CN104196166B - A kind of preparation method of ultra-large type combination H type section Steel Column - Google Patents

A kind of preparation method of ultra-large type combination H type section Steel Column Download PDF

Info

Publication number
CN104196166B
CN104196166B CN201410441603.5A CN201410441603A CN104196166B CN 104196166 B CN104196166 B CN 104196166B CN 201410441603 A CN201410441603 A CN 201410441603A CN 104196166 B CN104196166 B CN 104196166B
Authority
CN
China
Prior art keywords
iron
steel column
web
welding
ultra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410441603.5A
Other languages
Chinese (zh)
Other versions
CN104196166A (en
Inventor
李翠光
付鹏
李勇军
徐文秀
范涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201410441603.5A priority Critical patent/CN104196166B/en
Publication of CN104196166A publication Critical patent/CN104196166A/en
Application granted granted Critical
Publication of CN104196166B publication Critical patent/CN104196166B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses the preparation method of a kind of ultra-large type combination H type section Steel Column, the ultra-large type combination H type section Steel Column of making comprises two blocks of i iron and is connected web; Described two blocks of i iron are arranged on described connection web both sides respectively, and the cross section after installation is H type; Upper surface and the both sides i iron of described connection web form concave structure, are provided with stiffener along concave structure, on stiffener, are provided with bracing piece.The preparation method of ultra-large type combination H type section Steel Column of the present invention, while ensure that post bearing capacity, simplify the structure of post to greatest extent, raw material are saved, save cost, manufacturing process is simple and can ensure installation accuracy, adds efficient construction usable floor area, reduce dead load simultaneously, reduce structural seismic response.

Description

A kind of preparation method of ultra-large type combination H type section Steel Column
Technical field
The present invention relates to the preparation method of a kind of steel work and steel work, be specifically related to the preparation method of a kind of ultra-large type combination H type section Steel Column.
Background technology
Greenery patches, Wuhan is centrally located at Binjiang business district, Wuchang nucleus, and face each other across the river with century-old outbeach, Hankow, geographical position is very superior, is the key area of Wuhan new round urban development.Center, greenery patches, Wuhan is made up of handle official business auxiliary building, a building block of flats and annex of a king-tower building, building, a building, wherein king-tower building basement 6 floor, and 125 layers on the ground, superstructure area 32.3 ten thousand square metres, total building height is 606 meters.Be a comprehensive building integrating office, exhibitions, hotel, sightseeing amusement, business etc., Wuhan Super High landmark after building up, will be become.
High building framework adopts the structural system being applicable to commercial super highrise building: mega-frame-Core Walls Structure-cantilever truss structure system.This system is made up of three parts: the Reinforced Concrete Core Walls Structure of built-in reinforced concrete column and steel plate, housing profile steel concrete column and floor girder steel form mega-frame, the connection that respective storey position arranges endless belt truss, semi-girder truss strengthens housing and inner core.Underground steel work forms primarily of 12 huge posts of reinforcing bar, floor girder steel, Core Walls Structure reinforced concrete column steel plate shear force wall three parts,
The huge post of reinforcing bar comprises combination H type cross section and cross section; Combination H type cross section huge column sectional length is longer, and segment shape size is comparatively large, and heavier-weight, belong to overlength, ultra-wide component, larger on transport impact.The huge column sectional structure of reinforcing bar is relatively simple, and connected only only have floor girder steel bracket, therefore only there is stiffening rib its inside in local.Because huge column sectional appearance and size is large, web height is high, and structure easily produces distortion, therefore needs the reinforcement considering structure, prevents from having bad luck, produces plastic strain in hoisting process.Huge column sectional is higher to profile dimension precision requirement, should strictly control when factory process makes.
Summary of the invention
Goal of the invention: in order to solve transport inconvenience in work progress, on-the-spot difficulty of processing is large, and working face requires high problem, quality control of being more convenient for, saving installation cost, the invention provides the preparation method of a kind of ultra-large type combination H type section Steel Column.
Technical scheme: ultra-large type combination H type section Steel Column of the present invention, comprises two blocks of i iron and be connected web; Described two blocks of i iron are arranged on described connection web both sides respectively, and the cross section after installation is H type; Upper surface and the both sides i iron of described connection web form concave structure, are provided with stiffener along concave structure, on stiffener, are provided with bracing piece.
Described i iron side is provided with bracket and peg.
Described ultra-large type combination H type section Steel Column is of a size of 4050x2350x70x80mm, adopts Q345GJC-Z25 steel plate to make.
Described two blocks of i iron are not parallel setting, and angle is each other 1.5 ± 0.2 degree.
The preparation method of described ultra-large type combination H type section Steel Column, comprises the steps:
(1) adopt 2000 tons of hydraulic presses to i iron be connected web and carry out leveling, numerical control vertical bar cutting machine or numerical control plasma cutting machine is adopted to cut bracket, peg, reserve welding contracted quantity and allowance during cutting, carry out after cutting filling up, polishing, except stain and burr;
(2) on the platform of workshop, draw relevant huge post center line, bracket center line, angle line, the bracket end face tongue and groove position line, arrange horizontal moulding bed, horizontal moulding bed divides three row settings, middle moulding bed is high, both sides moulding bed is low;
(3) locate on the middle moulding bed of horizontal moulding bed, connection web is installed, the both sides moulding bed of horizontal moulding bed is located successively, i iron is installed;
(4) connection web is welded with the junction of both sides i iron;
(5) stiffener and bracing piece are installed;
(6) draw control line, mounted component is corrected, detected, end mill is carried out to H type end side;
(7) locate in i iron side, bracket is installed and welds, in location, i iron side, peg is installed and welds;
(8) overall measurement, checks and accepts.
By web center line and the outer edge alignment ground position line when described step (3) comprises location, control the goodness of fit of its end and ground location simultaneously.Location is afterwards correct and moulding bed spot welding is firm; Parts locally flatness is no more than 2mm, appearance and size ± 1mm, rigging datum line ± 0.5mm.During component location, with one end for just to carry out processing and fabricating as end, surplus is placed on other one end.
The welding of described step (4) comprising: adopt electric boiling plate butt welded seam both sides to carry out preheating, strictly monitor by electrical heating digital temperature control case and tempilstick, submerged arc welding is adopted after preheating, spot welding connects the junction of web upper surface and both sides i iron, groove depth one half to be welded to stands up and carries out the junction that back chipping is welded to connect web lower surface and both sides i iron again, the soldered junction connecing web upper surface and both sides i iron is stood up after being welded to half groove depth equally, be symmetrically welded by constantly standing up according to this, control welding deformation, postwelding carrying out flaw detection; Iron rust, greasy dirt etc. within the 50mm scope of commissure should carry out polishing and clean out, until just can carry out assembled after exposing metallic luster; Special i iron automatic assembling or dedicated set assembling platform are assembled into H type component, i iron be connected web center line and must align; The welding material that the assembled tacking of i iron adopts must be identical with the requirement of formal weld seam, what the leg of tacking should not be greater than design weld seam must be greater than 8mm, tack weld length is preferably 500mm ~ 600mm, and tacking must not have crackle, pore, slag inclusion, otherwise again welds after must removing.
Described step (6) comprising: carry out check measurement to member integrated, the particularly sectional dimension at the upper and lower two ends of steel column and verticality, the straightness accuracy of connection web and i iron, inspection must be measured by full-time inspection personnel comprehensively, ultrasonic testing/ ultrasonic examination is carried out to principal weld simultaneously, the method adopting draw point to rule after meeting the demands marks the end mill Working position line of upper and lower end face, and develop and print with ocean and mark, as inspection benchmark during end mill, then carry out H type component end face end mill.
Described step (7) comprising: must position by the origin reference location line on platform during bracket location, adopt plumb bob, utilizes steel ruler, transit to coordinate location, tacking should be firm, prevent collision from producing deviation, vertically just putting installation bracket by huge post, bracket welding adopts CO 2gas shielded arc welding welds, and welding sequence employing is first soldered connects web vertical fillet weld, the flat fillet weld of rear weldering i iron; According to technological requirement before welding, for needing the position of preheated weld to adopt ceramic electric heating plate to carry out preheating, and measure preheat temperature with tempilstick; The control of interlayer temperature should be carried out in time to welding position in welding process.
Described step (8) comprising: total powerstation and ground position line method need be adopted to carry out composite measurement, to guarantee its precision; Member Welding corrects rear tolerance: steel column height: ± 1mm, steel column width; ± 2mm, web off-centring: ± 1mm, frange plate verticality; ± 2mm, shaft bend arrow degree: L/1000mm.And be not more than 10mm, web local planeness: 2mm.
Beneficial effect: ultra-large type combination H type section Steel Column of the present invention and preparation method thereof tool has the following advantages:
1, novel in structural design of the present invention, while ensure that post bearing capacity, simplify the structure of post to greatest extent, saved raw material, save cost, add efficient construction usable floor area, reduce dead load simultaneously, reduce structural seismic response, improve support effect.
2, preparation method of the present invention, solves the problem of factorial praluction, greatly accelerates the progress of making, shortens the duration, and reasonably design decreases difficulty and the workload of welding simultaneously, convenient construction, reduces working measure expense, and saves the duration.
3, overall reasonably assembling sequence, welding sequence and welding method in the present invention, further ensure the quality of the huge post produced; Reduce the welding deformation in segmental machining process, ensure the form accuracy of large scale steel column simultaneously; Precision and overall dimension etc. in strict control installation process, ensure field erected convenient and swift and installation quality, simultaneously for reducing assembled workload.
4, the present invention is typical super-high building structure, and structure of the ultra-large type that provides combination H type section Steel Column and preparation method thereof can be generalized to the construction of other high building structures, and provides convenient for crossed construction.
Accompanying drawing explanation
Fig. 1 is the structural representation of ultra-large type combination H type section Steel Column.
Fig. 2 is the schematic diagram of step (2).
Fig. 3 is the schematic diagram of step (4).
Fig. 4 is the schematic diagram of step (5).
Detailed description of the invention
Below by accompanying drawing, technical solution of the present invention is described in detail, but protection scope of the present invention is not limited to embodiment.
embodiment 1:a kind of ultra-large type combination H type section Steel Column as shown in Figure 1, comprises two blocks of i iron 2 and is connected web 1; Two blocks of i iron 2 are arranged on respectively and connect web 1 both sides, and the cross section after installation is H type; The upper surface and the both sides i iron 2 that connect web 1 form concave structure, are provided with stiffener 3 along concave structure, on stiffener 3, are provided with bracing piece 4; I iron 2 side is provided with bracket 5 and peg 6; Two blocks of i iron 2 are in not parallel setting, and angle is each other 1.5.Ultra-large type combination H type section Steel Column adopts Q345GJC-Z25 steel plate to make, and is of a size of 4050x2350x70x80mm.
Above-mentioned ultra-large type combination H type section Steel Column is made by the following method:
(1) adopt 2000 tons of hydraulic presses to i iron be connected web and carry out leveling, numerical control vertical bar cutting machine or numerical control plasma cutting machine is adopted to cut bracket, peg, reserve welding contracted quantity and allowance during cutting, carry out after cutting filling up, polishing, except stain and burr;
(2) on the platform of workshop, draw relevant huge post center line, bracket center line, angle line, the bracket end face tongue and groove position line, arrange horizontal moulding bed, horizontal moulding bed divides three row settings, middle moulding bed is high, both sides moulding bed is low, as shown in Figure 2;
(3) locate on the middle moulding bed of horizontal moulding bed, connection web is installed, the both sides moulding bed of horizontal moulding bed is located successively, i iron is installed; Web center line and the outer edge alignment ground position line will be connected during location, control the goodness of fit of its end and ground location simultaneously.Location is afterwards correct and moulding bed spot welding is firm; Parts locally flatness is no more than 2mm, appearance and size ± 1mm, rigging datum line ± 0.5mm.During component location, with one end for just to carry out processing and fabricating as end, surplus is placed on other one end;
(4) connection web is welded with the junction 7 of both sides i iron, as shown in Figure 3; Electric boiling plate butt welded seam both sides are adopted to carry out preheating, strictly monitor by electrical heating digital temperature control case and tempilstick, submerged arc welding is adopted after preheating, spot welding connects the junction of web upper surface and both sides i iron, groove depth one half to be welded to stands up and carries out the junction that back chipping is welded to connect web lower surface and both sides i iron again, the soldered junction connecing web upper surface and both sides i iron is stood up after being welded to half groove depth equally, be symmetrically welded by constantly standing up according to this, control welding deformation, postwelding carrying out flaw detection; Iron rust, greasy dirt etc. within the 50mm scope of commissure should carry out polishing and clean out, until just can carry out assembled after exposing metallic luster; Special i iron automatic assembling or dedicated set assembling platform are assembled into H type component, i iron be connected web center line and must align; The welding material that the assembled tacking of i iron adopts must be identical with the requirement of formal weld seam, the leg of tacking should not be greater than 2/3 of design weld seam, and must not 8mm be greater than, tack weld length is preferably 500mm ~ 600mm, tacking must not have crackle, pore, slag inclusion, otherwise again welds after must removing.
(5) stiffener 3 and bracing piece 4 are installed, as shown in Figure 4;
(6) draw control line, mounted component is corrected, detected, end mill is carried out to H type end side; Check measurement is carried out to member integrated, the particularly sectional dimension at the upper and lower two ends of steel column and verticality, the straightness accuracy of connection web and i iron, inspection must be measured by full-time inspection personnel comprehensively, ultrasonic testing/ ultrasonic examination is carried out to principal weld simultaneously, the method adopting draw point to rule after meeting the demands marks the end mill Working position line of upper and lower end face, and develop and print with ocean and mark, as inspection benchmark during end mill, then carry out H type component end face end mill;
(7) locate in i iron side, bracket is installed and welds, in location, i iron side, peg is installed and welds; Must position by the origin reference location line on platform during bracket location, adopt plumb bob, utilize steel ruler, transit to coordinate location, tacking should be firm, prevents collision from producing deviation, vertically just putting installation bracket by huge post, and bracket welding adopts CO 2gas shielded arc welding welds, and welding sequence employing is first soldered connects web vertical fillet weld, the flat fillet weld of rear weldering i iron; According to technological requirement before welding, for needing the position of preheated weld to adopt ceramic electric heating plate to carry out preheating, and measure preheat temperature with tempilstick; The control of interlayer temperature should be carried out in time to welding position in welding process;
(8) overall measurement, checks and accepts; Total powerstation and ground position line method need be adopted to carry out composite measurement, to guarantee its precision; Member Welding corrects rear tolerance: steel column height: ± 1mm, steel column width; ± 2mm, web off-centring: ± 1mm, frange plate verticality; ± 2mm, shaft bend arrow degree: L/1000mm, and are not more than 10mm, web local planeness: 2mm.
As mentioned above, although represented with reference to specific preferred embodiment and described the present invention, it shall not be construed as the restriction to the present invention self.Under the spirit and scope of the present invention prerequisite not departing from claims definition, various change can be made in the form and details to it.

Claims (6)

1. a preparation method for ultra-large type combination H type section Steel Column, described ultra-large type combination H type section Steel Column comprises two blocks of i iron and is connected web; Described two blocks of i iron are arranged on described connection web both sides respectively, and the cross section after installation is H type; Upper surface and the both sides i iron of described connection web form concave structure, are provided with stiffener along concave structure, on stiffener, are provided with bracing piece, and described i iron side is provided with bracket and peg; It is characterized in that, the preparation method of described ultra-large type combination H type section Steel Column comprises the steps:
(1) adopt 2000 tons of hydraulic presses to i iron be connected web and carry out leveling, numerical control vertical bar cutting machine or numerical control plasma cutting machine is adopted to cut bracket, peg, reserve welding contracted quantity and allowance during cutting, carry out after cutting filling up, polishing, except stain and burr;
(2) on the platform of workshop, draw relevant huge post center line, bracket center line, angle line, the bracket end face tongue and groove position line, arrange horizontal moulding bed, horizontal moulding bed divides three row settings, middle moulding bed is high, both sides moulding bed is low;
(3) locate on the middle moulding bed of horizontal moulding bed, connection web is installed, the both sides moulding bed of horizontal moulding bed is located successively, i iron is installed ;
(4) connection web is welded with the junction of both sides i iron;
(5) stiffener and bracing piece are installed;
(6) draw control line, mounted component is corrected, detected, end mill is carried out to H type end side;
(7) at location, i iron side, welded and installed bracket, at location, i iron side, welded and installed peg;
(8) overall measurement, checks and accepts.
2. ultra-large type combines the preparation method of H type section Steel Column according to claim 1, it is characterized in that: described step (3) comprising: web center line and the outer edge alignment ground position line will be connected during location, control the goodness of fit of its end and ground location simultaneously; Location is afterwards correct and moulding bed spot welding is firm, and part plan degree is no more than 2mm, appearance and size ± 1mm, rigging datum line ± 0.5mm.
3. ultra-large type combines the preparation method of H type section Steel Column according to claim 1, it is characterized in that: the welding of described step (4) comprising: adopt electric boiling plate butt welded seam both sides to carry out preheating, strictly monitor by electrical heating digital temperature control case and tempilstick, submerged arc welding is adopted after preheating, spot welding connects the junction of web upper surface and both sides i iron, groove depth one half to be welded to stands up and carries out the junction that back chipping is welded to connect web lower surface and both sides i iron again, the soldered junction connecing web upper surface and both sides i iron is stood up after being welded to half groove depth equally, be symmetrically welded by constantly standing up according to this, control welding deformation, postwelding carrying out flaw detection, iron rust within the 50mm scope of commissure, greasy dirt should carry out polishing and clean out, until just can carry out assembled after exposing metallic luster, special i iron automatic assembling or dedicated set assembling platform are assembled into H type component, i iron be connected web center line and must align, the leg of tacking should not be greater than design weld seam and must not be greater than 8mm, and tack weld length is preferably 500mm ~ 600mm, and tacking must not have crackle, pore, slag inclusion, otherwise again welds after must removing.
4. ultra-large type combines the preparation method of H type section Steel Column according to claim 1, it is characterized in that: described step (6) comprising: carry out check measurement to member integrated, the particularly sectional dimension at the upper and lower two ends of steel column and the verticality of connection web and i iron, straightness accuracy, inspection must be measured by full-time inspection personnel comprehensively, ultrasonic testing/ ultrasonic examination is carried out to principal weld simultaneously, the method adopting draw point to rule after meeting the demands marks the end mill Working position line of upper and lower end face, and develop and print with ocean and mark, as inspection benchmark during end mill, then H type component end face end mill is carried out.
5. ultra-large type combines the preparation method of H type section Steel Column according to claim 1, it is characterized in that: described step (7) comprising: must position by the origin reference location line on platform during bracket location, adopt plumb bob, steel ruler, transit is utilized to coordinate location, tacking should be firm, prevent collision from producing deviation, vertically just putting installation bracket by steel column, bracket welding adopts CO 2gas shielded arc welding welds, and welding sequence employing is first soldered connects web vertical fillet weld, the flat fillet weld of rear weldering i iron; According to technological requirement before welding, for needing the position of preheated weld to adopt ceramic electric heating plate to carry out preheating, and measure preheat temperature with tempilstick; The control of interlayer temperature should be carried out in time to welding position in welding process.
6. ultra-large type combines the preparation method of H type section Steel Column according to claim 1, it is characterized in that: described step (8) comprising: total powerstation and ground position line method need be adopted to carry out composite measurement, to guarantee its precision; Rear tolerance is corrected in welding: steel column height: ± 1mm, steel column width; ± 2mm, connection web off-centring: ± 1mm, i iron verticality; ± 2mm, shaft bend arrow degree: L/1000mm, and are not more than 10mm, connect web local planeness: 2mm.
CN201410441603.5A 2014-09-01 2014-09-01 A kind of preparation method of ultra-large type combination H type section Steel Column Active CN104196166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410441603.5A CN104196166B (en) 2014-09-01 2014-09-01 A kind of preparation method of ultra-large type combination H type section Steel Column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410441603.5A CN104196166B (en) 2014-09-01 2014-09-01 A kind of preparation method of ultra-large type combination H type section Steel Column

Publications (2)

Publication Number Publication Date
CN104196166A CN104196166A (en) 2014-12-10
CN104196166B true CN104196166B (en) 2016-04-13

Family

ID=52081517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410441603.5A Active CN104196166B (en) 2014-09-01 2014-09-01 A kind of preparation method of ultra-large type combination H type section Steel Column

Country Status (1)

Country Link
CN (1) CN104196166B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104476142B (en) * 2014-12-19 2017-06-16 青岛维尔环保科技有限公司 Slipway beam anti-deformation manufacture craft
CN105220830A (en) * 2015-09-29 2016-01-06 江苏沪宁钢机股份有限公司 A kind of combined box type post and processing and fabricating method thereof
CN105155775A (en) * 2015-09-29 2015-12-16 江苏沪宁钢机股份有限公司 Twisted combined steel pipe column and manufacturing method thereof
CN105155776B (en) * 2015-09-29 2017-06-27 江苏沪宁钢机股份有限公司 A kind of box reinforcing bar coupled column and its processing method
CN105414892A (en) * 2015-11-27 2016-03-23 中国一冶集团有限公司 Method for welding and manufacturing H-shaped steel with cellular holes in web through ship position model
CN107199437B (en) * 2016-03-16 2019-06-07 中铁十五局集团有限公司 A kind of steel anchor beam segment preparation method
CN106944721B (en) * 2017-04-13 2019-05-14 中建钢构江苏有限公司 The production method that double H-type section turns box-type section composite steel column
CN107825389B (en) * 2017-11-21 2019-11-08 上海振华重工(集团)股份有限公司 A kind of scribble method suitable on overlength H-type rod piece
CN109057388B (en) * 2018-08-16 2020-06-05 中国十七冶集团有限公司 Medium pipeline transformation method for obstructing installation of steel column of expanded plant
CN109048172A (en) * 2018-10-10 2018-12-21 中铁宝桥集团有限公司 A kind of Steel Bridge curve drum rod piece production assembling device and its production assemble method
CN109356398B (en) * 2018-11-22 2020-01-10 中国十七冶集团有限公司 Transformation method for obstructing installation medium pipeline of steel column of expanded plant
CN114232898B (en) * 2021-12-22 2023-09-01 中铁三局集团建筑安装工程有限公司 Large-section rectangular thick plate steel tube concrete column and construction method
CN114192944B (en) * 2021-12-28 2023-09-22 江苏新蓝天钢结构有限公司 Full penetration back-gouging-free I-steel welding method introducing welding pre-deformation
CN115045439B (en) * 2022-01-30 2023-10-27 中冶(上海)钢结构科技有限公司 Assembling and welding method for giant steel column
CN115030404B (en) * 2022-06-30 2023-08-08 中冶(上海)钢结构科技有限公司 Construction method of thick plate oversized section combined king-shaped steel column

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329656A (en) * 2000-05-22 2001-11-30 Nippon Steel Corp Buckling stiffening structure of box-shaped cross-section thin plate member
CN102493600A (en) * 2011-11-18 2012-06-13 江苏沪宁钢机股份有限公司 Cross-box-shaped composite steel column and manufacturing method thereof
CN102733545B (en) * 2012-06-28 2014-07-30 广东中城建设集团有限公司 Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN103758280B (en) * 2013-12-27 2017-07-11 中国石油天然气第六建设公司 H profile steel and its manufacture method, steel construction and its assemble method
CN204081260U (en) * 2014-09-01 2015-01-07 江苏沪宁钢机股份有限公司 A kind of ultra-large type H type cross section composite steel column

Also Published As

Publication number Publication date
CN104196166A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN104196166B (en) A kind of preparation method of ultra-large type combination H type section Steel Column
CN104196164B (en) A kind of preparation method of huge cross coupled column
CN101691787B (en) Converse construction process for middle-high steel structure building
CN103510523B (en) Sectional cutting and overall craning method for supporting beam in deep foundation pit multilayered reinforced concrete
CN101691815B (en) Fast hoisting-aligning method for Large-sized steel frames, and steel frame base structure
CN101481902A (en) V type pier inclined leg combined type support for continuous rigid frame bridge and layered cast-in-situ construction method
CN110485429A (en) A kind of prestressing force fashioned iron assembled combination inner support construction method
CN115162182B (en) Cantilever type steel box girder high-precision cable hoisting construction method
CN103485539B (en) The construction control method of large-scale direct burial steel anchor fluke built-in fitting
CN102747735A (en) Treatment method for abnormal deformation of deep foundation pit concrete support piling
CN106140821B (en) Milling train tilts and the bearing calibration of skew
CN204081260U (en) A kind of ultra-large type H type cross section composite steel column
CN204081261U (en) A kind of huge cross structure coupled column
CN110295765B (en) Construction method for emigration protection of building site
CN106400675B (en) A kind of steel anchor box and its installation method
CN103669665A (en) Elevation difference joint construction technology for steel bar truss floor deck construction
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN104196165B (en) Huge post of a kind of ultra-large type Multi-cavity steel structure and preparation method thereof
CN106120793A (en) A kind of tilt the method for correcting error of pile for prestressed pipe and structure
CN104989107A (en) Curved ribbed beam processing and assembling construction process
CN202247907U (en) Supporting structure of urban track traffic super-large section cut-and-cover section tunnel
CN102720346B (en) Multifunctional upright column base for scaffold and manufacturing process thereof
CN117182461A (en) Manufacturing and construction control method for small-curvature high-pier continuous steel box girder
CN105040992B (en) Reverse inverted-insertion type construction method for structural steel columns
CN106884532A (en) The form bracing system and construction method of the cast-in-place decorative panel of staged Arc Stand

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 214200 Baijia village, Zhangzhu Town, Yixing City, Wuxi City, Jiangsu Province

Patentee after: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.

Address before: 214200 Zhang Zhu Zhen Bai Jia Cun, Yixing City, Wuxi City, Jiangsu Province

Patentee before: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.

CP02 Change in the address of a patent holder