CN102962872A - Laminated wood embedded steel bar construction technology - Google Patents

Laminated wood embedded steel bar construction technology Download PDF

Info

Publication number
CN102962872A
CN102962872A CN2012104775861A CN201210477586A CN102962872A CN 102962872 A CN102962872 A CN 102962872A CN 2012104775861 A CN2012104775861 A CN 2012104775861A CN 201210477586 A CN201210477586 A CN 201210477586A CN 102962872 A CN102962872 A CN 102962872A
Authority
CN
China
Prior art keywords
laminated wood
threaded rod
construction technology
adhesive
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104775861A
Other languages
Chinese (zh)
Inventor
倪竣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU CROWNHOMES CO Ltd
Original Assignee
SUZHOU CROWNHOMES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU CROWNHOMES CO Ltd filed Critical SUZHOU CROWNHOMES CO Ltd
Priority to CN2012104775861A priority Critical patent/CN102962872A/en
Publication of CN102962872A publication Critical patent/CN102962872A/en
Priority to PCT/CN2013/077569 priority patent/WO2014079211A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/12Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members
    • E04C3/18Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members with metal or other reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/10Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products
    • E04C2/12Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products of solid wood
    • E04C2/14Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products of solid wood reinforced

Abstract

The invention discloses a laminated wood embedded steel bar construction technology, comprising the following steps: step 1, the laminated wood is manufactured; step 2, a borehole is drilled in a thread rod; step 3, borehole cleaning is carried out; step 4, the thread rod is subjected to rust removal treatment; step 5, adhesive is blended; step 6, adhesive is slowly injected to the borehole; step 7, the thread rod is fixed by a cushion block; and step 8, curing is carried out. According to the laminated wood embedded steel bar construction technology, the preparation is simple, the load-carrying capacity is high, expansion damage is not caused to substrate, the side space is small, the production and mounting quality is stable and reliable, the product cost is low, and the effect of structural reinforcement is also realized.

Description

A kind of laminated wood construction technology of planting reinforcement bar
Technical field
The present invention relates to a kind of construction technology, what be specifically related to is a kind of laminated wood construction technology of planting reinforcement bar.
Background technology
In traditional reinforcing bar is planted, usually adopt following two kinds of methods:
1, inorganic material cast planting method;
2, the organic resin casting that contains volatile organic solvent.
The shortcoming of above-mentioned two kinds of methods is: inorganic material cast planting method long construction period makes reinforcement corrosion because the capillarity of concrete material self easily makes moisture infiltrate, and affects the life-span of building; Employing contains the organic resin casting of volatile organic solvent, contains the volatilization of organic solvent, produces unpleasant penetrating odor, for environment and operating personnel very large harm is arranged.Domestic and international being seen bar planting material mostly is acrylic acid, epoxy resin equal solvent type at present, and it generally contains the organic volatile solvent, in use produces a large amount of pernicious gases, and the harmful volatile ingredient that produces has pollution to environment and site operation personnel.Under cold environmental conditions, because its brittleness temperature is high, lower temperature resistance is poor especially, and hot strength is low, and material fragility is larger, tension, and poor seismic behavior, the pour mass easy fracture is broken.
Summary of the invention
The object of the invention is to overcome the above problem that prior art exists, a kind of laminated wood wood construction technology of planting reinforcement bar is provided, have high-bearing capacity, be difficult for broken.
For realizing above-mentioned technical purpose, reach above-mentioned technique effect, the present invention is achieved through the following technical solutions:
A kind of laminated wood construction technology of planting reinforcement bar may further comprise the steps:
The step 1) laminated wood is made: timber is processed into the laminated wood that needs the number of plies, and plastic sheeting on the described laminated wood surface coverage was displayed 15 days;
Step 2) first according to designing requirement, after employing three-dimensional laser position indicator is adjusted the level and plumb position of rig, determine to bury underground the plan-position of threaded rod, hole with drilling machine;
Step 3) hole wall hacking and clear hole;
The threaded rod that step 4) will be buried underground the in advance cleaning that eliminates rust is removed surface and oil contaminant with absolute ethyl alcohol;
Step 5) allotment adhesive;
Step 6) is injected the hole of accomplishing fluently slowly with glue, and threaded rod is screwed into until at the bottom of extending the hole along hand of spiral rotation slowly;
Step 7) was all filled with the adhesive that mixes up in 20 minutes, and threaded rod is fixed threaded rod with cushion block after all vertically being screwed into;
After the step 8) threaded rod is implanted, solidify.
Further, the diameter d of described threaded rod, laminated wood back gauge threaded rod is greater than 3d, and apart greater than 5d, described bore diameter is d+3 between the threaded rod, and drilling depth is 10d, and borehole perpendicularity is more than 5%.
Further, described adhesive is a kind of in epoxy resin, polyurethane, the phenol-resorcinol-formaldehyde.
Further, be set to 7 days described hardening time.
The invention has the beneficial effects as follows:
The present invention prepares simply, has high-bearing capacity, can not produce expansion damage to base material, and the limit spacing is little, and production and installation quality are reliable and stable, and product cost is low, structure is also had the effect of reinforcement.
The specific embodiment
Below in conjunction with embodiment, describe the present invention in detail.
A kind of laminated wood construction technology of planting reinforcement bar may further comprise the steps:
The step 1) laminated wood is made: timber is processed into the laminated wood that needs the number of plies, and plastic sheeting on the described laminated wood surface coverage was displayed 15 days;
Step 2) first according to designing requirement, after employing three-dimensional laser position indicator is adjusted the level and plumb position of rig, determine to bury underground the plan-position of threaded rod, hole with drilling machine;
Step 3) hole wall hacking and clear hole;
The threaded rod that step 4) will be buried underground the in advance cleaning that eliminates rust is removed surface and oil contaminant with absolute ethyl alcohol;
Step 5) allotment adhesive;
Step 6) is injected the hole of accomplishing fluently slowly with glue, and threaded rod is screwed into until at the bottom of extending the hole along hand of spiral rotation slowly;
Step 7) was all filled with the adhesive that mixes up in 20 minutes, and threaded rod is fixed threaded rod with cushion block after all vertically being screwed into;
After the step 8) threaded rod is implanted, solidify.
Further, the diameter d of described threaded rod, laminated wood back gauge threaded rod is greater than 3d, and apart greater than 5d, described bore diameter is d+3 between the threaded rod, and drilling depth is 10d, and borehole perpendicularity is more than 5%.
Further, described adhesive is a kind of in epoxy resin, polyurethane, the phenol-resorcinol-formaldehyde.
Further, be set to 7 days described hardening time.

Claims (4)

1. a laminated wood construction technology of planting reinforcement bar is characterized in that, may further comprise the steps:
The step 1) laminated wood is made: timber is processed into the laminated wood that needs the number of plies, and plastic sheeting on the described laminated wood surface coverage was displayed 15 days;
Step 2) according to designing requirement, after employing three-dimensional laser position indicator is adjusted the level and plumb position of rig, determine to bury underground the plan-position of threaded rod, hole with drilling machine;
Step 3) hole wall hacking and clear hole;
The threaded rod that step 4) will be buried underground the in advance cleaning that eliminates rust is removed surface and oil contaminant with absolute ethyl alcohol;
Step 5) allotment adhesive;
Step 6) is injected described hole slowly with glue, and described threaded rod is screwed into until at the bottom of extending the hole along hand of spiral rotation slowly;
Step 7) was all filled with the adhesive that mixes up in 20 minutes, and threaded rod is fixed threaded rod with cushion block after all vertically being screwed into;
After the step 8) threaded rod is implanted, solidify.
2. laminated wood construction technology of planting reinforcement bar according to claim 1, it is characterized in that: the diameter of described threaded rod arranges dmm, and laminated wood back gauge threaded rod is greater than d, between the threaded rod at a distance of greater than 5d, described bore diameter is d+3, and drilling depth is 10d, and borehole perpendicularity is more than 5%.
3. laminated wood construction technology of planting reinforcement bar according to claim 1 is characterized in that: described adhesive is a kind of in epoxy resin, polyurethane, the phenol-resorcinol-formaldehyde.
4. laminated wood construction technology of planting reinforcement bar according to claim 1, it is characterized in that: be set to 7 days described hardening time.
CN2012104775861A 2012-11-22 2012-11-22 Laminated wood embedded steel bar construction technology Pending CN102962872A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2012104775861A CN102962872A (en) 2012-11-22 2012-11-22 Laminated wood embedded steel bar construction technology
PCT/CN2013/077569 WO2014079211A1 (en) 2012-11-22 2013-06-20 Steel bar embedding construction process with glued wood

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104775861A CN102962872A (en) 2012-11-22 2012-11-22 Laminated wood embedded steel bar construction technology

Publications (1)

Publication Number Publication Date
CN102962872A true CN102962872A (en) 2013-03-13

Family

ID=47793454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104775861A Pending CN102962872A (en) 2012-11-22 2012-11-22 Laminated wood embedded steel bar construction technology

Country Status (2)

Country Link
CN (1) CN102962872A (en)
WO (1) WO2014079211A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014079211A1 (en) * 2012-11-22 2014-05-30 苏州皇家整体住宅系统股份有限公司 Steel bar embedding construction process with glued wood
CN109249480A (en) * 2018-10-16 2019-01-22 临泉县福隆木制品有限公司 A kind of woodwork process equipment
CN111958713A (en) * 2020-08-21 2020-11-20 苏州皇家整体住宅系统有限公司 Broken line type laminated wood splicing method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338969B (en) * 2017-08-07 2023-07-28 青海省建筑勘察设计研究院股份有限公司 Simple glue injection tool for building structure bar planting and application method thereof
CN115419291B (en) * 2022-09-02 2024-02-06 中铁十一局集团有限公司 Secondary structure bar planting device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4326620A1 (en) * 1993-08-07 1995-02-09 Baumann Walter K Industrietech Plywood
CN1382891A (en) * 2002-06-03 2002-12-04 刘宣传 Method for mounting anchor tendon penetrated mechanically
CN101144265A (en) * 2007-10-23 2008-03-19 武汉武大巨成加固实业有限公司 Mass concrete structure deep pore reinforced construction method
JP2009030299A (en) * 2007-07-26 2009-02-12 Yamashita System Zosaku:Kk Reinforcing glued laminated wood
CN101413305A (en) * 2008-11-20 2009-04-22 张长春 Curtain wall dried hanging method capable of adjusting wall plane
CN101558207A (en) * 2006-08-01 2009-10-14 温布利创新有限公司 Reinforced masonry panel structures
JP5166134B2 (en) * 2008-06-24 2013-03-21 ショーボンド建設株式会社 Installation structure of ultra-high-strength fiber reinforced concrete plates in concrete structures

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT385544B (en) * 1986-01-22 1988-04-11 Winter Herbert Ing Wooden structural part
FR2686107B1 (en) * 1992-01-14 1999-09-03 Aboul Fadl Jamal PROCESS FOR THE MANUFACTURE OF PRESTRESSED CONSTRUCTION MODULES, PARTICULARLY WOODEN, AND CONSTRUCTION MODULES THUS OBTAINED IN PARTICULAR FOR ARCHITECTURAL STRUCTURE.
JP3367018B2 (en) * 2000-03-09 2003-01-14 広島県 Metal composite wood beams
CN2755206Y (en) * 2004-12-14 2006-02-01 张厚 Assembled prestressed wooden beam
CN201254784Y (en) * 2008-08-22 2009-06-10 国家林业局北京林业机械研究所 Bamboo asis multi-component recombinant prestressed beam
CN101676503A (en) * 2008-09-20 2010-03-24 童根荣 Plastic wood
CN102962872A (en) * 2012-11-22 2013-03-13 苏州皇家整体住宅系统股份有限公司 Laminated wood embedded steel bar construction technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4326620A1 (en) * 1993-08-07 1995-02-09 Baumann Walter K Industrietech Plywood
CN1382891A (en) * 2002-06-03 2002-12-04 刘宣传 Method for mounting anchor tendon penetrated mechanically
CN101558207A (en) * 2006-08-01 2009-10-14 温布利创新有限公司 Reinforced masonry panel structures
JP2009030299A (en) * 2007-07-26 2009-02-12 Yamashita System Zosaku:Kk Reinforcing glued laminated wood
CN101144265A (en) * 2007-10-23 2008-03-19 武汉武大巨成加固实业有限公司 Mass concrete structure deep pore reinforced construction method
JP5166134B2 (en) * 2008-06-24 2013-03-21 ショーボンド建設株式会社 Installation structure of ultra-high-strength fiber reinforced concrete plates in concrete structures
CN101413305A (en) * 2008-11-20 2009-04-22 张长春 Curtain wall dried hanging method capable of adjusting wall plane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014079211A1 (en) * 2012-11-22 2014-05-30 苏州皇家整体住宅系统股份有限公司 Steel bar embedding construction process with glued wood
CN109249480A (en) * 2018-10-16 2019-01-22 临泉县福隆木制品有限公司 A kind of woodwork process equipment
CN111958713A (en) * 2020-08-21 2020-11-20 苏州皇家整体住宅系统有限公司 Broken line type laminated wood splicing method
CN111958713B (en) * 2020-08-21 2022-04-15 苏州皇家整体住宅系统有限公司 Broken line type laminated wood splicing method

Also Published As

Publication number Publication date
WO2014079211A1 (en) 2014-05-30

Similar Documents

Publication Publication Date Title
CN102962872A (en) Laminated wood embedded steel bar construction technology
CN103954740B (en) A kind of expansive soil slope hygroscopic deformation model test method and system
US20120009022A1 (en) Device for anchoring in multilayer soil
Hsieh et al. Use of jet grouting to limit diaphragm wall displacement of a deep excavation
CN105352884A (en) Experiment method and experiment member for testing bond strength of concrete and coal, rock or concrete
CN103452145A (en) Lime soil pile and determination of ultimate tip resistance of pile endpoint soil and ultimate side resistance of pile periphery soil
CN103485371B (en) Device and method for foundation failure mode simulation and bearing capacity testing
CN203654272U (en) Lateral friction boring filling pile for isolation pile
CN105421324B (en) Burying method for pore water pressure gauges
CN101899868A (en) Construction method for rear planted wall steel tie
CN205421322U (en) Pre -buried rag bolt crowd's positioning tool
CN104074183A (en) Drilling and concrete injected root composite pile implanting pile structure and construction method
CN102720346B (en) Multifunctional upright column base for scaffold and manufacturing process thereof
ATE544909T1 (en) PILE MANUFACTURING PROCESS
ATE552385T1 (en) METHOD FOR CONSOLIDATING SOILS AND STABILIZING FOUNDATIONS
CN204000522U (en) A kind of novel roadbed retaining structure
CN103397788B (en) Large span floor reinforcement means
CN103852380A (en) Method and device for detecting compressive strength of hill sand concrete through post-installed anchoring method
RU2012146594A (en) DESIGN FOR CONSTRUCTION OF RAILWAYS, UNDERGROUND RAILWAYS AND TRAMWAYS, INCLUDING ONE OR SEVERAL “HANGING” PLATFORMS CONNECTED FROM A FOREST OF FUND
CN202595720U (en) Spiral board load testing equipment
CN101458013B (en) Laying method of soil source heat pump vertical buried tube heat exchanger between foundation piles
CN201508179U (en) Stakes measuring lofting spotting annun-ciator
CN202017214U (en) Power pole tower base for frozen soil foundation
CN101576446B (en) Stress-relieving sampling method without damage of deeply buried rock
KR100687496B1 (en) Construction method of pile for building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130313