CN204081261U - A kind of huge cross structure coupled column - Google Patents
A kind of huge cross structure coupled column Download PDFInfo
- Publication number
- CN204081261U CN204081261U CN201420500405.7U CN201420500405U CN204081261U CN 204081261 U CN204081261 U CN 204081261U CN 201420500405 U CN201420500405 U CN 201420500405U CN 204081261 U CN204081261 U CN 204081261U
- Authority
- CN
- China
- Prior art keywords
- iron
- column
- steel
- huge
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 72
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 51
- 239000010959 steel Substances 0.000 claims abstract description 51
- 229910052742 iron Inorganic materials 0.000 claims abstract description 36
- 239000003351 stiffener Substances 0.000 claims abstract description 10
- 239000000463 material Substances 0.000 claims description 8
- 238000010276 construction Methods 0.000 abstract description 5
- 239000002994 raw material Substances 0.000 abstract description 2
- 238000003466 welding Methods 0.000 description 39
- 238000005520 cutting process Methods 0.000 description 10
- 238000000034 method Methods 0.000 description 9
- 238000005259 measurement Methods 0.000 description 8
- 238000000465 moulding Methods 0.000 description 8
- 238000007689 inspection Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 6
- 238000003801 milling Methods 0.000 description 6
- 238000002360 preparation method Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000005498 polishing Methods 0.000 description 4
- 229910052573 porcelain Inorganic materials 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000003754 machining Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 208000037656 Respiratory Sounds Diseases 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 238000009835 boiling Methods 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 239000002932 luster Substances 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 238000007639 printing Methods 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The utility model discloses a kind of huge cross structure coupled column, comprise two pieces of T-steels and one block of i iron; Described T-steel is arranged on the cross section column body structure that i iron both sides form band side plate; Described column structure upper, middle and lower are respectively equipped with two-layer stiffener, on the side plate of described column structure, are provided with peg, and described i iron is provided with bracket with the junction of described stiffener.Huge post described in the utility model, while ensure that post bearing capacity, simplifies the structure of post to greatest extent, has saved raw material, saves cost, adds efficient construction usable floor area, reduce dead load simultaneously, reduces structural seismic response.
Description
Technical field
The present invention relates to a kind of steel work, be specifically related to a kind of huge cross structure coupled column.
Background technology
Greenery patches, Wuhan is centrally located at Binjiang business district, Wuchang nucleus, and face each other across the river with century-old outbeach, Hankow, geographical position is very superior, is the key area of Wuhan new round urban development.Center, greenery patches, Wuhan is made up of handle official business auxiliary building, a building block of flats and annex of a king-tower building, building, a building, wherein king-tower building basement 6 floor, and 125 layers on the ground, superstructure area 32.3 ten thousand square metres, total building height is 606 meters.Be a comprehensive building integrating office, exhibitions, hotel, sightseeing amusement, business etc., Wuhan Super High landmark after building up, will be become.
High building framework adopts the structural system being applicable to commercial super highrise building: mega-frame-Core Walls Structure-cantilever truss structure system.This system is made up of three parts: the Reinforced Concrete Core Walls Structure of built-in reinforced concrete column and steel plate, housing profile steel concrete column and floor girder steel form mega-frame, the connection that respective storey position arranges endless belt truss, semi-girder truss strengthens housing and inner core.Underground steel work forms primarily of 12 huge posts of reinforcing bar, floor girder steel, Core Walls Structure reinforced concrete column steel plate shear force wall three parts,
The huge post of reinforcing bar comprises combination H type cross section and star section; Star section huge column sectional length is longer, and segment shape size is comparatively large, and heavier-weight, belong to overlength, ultra-wide component, larger on transport impact.The huge column sectional structure of reinforcing bar is relatively simple, and connected only only have floor girder steel bracket, therefore only there is stiffening rib its inside in local.Because huge column sectional appearance and size is large, web height is high, and structure easily produces distortion, therefore needs the reinforcement considering structure, prevents from having bad luck, produces plastic strain in hoisting process.Huge column sectional is higher to profile dimension precision requirement, should strictly control when factory process makes.
Summary of the invention
Goal of the invention: in order to solve transport inconvenience in work progress, on-the-spot difficulty of processing is large, and working face requires high problem, and quality control of being more convenient for, saving installation cost, the invention provides a kind of huge cross structure coupled column.
Technical scheme: huge cross structure coupled column of the present invention, comprises two pieces of T-steels and one block of i iron; Described T-steel is arranged on the cross section column body structure that i iron both sides are formed as being with side plate; Described column structure upper, middle and lower are respectively equipped with two-layer stiffener, on the side plate of described column structure, are provided with peg, and described i iron is provided with bracket with the junction of described stiffener.
The steel plate that described column structure adopts thickness of slab 40≤t < 60mm, material is Q345GJC-Z15 or thickness of slab t >=60mm, material are that the steel plate of Q345GJC-Z25 is made.
Angle between described two T-steel plates is 1.5 ± 0.2 degree.
The preparation method of described huge cross structure coupled column, comprises the steps:
(1) 2000 tons of hydraulic presses are adopted to carry out leveling to i iron and T-steel, numerical control vertical bar cutting machine or numerical control plasma cutting machine is adopted to cut bracket, peg, reserve welding contracted quantity and allowance during cutting, carry out after cutting filling up, polishing, except stain and burr;
(2) on the platform of workshop, draw relevant huge cross structure coupled column center line, bracket center line, angle line, the bracket end face tongue and groove position line, moulding bed is set;
(3) on moulding bed, two T-steels are assembled in opposite directions, carried out automatic submerged-arc welding to fillet weld, T-steel is taken apart, corrects
;
(4) locate on moulding bed, i iron is installed, locate in the both sides of i iron, T-steel is installed, adopt gas shielded arc welding and automatic submerged arc welding to combine welding, correct after welding;
(5) stiffener is installed, welding, and carries out check measurement;
(6) end mill is carried out to cross end face, mounted component is corrected, detected;
(7) locate, bracket is installed, peg line, welding;
(8) overall measurement, checks and accepts.
Described step (4) location comprises: must detect assembling angle special sample during location, after location is correct with moulding bed spot welding firmly, parts locally flatness is no more than 2mm, appearance and size ± 1mm, rigging datum line ± 0.5mm; During component location, with one end for just to carry out processing and fabricating as end, surplus is placed on other one end; To polish smooth with i iron junction before installation; The welding of described step (4) comprising: adopt electric boiling plate butt welded seam both sides to carry out preheating, strictly monitor by electrical heating digital temperature control case and tempilstick, submerged arc welding is adopted after preheating, the junction of spot welding i iron one end face and both sides T-steel, groove depth one half to be welded to stands up and carries out the junction that back chipping is welded to connect i iron other end and both sides T-steel again, the junction of the weldering former end face of i iron and both sides T-steel is stood up after being welded to half groove depth equally, be symmetrically welded by constantly standing up according to this, control welding deformation, postwelding carrying out flaw detection; Iron rust, greasy dirt etc. within the 50mm scope of commissure should carry out polishing and clean out, until just can carry out assembled after exposing metallic luster; Special i iron automatic assembling or dedicated set assembling platform are assembled into dagger, and i iron and T-shaped plate center line must align; The welding material that the assembled tacking of i iron adopts must be identical with the requirement of formal weld seam, the leg of tacking should not be greater than 2/3 of design weld seam, and must not 8mm be greater than, tack weld length is preferably 500mm ~ 600mm, tacking must not have crackle, pore, slag inclusion, otherwise again welds after must removing; Check following parameter during rectification: gap: ± 1.0mm, verticality: b/200, and should not be greater than 2.0, length: ± 2.0mm, off-centring: ± 1.0mm.
Described step (5) comprising: carry out check measurement to entirety, the particularly huge sectional dimension at the upper and lower two ends of cross structure coupled column and verticality, the straightness accuracy of i iron and T-steel, inspection must be measured by full-time inspection personnel comprehensively, ultrasonic testing/ ultrasonic examination is carried out to principal weld simultaneously, the method adopting draw point to rule after meeting the demands marks the end mill Working position line of upper and lower end face, and develop and print with ocean and mark, as inspection benchmark during end mill, then carry out next step component end face end mill.
Described step (6) comprising: on end face machine platform, reserve huge cross structure coupled column center line and levelness, carry out the integral end Milling Machining of end face, should note in end mill process developing and printing as benchmark using ocean, half ocean should be stayed during end mill to develop and print, after end mill, carry out the bevel for welding cutting of segmentation interface; End mill allowable variation is: two end mills are member profile size at ordinary times: ± 2.0mm, the planeness of milling flat: 0.3mm, and milling flat is to the verticality L/1500 of axis.
Described step (7) comprising: before bracket is installed, the verticality of bracket, straightness accuracy, planeness should have been corrected, and first carry out the drilling of bolt hole, just can install after meeting the requirements, interim location-plate is adopted to position and adjust during installation, must ensure the correct of bracket position, particularly the distance of bolt hole group and steel column center line will ensure, simultaneously the angle of priority control bracket and other relative positions; Appearance of weld effect between peg with steel column also has certain relation with porcelain ring with welding, before carrying out welding of peg certain note peg and to weld with porcelain ring between the goodness of fit, must fit tightly.
Described step (8) comprising: total powerstation and ground position line method need be adopted to carry out composite measurement, to guarantee its precision; Member Welding corrects rear tolerance: steel column height: ± 1mm, steel column width; ± 2mm, web off-centring: ± 1mm, frange plate verticality; Bending arrows degree: the L/1000mm of ± 2mm, shaft and be not more than 10mm, web locally planeness 2mm, shaft distortion: H/250 and be not more than 5mm.
Beneficial effect: huge cross structure coupled column of the present invention and preparation method thereof tool has the following advantages:
1, novel in structural design of the present invention, while ensure that post bearing capacity, simplify the structure of post to greatest extent, saved raw material, save cost, add efficient construction usable floor area, reduce dead load simultaneously, reduce structural seismic response, improve support effect.
2, preparation method of the present invention, solves the problem of factorial praluction, greatly accelerates the progress of making, shortens the duration, and reasonably design decreases difficulty and the workload of welding simultaneously, convenient construction, reduces working measure expense, and saves the duration.
3, overall reasonably assembling sequence, welding sequence and welding method in the present invention, further ensure the quality of the huge post produced; Reduce the welding deformation in segmental machining process, ensure the form accuracy of large scale steel column simultaneously; Precision and overall dimension etc. in strict control installation process, ensure field erected convenient and swift and installation quality, simultaneously for reducing assembled workload.
4, the present invention is typical super-high building structure, and structure of the ultra-large type that provides combination H type section Steel Column and preparation method thereof can be generalized to the construction of other high building structures, and provides convenient for crossed construction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is decomposition texture schematic diagram of the present invention.
Fig. 3 is the schematic diagram of step (3).
Fig. 4 is the schematic diagram of step (4).
Fig. 5 is the schematic diagram of step (5).
Detailed description of the invention
Below by accompanying drawing, technical solution of the present invention is described in detail, but protection scope of the present invention is not limited to described embodiment.
embodiment 1:huge cross structure coupled column as depicted in figs. 1 and 2, comprises two pieces of T-steels 2 and one block of i iron 1; T-steel 2 is arranged on the cross section column body structure that i iron 1 both sides are formed as being with side plate, and the angle between two T-steel 2 plates is 1.5 degree; Column structure upper, middle and lower are respectively equipped with two-layer stiffener 3, on the side plate of column structure, are provided with peg 5, and i iron 1 is provided with bracket 4 with the junction of stiffener 3.
The steel plate that column structure adopts thickness of slab 45mm, material is Q345GJC-Z15 and thickness of slab 60mm, material are that the steel plate of Q345GJC-Z25 is made.
The preparation method of above-mentioned huge cross structure coupled column, specifically comprises the steps:
(1) 2000 tons of hydraulic presses are adopted to carry out leveling to i iron and T-steel, numerical control vertical bar cutting machine or numerical control plasma cutting machine is adopted to cut bracket, peg, reserve welding contracted quantity and allowance during cutting, carry out after cutting filling up, polishing, except stain and burr;
(2) on the platform of workshop, draw relevant huge cross structure coupled column center line, bracket center line, angle line, the bracket end face tongue and groove position line, moulding bed is set;
(3) on moulding bed, two T-steels assembled in opposite directions, as shown in Figure 3, automatic submerged-arc welding carried out to fillet weld, T-steel is taken apart, correct
;
(4) locate on moulding bed, i iron is installed, locate in the both sides of i iron, T-steel is installed, adopt gas shielded arc welding and automatic submerged arc welding to combine welding, correct after welding, as shown in Figure 4; Must detect assembling angle and reversible deformation value special sample during location, after location is correct with moulding bed spot welding firmly, parts locally flatness is no more than 2mm, appearance and size ± 1mm, rigging datum line ± 0.5mm; During component location, with one end for just to carry out processing and fabricating as end, surplus is placed on other one end; To polish smooth with i iron junction before installation; Electric boiling plate butt welded seam both sides are adopted to carry out preheating, strictly monitor by electrical heating digital temperature control case and tempilstick, submerged arc welding is adopted after preheating, the junction of spot welding i iron one end face and both sides T-steel, groove depth one half to be welded to stands up and carries out the junction that back chipping is welded to connect i iron other end and both sides T-steel again, the junction of the weldering former end face of i iron and both sides T-steel is stood up after being welded to half groove depth equally, be symmetrically welded by constantly standing up according to this, control welding deformation, postwelding carrying out flaw detection; Iron rust, greasy dirt etc. within the 50mm scope of commissure should carry out polishing and clean out, until just can carry out assembled after exposing metallic luster; Special i iron automatic assembling or dedicated set assembling platform are assembled into dagger, and i iron and T-shaped plate center line must align; The welding material that the assembled tacking of i iron adopts must be identical with the requirement of formal weld seam, the leg of tacking should not be greater than 2/3 of design weld seam, and must not 8mm be greater than, tack weld length is preferably 500mm ~ 600mm, tacking must not have crackle, pore, slag inclusion, otherwise again welds after must removing; Check following parameter during rectification: gap: ± 1.0mm, verticality: b/200, and should not be greater than 2.0, length: ± 2.0mm, off-centring: ± 1.0mm;
(5) stiffener, welding are installed, as shown in Figure 5, and carry out check measurement; Check measurement is carried out to entirety, the particularly huge sectional dimension at the upper and lower two ends of cross structure coupled column and verticality, the straightness accuracy of i iron and T-steel, inspection must be measured by full-time inspection personnel comprehensively, ultrasonic testing/ ultrasonic examination is carried out to principal weld simultaneously, the method adopting draw point to rule after meeting the demands marks the end mill Working position line of upper and lower end face, and develop and print with ocean and mark, as inspection benchmark during end mill, then carry out next step component end face end mill;
(6) end mill is carried out to cross end face, mounted component is corrected, detected; End face machine platform is reserved center line and the levelness of huge cross structure coupled column, carry out the integral end Milling Machining of end face, should note in end mill process developing and printing as benchmark using ocean, half ocean during end mill, should be stayed to develop and print, after end mill, carry out the bevel for welding cutting of segmentation interface; End mill allowable variation is: two end mills are member profile size at ordinary times: ± 2.0mm, the planeness of milling flat: 0.3mm, and milling flat is to the verticality L/1500 of axis;
(7) locate, bracket is installed, peg line, welding; Before bracket is installed, the verticality of bracket, straightness accuracy, planeness should have been corrected, and first carry out the drilling of bolt hole, just can install after meeting the requirements, interim location-plate is adopted to position and adjust during installation, must ensure the correct of bracket position, particularly the distance of bolt hole group and steel column center line will ensure, simultaneously the angle of priority control bracket and other relative positions; Appearance of weld effect between peg with steel column also has certain relation with porcelain ring with welding, before carrying out welding of peg certain note peg and to weld with porcelain ring between the goodness of fit, must fit tightly;
(8) overall measurement, checks and accepts; Total powerstation and ground position line method need be adopted to carry out composite measurement, to guarantee its precision; Member Welding corrects rear tolerance: steel column height: ± 1mm, steel column width; ± 2mm, web off-centring: ± 1mm, frange plate verticality; Bending arrows degree: the L/1000mm of ± 2mm, shaft and be not more than 10mm, web locally planeness 2mm, shaft distortion: H/250 and be not more than 5mm.
As mentioned above, although represented with reference to specific preferred embodiment and described the present invention, it shall not be construed as the restriction to the present invention self.Under the spirit and scope of the present invention prerequisite not departing from claims definition, various change can be made in the form and details to it.
Claims (3)
1. a huge cross structure coupled column, is characterized in that: comprise two pieces of T-steels and one block of i iron; Described T-steel is arranged on the cross section column body structure that i iron both sides are formed as being with side plate; Described column structure upper, middle and lower are respectively equipped with two-layer stiffener, on the side plate of described column structure, are provided with peg, and described i iron is provided with bracket with the junction of described stiffener.
2. huge cross structure coupled column according to claim 1, is characterized in that: the steel plate that described column structure adopts thickness of slab 40≤t < 60mm, material is Q345GJC-Z15 or thickness of slab t >=60mm, material are that the steel plate of Q345GJC-Z25 is made.
3. huge cross structure coupled column according to claim 1, is characterized in that: the angle between described cross two T-steel plates is 1.5 ± 0.2 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420500405.7U CN204081261U (en) | 2014-09-01 | 2014-09-01 | A kind of huge cross structure coupled column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420500405.7U CN204081261U (en) | 2014-09-01 | 2014-09-01 | A kind of huge cross structure coupled column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204081261U true CN204081261U (en) | 2015-01-07 |
Family
ID=52173995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420500405.7U Expired - Lifetime CN204081261U (en) | 2014-09-01 | 2014-09-01 | A kind of huge cross structure coupled column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204081261U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104196164A (en) * | 2014-09-01 | 2014-12-10 | 江苏沪宁钢机股份有限公司 | Giant cruciform combination column and manufacturing method thereof |
CN113089723A (en) * | 2021-04-22 | 2021-07-09 | 郑州地铁集团有限公司 | Steel reinforced concrete member for subway station |
-
2014
- 2014-09-01 CN CN201420500405.7U patent/CN204081261U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104196164A (en) * | 2014-09-01 | 2014-12-10 | 江苏沪宁钢机股份有限公司 | Giant cruciform combination column and manufacturing method thereof |
CN104196164B (en) * | 2014-09-01 | 2016-04-13 | 江苏沪宁钢机股份有限公司 | A kind of preparation method of huge cross coupled column |
CN113089723A (en) * | 2021-04-22 | 2021-07-09 | 郑州地铁集团有限公司 | Steel reinforced concrete member for subway station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104196166B (en) | A kind of preparation method of ultra-large type combination H type section Steel Column | |
CN104196164B (en) | A kind of preparation method of huge cross coupled column | |
CN101691787B (en) | Converse construction process for middle-high steel structure building | |
CN103510523B (en) | Sectional cutting and overall craning method for supporting beam in deep foundation pit multilayered reinforced concrete | |
CN115162182B (en) | Cantilever type steel box girder high-precision cable hoisting construction method | |
CN110117963B (en) | Installation construction method of high-speed wire rod finishing mill | |
CN102874379A (en) | Manufacture method of offshore riprap leveling ship | |
CN103321350A (en) | Multi-connection and large-cross-section combination-box-type thick-plate side column and construction method therefor | |
CN106498853A (en) | A kind of construction method of high ferro across existing railway large-span steel bent cap | |
CN103276893A (en) | Novel composite structure for supporting rigid building template and construction method | |
CN106400675B (en) | A kind of steel anchor box and its installation method | |
CN103061448A (en) | Box-shaped secondary member and assembling process thereof | |
CN103758348A (en) | Profile steel framework structure concrete floor slab suspension mould pouring construction method | |
CN204081261U (en) | A kind of huge cross structure coupled column | |
CN202099719U (en) | Steel truss bridge | |
CN103526859B (en) | Method for constructing combined shock-resistant system of section steel columns, steel beams and buckling restraining support | |
CN204081260U (en) | A kind of ultra-large type H type cross section composite steel column | |
CN110295765B (en) | Construction method for emigration protection of building site | |
CN103321325B (en) | Construction method for giant combined L-shaped box-type thick plate shearing wall column | |
CN104196165B (en) | Huge post of a kind of ultra-large type Multi-cavity steel structure and preparation method thereof | |
CN104563525B (en) | A kind of box steel arch beam Integral horizontal type group is to method | |
CN117182461A (en) | Manufacturing and construction control method for small-curvature high-pier continuous steel box girder | |
CN202023298U (en) | Roof truss-sectioned roof girder structure capable of being hoisted by cross type tower crane | |
CN105040992A (en) | Reverse inverted-insertion type construction method for structural steel columns | |
CN202247907U (en) | Supporting structure of urban track traffic super-large section cut-and-cover section tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20150107 |