CN102720346B CN201210209143.4A CN201210209143A CN102720346B CN 102720346 B CN102720346 B CN 102720346B CN 201210209143 A CN201210209143 A CN 201210209143A CN 102720346 B CN102720346 B CN 102720346B
Authority
CN
China
Prior art keywords
equipment
shaped steel
anchor rod
steel plate
pole socket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210209143.4A
Other languages
Chinese (zh)
Other versions
CN102720346A (en
Inventor
马正春
马上奇
刘恒
戴习东
胡翔华
周远军
马文生
马女卓
马川林
刘铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan No3 Construction And Engineering Co Ltd
Original Assignee
Hunan No3 Construction And Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan No3 Construction And Engineering Co Ltd filed Critical Hunan No3 Construction And Engineering Co Ltd
Priority to CN201210209143.4A priority Critical patent/CN102720346B/en
Publication of CN102720346A publication Critical patent/CN102720346A/en
Application granted granted Critical
Publication of CN102720346B publication Critical patent/CN102720346B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a multifunctional upright column base for a scaffold and a manufacturing process thereof. The invention adopts the technical scheme as follows: the multifunctional upright column base comprises a horizontal bed which is formed by perpendicularly connecting a plurality of U-shaped steel plates, and a plurality of anchoring rod stands and anchoring rods matched with the anchoring rod stands, which are arranged on the U-shaped steel plates, wherein locking devices are arranged in layers and columns inside the cylindrical walls of the anchoring rods; and a product is manufactured under the synchronous control of discharge equipment, sand-blast equipment, grinding equipment, auxiliary equipment, marking equipment, drilling equipment, milling equipment, turning equipment, working clamp equipment, welding equipment, sleeve-pressing equipment and stacking equipment. The multifunctional upright column base overcomes the problems in the prior art that the construction efficiency and construction safety are poor because standard members are unavailable for the horizontal bed and the base during scaffold construction; and is suitable for building construction, advertising and decoration and building repair and maintenance.

Description

Multifunctional upright column base for scaffold and manufacturing process thereof
Technical field
The present invention relates to a kind of Multifunctional upright column base for scaffold and manufacturing process thereof.
Background technology
Along with the fast development of construction paces, the safety guarantee strengthening site operation safety management and constructor becomes the most important thing of production line trouble free service.The console mode scaffold safety management particularly relating to the uses such as existing building, ad decoration, building maintenance is particularly important.Before scaffold building, all need the feature according to work post and construction technology determination erection scheme, wherein loaded down with trivial details especially to the requirement on horizontal base basis.And the existing technical measures taked horizontal base basis when setting up scaffold are according to scaffolding height, adopt the plank re-laying thick 5cm on the construction plant that compacting is levelling respectively, or use sleeper pad again when adopting backfill compaction in layers to reach requirement, or on ground, overlay thick 20cm ballast aggregate, ballast aggregate lays concrete slab, steel plate is laid again on concrete slab, or make ground in underground 1m depths dirt, pad sleeper on this ground again, or pour into a mould thick 10-30cm concrete foundation, then in this concrete foundation pad sleeper.Above-mentioned not form a kind of standardized structural element to horizontal base basis and the overall requirement of base when setting up scaffold available, not only affected efficiency of construction but also hidden some dangers for for construction safety.
Summary of the invention
For above-mentioned situation, the object of the present invention is to provide one can improve efficiency of construction again without construction safety hidden danger, and use, convenient in carrying, operation manufacture simple and easy, applied range, is convenient to the Multifunctional upright column base for scaffold popularized.
To achieve these goals, a kind of Multifunctional upright column base for scaffold, it comprises and mutually vertically connects into horizontal base in length and breadth by several piece U-shaped steel plate, anchor rod U-shaped steel plate being arranged several anchoring pole socket and coordinate with this anchoring pole socket, arranges several number of plies row locking device in the post jamb of this anchor rod.
In order to improve installation effectiveness, reach structure optimization and the optimum efficiency without potential safety hazard, its further step is:
Locking device comprises the steel ball hole be evenly arranged in anchor rod post jamb radial section, and be loaded on the spring in steel ball hole and the steel ball being pressed on both ends of the spring, its steel ball bore dia Z is 1-1.5mm.
Locking device arranges and is no less than three layer of six row.
The U-shaped steel plate at anchoring pole socket center arranges through hole f, and the diameter of this through hole f is not more than 36mm, and anchoring pole socket height P is 20-50mm, anchoring pole socket internal diameter O and anchor rod outer diameter D interference fit.
Anchoring pole socket is laid by spacing A arrangement, and spacing A is 100-200mm five universal standards.
Non-model troughing plate selected by U-shaped steel plate, and the long L of its plate is six spacing A sums, and the wide W of plate is 120mm, and the thick S of base plate is 5.5mm, and leg height G is 53mm, and the thick E of leg is 6.2mm.
Anchor rod outer diameter D is 44-52mm, and internal diameter d is 40-48mm, and high H is 150-200mm.
The U-shaped steel plate that horizontal base longitudinally connects is at least 2 pieces, and U-shaped steel plate be arranged in parallel, and U-shaped plate centre line spacing is A × 3mm.
The inside and outside footpath of anchor rod all can be inserted with scaffold upright rod and is connected.
Another object of the present invention is to provide the one not only simple and easy but also low production cost of technique, and be convenient to that quick integral is installed, the Multifunctional upright column base for scaffold manufacturing process of technical scale production and penetration and promotion.
Make a kind of technique of Multifunctional upright column base for scaffold, it comprises and mutually vertically connects into horizontal base in length and breadth by several piece U-shaped steel plate, anchor rod U-shaped steel plate being arranged several anchoring pole socket and coordinate with this anchoring pole socket, several number of plies row locking device is set in the post jamb of this anchor rod, make product under the Synchronization Control of simultaneously, welding equipment, gland equipment standby respectively at blanking equipment, abrasive blast equipment, grinding apparatus, auxiliary equipment, scoring equipment, rig, milling device, turning equipment, work sandwiched, buttress decoding apparatus, its operating procedure is as follows:
I, cut out and process-blanking equipment, abrasive blast equipment, grinding apparatus, auxiliary equipment under U-shaped steel plate, anchoring pole socket, anchor rod;
II, U-shaped steel plate line, boring-scoring equipment, rig, milling device, auxiliary equipment;
III, anchoring pole socket, the rough turn process-turning equipment of anchor rod;
IV, anchoring pole socket, anchor rod finish turning process-turning equipment, auxiliary equipment;
V, anchor rod steel ball hole machined-rig, auxiliary equipment;
VI, standby, the auxiliary equipment of steel ball in locking device, spring assembling and steel ball hole sealing process-work sandwiched;
VII, anchoring pole socket welding-welding equipment, auxiliary equipment;
VIII, anchor rod external diameter and anchoring pole socket internal diameter interference press-fit assemble that-gland equipment, work sandwiched are standby, auxiliary equipment;
Ⅺ, U-shaped steel plate and U-shaped steel plate are by field operation requirement, mutually vertically connect into that horizontal base-work sandwiched is standby, auxiliary equipment in length and breadth;
Ⅹ, the examination and test of products, warehouse-in-buttress decoding apparatus, auxiliary equipment.
The present invention adopts to comprise and mutually vertically connects into horizontal base in length and breadth by several piece U-shaped steel plate, anchor rod U-shaped steel plate being arranged several anchoring pole socket and coordinate with this anchoring pole socket, several number of plies row locking device is set in the post jamb of this anchor rod, simultaneously respectively at blanking equipment, abrasive blast equipment, grinding apparatus, auxiliary equipment, scoring equipment, rig, milling device, turning equipment, work sandwiched is standby, welding equipment, gland equipment, the technical scheme of product is made under the Synchronization Control of buttress decoding apparatus, which overcome existing when setting up scaffold to horizontal base and base optional without standardized structural element, not only affected efficiency of construction but also without defects such as construction safety guarantees.
The beneficial effect that the present invention is produced compared to existing technology:
(I) the present invention adopts U-shaped steel plate mutually vertically to connect into horizontal base in length and breadth, and the anchor rod several anchoring pole socket being set on U-shaped steel plate and coordinating with this anchoring pole socket, the technical scheme of several number of plies row locking device is set in the post jamb of this anchor rod, achieve component standardization, use integration, assemble rapid, Standard Generalized, handling safety, manufacture, promotes popular target.
(II) adopt on U-shaped steel plate and fix anchoring pole socket, the technical measures that anchor rod is connected with anchoring pole socket interference fit, overall structure and component are broken the whole up into parts, first process and assemble afterwards, thus simplify processing technology, decrease parts machining quantity, reduce product cost.
(III) adopt anchoring pole socket and anchor rod by the evenly distributed laying of the spacing A universal standard, quality is set up in the installation significantly improving scaffold, enhances each fulcrum uniform stressed effect, decreases duplication of labour amount, shorten the whole engineering construction cycle.
(IV) employing U-shaped steel plate adds the overall typical construction that anchor rod is combined with anchoring pole socket, has unified specifications and models, has decreased kind quantity, saved storage area, reduced cost of transportation, improve efficiency of construction.
(V) anchor rod is arranged inside and outside locking device, fast, easily, anchor rod inserts post gap and automatically disappears under the effect of steel ball with spring in plug, use safety, reliably.
(VI) good integrity of the present invention, not easily loses, and unit area resistance to compression supporting capacity obviously strengthens, convenient carrying, and saving of work and time is laborsaving, and erection speed is fast, and effective, efficiency is high.
(VII) structure of the present invention is simple, and it is extremely convenient to use, and manufacture craft is easy, and part-subassemble standard rate is high, and product is economical, practical, function is many, application is wide, there is not any potential safety hazard, is convenient to penetration and promotion, has wide commercial promise.
The present invention is suitable for the use of operation of various building operations, ad decoration, building maintenance.
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Accompanying drawing explanation
Fig. 1 is the front view of Multifunctional upright column base for scaffold of the present invention along the cutting of horizontal base dextrad anchoring pole socket.
Fig. 2 is the partial enlargement front view of Multifunctional upright column base for scaffold of the present invention along anchor rod locking device sectional horizontal.
Fig. 3 is that Multifunctional upright column base for scaffold of the present invention cuts anchor rod front view along horizontal base Horizontal vertical deep cutting.
Fig. 4 is Multifunctional upright column base for scaffold top view of the present invention.
In figure: 1, U-shaped steel plate, 2, horizontal base, 3, anchoring pole socket, 4, anchor rod, 5, locking device, 51, steel ball, 52, spring, 53, steel ball hole, 6, scaffold upright rod.
Detailed description of the invention
Shown in accompanying drawing, a kind of Multifunctional upright column base for scaffold, it comprises and mutually vertically connects into horizontal base 2 in length and breadth by least several piece U-shaped steel plate 1, the anchor rod 4 U-shaped steel plate 1 being arranged more than 3 anchoring pole sockets 3 and coordinate with this anchoring pole socket 3, arranges several number of plies row locking device 5 in the post jamb of this anchor rod 4.
See accompanying drawing, in order to strengthen the integrated carrying ability of the anti-yielding of foundation of scaffold upright rod base, the U-shaped steel plate 1 of composition horizontal base 2, based on transverse direction, longitudinally at least arrange 2 pieces, longitudinal U-shaped steel plate 1 be arranged in parallel, the spacing of U-shaped steel plate 1 centreline space is A × 3mm, according to on-the-spot actual needs, and the spacing of U-shaped steel plate 1 centreline space or be A × 3mm, or be A × 2mm, or be A × 1mm, or be A × 4mm, or longitudinally arrange 3 pieces, or longitudinally arrange 4 pieces, or longitudinally arrange 5 pieces; Non-model troughing plate selected by U-shaped steel plate 1, U-shaped steel plate 1 used in present embodiment, and the long L of its plate is six spacing A sums, and the wide W of plate is 120mm, and the thick S of base plate is 5.5mm, and leg height G is 53mm, and the thick E of leg is 6.2mm; Also model can be selected as required to be No. 10-18 commercially available channel-section steel.
See accompanying drawing, in order to reduce production, use cost, extending product application life, improving Product transport, erection, installation effectiveness, accelerate the generalization of product, standard construction, the anchoring pole socket 3 arranged in U-shaped steel plate 1 is by the evenly distributed laying of spacing A.
Shown in accompanying drawing, anchoring pole socket 3 internal diameter O is 44-52mm, high P is 20-50mm, along U-shaped steel plate 1 by spacing 100-200mm, namely point five evenly distributed layings of universal standard spacing A are 100mm by normal pitch A, 120mm, 150mm, 180mm, 200mm five specifications are fixed on U-shaped steel plate 1 i.e. troughing plate; Be 44-52mm with anchor rod 4 outer diameter D of anchoring pole socket 3 adaptation, internal diameter d is 40-48mm, and high H is 150-200mm.Anchor rod 4 outer diameter D and anchoring pole socket 3 internal diameter O erect through interference fit and are connected on U-shaped steel plate 1.
See accompanying drawing, in order to increase the service life, prevent U-shaped steel plate 1 ponding at anchoring pole socket 3 center, the U-shaped steel plate 1 at anchoring pole socket 3 center arranges through hole f, still have seating surface for the ease of after the scaffold upright rod 6 that anchor rod 4 endoporus inserts, the diameter of this through hole f is not more than 36mm.
See accompanying drawing, in order to eliminate the gap of scaffold upright rod 6 and anchor rod 4, reach quick locking scaffold upright rod 6, arrange in the post jamb of anchor rod 4 and be no less than three layer of six row locking device 5, locking device 5 comprises the steel ball hole 53 be evenly arranged in anchor rod 4 post jamb radial section, is loaded on the spring 52 in steel ball hole 53 and the steel ball 51 being pressed on spring 52 two ends; Steel ball hole 53 is through hole, its steel ball hole 53 diameter Z is 1-1.5mm, and the work point multiple working procedure that adds in steel ball hole 53 is processed, and better can solve steel ball 51 activity and be fixed in anchor rod 4 post jamb, the inside and outside footpath of anchor rod 4 all can be inserted with scaffold upright rod 6 and is connected, and inserts junction through processing adaptation.
By reference to the accompanying drawings, make a kind of technique of Multifunctional upright column base for scaffold, it comprises and mutually vertically connects into horizontal base 2 in length and breadth by several piece U-shaped steel plate 1, the anchor rod 4 U-shaped steel plate 1 being arranged several anchoring pole socket 3 and coordinate with this anchoring pole socket 3, several number of plies row locking device 5 is set in the post jamb of this anchor rod 4, simultaneously respectively at blanking equipment, abrasive blast equipment, grinding apparatus, auxiliary equipment, scoring equipment, rig, milling device, turning equipment, work sandwiched is standby, welding equipment, gland equipment, product is made under the Synchronization Control of buttress decoding apparatus, its operating procedure is as follows:
I, U-shaped steel plate 1, anchoring pole socket 3, anchor rod are cut out and process-blanking equipment, abrasive blast equipment, grinding apparatus, auxiliary equipment for 4 times;
II, U-shaped steel plate 1 rule, hole-scoring equipment, rig, milling device, auxiliary equipment;
III, anchoring pole socket 3, the rough turn process-turning equipment of anchor rod 4;
IV, anchoring pole socket 3, anchor rod 4 finish turning process-turning equipment, auxiliary equipment;
V, anchor rod 4 steel ball hole 53 processes-rig, auxiliary equipment;
VI, steel ball 51 in locking device 5, spring 52 assemble and steel ball hole 53 seals that process-work sandwiched is standby, auxiliary equipment;
VII, anchoring pole socket 3 welds-welding equipment, auxiliary equipment;
VIII, anchor rod 4 external diameter and anchoring pole socket 3 internal diameter interference press-fit assemble that-gland equipment, work sandwiched are standby, auxiliary equipment;
Ⅺ, U-shaped steel plate 1 and U-shaped steel plate 1 are by field operation requirement, mutually vertically connect into that horizontal base 2-work sandwiched is standby, auxiliary equipment in length and breadth;
Ⅹ, the examination and test of products, warehouse-in-buttress decoding apparatus, auxiliary equipment.
By reference to the accompanying drawings, the present invention uses like this and works: perform based process according to construction operation field requirement, the horizontal base 2 of Multifunctional upright column base for scaffold is placed in by scaffold building requirement on the basis processed, horizontal base 2 can by combining dorsad or forward in opposite directions or in pairs in pairs, the radial dimension of scaffold upright rod 6 is selected to mate with the radial dimension of anchor rod 4, outside scaffold upright rod 6, internal diameter can simultaneously with in anchor rod 4, external diameter mates, or scaffold upright rod 6 internal diameter and anchor rod 4 external diameter, or scaffold upright rod 6 external diameter mates with anchor rod 4 internal diameter is single, after scaffold upright rod 6 inserts anchor rod 4 external diameter or internal diameter, its gap automatically disappears and locks under the effect of steel ball and spring, use safety, reliable, and plug fast, easily.
Below be only preferred embodiment of the present invention, according to above-mentioned design of the present invention, those skilled in the art can also make various amendment and conversion to this, as, combining form between anchor rod and anchoring pole socket, each component structural and their interconnective conversion and amendment in locking device, but similar this conversion and amendment all belong to essence of the present invention.

Claims (2)

1. a Multifunctional upright column base for scaffold, is characterized in that it comprises and mutually vertically connects into horizontal base (2) in length and breadth by several piece U-shaped steel plate (1); Horizontal base (2) longitudinally connects at least 2 blocks of U-shaped steel plates (1) be arranged in parallel; U-shaped steel plate (1) centreline spacing is A × 3 mm; Non-model troughing plate selected by U-shaped steel plate (1); The long L of troughing plate plate is six spacing A sums, and the wide W of plate is 120mm, and the thick S of base plate is 5.5mm, and leg height G is 53mm, and the thick E of leg is 6.2mm; The anchor rod (4) U-shaped steel plate (1) being arranged several anchoring pole socket (3) and coordinate with this anchoring pole socket (3); Anchoring pole socket (3) is that 100-200mm five universal standard arrangements are laid by spacing A; The U-shaped steel plate (1) at anchoring pole socket (3) center arranges through hole f, and the diameter of this through hole f is not more than 36mm; Anchoring pole socket (3) high P is 20-50mm; Anchoring pole socket (3) internal diameter O and anchor rod (4) outer diameter D interference fit; Anchor rod (4) outer diameter D is 44-52mm, and internal diameter d is 40-48mm, and high H is 150-200mm; The inside and outside footpath of anchor rod (4) all can be inserted with scaffold upright rod (6) and is connected; Arrange in the post jamb of anchor rod (4) and be no less than three layer of six row locking device (5); Locking device (5) comprises and is evenly arranged at the steel ball hole (51) that diameter Z in anchor rod (4) post jamb radial section is 1-1.5mm, is loaded on the spring (52) in steel ball hole (51) and is pressed on the steel ball (53) at spring (52) two ends.
2. make the technique of a kind of Multifunctional upright column base for scaffold according to claim 1, it is characterized in that it comprises and mutually vertically connect into horizontal base (2) in length and breadth by several piece U-shaped steel plate (1), the anchor rod (4) U-shaped steel plate (1) being arranged several anchoring pole socket (3) and coordinate with this anchoring pole socket (3), several number of plies row locking device (5) is set in the post jamb of this anchor rod (4), simultaneously respectively at blanking equipment, abrasive blast equipment, grinding apparatus, auxiliary equipment, scoring equipment, rig, milling device, turning equipment, work sandwiched is standby, welding equipment, gland equipment, product is made under the Synchronization Control of buttress decoding apparatus, its operating procedure is as follows:
I, cut out and process-blanking equipment, abrasive blast equipment, grinding apparatus, auxiliary equipment under U-shaped steel plate (1), anchoring pole socket (3), anchor rod (4):
1. sanction-blanking equipment, auxiliary equipment under U-shaped steel plate (1), anchoring pole socket (3), anchor rod (4);
2. U-shaped steel plate (1), anchoring pole socket (3), anchor rod (4) process-abrasive blast equipment, grinding apparatus, auxiliary equipment;
II, U-shaped steel plate (1) line, boring-scoring equipment, rig, milling device, auxiliary equipment:
1. U-shaped steel plate (1) line-scoring equipment, auxiliary equipment;
2. U-shaped steel plate (1) boring-rig, milling device, auxiliary equipment;
III, anchoring pole socket (3), the rough turn process-turning equipment of anchor rod (4);
IV, anchoring pole socket (3), anchor rod (4) finish turning process-turning equipment, auxiliary equipment;
V, anchor rod (4) steel ball hole (53) processing-rig, auxiliary equipment;
VI, standby, the auxiliary equipment of steel ball (51), spring (52) assembling and steel ball hole (53) sealing process-work sandwiched in locking device (5):
1. standby, the auxiliary equipment of steel ball (51) in locking device (5), spring (52) assembling-work sandwiched;
2. standby, the auxiliary equipment of steel ball hole (53) sealing process-work sandwiched in locking device (5);
VII, anchoring pole socket (3) welding-welding equipment, auxiliary equipment;
VIII, anchor rod (4) external diameter and anchoring pole socket (3) internal diameter interference press-fit assemble that-gland equipment, work sandwiched are standby, auxiliary equipment;
Ⅺ, U-shaped steel plate (1) and U-shaped steel plate (1) are by field operation requirement, mutually vertically connect into that horizontal base (2)-work sandwiched is standby, auxiliary equipment in length and breadth;
Ⅹ, the examination and test of products, warehouse-in-buttress decoding apparatus, auxiliary equipment.
CN201210209143.4A 2012-06-23 2012-06-23 Multifunctional upright column base for scaffold and manufacturing process thereof Active CN102720346B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210209143.4A CN102720346B (en) 2012-06-23 2012-06-23 Multifunctional upright column base for scaffold and manufacturing process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210209143.4A CN102720346B (en) 2012-06-23 2012-06-23 Multifunctional upright column base for scaffold and manufacturing process thereof

Publications (2)

Publication Number Publication Date
CN102720346A CN102720346A (en) 2012-10-10
CN102720346B true CN102720346B (en) 2015-05-13

Family

ID=46946198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210209143.4A Active CN102720346B (en) 2012-06-23 2012-06-23 Multifunctional upright column base for scaffold and manufacturing process thereof

Country Status (1)

Country Link
CN (1) CN102720346B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131693B (en) * 2014-08-04 2016-03-30 陈洁 A kind of base for support scaffolding
CN105171419B (en) * 2015-09-28 2017-07-21 国网山东省电力公司济南供电公司 A kind of cable fixing terminal manufacturing system
CN106351435A (en) * 2016-09-22 2017-01-25 无锡市龙海杰机械制造有限公司 Reinforced type scaffold base
CN114378585B (en) * 2022-03-22 2022-07-26 中国核工业中原建设有限公司 Reusable outer frame wall connecting piece machining device and method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2348611A (en) * 1942-06-12 1944-05-09 Davidson Cecil Stanley Clamp for holding drill rods or casings
JPH09158467A (en) * 1995-12-05 1997-06-17 Tomihiko Kotake Scafford for working
US7195099B2 (en) * 2003-09-24 2007-03-27 Regency Innovations, Llc Hinged supported roof scaffold
CN201857746U (en) * 2010-11-08 2011-06-08 北京金誉达租赁有限公司 Base of scaffold
CN202706506U (en) * 2012-06-23 2013-01-30 湖南省第三工程有限公司 Multifunctional upright rod bottom seat for scaffold

Also Published As

Publication number Publication date
CN102720346A (en) 2012-10-10

Similar Documents

Publication Publication Date Title
CN108051294B (en) Device and method for simulating rock mass anchoring under conditions of high ground stress and underground water
CN104196166B (en) A kind of preparation method of ultra-large type combination H type section Steel Column
CN102720346B (en) Multifunctional upright column base for scaffold and manufacturing process thereof
CN102322071B (en) Universal base structure of main transformer of 220kV substation
CN203939043U (en) A kind of novel tower-type crane precast reinforced concrete plinth
CN103216114B (en) The translation construction method of building
CN103470270B (en) Deep well ingate supporting structure and construction method thereof
CN102747735A (en) Treatment method for abnormal deformation of deep foundation pit concrete support piling
CN110117963B (en) Installation construction method of high-speed wire rod finishing mill
CN102425186B (en) Foundation bolt stock and manufacture method thereof
CN202768012U (en) Tunnel primary lining prefabricated concrete block assembly
CN101881029B (en) Detachable tower foundation
CN105756380B (en) A kind of multilayer large-span assembled integral space steel lattice box structure construction of hydropower method
CN202706506U (en) Multifunctional upright rod bottom seat for scaffold
CN204825945U (en) A fixture for fixing buried bolt in advance
CN202164623U (en) Universal foundation structure of 220 kV transformer substation main transformer
CN113846714B (en) Method for repairing and reinforcing raft foundation
CN114232656A (en) UHPC (ultra high performance polycarbonate) assembled soil nailing wall structure and construction method
CN212427717U (en) Raw soil-laminated wood composite floor slab
CN204081260U (en) A kind of ultra-large type H type cross section composite steel column
CN201704698U (en) Detachable tower footing
CN202850469U (en) One-step formed wear-resisting floor construction level control component
CN206053364U (en) Building construction hoist support meanss
CN204510258U (en) A kind of reinforced bar net layered rolling retaining wall structure
CN218522668U (en) Safety supporting structure of inclined shaft measure well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant