CN102953714A - 一种井下智能分层压控采油方法 - Google Patents
一种井下智能分层压控采油方法 Download PDFInfo
- Publication number
- CN102953714A CN102953714A CN2012104157826A CN201210415782A CN102953714A CN 102953714 A CN102953714 A CN 102953714A CN 2012104157826 A CN2012104157826 A CN 2012104157826A CN 201210415782 A CN201210415782 A CN 201210415782A CN 102953714 A CN102953714 A CN 102953714A
- Authority
- CN
- China
- Prior art keywords
- voltage
- pressure
- controlled
- pressure controlled
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Fats And Perfumes (AREA)
Abstract
本发明涉及一种井下智能分层压控采油方法,步骤如下:预设定:为每个压控开关器预设各自的压控时间段Ai,电机运转时间Bi,每个压控开关器仅在自己的压控时间段Ai内,电机才能够运转;任一油层的采油与停止采油:对于该油层对应的压控开关器,在其压控时间段Ai内,进行地面加压操作,压力传感器记录到至少两位跳变的压力编码后,电机依照设定的运转时间Bi运转,电机运转方向根据当前压控开关器状态判断,电机运转使开关器状态与当前状态相反。本发明的方法大大提高了操作的可靠性,降低了操作难度,减少了操作时间,提高了工作效率。
Description
技术领域
本发明涉及一种井下智能分层压控采油方法。
背景技术
分层注水采油是我国陆上油田进入高含水期的主要采油方式之一。我国已经应用了多种分层注水工艺。智能分层压控采油的设备如图1所示。在套管22中下入油管23,油管23上设置压控开关器30-1、30-2、30-3,开关器之间设有堵水封隔器29-1、29-2、29-3。压控开关器结构原理图如图2所示,主要由单片机(下文也称微处理器)、传感器(即压力传感器)和电池等部分组成,执行机构为减速电机,减速电机带动活塞封堵或打开对应油层的进油孔,从而实现对需要开采油层的开采工作。当需要压力控制时,通过井上加压,井下压力传感器将注水压力信号转换为电信号,经过压力传感器外围调理电路将信号转换为标准电信号,单片机对电信号进行采集、处理,当接收到的压力信号有效时,单片机便输出控制信号,控制执行机构打开或关闭相应油层的阀门开关、从而达到调层采油的目的。
如图1中有1、2、3三个油层,每个油层的进油孔分别由压控开关器30-1、30-2、30-3控制。现有技术中,为了使单片机(微处理器)识别,需要编制压力密码表,确定压力密码结构,即加压操作工艺,加压操作形成被压力传感器记录的压力编码,才能被单片机识别。通常的压力编码包括压控起始段,开关编号段、命令段、压控结束段。压控起始段表明即将进行压控操作;开关编号段用于选择油层,通知相应油层的开关器准备工作;命令段表示减速电机的两种工作状态;压控结束段用于通知开关器压控操作结束。如《井下开关压力控制实现方法的研究》(石油机械2010第8期)就介绍了一种上述思路的压控方法。
如下表是一种12位压力编码,由于需要地面打压形成压力编码,每位编码脉冲需要5分钟,执行一次压控动作,需要60分钟,对于图1的设备,三个开关器都进行压控操一次,需要180分钟,作且1位编码出错一次,该压控操作就会失败,必须重新开始压控。所以,现有的压控方法对技术操作人员连续操作要求高,对泵车、管线设备要求高,压力编码位数多,重复操作泵车开、停次数多,因操作或设备原因,任何一位数打压信号不正确,都会引起误操作,从而导致压控实施强度大、可靠性差。
发明内容
本发明的目的是提供一种井下智能分层压控采油方法,用以解决现有技术压控实施强度大、可靠性差的问题。
为实现上述目的,本发明的方案是:一种井下智能分层压控采油方法,步骤如下:
1) 为每个压控开关器设定各自的压控时间段;各压控开关器的压控时间段互不重叠;
2) 在任一个压控时间段内,进行地面压控操作,对于与该压控时间段对应的压控开关器,其压力传感器记录到设定的压力编码后,控制电机依照设定的运转时长运转,电机运转方向根据当前压控开关器状态判断,电机运转使开关器状态与当前状态相反。
所述步骤2)中,如果初始井下压力为低,则设定的压力编码为“10”;如果初始井下压力为高,则设定的压力编码为“01”。
所述步骤2)中,电机运转方向根据当前压控开关器状态判断;若开关器已经打开,则电机运转使开关器关闭,若开关器已经关闭,则电机运转使开关器打开。
本发明的方法在预设阶段为各开关器设定各自的压控时间段,省去了开关编号段,而且电机运转时间也是固定的,不需要再压力编码中通知微处理器,电机只有正转和反转,即开关有打开和关闭两种状态,所以只需要根据开关现在的状态判断下次动作方向。在压控操作前保证井下压力维持高压或低压,则压控编码最少只需要两位即可,压控起始段也可以省略,整个压控编码得到了极大的简化。本发明的方法大大提高了操作的可靠性,降低了操作难度,减少了操作时间,提高了工作效率。
附图说明
图1是本发明的分层采油系统原理图;
图2是压控开关器原理图;
图3是油层3采油示意图;
图4是油层2采油示意图;
图5是油层1采油示意图;
19—压力表,20—压力控制器,21—地面管线,22—套管,23-1、23-2、—油管,24—抽油杆,25—抽油泵,26-1、26-2—筛管,27-1、27-2—丝堵,28—水力锚,29-1、29-2、29-3—堵水封隔器,30-1、30-2、30-3—压控开关器,31-单向阀,1、2、3—油层。
具体实施方式
下面结合附图对本发明做进一步详细的说明。
如图1系统,首先预设定:为压控开关器30-1、30-2、30-3预设各自的压控时间段A1、A2、A3,电机运转时间B1、B2、B3,每个压控开关器仅在自己的压控时间段内,将减速电机接通电池,为减速电机供电;各压控开关器的压控时间段A1、A2、A3互不重叠;由于开关器相同,B1=B2=B3。
比如,可以设定A1、A2、A3为每天的8点到12点、13点到18点、19点到24点。在每天的A1时段内进行压控操作,只有压控开关器30-1会响应。在A2时段内进行压控操作,只有30-2会响应。
如图3所示为开采油层3时的示意图。在任何一天在A3时间段,电池和减速电机接通,在通过地面压力控制器20向套管22内打高、低压力,压力表19记录压力,形成“10”两位编码信号,压力传感器将压力信号传递给微处理器,微处理器向电机发出正向旋转信号,减速电机正向旋转,运行B3时间后,微处理器发出停止信号,减速电机停止旋转,开关器30-3进入持续开启状态,油层3开始采油。某一天油层3需要停止生产时,在该天的A3时间段,电池组和减速电机接通,在通过地面压力控制器20向套管22内打高、低压力,压力表19记录压力,形成“10”两位编码信号,压力传感器将压力信号传递给微处理器,微处理器向电机发出反向旋转信号,减速电机反向旋转B3时间后,微处理器发出停止信号,减速电机停止旋转,压控开关器30-3进入持续关闭状态,油层3停止采油,准备换层采油。
以上实施例采用了“10”两位编码,是由于在初始状态井下压力为低压(低于某设定值),进行压控操作,使井下压力跳变,升至高压一段时间(如5分钟),然后再回落至初始压力状态。如果采用更多位数的编码,如“1010”,也必须保证最终回到初始压力状态。同理,如果初始压力状态为高,可采用“01”、“0101”等编码。
以上实施例中,为压控开关器预设压控时间段,可以通过设置相应硬件电路控制电机与电池之间的供电,在压控时间段内接通电路使电池能够为电池供电,在其他时间段端口电路的供电连接。还可以设置微处理器,使其在压控时间段以外处于休眠状态,仅在压控时间段以内才会为电机提供控制信号,使电机工作。关于微处理器根据当前开关状态判断下次电机的运转方向,属于本领域人员熟知的惯用技术手段,在此不再赘述。
如图4、图5分别为开采油层2、1时的示意图,过程与开采油层3类同,不再赘述。
Claims (3)
1.一种井下智能分层压控采油方法,其特征在于,步骤如下:
为每个压控开关器设定各自的压控时间段;各压控开关器的压控时间段互不重叠;
在任一个压控时间段内,进行地面压控操作,对于与该压控时间段对应的压控开关器,其压力传感器记录到设定的压力编码后,控制电机依照设定的运转时长运转,电机运转方向根据当前压控开关器状态判断,电机运转使开关器状态与当前状态相反。
2.根据权利要求1所述的一种压控采油方法,其特征在于,所述步骤2)中,如果初始井下压力为低,则设定的压力编码为“10”;如果初始井下压力为高,则设定的压力编码为“01”。
3.根据权利要求1所述的一种压控采油方法,其特征在于,所述步骤2)中,电机运转方向根据当前压控开关器状态判断;若开关器已经打开,则电机运转使开关器关闭,若开关器已经关闭,则电机运转使开关器打开。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104157826A CN102953714A (zh) | 2012-10-26 | 2012-10-26 | 一种井下智能分层压控采油方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104157826A CN102953714A (zh) | 2012-10-26 | 2012-10-26 | 一种井下智能分层压控采油方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102953714A true CN102953714A (zh) | 2013-03-06 |
Family
ID=47763043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012104157826A Pending CN102953714A (zh) | 2012-10-26 | 2012-10-26 | 一种井下智能分层压控采油方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102953714A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104533356A (zh) * | 2014-12-31 | 2015-04-22 | 中国石油天然气股份有限公司 | 一种两层自控分层采油的方法和分层采油方法 |
CN104747142A (zh) * | 2015-03-24 | 2015-07-01 | 中国石油天然气股份有限公司 | 一种牙刷状油藏分层开采换层的方法 |
CN106089162A (zh) * | 2016-08-21 | 2016-11-09 | 中国石油化工股份有限公司 | 一种双向无线识别控制的分层段开采生产管柱及调控装置 |
CN106121600A (zh) * | 2016-08-21 | 2016-11-16 | 中国石油化工股份有限公司 | 一种分层段开采测控生产管柱 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1554855A (zh) * | 2003-12-20 | 2004-12-15 | 琳 陈 | 一种油井找水堵水的方法 |
CN101012737A (zh) * | 2007-02-08 | 2007-08-08 | 兰群 | 采油井在生产状态下开关器求产、找水和堵水方法 |
CN102425404A (zh) * | 2011-09-23 | 2012-04-25 | 陈爱民 | 油井分层测压、分层产能测试的方法 |
-
2012
- 2012-10-26 CN CN2012104157826A patent/CN102953714A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1554855A (zh) * | 2003-12-20 | 2004-12-15 | 琳 陈 | 一种油井找水堵水的方法 |
CN101012737A (zh) * | 2007-02-08 | 2007-08-08 | 兰群 | 采油井在生产状态下开关器求产、找水和堵水方法 |
CN102425404A (zh) * | 2011-09-23 | 2012-04-25 | 陈爱民 | 油井分层测压、分层产能测试的方法 |
Non-Patent Citations (2)
Title |
---|
刘明尧等: "井下压力控制系统的研究与应用", 《石油机械》 * |
刘明尧等: "井下开关压力控制实现方法的研究", 《石油机械》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104533356A (zh) * | 2014-12-31 | 2015-04-22 | 中国石油天然气股份有限公司 | 一种两层自控分层采油的方法和分层采油方法 |
CN104533356B (zh) * | 2014-12-31 | 2017-07-07 | 中国石油天然气股份有限公司 | 一种两层自控分层采油的方法和分层采油方法 |
CN104747142A (zh) * | 2015-03-24 | 2015-07-01 | 中国石油天然气股份有限公司 | 一种牙刷状油藏分层开采换层的方法 |
CN104747142B (zh) * | 2015-03-24 | 2017-07-07 | 中国石油天然气股份有限公司 | 一种牙刷状油藏分层开采换层的方法 |
CN106089162A (zh) * | 2016-08-21 | 2016-11-09 | 中国石油化工股份有限公司 | 一种双向无线识别控制的分层段开采生产管柱及调控装置 |
CN106121600A (zh) * | 2016-08-21 | 2016-11-16 | 中国石油化工股份有限公司 | 一种分层段开采测控生产管柱 |
CN106089162B (zh) * | 2016-08-21 | 2018-07-31 | 中国石油化工股份有限公司 | 一种双向无线识别控制的分层段开采生产管柱及调控装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102953714A (zh) | 一种井下智能分层压控采油方法 | |
CN101517233B (zh) | 用于变速驱动器中电力跨越的系统和方法 | |
CN104481470B (zh) | 一种油井自适应控水管柱及方法 | |
CN201511980U (zh) | 一种全电子化信号执行模块电路 | |
CN103104217B (zh) | 随钻电缆井下液控套管阀 | |
CN203164663U (zh) | 采油设备的智能保护装置 | |
CN100422504C (zh) | 用压力波调控分层配水的方法 | |
CN105422053A (zh) | 一种潜油直驱螺杆泵吞吐采油装置 | |
CN107630693B (zh) | 一种应用于页岩气开采的电动水力压裂装置 | |
CN201835827U (zh) | 一种多功能石油测井缆芯复用装置 | |
CN111622711A (zh) | 一种用于开启井下安全阀的微型井下液站系统 | |
CN101931272A (zh) | 一种无源网络智能锁具 | |
CN207377547U (zh) | 一种利用流量波调控分层注水的装置 | |
CN203474132U (zh) | 一种中压变频双控制器冗余装置 | |
CN108708679A (zh) | 一种修井机动力猫道控制系统及控制方法 | |
CN113719257B (zh) | 一种全通径无限级智能压裂滑套及其分层压裂实施方法 | |
CN205173129U (zh) | 旋转导向液压系统电磁阀组测试装置 | |
CN105422050B (zh) | 井下自主供电含油饱和度控制智能控流采油管 | |
CN108086925A (zh) | 一种适用于带压修井作业的辅助起下管设备及作业方法 | |
US11306569B2 (en) | Electronic control for simultaneous injection and production | |
CN206267810U (zh) | 一种钻机夹持结构 | |
US10309197B2 (en) | System and method for autonomous downhole power generation | |
CN105137900B (zh) | 一种供电装置和方法 | |
CN103388552A (zh) | 水电机组球阀控制装置及其控制方法 | |
CN205382921U (zh) | 一种潜油直驱螺杆泵吞吐采油装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130306 |