采用钢波纹板加固危桥的方法 Download PDFInfo
- Publication number
- CN103758048B CN103758048B CN201410031178.2A CN201410031178A CN103758048B CN 103758048 B CN103758048 B CN 103758048B CN 201410031178 A CN201410031178 A CN 201410031178A CN 103758048 B CN103758048 B CN 103758048B
- Authority
- CN
- China
- Prior art keywords
- bridge
- steel
- arch
- ripple plate
- arch ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 49
- 239000010959 steel Substances 0.000 title claims abstract description 49
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000007747 plating Methods 0.000 title claims abstract description 15
- 230000002787 reinforcement Effects 0.000 claims abstract description 6
- 230000002093 peripheral effect Effects 0.000 claims abstract description 5
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 4
- 239000002002 slurry Substances 0.000 claims abstract description 4
- 238000009412 basement excavation Methods 0.000 claims abstract description 3
- 238000002360 preparation method Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 2
- 238000005266 casting Methods 0.000 abstract description 5
- 238000010276 construction Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 230000032683 aging Effects 0.000 description 2
- 241000196324 Embryophyta Species 0.000 description 1
- 238000003483 aging Methods 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012946 outsourcing Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410031178.2A CN103758048B (zh) | 2014-01-23 | 2014-01-23 | 采用钢波纹板加固危桥的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410031178.2A CN103758048B (zh) | 2014-01-23 | 2014-01-23 | 采用钢波纹板加固危桥的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103758048A CN103758048A (zh) | 2014-04-30 |
CN103758048B true CN103758048B (zh) | 2016-05-04 |
Family
ID=50525357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410031178.2A Active CN103758048B (zh) | 2014-01-23 | 2014-01-23 | 采用钢波纹板加固危桥的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103758048B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104631346B (zh) * | 2015-01-16 | 2016-08-24 | 北京建筑大学 | 两铰拱桥双侧单向压力杆加固结构及方法 |
CN105464006B (zh) * | 2015-12-31 | 2017-07-14 | 长安大学 | 一种圬工拱桥加固结构及其施工方法 |
CN113089507B (zh) * | 2021-05-11 | 2022-11-08 | 哈尔滨工业大学 | 受损桥涵的双层波纹钢加固结构及其加固方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0089861A1 (fr) * | 1982-03-22 | 1983-09-28 | CAMPENON BERNARD, Société Anonyme dite: | Procédé pour conforter des arches ou des constructions analogues |
WO2007021113A1 (en) * | 2005-08-12 | 2007-02-22 | Pyungsan Si Ltd. | Prefabricated bridge using corrugated steel plate and method for constructing the same |
CN101881005A (zh) * | 2009-05-08 | 2010-11-10 | 王绍先 | 一种双曲拱桥的加固方法 |
CN102251488A (zh) * | 2011-04-20 | 2011-11-23 | 中铁二十三局集团第三工程有限公司 | 石砌旧拱桥加固结构 |
CN102322026A (zh) * | 2011-08-24 | 2012-01-18 | 重庆交通大学 | 一种圬工拱桥的加固方法 |
CN102359058A (zh) * | 2011-07-15 | 2012-02-22 | 广东冠生土木工程技术有限公司 | 一种组合桥梁及其制造方法 |
CN202298482U (zh) * | 2011-06-17 | 2012-07-04 | 广东工业大学 | 新增钢桁架加固混凝土箱梁桥结构 |
CN102966048A (zh) * | 2012-11-28 | 2013-03-13 | 华南理工大学 | 一种提高实腹式拱桥承载力的加固方法 |
-
2014
- 2014-01-23 CN CN201410031178.2A patent/CN103758048B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0089861A1 (fr) * | 1982-03-22 | 1983-09-28 | CAMPENON BERNARD, Société Anonyme dite: | Procédé pour conforter des arches ou des constructions analogues |
WO2007021113A1 (en) * | 2005-08-12 | 2007-02-22 | Pyungsan Si Ltd. | Prefabricated bridge using corrugated steel plate and method for constructing the same |
CN101881005A (zh) * | 2009-05-08 | 2010-11-10 | 王绍先 | 一种双曲拱桥的加固方法 |
CN102251488A (zh) * | 2011-04-20 | 2011-11-23 | 中铁二十三局集团第三工程有限公司 | 石砌旧拱桥加固结构 |
CN202298482U (zh) * | 2011-06-17 | 2012-07-04 | 广东工业大学 | 新增钢桁架加固混凝土箱梁桥结构 |
CN102359058A (zh) * | 2011-07-15 | 2012-02-22 | 广东冠生土木工程技术有限公司 | 一种组合桥梁及其制造方法 |
CN102322026A (zh) * | 2011-08-24 | 2012-01-18 | 重庆交通大学 | 一种圬工拱桥的加固方法 |
CN102966048A (zh) * | 2012-11-28 | 2013-03-13 | 华南理工大学 | 一种提高实腹式拱桥承载力的加固方法 |
Non-Patent Citations (2)
Title |
---|
常用石拱桥加固技术综述;林晓峰等;《山西建筑》;20070331;第33卷(第9期);第261-262页 * |
旧石拱桥加固维修技术的应用;丁国铭;《山西建筑》;20090228;第35卷(第6期);第343-344页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103758048A (zh) | 2014-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103277106B (zh) | 公路隧道三台阶五步开挖施工方法 | |
CN103953351B (zh) | 一种不中断交通情况下的既有隧道下挖扩建施工方法 | |
CN102094649A (zh) | 盾构-浅埋暗挖复合法建造地下空间的施工方法 | |
CN107130968A (zh) | 一种隧道建设用中隔墙 | |
CN103758048B (zh) | 采用钢波纹板加固危桥的方法 | |
CN110700841A (zh) | 用于隧道开挖的双侧壁导坑式开挖方法 | |
CN109868726A (zh) | 一种预制装配式柱形桥墩及其施工方法 | |
CN206860179U (zh) | 一种隧道建设用中隔墙 | |
CN204715366U (zh) | 一种大面积深基坑分区顺逆工况下的支撑体系 | |
CN205743911U (zh) | 加固型矿山溜井 | |
CN204626427U (zh) | 装配式围堰 | |
CN109681233B (zh) | 城市浅埋大断面隧道采用预制支撑管片倒“t”形开挖工法及临时支撑结构 | |
CN202090297U (zh) | 一种高速公路拓宽和高速公路通道新建拼装箱涵结构 | |
CN207619987U (zh) | 一种环保型地下车库的预制式基坑围护结构 | |
CN204059460U (zh) | 电厂循环水系统的内河水取水口结构 | |
CN204282399U (zh) | 一种地铁围护结构 | |
CN104074234B (zh) | 电厂循环水系统的内河水取水口结构及其施工方法 | |
CN204059401U (zh) | 新型复合式交通隧道 | |
CN206554310U (zh) | 一种带暗梁暗柱的装配式剪力墙竖向连接体系 | |
CN204509922U (zh) | 下穿道结构 | |
CN204780894U (zh) | 一种可拆卸钢护筒装置 | |
CN203856477U (zh) | 一种利用既有隧道下挖扩建而成的新型立体结构城市隧道 | |
CN103953066B (zh) | 新型复合式交通隧道 | |
CN209277146U (zh) | 一种单肢矩形钢骨地下连续墙 | |
CN206800435U (zh) | 一种沿竖向发育狭长溶洞下压的交叉型承台结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Method of strengthening dangerous bridges with steel corrugated plates Effective date of registration: 20220704 Granted publication date: 20160504 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20160504 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |