CN106120793A CN201610699652.8A CN201610699652A CN106120793A CN 106120793 A CN106120793 A CN 106120793A CN 201610699652 A CN201610699652 A CN 201610699652A CN 106120793 A CN106120793 A CN 106120793A
Authority
CN
China
Prior art keywords
pile
pile tube
bed course
gathering sill
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610699652.8A
Other languages
Chinese (zh)
Inventor
李松晏
周尚宪
梁森
张明
张文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201610699652.8A priority Critical patent/CN106120793A/en
Publication of CN106120793A publication Critical patent/CN106120793A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods

Abstract

The invention discloses a kind of tilt the method for correcting error of pile for prestressed pipe and structure, the present invention, when rectifying a deviation the pile tube tilted, implements: step one according to the following steps, bed course reparation;Step 2, correction location;Step 3, the clear hole of tubular pile body;Step 4, pipe pile side draw soil;Step 5, jack in place, push away stake displacement;Step 6, compound fills;Step 7, hole of post is filled core, is i.e. installed in stake holes by the steel reinforcement cage made in advance by hanging device, and then in stake holes, placing concrete carries out hole of post filling core.The present invention not only has the advantage that construction is easy, cheap, also has the advantage that safety is high.The pile for prestressed pipe after present invention correction is used to be entirely capable of reaching national security codes and standards.The invention is particularly suited to the super rule of the gradient to pile tube, its small strain testing result is that the most perfect inclination pile tube of a class, two class stakes, and its pile body integrity carries out correction process.

Description

A kind of tilt the method for correcting error of pile for prestressed pipe and structure
Technical field
The present invention relates to a kind of tilt the method for correcting error of pile for prestressed pipe and structure, belong to building foundation pile correction skill Art field.
Background technology
The engineering roadblock that the project that the inclination of pile for prestressed pipe is in Unfavorable geology condition is frequently encountered.Geology bar Part is severe, and silt soil strata is thicker, piling route confusion, to finished peg protection deficiency, and the excavation of foundation pit on building basis is improper And push away to carry and lack of standardization etc. all can cause pile for prestressed pipe that the phenomenon of inclination occurs.According to " foundation basic construction inspection of quality is advised Model " and design drawing requirement: after pile tube tilts, the deviation of taper pile gradient cannot be greater than the 15%(pipe of inclination angle tangent value Angle between the longitudinal centre line of the inclination angle ridding bitt of stake and plumb line);Deviation≤20mm is discharged in stake position, the perpendicularity deviation of pile ≤1%.When all kinds of indexs are all in prescribed limit, stake can normally use;When gradient is beyond specification allowed band, and stake is little When strain detecting is a class stake, two class stakes, because of the super rule of gradient, stake cannot normally use need to piling again, cause great warp Ji loss.Surpassing a class stake of rule, two class stakes for gradient, hesitate to discard, use as normal, pile framing and post exist bias to be needed Increase cushion cap and increase arrangement of reinforcement accordingly with opposing because of the eccentric throw being eccentrically formed.Because such stake is to complete on the premise of super rule , often there is potential safety hazard and there is examination risk in this method of the prior art, and uncontrollable.At present, pile tube is worked as When inclination index has transfinited, prior art all use aforesaid conservative way pile foundation is carried out piling process, existing This piling processing mode not only also exists potential safety hazard and there is the uncontrollability of the potential safety hazard checking and accepting risk and existence, and And there is also constructional difficulties, high cost problem, so existing this to tilting the processing mode of pile for prestressed pipe still Not ideal enough, it is impossible to meet the needs used.
Summary of the invention
It is an object of the invention to: entangling of the inclination pile for prestressed pipe that a kind of safety is high, construction is easy, cost is relatively low is provided Folk prescription method and structure, to overcome the deficiencies in the prior art.
The technical scheme is that and be achieved in that:
The present invention a kind of tilt pile for prestressed pipe method for correcting error be that the method is to rectify a deviation the pile tube tilted Time, implement according to the following steps:
Step one, bed course reparation: excavate original place matter soil layer around the pile tube tilted, make the pile crown end face of pile tube exceed original place matter Soil layer 200~350mm, then uses concreting to lay on by the original place matter soil layer after excavating and repairs bed course, is laying When repairing bed course, precast gathering sill repairing on bed course, make the pile crown of pile tube can pass from this gathering sill, inclining at pile tube Repairing of tilted direction reserves the jack mounting groove placing jack on bed course;
Step 2, correction location: determine the position after pile tube is corrected, the position after this correction in the gathering sill repairing bed course Vertical position is reached for pile tube or for original design pile tube position after being rectified a deviation;
Step 3, the clear hole of tubular pile body: first for superficial part broken concrete that may be present, stone, building rubbish in pile tube stake holes Rubbish or earth use fishing tool to be salvaged, and carry out high-pressure flush the most again and fetch earth, and when high-pressure flush fetches earth, use high pressure Hydraulic giant, compressed air carry out bath along pile tube stake holes periphery of inner wall and fetch earth, and make clear hole depth exceed in tubular pile body and occur lacking Fall into or crack at below 2~3m;
Step 4, pipe pile side draw soil: in the rightabout side along pile tube incline direction, i.e. along the direction water under high pressure of gathering sill Rifle bath is fetched earth, and the degree of depth in the hole that makes to fetch earth exceedes and occurs below at defect or crack 2~3m in tubular pile body, the width in hole of fetching earth More than or equal to tubular pile body diameter, the length in hole of fetching earth should be greater than or equal to playing pile tube from the pipe pile side fetched earth along guiding Groove arrives the distance determining the position after pile tube is corrected after moving;
Step 5, jack in place, push away stake displacement: be supported on reparation bed course by jack in the side that pile tube tilts, and use Jack pushing and withstanding pile tube makes it shift along gathering sill, makes pile tube arrive in gathering sill and determines the position after pile tube is corrected,
Step 6, compound fills: in jack side during pile tube is rectified a deviation, in the hole that pile tube side occurs, by Step pours into the compound of rubble that particle diameter is 5~25mm and fine sand and carries out compound and fill, and densification of vibrating, and this compound fills It is continued until that correction puts in place;
Step 7, hole of post fills core: first passes through sash weight method and carries out tubular pile body perpendicularity repetition measurement, and tubular pile body perpendicularity is compound to be wanted After asking, by giant, compressed air, wire brush cleans pile tube endoporus, the steel then will made in advance by hanging device Muscle cage is installed in stake holes, treats that steel reinforcement cage is installed the placing concrete in backward stake holes that puts in place and carried out hole of post and fill core, treats concrete The rectification work of pile for prestressed pipe is i.e. completed after solidification.
In above-mentioned method for correcting error, when the steel reinforcement cage made in advance is installed in stake holes, installs at steel reinforcement cage and put in place After, or the crannied position defective relative to pile tube at steel reinforcement cage, should be in the steel reinforcement cage of this position upper and lower 1.5m scope Interior encryption stirrup.
According to said method build the present invention a kind of tilt pile for prestressed pipe error-correction structure be, this error-correction structure bag Include the pile tube rectified a deviation, the original place matter soil layer of pile tube upper end is provided with reparation bed course, be provided with gathering sill repairing on bed course, pipe Stake is through the gathering sill of reparation bed course, and the top end face of pile tube is greater than or equal to the upper surface of reparation bed course, is repairing bed course Being provided with jack mounting groove, jack mounting groove communicates with gathering sill.
In above-mentioned error-correction structure, the position of the jack mounting groove on described reparation bed course is provided through the pipe of gathering sill The position of stake incline direction.
In above-mentioned error-correction structure, the width of described gathering sill is more than pile tube diameter 5~30 millimeters, and the length of gathering sill is more than Or wanted the maximum linear distance through gathering sill equal to pile tube upright position after its obliquity is put in place to it by correction.
In above-mentioned error-correction structure, the thickness of described reparation bed course is 200~250mm.
In above-mentioned error-correction structure, equipped with steel reinforcement cage in the stake holes of pile tube, and in the stake holes of pile tube and in steel reinforcement cage It is filled with concrete.
In above-mentioned error-correction structure, described in be arranged in pile tube stake holes steel reinforcement cage be provided with encryption stirrup, and encryption stirrup It is arranged at the defect of pile tube or crack location on the steel reinforcement cage in the range of the most each 1.5m.
Owing to have employed technique scheme, the present invention is directed to the gradient of pile tube and surpass rule and carry out correction process, the present invention This correction processing mode abandoned existing piling processing mode completely.So the present invention is compared with prior art, this Bright not only have the advantage that construction is easy, cheap, and owing to pile tube can be returned to original design requirement, therefore by the present invention Substantially increase the security performance of pile tube, so the present invention also has the advantage that safety is high.The present invention tests through practice of construction Prove, use the pile for prestressed pipe after present invention correction to be entirely capable of reaching national security codes and standards.The invention is particularly suited to The super rule of gradient, its small strain testing result to pile tube are a class, two class stakes, and the inclination that its pile body integrity is the most perfect Pile tube carries out correction process.
Accompanying drawing explanation
Fig. 1 is that (pile tube that pile tube is obliquity drawn by solid line in Fig. 1, drawn by dotted line for the structural representation of the present invention Pile tube is pile tube in vertical position after correction puts in place);
Fig. 2 is the plan structure schematic diagram of Fig. 1.
Description of reference numerals: 1-original place matter soil layer, 2-pile tube, 2.1-defect or crack, 3-repairs bed course, and 4-leads To groove, 5-jack mounting groove, 6-steel reinforcement cage, 6.1-encrypts stirrup, the water of 7-giant punching, 8-jack, 9- Compound, b-repairs the thickness of bed course.
Detailed description of the invention
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings.
The present invention a kind of tilt pile for prestressed pipe method for correcting error be that the method is to the pile tube 2(tilted such as Pile tube drawn by solid line in Fig. 1) when rectifying a deviation, implement according to the following steps:
Step one, bed course reparation: excavate original place matter soil layer 1 around the pile tube 2 tilted, make the pile crown end face of pile tube 2 exceed former Geology soil layer 200~350mm, then uses concreting to lay on by the original place matter soil layer 1 after excavating and repairs bed course 3, When laying reparation bed course 3, precast gathering sill 4 repairing on bed course 3, make the pile crown of pile tube 2 can wear from this gathering sill 4 Cross, the reparation bed course 3 of the incline direction of pile tube 2 reserves the jack mounting groove 5 placing jack;
Step 2, correction location: determine the position after pile tube 2 is corrected in the gathering sill 4 repairing bed course 3, after this correction Position is to reach vertical position after pile tube 2 is rectified a deviation or is original design pile tube 2 position;
Step 3, the clear hole of tubular pile body: first for superficial part broken concrete that may be present, stone, building in the stake holes of pile tube 2 Rubbish or earth use fishing tool to be salvaged, and carry out high-pressure flush the most again and fetch earth, and when high-pressure flush fetches earth, use height Setting-out rifle, compressed air carry out bath along pile tube stake holes periphery of inner wall and fetch earth, and make clear hole depth exceed in pile tube 2 pile body and occur Below at defect or crack 2.1 2~3m;
Step 4, pipe pile side draw soil: in the rightabout side along pile tube incline direction, i.e. along the direction water under high pressure of gathering sill The water 7 of rifle punching fetches earth (as shown in Figure 1), and the degree of depth in the hole that makes to fetch earth exceedes and occurs below at defect or crack 2.1 2 in tubular pile body ~3m, the width in hole of fetching earth is more than or equal to pile tube 2 pile body diameter, and the length in hole of fetching earth should be greater than or equal to from the pile tube fetched earth 2 sides are played to arrive after pile tube 2 moves along gathering sill 4 and are determined the distance of the position after pile tube is corrected (such as dotted line institute in Fig. 1 Draw shown in pile tube position);
Step 5, jack in place, push away stake displacement: jack 8 is put in jack mounting groove 5 by the side tilted at pile tube 2 And be supported on reparation bed course 3, make it shift along gathering sill 4 with jack 8 pushing and withstanding pile tube 2, make pile tube 2 arrive gathering sill 4 In determine pile tube 2 correct after position (as drawn by dotted line in Fig. 1 shown in pile tube position);
Step 6, compound fills: in jack 8 side during pile tube is rectified a deviation, in the hole that pile tube 2 side occurs, Progressively pour into the compound 9 of rubble that particle diameter is 5~25mm and fine sand to carry out compound and fill, and densification of vibrating, this compound Fill and be continued until that correction puts in place;
Step 7, hole of post fills core: first passes through sash weight method and carries out pile tube 2 pile body perpendicularity repetition measurement, and pile tube 2 pile body perpendicularity is combined After requirement, by giant, compressed air, wire brush cleans pile tube endoporus, then will be made in advance by hanging device Steel reinforcement cage 6 is installed in stake holes, treats that steel reinforcement cage 6 is installed the placing concrete in backward stake holes that puts in place and carried out hole of post and fill core, waits to mix The rectification work of pile for prestressed pipe 2 can be completed after solidifying soil solidification.
During construction, in order to reach relatively reliable tube pile structure, the steel reinforcement cage made in advance 6 is installed in stake holes Time, after steel reinforcement cage 6 is installed and put in place, on steel reinforcement cage 6, defective relative to pile tube 2 or crack 2.1 position arranges encryption Stirrup 6.1.
In order to reach preferably to rectify a deviation quality, when after hole of post filling core has been constructed, concrete solidifies the most completely, should Repetition measurement tubular pile body whether off normal, and to completing correction and filling the pile tube of core consolidation process and again carry out pile body integrity inspection Survey.
According to said method build the present invention a kind of tilt pile for prestressed pipe error-correction structure, such as Fig. 1 and Fig. 2 institute Showing, this structure includes the pile tube 2 rectified a deviation, and is provided with reparation bed course 3, repairs bed course 3 on the original place matter soil layer 1 of pile tube 2 upper end Thickness b control in the range of 200~250mm;It is provided with gathering sill 4 repairing on bed course 3, makes pile tube 2 can pad through repairing The gathering sill 4 of layer 3, and make the top end face upper surface greater than or equal to reparation bed course 3 of pile tube 2, it is provided with on bed course 3 repairing Jack mounting groove 5, jack mounting groove 5 communicates with gathering sill 4;The position of the jack mounting groove 5 repaired on bed course 3 is set Put the position at pile tube 2 incline direction through gathering sill 4;During making, the width being directed to groove 4 is fabricated to more than pile tube 2 Diameter 5~30 millimeters, the length being simultaneously directed to groove 4 is fabricated to be rectified a deviation to it from its obliquity more than or equal to pile tube 2 The maximum linear distance through gathering sill is wanted in upright position after putting in place;Pile tube 2 is being rectified a deviation to it from its obliquity Behind upright position after putting in place, equipped with steel reinforcement cage 6 in the stake holes of pile tube 2, and in the stake holes of pile tube 2 and in steel reinforcement cage 6 It is filled with concrete;In order to reach more stable and reliable effect, on the steel reinforcement cage 6 in pile tube 2 stake holes, encryption can be set Stirrup 6.1, is arranged on the steel reinforcement cage in the range of the defect of pile tube 2 or the most each 1.5m in position, crack 2.1 by encryption stirrup 6.1 On 6.

Claims (8)

1. the method for correcting error tilting pile for prestressed pipe, it is characterised in that: when the pile tube tilted is rectified a deviation, press Following steps are implemented:
Step one, bed course reparation: excavate original place matter soil layer around the pile tube tilted, make the pile crown end face of pile tube exceed original place matter Soil layer 200~350mm, then uses concreting to lay on by the original place matter soil layer after excavating and repairs bed course, is laying When repairing bed course, precast gathering sill repairing on bed course, make the pile crown of pile tube can pass from this gathering sill, inclining at pile tube Repairing of tilted direction reserves the jack mounting groove placing jack on bed course;
Step 2, correction location: determine the position after pile tube is corrected, the position after this correction in the gathering sill repairing bed course Vertical position is reached for pile tube or for original design pile tube position after being rectified a deviation;
Step 3, the clear hole of tubular pile body: first for superficial part broken concrete that may be present, stone, building rubbish in pile tube stake holes Rubbish or earth use fishing tool to be salvaged, and carry out high-pressure flush the most again and fetch earth, and when high-pressure flush fetches earth, use high pressure Hydraulic giant, compressed air carry out bath along pile tube stake holes periphery of inner wall and fetch earth, and make clear hole depth exceed in tubular pile body and occur lacking Fall into or crack at below 2~3m;
Step 4, pipe pile side draw soil: in the rightabout side along pile tube incline direction, i.e. along the direction water under high pressure of gathering sill Rifle bath is fetched earth, and the degree of depth in the hole that makes to fetch earth exceedes and occurs below at defect or crack 2~3m in tubular pile body, the width in hole of fetching earth More than or equal to tubular pile body diameter, the length in hole of fetching earth should be greater than or equal to playing pile tube from the pipe pile side fetched earth along guiding Groove arrives the distance determining the position after pile tube is corrected after moving;
Step 5, jack in place, push away stake displacement: be supported on reparation bed course by jack in the side that pile tube tilts, and use Jack pushing and withstanding pile tube makes it shift along gathering sill, makes pile tube arrive in gathering sill and determines the position after pile tube is corrected;
Step 6, compound fills: in jack side during pile tube is rectified a deviation, in the hole that pile tube side occurs, by Step pours into the compound of rubble that particle diameter is 5~25mm and fine sand and carries out compound and fill, and densification of vibrating, and this compound fills It is continued until that correction puts in place;
Step 7, hole of post fills core: first passes through sash weight method and carries out tubular pile body perpendicularity repetition measurement, and tubular pile body perpendicularity is compound to be wanted After asking, by giant, compressed air, wire brush cleans pile tube endoporus, the steel then will made in advance by hanging device Muscle cage is installed in stake holes, treats that steel reinforcement cage is installed the placing concrete in backward stake holes that puts in place and carried out hole of post and fill core, treats concrete The rectification work of pile for prestressed pipe is i.e. completed after solidification.
The method for correcting error of inclination pile for prestressed pipe the most according to claim 1, it is characterised in that: will make in advance When steel reinforcement cage is installed in stake holes, after steel reinforcement cage is installed and put in place, defective relative to pile tube or crannied on steel reinforcement cage Position arranges encryption stirrup.
3. tilt an error-correction structure for pile for prestressed pipe, including the pile tube (2) rectified a deviation, it is characterised in that: in pile tube (2) Original place matter soil layer (1) of upper end is provided with reparation bed course (3), is provided with gathering sill (4) repairing on bed course (3), and pile tube (2) passes Repair the gathering sill (4) of bed course (3), and the top end face of pile tube (2) is greater than or equal to the upper surface of reparation bed course (3), is repairing Multiple bed course (3) is provided with jack mounting groove (5), and jack mounting groove (5) communicates with gathering sill (4).
The error-correction structure of inclination pile for prestressed pipe the most according to claim 3, it is characterised in that: repair on bed course (3) The position of jack mounting groove (5) is provided through the position of pile tube (2) incline direction of gathering sill (4).
The error-correction structure of inclination pile for prestressed pipe the most according to claim 3, it is characterised in that: the width of gathering sill (4) More than pile tube (2) diameter 5~30 millimeters, the length of gathering sill (4) is entangled to it from its obliquity more than or equal to pile tube (2) It is biased to the upright position behind position and is wanted the maximum linear distance through gathering sill.
The error-correction structure of inclination pile for prestressed pipe the most according to claim 3, it is characterised in that: repair the thickness of bed course (3) Degree (b) is 200~250mm.
The error-correction structure of inclination pile for prestressed pipe the most according to claim 3, it is characterised in that: in the stake holes of pile tube (2) In equipped with steel reinforcement cage (6), and in the stake holes of pile tube (2) and steel reinforcement cage (6) is filled with concrete.
The error-correction structure of inclination pile for prestressed pipe the most according to claim 7, it is characterised in that: it is arranged on pile tube (2) stake Steel reinforcement cage (6) in hole is provided with encryption stirrup (6.1), and encryption stirrup (6.1) is arranged on defect or the crack of pile tube (2) (2.1) on the steel reinforcement cage (6) in the range of the most each 1.5m in position.
CN201610699652.8A 2016-08-23 2016-08-23 A kind of tilt the method for correcting error of pile for prestressed pipe and structure Pending CN106120793A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610699652.8A CN106120793A (en) 2016-08-23 2016-08-23 A kind of tilt the method for correcting error of pile for prestressed pipe and structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610699652.8A CN106120793A (en) 2016-08-23 2016-08-23 A kind of tilt the method for correcting error of pile for prestressed pipe and structure

Publications (1)

Publication Number Publication Date
CN106120793A true CN106120793A (en) 2016-11-16

Family

ID=57279369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610699652.8A Pending CN106120793A (en) 2016-08-23 2016-08-23 A kind of tilt the method for correcting error of pile for prestressed pipe and structure

Country Status (1)

Country Link
CN (1) CN106120793A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487837A (en) * 2018-11-15 2019-03-19 广东固易特种工程有限公司 A kind of inclination of pile for prestressed pipe is rectified a deviation back positive construction method
CN109537585A (en) * 2018-11-27 2019-03-29 杭州东升建设工程有限公司 The antidote of tubular pole verticality in a kind of work progress
CN113664979A (en) * 2021-07-07 2021-11-19 福建省大地管桩有限公司 Deviation rectifying method for pointed pile head of concrete tubular pile
CN114622556A (en) * 2022-03-24 2022-06-14 中国电建市政建设集团有限公司 AI image recognition-based CFG pile intelligent deviation rectifying method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006083586A (en) * 2004-09-15 2006-03-30 Takenaka Doboku Co Ltd Inclined concrete pile driving method
CN103243745A (en) * 2013-04-28 2013-08-14 江苏兴厦建筑安装有限公司 Pipe pile deviation-rectifying and resetting method
CN203129202U (en) * 2013-03-03 2013-08-14 大荣建设集团有限公司 Deviation rectifying device for tube pile
CN205975615U (en) * 2016-08-23 2017-02-22 中建四局第一建筑工程有限公司 Structure of rectifying of stress tube stake in advance inclines

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006083586A (en) * 2004-09-15 2006-03-30 Takenaka Doboku Co Ltd Inclined concrete pile driving method
CN203129202U (en) * 2013-03-03 2013-08-14 大荣建设集团有限公司 Deviation rectifying device for tube pile
CN103243745A (en) * 2013-04-28 2013-08-14 江苏兴厦建筑安装有限公司 Pipe pile deviation-rectifying and resetting method
CN205975615U (en) * 2016-08-23 2017-02-22 中建四局第一建筑工程有限公司 Structure of rectifying of stress tube stake in advance inclines

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487837A (en) * 2018-11-15 2019-03-19 广东固易特种工程有限公司 A kind of inclination of pile for prestressed pipe is rectified a deviation back positive construction method
CN109537585A (en) * 2018-11-27 2019-03-29 杭州东升建设工程有限公司 The antidote of tubular pole verticality in a kind of work progress
CN109537585B (en) * 2018-11-27 2020-09-25 杭州东升建设工程有限公司 Method for correcting perpendicularity of tubular pile in construction process
CN113664979A (en) * 2021-07-07 2021-11-19 福建省大地管桩有限公司 Deviation rectifying method for pointed pile head of concrete tubular pile
CN114622556A (en) * 2022-03-24 2022-06-14 中国电建市政建设集团有限公司 AI image recognition-based CFG pile intelligent deviation rectifying method and device
CN114622556B (en) * 2022-03-24 2023-08-08 中国电建市政建设集团有限公司 Intelligent correction method and correction device for CFG pile based on AI image recognition

Similar Documents

Publication Publication Date Title
CN106641440B (en) A kind of transverse crossing railway line underground piping jacking construction method
CN110374633B (en) Tunnel opening section construction method for tunnel to pass through loose body
CN108797587A (en) A kind of novel sinking construction technology of static pressed pile
CN108894214B (en) Karst cave geological environment cast-in-place pile and pile-forming construction method thereof
CN101429768B (en) Pre-stress high-strength concrete pipe pile static-pressure construction method
CN106120793A (en) A kind of tilt the method for correcting error of pile for prestressed pipe and structure
CN110485429A (en) A kind of prestressing force fashioned iron assembled combination inner support construction method
CN112900450A (en) Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method
CN108612087A (en) A kind of novel long screw auger pore pressure fills the construction technology of support pile
CN108330835A (en) The construction method of setting bracket
CN111894204A (en) Steel pipe concrete composite column construction method
CN111560941A (en) Karst landform cavity treatment method
CN107489164A (en) The heightening and consolidation structure and method of a kind of in-service reinforced concrete retaining wall
CN112412467B (en) Construction method of ventilation vertical shaft (200-600 m) with extra-long highway tunnel by' well reversing method
CN109056710B (en) Hard stratum steel pipe pile and construction method thereof
CN205975615U (en) Structure of rectifying of stress tube stake in advance inclines
CN114215090A (en) Construction method of raft and compression pile in closed space
CN104895054A (en) Construction method of fiber rib concrete uplift pile
CN114411761B (en) Advanced pre-supporting system and method for subway tunnel to be built in new building construction
CN108797586A (en) A kind of construction method of anchor jacked pile
CN111335305A (en) Double-casing zero-friction static load detection construction method based on uplift pile
CN111335912B (en) Large-pipe-diameter mechanical pipe jacking construction process for soft soil foundation in collapsible loess area
CN108708370B (en) Pile hole construction process for bridge pile foundation in alpine region
CN111648788A (en) Tunnel protection construction method adjacent to subway line
CN111042049A (en) Rainwater pipe construction process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication