CN106276640B - The combined type support platform of high-building construction tower crane - Google Patents

The combined type support platform of high-building construction tower crane Download PDF

Info

Publication number
CN106276640B
CN106276640B CN201510283940.0A CN201510283940A CN106276640B CN 106276640 B CN106276640 B CN 106276640B CN 201510283940 A CN201510283940 A CN 201510283940A CN 106276640 B CN106276640 B CN 106276640B
Authority
CN
China
Prior art keywords
screw rod
oblique pull
steel corbel
supporting plate
pull screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510283940.0A
Other languages
Chinese (zh)
Other versions
CN106276640A (en
Inventor
刘阳
马星桥
靳峰
南锐
刘洪亮
杨统元
年全军
庞洪海
唐文革
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201510283940.0A priority Critical patent/CN106276640B/en
Publication of CN106276640A publication Critical patent/CN106276640A/en
Application granted granted Critical
Publication of CN106276640B publication Critical patent/CN106276640B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of combined type support platform of high-building construction tower crane, and it includes steel corbel, oblique pull screw rod, sleeve pipe with ribbing, pier nose cushion block, nut, billet, supporting plate, threaded rod, adjustable nut and wall;The sleeve pipe with ribbing is oblique to be embedded in wall, oblique pull screw rod is located at the lower surface of inside pipe casing with ribbing through sleeve pipe with ribbing, the both ends of oblique pull screw rod are stretched out from wall respectively, the upper one end of oblique pull screw rod is cased with steel corbel and pier nose cushion block and fixed by nut, and the lower end thereof of oblique pull screw rod is cased with billet and pier nose cushion block and fixed by nut;The supporting plate is located at steel corbel top, is connected between supporting plate and steel corbel by threaded rod, and adjustable nut is placed on the threaded rod between supporting plate and steel corbel;The present invention without welding, assemble and disassemble it is easy to adjust, do not influence agent structure performance, bearing capacity it is higher, turnover efficiency high.

Description

The combined type support platform of high-building construction tower crane
Technical field
The present invention relates to a kind of combined type support platform, the combined type support of specifically high-building construction tower crane are flat Platform.
Background technology
Accelerate with the development process of urban construction, high-rise building is built demand and is continuously increased.Due to high-rise building Height is higher, generally requires to construct by mechanical transportation equipment in building course, thus tower crane is as construction of super highrise building In it is most important lifting and vertical transportation machinery occupy critical positions.In order to adapt to upward construction speed needs, in general use It is in the majority to climb formula tower crane.Inner climbing crane tower is climbed in interior of building by a set of bracket and lifting system, and bracket is installed on In support platform, load passes to wall through support platform.
In published patent, there are following several ways as support platform:(1) support platform by girder steel, steel corbel, Built-in fitting is formed, and girder steel is connected by screw bolts with steel corbel, and steel corbel welds with built-in fitting, and built-in fitting is generally located on Core Walls Structure Inside wall, welded by reinforcing bar one end and steel plate, and integral built-in plays the anchorage effect to structure in concrete, this Kind mode is at present in Practical Project using wide;(2) it is to be provided with type inside concrete wall with the first difference Steel, shaped steel are vertically connected with anchor slab side, and the opposite side of described anchor slab is welded with bracket and (refers to publication CN 203998719 U);(3) in wall internal openings, girder steel, which is placed directly on pre-embedded steel slab, to be bolted (with reference to open The U of patent CN 201447323);(4) the pre-buried steel sleeve inside wall, high-strength bolt pass through steel sleeve, and nut is tightened in height The both ends of strength bolt, so as to which bracket and billet are fixed on into structural wall metope (referring to the A of publication CN 103072906).
The content of the invention
It is contemplated that the defects of overcoming prior art, there is provided a kind of combined type support of high-building construction tower crane is flat Platform, without weld, assemble and disassemble it is easy to adjust, do not influence agent structure performance, bearing capacity it is higher, turnover efficiency high.
In order to solve the above-mentioned technical problem, the present invention is realized in:
A kind of combined type support platform of high-building construction tower crane, it is characterised in that:It includes steel corbel, oblique pull spiral shell Bar, sleeve pipe with ribbing, pier nose cushion block, nut, billet, supporting plate, threaded rod, adjustable nut and wall;The sleeve pipe with ribbing is oblique To being embedded in wall, oblique pull screw rod is located at the lower surface of inside pipe casing with ribbing, the both ends point of oblique pull screw rod through sleeve pipe with ribbing Do not stretched out from wall, the upper one end of oblique pull screw rod is cased with steel corbel and pier nose cushion block and fixed by nut, oblique pull screw rod Lower end thereof is cased with billet and pier nose cushion block and fixed by nut;The supporting plate is located at steel corbel top, supporting plate and Connected between steel corbel by threaded rod, adjustable nut is placed on the threaded rod between supporting plate and steel corbel.
The combined type support platform of described high-building construction tower crane, it is characterised in that:The supporting plate is provided with horizontal stroke To baffle plate.
The combined type support platform of described high-building construction tower crane, it is characterised in that:The supporting plate and steel corbel Between be provided with spring shim.
The beneficial effects of the invention are as follows:Oblique pull screw rod can be closely connected with sleeve pipe with ribbing, and the tension masterpiece used time can be with sleeve pipe Inner surface produces frictional force, increases the bearing capacity of support platform.
Angularly disposed wall-through hole, pulling force can be made to be decomposed in vertical direction, carrying is provided by the support of wall.
Slanted apertures diameter is more than the diameter of threaded rod, after unloading, can very easily take out, be adapted to fit from hole Or dismounting, improve turnover rate.
Steel corbel top sets supporting plate, is adjusted with adapting to the flatness after installation, is in the support platform of each wall It is horizontal.
Support platform is combined by all parts, and without high-temperature soldering, all parts can be changed freely, and repetition makes With realizing industrialization processing and green construction, save and on-site construction time and come into operation the time, reduce overall is constructed into This.
Brief description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation in Fig. 1 main views direction;
Fig. 3 is the structural representation of the overlook direction of steel corbel and supporting plate in Fig. 1;
Fig. 4 is the structural representation of pier nose cushion block in Fig. 1;
In figure, 1 steel corbel, 2 oblique pull screw rods, 3 sleeve pipes with ribbing, 4 pier nose cushion blocks, 5 nuts, 6 billets, 7 supporting plates, 8 spiral shells Rasp bar, 9 adjustable nuts, 10 walls.
Embodiment
As shown in Figure 1:A kind of combined type support platform of high-building construction tower crane, it includes steel corbel 1, oblique pull screw rod 2nd, sleeve pipe 3 with ribbing, pier nose cushion block 4, nut 5, billet 6, supporting plate 7, threaded rod 8, adjustable nut 9 and wall 10;The band Rib sleeve pipe is oblique to be embedded in wall, and its surface is the steel pipe of line with ribbing, and oblique pull screw rod is close to set with ribbing through sleeve pipe with ribbing Lower surface inside pipe, makes both closely be engaged, and the both ends of oblique pull screw rod are stretched out from wall respectively, the upper one end of oblique pull screw rod It is cased with steel corbel and pier nose cushion block and is fixed by nut, the lower end thereof of oblique pull screw rod is cased with billet and pier nose cushion block and led to Nut is crossed to fix;The supporting plate is located at steel corbel top, is connected between supporting plate and steel corbel by threaded rod, adjustable nut It is placed on the threaded rod between supporting plate and steel corbel;The supporting plate is provided with transverse baffle, to prevent in support platform Crossbeam drops or produced lateral displacement;Spring shim is provided between the supporting plate and steel corbel, is caused with alleviating tower body motion Dynamic impact load pass to wall.
As shown in Fig. 2 the oblique pull screw rod 2 is symmetrically arranged at the hole position of inside steel plate of steel corbel 1, hole position and oblique pull The quantity of screw rod 2 can determine according to force analysis, first the hole position of steel corbel 1 be alignd with the hole position of wall 10 during installation, oblique pull spiral shell Then pier nose cushion block 4 is put oblique pull screw rod 2 and nut 5 through the endoporus of sleeve pipe 3 with ribbing and steel corbel 1 by bar 2, can during installation It is symmetrically installed successively under upper, tightens nut 5 after the positioning of steel corbel 1, steel corbel 1 is close to the surface of wall 10.
As shown in figure 3, the supporting plate 7 is arranged at the top of steel corbel 1, threaded rod 8 is first passed through into steel when supporting plate 7 is installed The top hole position of bracket 1, puts adjustable nut 9 and supporting plate 7, and supporting plate 7 sets symmetrical threaded hole position, itself and steel corbel The hole position alignment on 1 top, is then made its up and down motion by rotating adjustable nut 9 according to the level requirement of setting, is realized with this Leveling to supporting plate 7.
As shown in figure 4, the pier nose cushion block 4 is the special anchorage that inclined-plane carries hole position, diameter and the oblique pull screw rod 2 of hole position Diameter is consistent, and the angle of hole position is consistent with the angle of wall hole position.
The hole position quantity of described oblique pull screw rod 2 is not limited to the quantity of above-described embodiment, should determine hole according to force analysis Position diameter and quantity, the diameter of oblique pull screw rod 2 are less than the oblique hole position in wall 1, oblique pull screw rod 2 can be made conveniently to penetrate with ribbing Sleeve pipe 3, included angle also should not be excessive, can be according to the stress of specific wall steel bar arrangement, oblique pull screw rod 2 and steel corbel 1 Energy etc. is comprehensive to be determined.
The shape of the steel corbel 1 can add deep floor, and this is converted as one kind of embodiment.
Steel corbel is set to be fixed together by bolted connection with wall, dismounting is easy for assembly;Due to angularly disposed, And inside pipe casing carries rib line, oblique pull screw rod can be made to produce friction counterforce with sleeve pipe under a stretching force, can also make to mix in addition Solidifying cob wall body provides reaction of bearing, improves the bearing capacity of whole support platform comprehensively;Secondly, in order to avoid once mounting flatness The problem of being difficult to adjustment, adjusting support board is addition of, the performance that can make support platform by these technological improvements more safely may be used Lean on.

Claims (3)

  1. A kind of 1. combined type support platform of high-building construction tower crane, it is characterised in that:It include steel corbel, oblique pull screw rod, Sleeve pipe, pier nose cushion block, nut, billet, supporting plate, threaded rod, adjustable nut and wall with ribbing;The sleeve pipe with ribbing is oblique pre- Be embedded in wall, oblique pull screw rod is located at the lower surface of inside pipe casing with ribbing through sleeve pipe with ribbing, the both ends of oblique pull screw rod respectively from Wall stretches out, and the upper one end of oblique pull screw rod is cased with steel corbel and pier nose cushion block and fixed by nut, the bottom of oblique pull screw rod One end is cased with billet and pier nose cushion block and fixed by nut;The supporting plate is located at steel corbel top, supporting plate and steel ox Connected between leg by threaded rod, adjustable nut is placed on the threaded rod between supporting plate and steel corbel.
  2. 2. the combined type support platform of high-building construction tower crane according to claim 1, it is characterised in that:The support Plate is provided with transverse baffle.
  3. 3. the combined type support platform of high-building construction tower crane according to claim 1, it is characterised in that:The support Spring shim is provided between plate and steel corbel.
CN201510283940.0A 2015-05-29 2015-05-29 The combined type support platform of high-building construction tower crane Active CN106276640B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510283940.0A CN106276640B (en) 2015-05-29 2015-05-29 The combined type support platform of high-building construction tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510283940.0A CN106276640B (en) 2015-05-29 2015-05-29 The combined type support platform of high-building construction tower crane

Publications (2)

Publication Number Publication Date
CN106276640A CN106276640A (en) 2017-01-04
CN106276640B true CN106276640B (en) 2017-12-29

Family

ID=57635321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510283940.0A Active CN106276640B (en) 2015-05-29 2015-05-29 The combined type support platform of high-building construction tower crane

Country Status (1)

Country Link
CN (1) CN106276640B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565676A (en) * 2019-08-01 2019-12-13 中交二公局第二工程有限公司 Cantilever type tower crane foundation structure and construction method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2125872A (en) * 1982-08-13 1984-03-14 Keyworthy Limited Attachment of scaffolding or like structures to buildings
KR20090002041U (en) * 2007-08-28 2009-03-04 강혜영 Install bracket of dropping prevention net
JP4851165B2 (en) * 2005-11-01 2012-01-11 敬 橋口 Scaffolding support
CN102992210A (en) * 2012-12-24 2013-03-27 从卫民 Assembly-available tower crane platform base attached to wall body
CN103072906A (en) * 2013-01-16 2013-05-01 广州建筑股份有限公司 Connecting device of inner climbing type tower crane and building structure and construction method utilizing same
CN203295079U (en) * 2013-04-26 2013-11-20 中昇建机(南京)重工有限公司 External mounting type inner climbing support device of tower crane for super high-rise building
CN203373956U (en) * 2013-05-30 2014-01-01 许东强 Overhanging steel pipe scaffold supporting steel pipe fixing piece with H-shaped steel
CN203499236U (en) * 2013-10-14 2014-03-26 吴强 Novel wall-attaching support base
CN203998719U (en) * 2014-03-20 2014-12-10 中国建筑第六工程局有限公司 A kind of high-building construction tower crane adheres to uses shaped steel anchor structure
CN204024042U (en) * 2014-05-21 2014-12-17 中国建筑第八工程局有限公司 Bracket climbs
CN204675698U (en) * 2015-05-29 2015-09-30 上海宝冶集团有限公司 The compound type support platform of high-building construction tower crane
CN105064670A (en) * 2015-07-31 2015-11-18 北京建工路桥工程建设有限责任公司 Exterior wall suspension board pouring form board erecting support

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2125872A (en) * 1982-08-13 1984-03-14 Keyworthy Limited Attachment of scaffolding or like structures to buildings
JP4851165B2 (en) * 2005-11-01 2012-01-11 敬 橋口 Scaffolding support
KR20090002041U (en) * 2007-08-28 2009-03-04 강혜영 Install bracket of dropping prevention net
CN102992210A (en) * 2012-12-24 2013-03-27 从卫民 Assembly-available tower crane platform base attached to wall body
CN103072906A (en) * 2013-01-16 2013-05-01 广州建筑股份有限公司 Connecting device of inner climbing type tower crane and building structure and construction method utilizing same
CN203295079U (en) * 2013-04-26 2013-11-20 中昇建机(南京)重工有限公司 External mounting type inner climbing support device of tower crane for super high-rise building
CN203373956U (en) * 2013-05-30 2014-01-01 许东强 Overhanging steel pipe scaffold supporting steel pipe fixing piece with H-shaped steel
CN203499236U (en) * 2013-10-14 2014-03-26 吴强 Novel wall-attaching support base
CN203998719U (en) * 2014-03-20 2014-12-10 中国建筑第六工程局有限公司 A kind of high-building construction tower crane adheres to uses shaped steel anchor structure
CN204024042U (en) * 2014-05-21 2014-12-17 中国建筑第八工程局有限公司 Bracket climbs
CN204675698U (en) * 2015-05-29 2015-09-30 上海宝冶集团有限公司 The compound type support platform of high-building construction tower crane
CN105064670A (en) * 2015-07-31 2015-11-18 北京建工路桥工程建设有限责任公司 Exterior wall suspension board pouring form board erecting support

Also Published As

Publication number Publication date
CN106276640A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN101619630B (en) Mounting method of steel chimney and implementary jacking device
CN104695336B (en) The double-deck first up and then down stand construction method of Cast-in-situ Beam
CN212503601U (en) Installation die for unit sections of vertical pipes of pipe well
CN108489748B (en) A kind of experimental rig and test method for continuous bridge long period Study of Cyclic Loading
CN109403622A (en) A kind of track hangs modular system and its construction method from hoisting type suspension levelling
CN105464216A (en) Construction method for ultrahigh oblique post with super-large cross section based on integral lifting formwork reinforcing system
CN204675698U (en) The compound type support platform of high-building construction tower crane
CN108729640B (en) Mounting method of cantilever plate of assembled building
CN106276640B (en) The combined type support platform of high-building construction tower crane
CN206607506U (en) A kind of through type adds the capping construction support of passive stress trapezoid block
CN206397136U (en) Assembled aluminum template masonry shearwalls reinforced concrete structural column
CN106150105A (en) A kind of stiffened column installation method
CN115341701B (en) Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate
CN215482366U (en) Double-line continuous beam bracket structure
CN205296829U (en) Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN213174742U (en) Top bracing steel stand structure
CN211341789U (en) Wall form reinforcing tool
CN213740639U (en) Dismantled and assembled roof beam temporary support steel pipe's anchor that irritates that hangs
CN108867548B (en) Construction platform and construction platform erection method for on-site watering high pile wharf
CN208088326U (en) A kind of lag pile formula bearing being used to support pile framing
CN101845914B (en) Installation method of three-tube steel chimney
CN105926662B (en) A kind of construction method of top plate type main transformer foundation
CN105569070B (en) The method for pouring large-size concrete beam column
CN205954490U (en) Large -tonnage jack is put with taking out drawer type rising -falling tone paper -back edition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant