CN102966255A - 用于连接混凝土塔筒与钢塔筒的连接装置 - Google Patents
用于连接混凝土塔筒与钢塔筒的连接装置 Download PDFInfo
- Publication number
- CN102966255A CN102966255A CN2012104835400A CN201210483540A CN102966255A CN 102966255 A CN102966255 A CN 102966255A CN 2012104835400 A CN2012104835400 A CN 2012104835400A CN 201210483540 A CN201210483540 A CN 201210483540A CN 102966255 A CN102966255 A CN 102966255A
- Authority
- CN
- China
- Prior art keywords
- cylinder
- concrete towers
- head tower
- billet
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title abstract description 9
- 239000010959 steel Substances 0.000 title abstract description 9
- 239000011440 grout Substances 0.000 claims description 13
- 230000006835 compression Effects 0.000 abstract description 3
- 238000007906 compression Methods 0.000 abstract description 3
- 230000006378 damage Effects 0.000 abstract description 3
- 238000010248 power generation Methods 0.000 abstract description 2
- 230000002411 adverse Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 abstract 1
- 238000010008 shearing Methods 0.000 description 3
- 239000002131 composite material Substances 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000007788 roughening Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明实施例提供一种用于连接混凝土塔筒与钢塔筒的连接装置,涉及风力发电技术领域,解决了使用现有技术连接混凝土塔筒与钢塔筒时,连接处的受力机理和破坏形态复杂、安全性低、成本高及混凝土塔筒受力不均匀的问题。本发明中,由于在混凝土塔筒与钢塔筒之间设有钢垫板及灌浆层,能够增大受压面积,分散钢塔筒传来的压力,使该压力更加均匀的施加在混凝土塔筒上,使混凝土塔筒受力简单、均匀,避免了局部压力较大的不利情况,同时混凝土塔筒内部不存在剪力作用,避免了混凝土塔筒受力不均匀的情况,提高了安全性;另外由于仅采用钢垫板与灌浆层进行混凝土塔筒与钢塔筒的连接,降低了成本。
Description
技术领域
本发明涉及风力发电技术领域,尤其涉及用于连接混凝土塔筒与钢塔筒的连接装置。
背景技术
钢塔筒与混凝土塔筒组合形成的风力发电机塔架,是风力发电机组常用的支撑结构。
混凝土塔筒与钢塔筒之间的连接方式通常有两种:嵌固式和螺栓连接方式。
其中,嵌固式具体为:将钢塔筒的底部一定长度预埋进混凝土塔筒中,混凝土塔筒内部通过特定的钢筋和混凝土配置方式,将钢塔筒与混凝土塔筒进行固定连接。该连接方式中,钢塔筒埋入混凝土塔筒结构之中,形成钢-混凝土混合结构,其受力机理和破坏形态复杂,且安全性低;另外在钢塔筒露出混凝土塔筒的截面处,由于混凝土结构突然变化为钢结构,刚度变化较大,使得混凝土塔筒的受力不均匀。
螺栓连接方式具体为:在混凝土塔筒内部预埋螺栓,或预留螺栓孔位后穿设螺栓,钢塔筒的底部与螺栓进行固定连接。该连接方式中,螺栓需采用高强度预应力螺栓,为了固定牢固,螺栓较长,导致成本过高;另外,由于螺栓与钢塔筒连接,当螺栓受到拉力时,混凝土塔筒将受到相应的剪力,这使得混凝土塔筒的受力不均匀。
发明内容
本发明的实施例提供一种用于连接混凝土塔筒与钢塔筒的连接装置,解决了使用现有技术连接混凝土塔筒与钢塔筒时,连接处的受力机理和破坏形态复杂、安全性低、成本高及混凝土塔筒受力不均匀的问题。
为达到上述目的,本发明的实施例采用如下技术方案:
一种用于连接混凝土塔筒与钢塔筒的连接装置,包括灌浆层及钢垫板,所述钢垫板水平放置在所述混凝土塔筒的顶面上,且所述钢垫板覆盖所述混凝土塔筒的顶面;所述灌浆层填充在所述钢垫板与所述混凝土塔筒的顶面之间,用于固定连接所述钢垫板与所述混凝土塔筒;所述钢垫板的顶面与所述钢塔筒的底法兰的底面贴合。
优选地,所述钢垫板上设有多个第一通孔,所述钢塔筒的底法兰上设有与所述第一通孔对应的第二通孔,穿设于所述混凝土塔筒内的预应力索穿过所述第一通孔和所述第二通孔,并由锚具锚固在所述钢塔筒的底法兰上。
进一步地,用于连接混凝土塔筒与钢塔筒的连接装置还包括多个调平装置,所述调平装置包括套筒及与所述套筒螺纹配合的调平螺栓,所述套筒预埋在所述混凝土塔筒中;所述调平螺栓的头部距离所述混凝土塔筒顶面的高度可调;所述调平螺栓的头部抵靠所述钢垫板的底面。
优选地,所述第二通孔由贯通孔及沉孔组成,所述贯通孔位于所述沉孔之下,所述沉孔用于容纳所述锚具。
优选地,所述钢塔筒的底法兰为T型结构,且所述第二通孔设在所述底法兰的朝向所述钢塔筒内部的凸伸部分上。
并进一步地,所述混凝土塔筒的顶面为经由凿毛处理的表面。
优选地,所述底法兰及所述钢垫板为圆环结构。
优选地,所述第一通孔沿所述钢垫板的周向均匀分布,所述第二通孔沿所述底法兰的周向均匀分布。
进一步地,所述预应力索的位于所述混凝土塔筒内的部分与所述混凝土塔筒为无粘结连接。
本发明实施例提供的用于连接混凝土塔筒与钢塔筒的连接装置中,由于在混凝土塔筒与钢塔筒之间设有钢垫板及灌浆层,能够增大受压面积,分散钢塔筒传来的压力,使该压力更加均匀的施加在混凝土塔筒上,使混凝土塔筒受力简单、均匀,避免了局部压力较大的不利情况,同时混凝土塔筒内部不存在剪力作用,避免了混凝土塔筒受力不均匀的情况,提高了安全性;另外由于仅采用钢垫板与灌浆层进行混凝土塔筒与钢塔筒的连接,降低了成本。
附图说明
为了更清楚地说明本发明实施例的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍。
图1为本发明实施例提供的一种用于连接混凝土塔筒与钢塔筒的连接装置的部分剖视图;
图2为本发明实施例提供的另一种用于连接混凝土塔筒与钢塔筒的连接装置中调平装置的剖视图;
图3为图1所示的用于连接混凝土塔筒与钢塔筒的连接装置中钢垫板的顶示图;
图4为本发明实施例提供的用于连接混凝土塔筒与钢塔筒的连接装置中钢塔筒的结构示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述。
本发明实施例提供一种用于连接混凝土塔筒与钢塔筒的连接装置,如图1所示,包括灌浆层11及钢垫板12,钢垫板12水平放置在混凝土塔筒13的顶面上,且钢垫板12覆盖混凝土塔筒13的顶面;灌浆层11填充在钢垫板12与混凝土塔筒13的顶面之间,用于固定连接钢垫板12与混凝土塔筒13;其中,钢垫板12的顶面与钢塔筒14的底法兰141的底面贴合。
本发明提供的用于连接混凝土塔筒与钢塔筒的连接装置中,由于在混凝土塔筒与钢塔筒之间设有钢垫板及灌浆层,能够增大受压面积,分散钢塔筒传来的压力,使该压力更加均匀的施加在混凝土塔筒上,使混凝土塔筒受力简单、均匀,避免了局部压力较大的不利情况,同时混凝土塔筒内部不存在剪力作用,避免了混凝土塔筒受力不均匀的情况,提高了安全性;另外由于仅采用钢垫板与灌浆层进行混凝土塔筒与钢塔筒的连接,降低了成本。
上述实施例描述的用于连接混凝土塔筒与钢塔筒的连接装置中,钢垫板12上可以设有多个第一通孔121,钢塔筒14的底法兰141上可以设有与第一通孔121对应的第二通孔142,穿设于混凝土塔筒13内的预应力索15穿过第一通孔121和第二通孔142,并由锚具16锚固在钢塔筒14的底法兰141上。
上述实施例描述的用于连接混凝土塔筒与钢塔筒的连接装置中,如图2所示,还可以包括多个调平装置21,调平装置21包括套筒211及与套筒螺纹配合的调平螺栓212,套筒211预埋在混凝土塔筒13中;调平螺栓212的头部距离混凝土塔筒13顶面的高度可调;调平螺栓212的头部抵靠钢垫板12的底面。调平装置21能够有效调节自身高度,使多个调平装置21的高度在同一个水平面上,保证钢垫板12水平放置。
上述实施例描述的用于连接混凝土塔筒与钢塔筒的连接装置中,第二通孔142可以由贯通孔143及沉孔144组成,贯通孔143位于沉孔144之下,沉孔144用于容纳锚具16。也可以在底法兰141上采用其他结构固定锚具16,限制锚具16在水平方向的位移。
上述实施例描述的用于连接混凝土塔筒与钢塔筒的连接装置中,钢塔筒14的底法兰141可以为T型结构,且第二通孔142设在底法兰141的朝向钢塔筒14内部的凸伸部分上。其中,T型结构能够增大底法兰141的受力面积,能更有效的分散钢塔筒14的压力。此外,底法兰141也可以L型结构。
上述实施例描述的用于连接混凝土塔筒与钢塔筒的连接装置中,混凝土塔筒13的顶面为经由凿毛处理的表面。凿毛处理使混凝土塔筒13的上表面变粗糙,使得混凝土塔筒13与灌浆层11的粘结更加牢固。
上述实施例描述的用于连接混凝土塔筒与钢塔筒的连接装置中,如图3和图4所示,底法兰141及钢垫板12可以为圆环结构。底法兰141及钢垫板12也可以为其他环形结构,例如方环结构等。
上述实施例描述的用于连接混凝土塔筒与钢塔筒的连接装置中,第一通孔121沿钢垫板12的周向均匀分布,第二通孔142沿底法兰141的周向均匀分布。第一通孔121与第二通孔142均匀分布,使预应力索15均匀穿过第一通孔121与第二通孔142,使预应力索15的受力均匀。
上述实施例描述的用于连接混凝土塔筒与钢塔筒的连接装置中,预应力索15的位于混凝土塔筒13内的部分与混凝土塔筒13为无粘结连接。采用该连接方式,使预应力索15在张拉时有足够的变形,使固定更加方便、牢固。
下面结合图1和图2对上述实施例描述的用于连接混凝土塔筒与钢塔筒的连接装置的工作原理进行详细的说明。
如图2所示,通过预埋在混凝土塔筒13中的套筒211及在套筒211中能够拧转的调平螺栓212的配合,使多个调平螺栓212保持在同一个水平面上,如图1所示,将钢垫板12水平放置在调平螺栓212上,同时使多个预应力索15分别穿过第一通孔121,在钢垫板12与混凝土塔筒13之间浇灌灌浆层11,使钢垫板12与混凝土塔筒13通过灌浆层11固定连接,将钢塔筒14放置在钢垫板12之上,同时使多个预应力索15分别穿过第二通孔142,最后通过锚具16固定预应力索15,最后使钢塔筒14固定在混凝土塔筒13上,完成钢塔筒14与混凝土塔筒13的固定连接。
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应以所述权利要求的保护范围为准。
Claims (9)
1.一种用于连接混凝土塔筒与钢塔筒的连接装置,其特征在于,包括灌浆层及钢垫板,所述钢垫板水平放置在所述混凝土塔筒的顶面上,且所述钢垫板覆盖所述混凝土塔筒的顶面;所述灌浆层填充在所述钢垫板与所述混凝土塔筒的顶面之间,用于固定连接所述钢垫板与所述混凝土塔筒;
所述钢垫板的顶面与所述钢塔筒的底法兰的底面贴合。
2.根据权利要求1所述的用于连接混凝土塔筒与钢塔筒的连接装置,其特征在于,所述钢垫板上设有多个第一通孔,所述钢塔筒的底法兰上设有与所述第一通孔对应的第二通孔,穿设于所述混凝土塔筒内的预应力索穿过所述第一通孔和所述第二通孔,并由锚具锚固在所述钢塔筒的底法兰上。
3.根据权利要求1所述的用于连接混凝土塔筒与钢塔筒的连接装置,其特征在于,还包括多个调平装置,所述调平装置包括套筒及与所述套筒螺纹配合的调平螺栓,所述套筒预埋在所述混凝土塔筒中;所述调平螺栓的头部距离所述混凝土塔筒顶面的高度可调;所述调平螺栓的头部抵靠所述钢垫板的底面。
4.根据权利要求2所述的用于连接混凝土塔筒与钢塔筒的连接装置,其特征在于,所述第二通孔由贯通孔及沉孔组成,所述贯通孔位于所述沉孔之下,所述沉孔用于容纳所述锚具。
5.根据权利要求2所述的用于连接混凝土塔筒与钢塔筒的连接装置,其特征在于,所述钢塔筒的底法兰为T型结构,且所述第二通孔设在所述底法兰的朝向所述钢塔筒内部的凸伸部分上。
6.根据权利要求1所述的用于连接混凝土塔筒与钢塔筒的连接装置,其特征在于,所述混凝土塔筒的顶面为经由凿毛处理的表面。
7.根据权利要求1所述的用于连接混凝土塔筒与钢塔筒的连接装置,其特征在于,所述底法兰及所述钢垫板为圆环结构。
8.根据权利要求6所述的用于连接混凝土塔筒与钢塔筒的连接装置,其特征在于,所述第一通孔沿所述钢垫板的周向均匀分布,所述第二通孔沿所述底法兰的周向均匀分布。
9.根据权利要求1所述的用于连接混凝土塔筒与钢塔筒的连接装置,其特征在于,所述预应力索的位于所述混凝土塔筒内的部分与所述混凝土塔筒无粘结连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210483540.0A CN102966255B (zh) | 2012-11-23 | 2012-11-23 | 用于连接混凝土塔筒与钢塔筒的连接装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210483540.0A CN102966255B (zh) | 2012-11-23 | 2012-11-23 | 用于连接混凝土塔筒与钢塔筒的连接装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102966255A true CN102966255A (zh) | 2013-03-13 |
CN102966255B CN102966255B (zh) | 2014-09-17 |
Family
ID=47796665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210483540.0A Active CN102966255B (zh) | 2012-11-23 | 2012-11-23 | 用于连接混凝土塔筒与钢塔筒的连接装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102966255B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103982380A (zh) * | 2014-05-27 | 2014-08-13 | 北京金风科创风电设备有限公司 | 预制混凝土塔架构件、其组合件、其累叠方法及预埋件 |
CN105240224A (zh) * | 2015-09-23 | 2016-01-13 | 南车株洲电力机车研究所有限公司 | 一种风力发电机组基础环调平装置及方法 |
CN105275753A (zh) * | 2015-11-13 | 2016-01-27 | 北京市建筑工程研究院有限责任公司 | 一种预应力混凝土塔架用锚具 |
CN107288822A (zh) * | 2017-08-14 | 2017-10-24 | 北京中建建筑科学研究院有限公司 | 一种组合塔架的连接机构 |
CN112727695A (zh) * | 2021-01-22 | 2021-04-30 | 明阳智慧能源集团股份公司 | 一种风力发电机组预制混凝土塔架转换段及其施工方法 |
CN115354903A (zh) * | 2022-08-24 | 2022-11-18 | 中国电建集团西北勘测设计研究院有限公司 | 一种混合塔筒转换段上法兰水平度测平、调节方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009057713A (ja) * | 2007-08-30 | 2009-03-19 | Kyushu Electric Power Co Inc | 風力発電用ハイブリッドタワー及びその施工法 |
CN201221448Y (zh) * | 2008-07-10 | 2009-04-15 | 马人乐 | 立体可调节组合式预应力锚栓 |
CN201635180U (zh) * | 2009-12-24 | 2010-11-17 | 上海勘测设计研究院 | 一种钢管柱柱脚结构 |
CN201747544U (zh) * | 2010-08-26 | 2011-02-16 | 华锐风电科技(集团)股份有限公司 | 风力发电机的安装基座和风力发电机 |
CN102071745A (zh) * | 2010-12-10 | 2011-05-25 | 上海电力设计院有限公司 | 一种构架柱的柱脚节点 |
CN202031370U (zh) * | 2011-04-22 | 2011-11-09 | 辽宁大金重工股份有限公司 | 一种混凝土-钢结构复合风电塔架 |
CN102758445A (zh) * | 2011-04-27 | 2012-10-31 | 华锐风电科技(集团)股份有限公司 | 风力发电机塔架基础调平装置、基础总成及基础成型方法 |
CN102767303A (zh) * | 2012-07-13 | 2012-11-07 | 北京金风科创风电设备有限公司 | 一种预制混凝土塔架及其构建方法 |
-
2012
- 2012-11-23 CN CN201210483540.0A patent/CN102966255B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009057713A (ja) * | 2007-08-30 | 2009-03-19 | Kyushu Electric Power Co Inc | 風力発電用ハイブリッドタワー及びその施工法 |
CN201221448Y (zh) * | 2008-07-10 | 2009-04-15 | 马人乐 | 立体可调节组合式预应力锚栓 |
CN201635180U (zh) * | 2009-12-24 | 2010-11-17 | 上海勘测设计研究院 | 一种钢管柱柱脚结构 |
CN201747544U (zh) * | 2010-08-26 | 2011-02-16 | 华锐风电科技(集团)股份有限公司 | 风力发电机的安装基座和风力发电机 |
CN102071745A (zh) * | 2010-12-10 | 2011-05-25 | 上海电力设计院有限公司 | 一种构架柱的柱脚节点 |
CN202031370U (zh) * | 2011-04-22 | 2011-11-09 | 辽宁大金重工股份有限公司 | 一种混凝土-钢结构复合风电塔架 |
CN102758445A (zh) * | 2011-04-27 | 2012-10-31 | 华锐风电科技(集团)股份有限公司 | 风力发电机塔架基础调平装置、基础总成及基础成型方法 |
CN102767303A (zh) * | 2012-07-13 | 2012-11-07 | 北京金风科创风电设备有限公司 | 一种预制混凝土塔架及其构建方法 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103982380A (zh) * | 2014-05-27 | 2014-08-13 | 北京金风科创风电设备有限公司 | 预制混凝土塔架构件、其组合件、其累叠方法及预埋件 |
CN105240224A (zh) * | 2015-09-23 | 2016-01-13 | 南车株洲电力机车研究所有限公司 | 一种风力发电机组基础环调平装置及方法 |
CN105275753A (zh) * | 2015-11-13 | 2016-01-27 | 北京市建筑工程研究院有限责任公司 | 一种预应力混凝土塔架用锚具 |
CN105275753B (zh) * | 2015-11-13 | 2017-09-29 | 北京市建筑工程研究院有限责任公司 | 一种预应力混凝土塔架用锚具 |
CN107288822A (zh) * | 2017-08-14 | 2017-10-24 | 北京中建建筑科学研究院有限公司 | 一种组合塔架的连接机构 |
CN112727695A (zh) * | 2021-01-22 | 2021-04-30 | 明阳智慧能源集团股份公司 | 一种风力发电机组预制混凝土塔架转换段及其施工方法 |
CN112727695B (zh) * | 2021-01-22 | 2023-10-03 | 明阳智慧能源集团股份公司 | 一种风力发电机组预制混凝土塔架转换段及其施工方法 |
CN115354903A (zh) * | 2022-08-24 | 2022-11-18 | 中国电建集团西北勘测设计研究院有限公司 | 一种混合塔筒转换段上法兰水平度测平、调节方法 |
CN115354903B (zh) * | 2022-08-24 | 2024-04-09 | 中国电建集团西北勘测设计研究院有限公司 | 一种混合塔筒转换段上法兰水平度测平、调节方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102966255B (zh) | 2014-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102966255B (zh) | 用于连接混凝土塔筒与钢塔筒的连接装置 | |
CN103147391B (zh) | 一种易于震后修复及耐腐蚀的自定心桥墩结构 | |
CN105780994B (zh) | 一种震后自复位的偏心支撑钢框架组合楼板及其施工方法 | |
CN106545472A (zh) | 全向预应力抗疲劳组合钢结构风塔及其安装方法 | |
CN101929338B (zh) | 隧道施工中用于控制钢架变形的液压扇形支撑系统 | |
US20160251818A1 (en) | Apparatus for securing, in particular remediating, the foundation of a wind turbine, as well as foundation and method for remediating | |
CN109750791A (zh) | 一种装配式大悬挑钢结构 | |
CN103741877A (zh) | 梯格抗剪装置-钢-压型钢板-再生混凝土组合梁及作法 | |
CN101701497A (zh) | 预应力纤维布加固混凝土立柱的方法 | |
CN112195957B (zh) | 一种风机塔筒与基础的加强型连接结构及施工方法 | |
CN210263111U (zh) | 一种土木工程施工用空心桩体 | |
CN211949048U (zh) | 一种型钢混凝土剪力墙结构 | |
CN201695339U (zh) | 盖梁施工钢支撑 | |
CN106592622A (zh) | 一种基于环形砼带竖向预应力的风机基础结构 | |
CN216407048U (zh) | 一种风光一体式发电的风机塔筒结构 | |
CN208430522U (zh) | 钢桁架结构的风机基础 | |
CN202214718U (zh) | 拆分式夯锤及单层夯体 | |
CN214577050U (zh) | 一种新型联络通道预应力支架装置 | |
CN210396223U (zh) | 一种光伏电站杆塔加固装置 | |
CN210564899U (zh) | 一种新型预应力钢混塔架过渡段转换装置 | |
CN212153150U (zh) | 一种桥梁整体加固装置 | |
CN201343699Y (zh) | 易更换式盆式支座 | |
CN104652249B (zh) | 一种拉索与主梁的传力装置 | |
CN210712562U (zh) | 斜拉桥现浇塔柱施工塔吊体系 | |
CN201865058U (zh) | 桥墩钢-混凝土组合结构抱柱梁 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160706 Address after: 100176 Building 1, No. 19, Kangding street, Beijing economic and Technological Development Zone, Beijing, 401 Patentee after: BEIJING TIANBIN HIGH-TECH WIND POWER TECHNOLOGY CO., LTD. Address before: 100176 Beijing economic and Technological Development Zone, Beijing, Kangding street, No. 19, No. Patentee before: Beijing Goldwind Science & Creation Windpower Equipment Co., Ltd |