CN102966048A - 一种提高实腹式拱桥承载力的加固方法 - Google Patents

一种提高实腹式拱桥承载力的加固方法 Download PDF

Info

Publication number
CN102966048A
CN102966048A CN2012104991574A CN201210499157A CN102966048A CN 102966048 A CN102966048 A CN 102966048A CN 2012104991574 A CN2012104991574 A CN 2012104991574A CN 201210499157 A CN201210499157 A CN 201210499157A CN 102966048 A CN102966048 A CN 102966048A
Authority
CN
China
Prior art keywords
bridge
arch
concrete slab
arch bridge
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104991574A
Other languages
English (en)
Other versions
CN102966048B (zh
Inventor
单成林
余锦州
许薛军
雷江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Golden Shield Reinforcement Engineering Co Ltd
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201210499157.4A priority Critical patent/CN102966048B/zh
Publication of CN102966048A publication Critical patent/CN102966048A/zh
Application granted granted Critical
Publication of CN102966048B publication Critical patent/CN102966048B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种提高实腹式拱桥承载力的加固方法,步骤如下:(1)将拱脚的拱背上方填土挖开,在原桥台的台帽余宽处,建筑支承墩,然后再将挖开的填土回填至支承墩的墩顶;(2)在两支承墩之间开挖桥面填料,其深度在拱圈顶面与桥面之间的范围内,现浇筑钢筋混凝土板,钢筋混凝土板的两端置于支承墩上;钢筋混凝土板与拱桥结合面预先需铺设砂垫层,砂垫层及原拱桥将钢筋混凝土板形成弹性地基上的简支板,参与拱桥共同承受车辆荷载,加固后形成实腹式拱与弹性地基上的简支板的组合体系,很大程度减轻拱桥的负担,施工时不受桥下环境的限制,方便快速,不影响桥梁美观。

Description

一种提高实腹式拱桥承载力的加固方法
技术领域
本发明涉及桥梁结构加固工艺,尤其涉及一种提高实腹式拱桥承载力的加固方法。
背景技术
16米以下的小跨径实腹式拱桥是一种常见的桥梁,大多为石拱桥,也有部分为混凝土拱桥,随着车辆重量和交通量的增加,有些拱桥的拱圈出现了不同程度的病害,如纵、横向开裂,钢筋严重锈蚀、砌缝脱落等,使桥梁的承载能力降低,需要进行加固;或者是拱桥本身没有多大的病害,但考虑到车辆重量和交通流量的增加或道路的改造,需要提高桥梁的安全储备或车辆荷载等级而进行加固,针对这种目的的加固,现今常规的办法是增大拱圈厚度来加固,只有病害不严重的时候可采用灌缝修补、加套箍的方法加固。这些方法加固的拱桥,承载能力提高有限,往往还受桥下现场环境的限制,不便进行施工。如果对尚能大部分利用的拱桥拆除重建,不仅成本高,工期也长,而若对其进行常规加固,又难以保证承载能力要求及使用寿命,需寻求性价比较好的方法进行加固。
发明内容
本发明的目的在于克服现有技术的缺点和不足,提供一种提高实腹式拱桥承载力的加固方法。其施工方便、成本低、工期短,经本方法加固的实腹式拱桥用料省,承载能力提高很大,使用寿命长。
本发明通过下述技术方案实现:
一种提高实腹式拱桥承载力的加固方法,步骤如下:
(1)将拱脚的拱背上方填土挖开,在原桥台的台帽余宽处,建筑支承墩,然后再将挖开的填土回填至支承墩的墩顶;
(2)在两支承墩之间开挖桥面填料,其深度在拱圈顶面与桥面之间范围内,现浇筑钢筋混凝土板,钢筋混凝土板的两端置于支承墩上;钢筋混凝土板与拱桥结合面预先需铺设砂垫层,砂垫层及原拱桥将钢筋混凝土板形成弹性地基上的简支板。
所述钢筋混凝土板为空心板或实心板。
本发明与现有的技术相比具有以下优点:
现浇的钢筋混凝土板成为弹性地基(砂垫层)上的简支板,参与拱桥共同承受车辆荷载,加固后形成实腹式拱与弹性地基上的简支板的组合体系,很大程度减轻拱桥的负担,施工时不受桥下环境的限制,方便快速,不影响桥梁美观。
加固后的拱桥外观上看无变化,但内部受力已大为改变,成为实腹式拱-弹性地基上的简支板的组合体系共同受力。原拱桥所受车辆荷重有相当一部分由简支板分担,具体分担比例要通过有限元计算得知。该组合体系可大幅提高桥梁的承载能力,提高幅度也根据现浇板的尺寸和配筋由上述有限元计算而知,一般在60%以上。
附图说明
图1是采用本发明的加固方法,加固后的实腹式拱桥示意图。
具体实施方式
下面结合具体实施例对本发明作进一步具体详细描述。
实施例
如图1所示,本发明提高实腹式拱桥承载力的加固方法,其步骤如下:
(1)将拱脚的拱背上方填土挖开,在原桥台4的台帽余宽处,建筑支承墩3,然后再将挖开的填土回填至支承墩3的墩顶;
(2)在两支承墩3之间开挖桥面填料,其深度在拱圈顶面与桥面之间范围内,现浇筑钢筋混凝土板1,钢筋混凝土板1的两端置于支承墩3上;钢筋混凝土板1与拱桥结合面预先需铺设砂垫层2,砂垫层2及原拱桥将钢筋混凝土板1形成弹性地基上的简支板。浇筑的钢筋混凝土板1可以是空心板或实心板。砂垫层2约3cm厚。
钢筋混凝土板1的厚度,经试算,一般取同等跨径及荷载等级的钢筋混凝土板桥厚度的2/3,最终尺寸及配筋需通过有限元计算分析,经试算后确定。若拱顶填料厚度小于上述厚度,需适当增加桥面标高;
现浇的钢筋混凝土板1成为弹性地基(砂垫层2)上的简支板,参与拱桥共同承受车辆荷载,加固后形成实腹式拱与弹性地基上的简支板的组合体系,很大程度减轻拱桥的负担,施工时不受桥下环境的限制,方便快速,不影响桥梁美观。
加固后的拱桥外观上看无变化,但内部受力已大为改变,成为实腹式拱-弹性地基上的简支板的组合体系共同受力。原拱桥所受车辆荷重有相当一部分由简支板分担,具体分担比例要通过有限元计算得知。该组合体系可大幅提高桥梁的承载能力,提高幅度也根据现浇板的尺寸和配筋由上述有限元计算而知,一般在60%以上。
本发明的实施方式并不受上述实施例的限制,其他任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。

Claims (2)

1.一种提高实腹式拱桥承载力的加固方法,其特征在于步骤如下:
(1)将拱脚的拱背上方填土挖开,在原桥台的台帽余宽处,建筑支承墩,然后再将挖开的填土回填至支承墩的墩顶;
(2)在两支承墩之间开挖桥面填料,其深度在拱圈顶面与桥面之间范围内,现浇筑钢筋混凝土板,钢筋混凝土板的两端置于支承墩上;钢筋混凝土板与拱桥结合面预先需铺设砂垫层,砂垫层及原拱桥将钢筋混凝土板形成弹性地基上的简支板。
2.根据权利要求1所述的加固方法,其特征在于,所述钢筋混凝土板为空心板或实心板。
CN201210499157.4A 2012-11-28 2012-11-28 一种提高实腹式拱桥承载力的加固方法 Active CN102966048B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210499157.4A CN102966048B (zh) 2012-11-28 2012-11-28 一种提高实腹式拱桥承载力的加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210499157.4A CN102966048B (zh) 2012-11-28 2012-11-28 一种提高实腹式拱桥承载力的加固方法

Publications (2)

Publication Number Publication Date
CN102966048A true CN102966048A (zh) 2013-03-13
CN102966048B CN102966048B (zh) 2014-10-08

Family

ID=47796461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210499157.4A Active CN102966048B (zh) 2012-11-28 2012-11-28 一种提高实腹式拱桥承载力的加固方法

Country Status (1)

Country Link
CN (1) CN102966048B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758048A (zh) * 2014-01-23 2014-04-30 岩土科技股份有限公司 采用钢波纹板加固危桥的方法
CN104074139A (zh) * 2014-06-18 2014-10-01 广西交通科学研究院 一种分区域调节圬工拱桥拱上填料重度的方法
CN105040571A (zh) * 2015-06-09 2015-11-11 中交第二公路勘察设计研究院有限公司 预制钢筋混凝土埋置式斜腿框架桥
CN109235262A (zh) * 2018-11-27 2019-01-18 江苏沪宁钢机股份有限公司 一种桥塔钢混段结构及其施工工艺
CN112064523A (zh) * 2020-09-29 2020-12-11 保利长大工程有限公司 旧有石拱桥上增设梁板结构的加固方法
CN114808664A (zh) * 2022-04-08 2022-07-29 山东大学 一种基于高铝水泥的实腹式拱桥储能装置和建筑方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2302896A (en) * 1995-07-01 1997-02-05 William George Edscer Arch reinforcement
CN1525011A (zh) * 2003-09-15 2004-09-01 云 蒙 提高拱桥承载力的消能法
US20050229502A1 (en) * 2002-11-13 2005-10-20 The Queen's University Of Belfast Concrete arch and method of manufacture
CN102322026A (zh) * 2011-08-24 2012-01-18 重庆交通大学 一种圬工拱桥的加固方法
CN102776842A (zh) * 2012-08-10 2012-11-14 河北农业大学 一种加固拱上侧墙的综合技术方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2302896A (en) * 1995-07-01 1997-02-05 William George Edscer Arch reinforcement
US20050229502A1 (en) * 2002-11-13 2005-10-20 The Queen's University Of Belfast Concrete arch and method of manufacture
CN1525011A (zh) * 2003-09-15 2004-09-01 云 蒙 提高拱桥承载力的消能法
CN102322026A (zh) * 2011-08-24 2012-01-18 重庆交通大学 一种圬工拱桥的加固方法
CN102776842A (zh) * 2012-08-10 2012-11-14 河北农业大学 一种加固拱上侧墙的综合技术方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李学伟等: "实腹式圆弧拱桥病害机理分析与综合加固技术的研究", 《世界桥梁》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758048A (zh) * 2014-01-23 2014-04-30 岩土科技股份有限公司 采用钢波纹板加固危桥的方法
CN103758048B (zh) * 2014-01-23 2016-05-04 岩土科技股份有限公司 采用钢波纹板加固危桥的方法
CN104074139A (zh) * 2014-06-18 2014-10-01 广西交通科学研究院 一种分区域调节圬工拱桥拱上填料重度的方法
CN104074139B (zh) * 2014-06-18 2016-06-01 广西交通科学研究院 一种分区域调节圬工拱桥拱上填料重度的方法
CN105040571A (zh) * 2015-06-09 2015-11-11 中交第二公路勘察设计研究院有限公司 预制钢筋混凝土埋置式斜腿框架桥
CN109235262A (zh) * 2018-11-27 2019-01-18 江苏沪宁钢机股份有限公司 一种桥塔钢混段结构及其施工工艺
CN112064523A (zh) * 2020-09-29 2020-12-11 保利长大工程有限公司 旧有石拱桥上增设梁板结构的加固方法
CN114808664A (zh) * 2022-04-08 2022-07-29 山东大学 一种基于高铝水泥的实腹式拱桥储能装置和建筑方法

Also Published As

Publication number Publication date
CN102966048B (zh) 2014-10-08

Similar Documents

Publication Publication Date Title
CN102966048B (zh) 一种提高实腹式拱桥承载力的加固方法
Bartlett et al. Methods of protecting buried pipelines and culverts in transportation infrastructure using EPS geofoam
CN106087629B (zh) 无桥头锥坡预制挡板泡沫混凝土轻质路堤结构及施工方法
CN105696622B (zh) 一种预制式城市管廊及其施工方法
CN102359046A (zh) 一种高填方路基拼接方法
CN203295966U (zh) 基于柔性桩的减少桥台跳车的结构
CN103194962A (zh) 基于柔性桩的减少桥台跳车的结构及施工方法
CN205012214U (zh) 一种基于无缝桥的链条式搭板构造
CN104674645A (zh) 一种适合软土地基的整板式小桥涵
CN106836007B (zh) 适合顶推法施工的跨线桥设计施工方法
CN105804101B (zh) 减小支挡结构受力的减荷支挡体系及施工方法及应用
CN209836779U (zh) 钢筋混凝土轻型桥台
CN104499425A (zh) 一种降低无缝桥梁台后动力冲击响应的结构及其施工工艺
CN105887657A (zh) 软土地基路桥接坡双向预应力弹性壳板应用技术
CN209675907U (zh) 深基坑顶部高压电力管线的回填保护结构
CN211079792U (zh) 一种临河加筋路基结构
CN102966046B (zh) 一种u型桥台的台身外倾加固方法
CN204589783U (zh) 一种适合软土地基的整板式小桥涵
CN204417945U (zh) 一种道路路基沉陷修复装置
CN109888712A (zh) 深基坑顶部高压电力管线的回填保护结构及方法
CN104264581A (zh) 基于消除桥台土压力的桥台结构及施工方法
CN104532713B (zh) 一种道路路基沉陷修复装置及修复方法
CN210827161U (zh) 一种具有沉降缓冲搭板的公路涵洞
Foglar et al. Centre-line optimisation of buried arch bridges
CN203808211U (zh) 矩形雨水井的井口周边的防沉陷结构体

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220818

Address after: Room 504, No. 6, Fifth Lane, Suinan New Village, Tangxia, Tianhe District, Guangzhou City, Guangdong Province, 510665

Patentee after: Guangdong Golden Shield Reinforcement Engineering Co., Ltd.

Address before: 510640 No. five, 381 mountain road, Guangzhou, Guangdong, Tianhe District

Patentee before: SOUTH CHINA University OF TECHNOLOGY

TR01 Transfer of patent right