidewall bottom projection.The bottom projection can be used to support prefabricated panel, makes prefabricated sidewall and prefabricated panel form integral body.In top projection and the bottom projection reinforcing bar can be set, improve the strength and stiffness of prefabricated sidewall, can resist rupture load effectively.
Feature of the present utility model is that also described prefabricated top side wall has anchor rib.Behind the concreting, anchor rib and cast-in-situ concrete bonding, build-in, the collaborative work between prefabricated sidewall and the cast-in-situ concrete is stronger, and stress performance, the globality of cassette ceiling are better.
Feature of the present utility model also is on the described prefabricated sidewall hold item is arranged.Hold item on the prefabricated sidewall can be used for shelving prefabricated panel, and prefabricated panel places on the hold item, plays the effect of template.After treating that concrete reaches certain intensity, remove hold item, prefabricated panel is placed on the projection of prefabricated sidewall bottom.
Feature of the present utility model also is on the described prefabricated panel separation layer is arranged.For preventing cast-in-situ concrete and prefabricated panel bonding, before the concreting, on prefabricated panel, lay separation layer, like this, prefabricated panel is easy to separate with cast-in-place top board.
Feature of the present utility model is that also described prefabricated sidewall has integral side walls, assembly unit sidewall.Prefabricated sidewall can be whole, also can be assembled by the precast plate more than two or two, makes that like this making of prefabricated sidewall is comparatively convenient, implements easily.
Feature of the present utility model is that also described prefabricated panel is made up of the precast plate more than one or.Prefabricated panel can be assembled for the precast plate of different size, makes the easy to make of precast plate, and can satisfy different design and construction needs.
Feature of the present utility model also is on the described prefabricated panel hole is arranged.Hole on the prefabricated panel can be used to settle bolt, after cast-in-situ concrete reaches certain intensity, utilizes bolt that prefabricated panel is separated with cast-in-place top board, and prefabricated panel is placed on the projection of sidewall bottom.
Description of drawings:
Fig. 1 is reinforced concrete hollow floor construction schematic diagram, 2 is prefabricated sidewall, and 3 is prefabricated panel, and 4 is cast-in-place top board, 6 is the top projection on the prefabricated sidewall 2,7 is the bottom projection on the prefabricated sidewall 2, and 8 is the anchor rib at prefabricated sidewall 2 tops, and 9 is hold item, 10 is separation layer, 11 is template, and 12 is reinforcing bar, and 13 is bolt.
Fig. 2 is a reinforced concrete hollow floor overall structure schematic diagram, and 1 is cast-in-place close rib, and 5 is the cavity of prefabricated sidewall 2, prefabricated panel 3,4 formation of cast-in-place top board, and 15 is mortar.
Fig. 3 is prefabricated side wall construction schematic diagram.
Fig. 4 is another embodiment of prefabricated sidewall.
Fig. 5 is prefabricated sidewall assembly unit schematic diagram.
Fig. 6 is prefabricated panel and prefabricated sidewall assembly unit schematic diagram, and 14 is precast plate, and two precast plates 14 form prefabricated panel 3.
Fig. 7 is the prefabricated panel structural representation, and 16 is the hole on the prefabricated panel, and 10 is the separation layer on the prefabricated panel 3.
The specific embodiment:
The utility model is described in further detail below in conjunction with accompanying drawing.
The utility model is shown in accompanying drawing 1~7, and a kind of reinforced concrete hollow floor, this cassette ceiling comprise cast-in-place close rib 1, prefabricated sidewall 2, prefabricated panel 3, cast-in-place top board 4.Described cassette ceiling forms cavity 5 by prefabricated sidewall 2, prefabricated panel 3, cast-in-place top board 4.During site operation, prop up template 11 earlier, colligation girt strip reinforcing bar 12 is placed prefabricated sidewall 2; Again prefabricated panel 3 is placed on the hold item 9, concreting, treat that concrete reaches certain intensity after, remove hold item 9, prefabricated panel 3 is placed on the projection 7 of sidewall bottom; Prefabricated sidewall 2, prefabricated panel 3, cast-in-place top board 4 form cavity 5, at 3 times whitewash mortars 15 of prefabricated panel, form whole cassette ceiling.Fig. 1 is reinforced concrete hollow floor construction schematic diagram, and Fig. 2 be a reinforced concrete hollow floor overall structure schematic diagram, and 5 is the cavity of prefabricated sidewall 2, prefabricated panel 3,4 formation of cast-in-place top board, in other accompanying drawings, numbers identically, and its explanation is identical.
Top projection 6 or bottom projection 7 are arranged on the described prefabricated sidewall 2 or top projection 6 is arranged simultaneously and bottom projection 7.Fig. 3 is prefabricated sidewall 2 structural representations, and Fig. 4 is prefabricated sidewall 2 another embodiment.Top projection 6 can make prefabricated panel 3 ends and prefabricated sidewall 2 side plates that certain distance is arranged, and like this, has guaranteed that prefabricated panel 3 can not be stuck in the process that is placed into sidewall bottom projection 7.Bottom projection 7 can be used to support prefabricated panel 3, makes prefabricated sidewall 2 and base plate 3 form whole.
Anchor rib 8 is arranged at described prefabricated sidewall 2 tops.Behind the concreting, anchor rib 8 and cast-in-situ concrete bonding, build-in, the collaborative work between prefabricated sidewall 2 and the cast-in-situ concrete is stronger.
On the described prefabricated sidewall 2 hold item 9 is arranged.Hold item 9 on the prefabricated sidewall 2 can be used for shelving prefabricated panel 3, and prefabricated panel 3 places on the hold item 9, plays the effect of template.After treating that concrete reaches certain intensity, remove hold item 9, prefabricated panel 3 is placed on the prefabricated sidewall 2 bottom projections 7.
On the described prefabricated panel 3 separation layer 10 is arranged.For preventing cast-in-situ concrete and prefabricated panel 3 bondings, before the concreting, on prefabricated panel 3, lay separation layer 10, like this, prefabricated panel 3 is easy to separate with cast-in-place top board 4.
Described prefabricated sidewall 2 has integral side walls, assembly unit sidewall.Prefabricated sidewall 2 among Fig. 5 is assembled by two precast plates.
Described prefabricated panel 3 is made up of one or an above precast plate 14.Prefabricated panel 3 among Fig. 6 is made up of two precast plates 14, and two precast plates 14 all are shelved on the hold item 9.
On the described prefabricated panel 3 hole 16 is arranged.Fig. 7 is the prefabricated panel structural representation, and separation layer 10 is arranged on the prefabricated panel 3.Hole 16 on the prefabricated panel 3 can be used to settle bolt 13, after cast-in-situ concrete reaches certain intensity, utilizes bolt 13 that prefabricated panel 3 is separated with cast-in-place top board 4, prefabricated panel 3 is placed on the bottom projection 7 of prefabricated sidewall 2.

Claims (8)

1. reinforced concrete hollow floor, this cassette ceiling comprises cast-in-place close rib (1), prefabricated sidewall (2), prefabricated panel (3), cast-in-place top board (4), it is characterized in that: described cassette ceiling forms cavity (5) by prefabricated sidewall (2), prefabricated panel (3), cast-in-place top board (4).
2. reinforced concrete hollow floor according to claim 1 is characterized in that: top projection (6) or bottom projection (7) are arranged on the described prefabricated sidewall (2) or top projection (6) is arranged simultaneously and bottom projection (7).
3. reinforced concrete hollow floor according to claim 1 is characterized in that: anchor rib (8) is arranged at described prefabricated sidewall (2) top.
4. reinforced concrete hollow floor according to claim 1 is characterized in that: hold item (9) is arranged on the described prefabricated sidewall (2).
5. reinforced concrete hollow floor according to claim 1 is characterized in that: separation layer (10) is arranged on the described prefabricated panel (3).
6. reinforced concrete hollow floor according to claim 1 is characterized in that: described prefabricated sidewall (2) has integral side walls, assembly unit sidewall.
7. reinforced concrete hollow floor according to claim 1 is characterized in that: described prefabricated panel (3) is made up of one or an above precast plate (14).
8. reinforced concrete hollow floor according to claim 1 is characterized in that: on described prefabricated panel (3), the precast plate (14) hole (16) is arranged.
CN2010202941064U 2010-08-17 2010-08-17 Reinforced concrete hollow floorslab Expired - Fee Related CN201771075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202941064U CN201771075U (en) 2010-08-17 2010-08-17 Reinforced concrete hollow floorslab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202941064U CN201771075U (en) 2010-08-17 2010-08-17 Reinforced concrete hollow floorslab

Publications (1)

Publication Number Publication Date
CN201771075U true CN201771075U (en) 2011-03-23

Family

ID=43750918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202941064U Expired - Fee Related CN201771075U (en) 2010-08-17 2010-08-17 Reinforced concrete hollow floorslab

Country Status (1)

Country Link
CN (1) CN201771075U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074293A (en) * 2014-07-16 2014-10-01 赵春樵 Reinforced-concrete prefabricated dense-rib sheet and constructing method
CN106088435A (en) * 2016-06-08 2016-11-09 湖南标迪夫节能科技有限公司 A kind of stress island steel construction assembled cavity building roof
CN106149941A (en) * 2016-05-06 2016-11-23 湖南标迪夫节能科技有限公司 A kind of combined method of steel construction assembled cavity building roof
CN106836592A (en) * 2017-03-03 2017-06-13 重庆大学 Overlapped hollow floor system after partial precast assembled

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074293A (en) * 2014-07-16 2014-10-01 赵春樵 Reinforced-concrete prefabricated dense-rib sheet and constructing method
CN106149941A (en) * 2016-05-06 2016-11-23 湖南标迪夫节能科技有限公司 A kind of combined method of steel construction assembled cavity building roof
CN106088435A (en) * 2016-06-08 2016-11-09 湖南标迪夫节能科技有限公司 A kind of stress island steel construction assembled cavity building roof
CN106836592A (en) * 2017-03-03 2017-06-13 重庆大学 Overlapped hollow floor system after partial precast assembled
CN106836592B (en) * 2017-03-03 2020-02-11 重庆大学 Partially prefabricated assembled rear-superposed hollow floor

Similar Documents

Publication Publication Date Title
CN101858119B (en) Reinforced concrete hollow floor slab and construction method
CN102296723A (en) Outer multi-cavity steel plate concrete combined shear wall and construction method thereof
CN102277920B (en) Hollow reinforced concrete floor and construction method
CN110318490B (en) Construction method for connecting laminated slab and secondary beam and node connecting structure
CN201771075U (en) Reinforced concrete hollow floorslab
CN102261148A (en) Reinforced concrete hollow floor slab
CN204356996U (en) The U-shaped beam of prefabricated reinforced concrete with horizontal steel diaphragm
CN203867067U (en) U-shaped steel concrete compound section beam
CN101906875A (en) Hollow slab template for buildings
CN101858118A (en) Reinforced concrete hollow floor slab and construction method
CN101914967B (en) Reinforced concrete hollow floor and construction method
CN107975165B (en) Laminated wall structure and manufacturing method thereof
CN105297910A (en) Connecting structure of prefabricated floor plate and steel beam
CN206090815U (en) Prefabricated assembled tube structure public building
CN203213396U (en) Prefabricating cast-in-situ integral type reinforced concrete beam component
CN201771078U (en) Reinforced concrete hollow floor slab
CN101871240B (en) Reinforced concrete hollow floorslab and construction method
CN204356937U (en) The shear wall strengthened bottom a kind of integral reinforcing
CN106567543A (en) Slab-bottom structural concrete column reserved hole construction method
CN106638260A (en) Combined box beam structure and manufacturing method thereof
CN102251673B (en) Construction method for reinforced concrete hollow floor
CN101864819A (en) Reinforced concrete hollow floor slab and construction method
CN202831440U (en) Precast light plate type stair
CN102051963A (en) Concrete composite beam floor system and pouring method thereof
CN205206112U (en) Novel three -dimensional steel bar truss building carrier plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110323

Termination date: 20180817