CN102927442B - Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device - Google Patents

Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device Download PDF

Info

Publication number
CN102927442B
CN102927442B CN 201210458591 CN201210458591A CN102927442B CN 102927442 B CN102927442 B CN 102927442B CN 201210458591 CN201210458591 CN 201210458591 CN 201210458591 A CN201210458591 A CN 201210458591A CN 102927442 B CN102927442 B CN 102927442B
Authority
CN
China
Prior art keywords
hydrate
gas
pipeline
tank
thermometer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201210458591
Other languages
Chinese (zh)
Other versions
CN102927442A (en
Inventor
王树立
饶永超
周诗岽
李恩田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liyang Chang Technology Transfer Center Co., Ltd.
Original Assignee
Changzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou University filed Critical Changzhou University
Priority to CN 201210458591 priority Critical patent/CN102927442B/en
Publication of CN102927442A publication Critical patent/CN102927442A/en
Application granted granted Critical
Publication of CN102927442B publication Critical patent/CN102927442B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention belongs to the field of petroleum engineering, and particularly relates to a pipeline conveying method and a pipeline conveying device for natural gas hydrate. The gas hydrate pipeline conveying device comprises a gas collecting unit, a hydrate generating and transporting unit, and a hydrate separating and decomposing unit. Correspondingly, the gas hydrate pipeline conveying method also comprises the steps of collecting gas, generating and transporting hydrate, and separating and decomposing hydrate. According to the gas hydrate pipeline conveying method and the gas hydrate pipeline conveying device, helical gas hydrate pipeline conveying method is adopted, chemicals such as a depressor, and an inhibitor are not added, and therefore, pipeline blockage is completely avoided and the safety and economics of conveying the natural gas is improved. Compared with traditional natural gas pipeline conveying, the economic benefits are increased by 20-30%. Coiled tube type hydrate and generating device are adopted, and low-temperature environment in sea bottom is utilized to generate hydrate, and the continuous generation of the gas hydrates is guaranteed. Different land processing methods are adopted to meet different conveying requirements of a natural gas market. Besides, the comprehensive efficiency of the system is improved.

Description

Gas hydrate applied pipeline transportation method and equipment
Technical field
The invention belongs to the petroleum works field, be specifically related to a kind of applied pipeline transportation method and equipment of gas hydrates, it is mainly used in the conveying and the petroleum works fields such as pipe natural gas conveying under land mal-condition of the submarine pipeline rock gas in the petroleum gas storage and transportation process, and the storage that also can be used for other gases such as separates at the field with transportation and hydrate gas.
Background technique
Submarine oil, gas reserves are very abundant, in oceanic mineral resources, rank first.Submarine oil, natural gas transport are important rings of hydrocarbon sub-marine field exploitation, and wherein the pipeline conveying is the most common mode.From Brown &amp in 1954; Root Oceanographic Engineering Corporation is since article one submarine pipeline has been laid in the U.S. Gulf of Mexico, and people have successfully laid the submarine pipeline without several all kinds, various calibers all over the world, and total length has reached tens0000 kilometers.Because the submerged pipeline discharge pressure is higher, ambient temperature is lower, very easily generates gas hydrates and block pipeline in the oil gas course of conveying.At present, prevent that hydrate from generating and blocking the method that pipeline adopts is to add the hydrate formation inhibitor, the most frequently used hydrate formation inhibitor is methyl alcohol.According to incompletely statistics, about 500,000,000 dollars of the expense that the annual injecting inhibitor in the whole world generates with the prevention of water compound.In order to solve the high cost problem of using inhibitor and bringing, people utilize the pipe insulation material to keep the way of temperature in pipeline to suppress the generation of hydrate, and the expense of the thermoinsulation material still generated for submarine pipeline prevention of water compound is also up to 620,000 dollars/km.There is again the scholar to propose to equip the generation that multistage natural qi exhaustion water device is controlled hydrate at sea, although multistage dewatering unit can effectively remove the moisture in rock gas, but, because the offshore platform area is limited, high cost is difficult to realize in actual moving process.
In order to prevent and treat hydrate to generate, to the harm of Natural Gas Pipeline Transportation, the present invention proposes a kind of new gas hydrate applied pipeline transportation method and equipment.The core of this method is not the appearance of stopping hydrate fully, but adopt the method for dredging to allow rock gas and water generate the hydrate slurry, in pipeline, flow, this method not only can prevent the Hydrate Plugging pipeline, be beneficial to the transportation of rock gas, and can significantly reduce the use of hydrate inhibitor and the use of thermal insulating material, can significantly reduce operating cost.In addition, according to relevant research, show, gas hydrates have very strong gas storage ability, 1 m 3gas hydrates generally can store 160~180 m 3rock gas, transport capacity is very strong.Therefore, with gas hydrate form transport natural gas, important practical usage is arranged.
By research, find, the industrialization of gas hydrate application technology will realize the continuous generation of hydrate and shift continuously these two elementary processes.And to realize this two processes, the hydrate need to guarantee generated has under the prerequisite of q.s can also continuous-flow and blocking pipe not.Based on above situation, the present invention can guarantee that the hydrate slurry generates fast under both economical condition, and steadily carry in pipeline, arriving after land fast decoupled to be that rock gas enters the land transportation system, or is separated into hydrate solids and is transported.
Summary of the invention
The objective of the invention is the series of problems occurred in current submarine pipeline transport natural gas process, a kind of efficient gas hydrate pipe transportation technology equipment is provided.By the system in combination of various device, realized the complete process at the safe and efficient transport gas in seabed, and there is little investment, the advantage such as operating cost is low.The present invention has mainly solved following problem: 1. invented spiral flow hydrate slurry pipeline transport gas technique, avoided the obstruction of submarine pipeline; 2. invent the method for decomposition of hydrate or separation, met different natural gas transport requirements; 3. invented coil pipe type hydrate generator and utilized the cryogenic high pressure environment generation hydrate in seabed, reduced costs; 4. invent the local cyclone that rises, prevented that in course of conveying, hydrate deposits at tube wall, improved tube fluid and extraneous heat exchange efficiency, promoted the hydrate formation speed; 5. invent decomposition of hydrate fresh water recovering device and cold energy recovering device, improved system synthesis efficiency.
A kind of gas hydrate delivery method of the present invention, comprise the steps:
(1) gas collection step: natural gas via overcompression machine is delivered to pre-treater, and rock gas is carried out to preliminary purification, removes the impurity such as small solid particle wherein; Operating conditions by pressure meter, thermometer and flowmeter Real-Time Monitoring gas pipeline; Draw up by seabed the seawater come at first filter through filter simultaneously, pass through subsequently the aqueduct that delivers into of transfer pump, aqueduct arranges pressure meter equally, thermometer and flowmeter carry out the monitoring of operating mode, one dosing mouth is set after the flowmeter of aqueduct, adds hydrate formation promoter to promote that hydrate generates fast; Rock gas and seawater are through after the effect of air and liquid mixer, and both fully mix, and enter seabed, for the generation of hydrate is prepared;
(2) hydrate generates and the transportation step: the hydrate that enters seabed through rock gas and the seawater of gas-liquid mixed generates coil pipe, and in pipeline, temperature is 1-5 ℃, and manifold pressure is 3-8MPa, generates hydrate crystal; Hydrate crystal enters pipe-line transportation system after generating, and cyclone has been set in pipe-line transportation system, and the hydrate slurry is rotated in the transportation of submarine pipeline, and the velocity in pipes of hydrate slurry is 1.0~3.5m/s;
(3) hydrate separation and decomposition step: the hydrate slurry that contains free water enters knockout drum after transporting disembarkation by pipeline through screw pump; After the hydrate slurry that contains free water is separated in knockout drum, free water directly enters sea by drain opening; Isolated hydrate slurry adopts resolution process method and/or separating treatment method to process:
The resolution process method: by knockout drum carry come remove free water hydrate slurry, through spiral shell pressure type water separator, further dewater, isolated water enters sea through drain opening; Then enter the decomposition tank through screw pump, the hydrate slurry progressively resolves into rock gas in decomposing tank, one deck isolation net is set in tank, block hydrate is retained on isolation net, at the bottom of the clastic hydrate is fallen tank, a Jet injector is set in pipe, recycle by water transport pump the fresh water that decomposition of hydrate obtains, and fresh water is introduced to Jet injector, Jet injector guarantees the clastic hydrate persistent movement at the bottom of tank, to improve the decomposition rate of hydrate; The fresh water decomposited is transferred in water storage tank; Cold energy in the process of decomposition of hydrate is recycled by heat-exchanger rig; The natural gas via overcompression machine input gas holder obtained at the decomposition tank stores in gas holder; Natural gas via in gas holder is inputted cyclone separator by compressor, and the moisture in rock gas is further separated, and then input processing device, in treatment device, rock gas is carried out to purified treatment, removes SO 2, CO 2deng gas, make rock gas meet the outer defeated standard of pipeline, enter multi-purpose station pipeline finally by the overcompression machine;
The hydrate separation method: by knockout drum carry come remove free water hydrate slurry, through spiral shell pressure type water separator, further dewater, the water that sub-argument goes out enters sea through drain opening; The hydrate slurry enters the hydrate forming unit through screw pump, under the cryogenic high pressure condition, makes the hydrate slurry generate gradually hydrate brick or hydrate ball in mould, thereby obtains hydrate solids;
In each step, the data that obtain in pressure meter, thermometer, flowmeter are all inputted computer data acquisition system and are carried out Treatment Analysis, guarantee the normal operation of whole system.
In order further to improve decomposition rate, a dosing mouth can be set before water transport pump, the decomposition situation according to hydrate, add hydrate inhibitor in right amount, improves decomposition rate.
The present invention also discloses a kind of gas hydrate pipe conveying equipment, comprises gas collection unit, hydrate generation and delivery unit, hydrate separation and three parts of resolving cell; Wherein:
The gas collection unit, comprise computer data acquiring device 1, gas-entered passageway and intake tunnel, intake tunnel is by seawer inlet pipeline 11, filter 2, transfer pump 3, pressure meter 4, thermometer 5, flowmeter 6, dosing mouth 7 forms, gas-entered passageway is by Imported gas pipeline 8, compressor 9, rock gas pre-treater 10, pressure meter 12, thermometer 13, flowmeter 14 forms, and gas-entered passageway and intake tunnel meet at air and liquid mixer 15; The computer data acquiring device is by being arranged on pressure meter, thermometer, the flowmeter Real-Time Monitoring operating conditions on gas-entered passageway and intake tunnel;
Hydrate generates and delivery unit, comprise and generate coil pipe import 21, hydrate generation coil pipe 20 hydrate slurry conveyance conduits 19 and play the passage that cyclone 22 connects and composes successively, hydrate generates coil pipe and is provided with pressure meter 17, thermometer 18, one computer data acquiring devices 16 are by pressure meter, thermometer Real-Time Monitoring operating conditions; Generate the input end that the coil pipe import is this unit, be connected with the output terminal of air and liquid mixer in the gas collection unit by pipeline; Play the output terminal that spinning is set to this unit, be connected with the screw pump of hydrate separation and resolving cell input end by pipeline;
The decomposition of hydrate unit, comprise the first screw pump 34, knockout drum 35, spiral shell pressure type water separator 38, the second screw pumps 39 that are communicated with successively, decompose tank 40, decompose tank and be provided with heat-exchanger rig 41, decompose pot bottom one Jet injector 42 is set, Jet injector water transport pump, the water storage tank 45 outer with decomposing tank is connected; The top of decomposing tank is connected with the first compressor 46, gas holder 47 second compressors 48, cyclone separator 49, treatment device 50 the 3rd compressor 51 successively; Pressure meter, thermometer are installed with pressure and temperature in the monitoring tank on knockout drum, decomposition tank and gas holder; Computer data acquisition system (55) is carried out Treatment Analysis by pressure meter and thermometer image data, guarantees the normal operation of whole system;
Hydrate separation unit: comprise the first screw pump 34, knockout drum 35, spiral shell pressure type water separator 52, the three screw pumps 53 and the hydrate forming unit 54 that are communicated with successively, pressure meter, thermometer are installed with pressure and temperature in the monitoring tank on knockout drum; Computer data acquisition system 55 is carried out Treatment Analysis by pressure meter and thermometer image data, guarantees the normal operation of whole system.
In the present invention, also a dosing mouth can be set before water transport pump in the decomposition of hydrate unit.
Pipe-line transportation system has designed two kinds and has played cyclone, but is not limited to this.Play cyclone for the first, as Fig. 4, comprise conduit entrance 23, spiral hole 24, play coil road 25, flange 26 and pipe outlet 27; For playing coil 25, it is comprised of 3-6 the less pipe of internal diameter, and the size of internal diameter is relevant with the number that plays coil, and playing coil is 5-20 ° with axial angle.The coil road that rises of conduit entrance 21 and pipe outlet carries out circulating and being connected clockwise or counterclockwise, is the equal of several strands of jets, and the hydrate slurry is rotated in the transportation of submarine pipeline; Play cyclone for the second, comprise conduit entrance 28, spiral hole 29, dumping-guiding plate 30, flange 31 and pipe outlet 32 etc.; For dumping-guiding plate 30, it is arranged on the wall of pipe interior, and its long limit and tube wall are fixedly linked, and minor face radially points to conduit axis, and bond length is dumping-guiding plate height h, and scope is 20-50mm.Dumping-guiding plate is uniformly distributed at pipe interior, enter flow resistance and guarantee uniform inflow for reducing dumping-guiding plate, the dumping-guiding plate front portion is the straight section of 10-50cm, evenly be twisted into subsequently certain cornerite a, the scope of cornerite is 5 °-30 °, and for reducing resistance, the dumping-guiding plate leading edge is frustrated into obtuse, for avoiding streaming, the dumping-guiding plate trailing edge is processed into wing.When dumping-guiding plate is installed with etc. arc length or wait central angle evenly to be fixed on tube wall, the number that dumping-guiding plate is installed is that 3-9 is individual.For two kinds above cyclone, every kind of length that plays cyclone is 4-12m, spacing 100-5000m.Two kinds are played cyclone and can select according to actual conditions.The local existence that plays spigot can prevent the deposition of hydrate in course of conveying, can improve again formation speed and the conveying efficiency of hydrate.
About the hydrate delivery unit, employing be the compound mode of monolayer steel pipe and anticorrosive coat.The velocity in pipes of hydrate slurry is 1.0~3.5m/s.Scribble one deck anticorrosive coat in the outside of steel pipe, to prevent the erosion of seabed particular surroundings to pipeline.
Figure 2012104585918100002DEST_PATH_IMAGE002
Remarkable advantage of the present invention is in the following aspects:
(1) spiral pipeline gas hydrate delivery method has been abolished the chemical product such as interpolation inhibitor, polymerization inhibitor, has avoided line clogging fully, has improved natural gas transportation Security and Economy.Carry and increase economic efficiency 20-30% than conventional natural gas pipelines.
(2) invented coil pipe type hydrate and generating apparatus, and utilized the low temperature environment in seabed to generate hydrate, guaranteed that gas hydrate generates continuously.
(3) invent hydrate and directly be decomposed into rock gas or isolate two kinds of land handlings of solid hydrate, met the conveying requirement that market for natural gas is different.
(4) invent two kinds of parts and played cyclone, prevented the deposition of hydrate in course of conveying, strengthened the system heat exchange efficiency, improved the formation speed of hydrate.
(5) water gone out by seawater generation decomposition of hydrate is fresh water, and water is precious resources, has therefore improved system synthesis efficiency.
The accompanying drawing explanation
Fig. 1 gas hydrate pipeline transportation process flow process.
Fig. 2 gas collection unit.
Fig. 3 hydrate generates and delivery unit.
Fig. 4 plays cyclone 1.
Fig. 5 plays cyclone 2.
Fig. 6 hydrate separation and resolving cell.
Embodiment
Below in conjunction with the drawings and specific embodiments, content of the present invention is further described in detail:
The present invention is gas hydrate applied pipeline transportation method and equipment, as shown in Figure 1, comprises the gas collection unit, three parts of hydrate generation and delivery unit and hydrate separation and resolving cell.
About the gas collection unit, as Fig. 2, comprise computer data acquiring device 1, filter 2, transfer pump 3, pressure meter 4, thermometer 5, flowmeter 6, dosing mouth 7, Imported gas pipeline 8, compressor 9, pre-treater 10, seawer inlet pipeline 11, pressure agent 12, temperature agent 13, flowmeter 14 and air and liquid mixer 15 etc.; Rock gas out is delivered to pre-treater 10 through compressor 9 by offshore drilling platform from the seabed gas-field exploitation, and rock gas is carried out to preliminary purification, removes the impurity such as small solid particle wherein; Operating conditions in pressure agent and temperature agent monitoring gas pipeline, its instantaneous flow of flowmeter survey and integrated flux; Then enter air and liquid mixer 15.Draw up by seabed the seawater come at first filter through filter 2 simultaneously, pass through subsequently the aqueduct that delivers into of transfer pump 3, aqueduct arranges pressure meter 4 equally, thermometer 5 and flowmeter 6 carry out the monitoring of operating mode, in order further to promote that hydrate generates fast, one dosing mouth 7 is set after flowmeter, adds hydrate formation promoter.Rock gas and seawater are through after the effect of air and liquid mixer 15, and both fully mix, and enter seabed, for the generation of hydrate is prepared.
Generate and delivery unit about hydrate, as Fig. 3, comprise computer data acquiring device 16, pressure meter 17, thermometer 18, hydrate slurry conveyance conduit 19, hydrate generates coil pipe 20, generates coil pipe import 21, plays cyclone 22 etc.; The generation of hydrate needs natural G&W, and be in the condition of high pressure low temperature, at first the environment in seabed can provide hydrate to generate needed temperature, and pressure when rock gas out enters conveyance conduit by offshore drilling platform from the seabed gas-field exploitation in addition can provide pressure condition.Keep temperature in pipeline to be about 3 ℃, manifold pressure is about 5MPa.The generation that is designed to hydrate that hydrate generates coil pipe provides guarantee, the caliber of coil pipe is identical with conveyance conduit, is the generation unit formed by continuous bending, and every segment length is 10-20m, the coil pipe total length to the land distance, is generally 100-300m depending on concrete offshore platform.Hydrate is delivered to pipe-line transportation system to realize the transportation of rock gas by high-pressure delivery pump by hydrate after generating.The hydrate delivery unit adopts the second to play cyclone, as Fig. 5, comprises conduit entrance 28, spiral hole 29, dumping-guiding plate 30, flange 31 and pipe outlet 32 etc.; For dumping-guiding plate 30, it is arranged on the wall of pipe interior, and its long limit and tube wall are fixedly linked, and minor face radially points to conduit axis, and bond length is dumping-guiding plate height h, is 25mm.Dumping-guiding plate is uniformly distributed at pipe interior, enter flow resistance and guarantee uniform inflow for reducing dumping-guiding plate, the dumping-guiding plate front portion is the straight section of 40cm, evenly be twisted into subsequently certain cornerite a, the scope of cornerite is 5 °, and for reducing resistance, the dumping-guiding plate leading edge is frustrated into obtuse, for avoiding streaming, the dumping-guiding plate trailing edge is processed into wing.When dumping-guiding plate is installed with etc. arc length or etc. central angle evenly be fixed on tube wall, 6 dumping-guiding plates are installed.The length that plays cyclone is 6m, spacing 120m.The local existence that plays spigot can prevent the deposition of hydrate in course of conveying, can improve again formation speed and the conveying efficiency of hydrate.About the hydrate delivery unit, employing be the compound mode of monolayer steel pipe and anticorrosive coat.For steel pipe, thickness is 10mm, and internal diameter is 460mm, and material is 16Mn, for delivery of hydrate.The mean velocity of setting in hydrate slurry pipe is 2m/s, within 1 year, according to 360 days, calculates, and a year conveying hydrate slurry scale of construction is 1.03 * 10 7m 3.There is anticorrosive coat outside at steel pipe, to prevent the erosion of seabed particular surroundings to pipeline.
About hydrate separation and resolving cell, as Fig. 6, the hydrate slurry that contains free water enters knockout drum 35 after serving bank by pipeline through screw pump fortune 34, and knockout drum is equipped with thermometer 36 and pressure meter 37, is used for detecting temperature and the pressure of tank inside.After the hydrate slurry that contains free water is separated in knockout drum, free water directly enters sea by drain opening 33.Isolated hydrate slurry has two kinds of processing schemes: resolution process method and separating treatment method.For the decomposition of hydrate unit, comprise spiral shell pressure type water separator 38, screw pump 39, decompose tank 40, heat-exchanger rig 41, Jet injector 42, water transport pump 43, dosing mouth 44, water storage tank 45, compressor 46, gas holder 47, compressor 48, cyclone separator 49, treatment device 50 and compressor 51 etc.By knockout drum 35 carry come remove free water hydrate slurry, through further dehydration of spiral shell pressure type water separator 38, isolated water enters sea through drain opening 33; Then enter and decompose tank 40 through screw pump 39, the hydrate slurry progressively resolves into rock gas in decomposing tank, one deck isolation net is set in tank, block hydrate is retained on isolation net, at the bottom of the clastic hydrate is fallen tank, a Jet injector 42 is set in pipe, recycle by water transport pump 43 fresh water that decomposition of hydrate obtains, and fresh water is introduced to Jet injector 42, Jet injector 42 guarantees the clastic hydrate persistent movement at the bottom of tank, to improve the decomposition rate of hydrate.Be further to improve the decomposition rate of hydrate in addition, a dosing mouth 44 is set before water transport pump 43, the decomposition situation according to hydrate, add the hydrate inhibitors such as alcohols in right amount, further improves decomposition rate.Unnecessary fresh water is transferred in water storage tank 45.Owing in the process of decomposition of hydrate, can absorbing a large amount of heats, this part cold energy is recycled by heat-exchanger rig 41, outer air enters heat-exchanger rig 41 by the coil pipe import, hydrate absorbs a large amount of heat in decomposition process, the outer air temperature is reduced, then by outer defeated being used of coil pipe outlet.The natural gas via overcompression machine 46 input gas holder 47 that obtain in decomposing tank 40 store in gas holder, and gas holder is equipped with pressure meter and thermometer to supervise at any time
Survey pressure and temperature in tank, can safe operation with assurance equipment.Natural gas via in gas holder 47, by compressor 48 input cyclone separators 49, is further separated the moisture in rock gas, and then input processing device 50, in treatment device, rock gas is carried out to purified treatment, removes SO 2, CO 2deng gas, make rock gas meet the outer defeated standard of pipeline, enter multi-purpose station pipeline finally by overcompression machine 51.
For the hydrate separation unit, comprise spiral shell pressure type water separator 52, screw pump 53 and " hydrate moulding " install 54 etc., by knockout drum 35 carry come remove free water hydrate slurry, through further dehydration of spiral shell pressure type water separator 52, isolated water enters sea through drain opening; Then enter " hydrate moulding " through screw pump 53 and install 54, " hydrate moulding " installs 54 environment that maintain cryogenic high pressure, make the hydrate slurry generate gradually " hydrate brick " or " hydrate ball " in mould, obtain hydrate solids, by the means of transportation such as hydrate transport vehicle transportations, in this kind of method situation for the user that there is no land gas pipeline or less gas consumption.Finally, from knockout drum 35, decompose the data input computer data acquisition system 55 obtained in tank 40 and the pressure meter above gas holder 47 and thermometer and carry out analysing and processing, guarantee the normal operation of whole system.
This system running is as follows: by the gas collection unit, from the seabed gas-field exploitation, rock gas out enters hydrate by pipeline and generates coil pipe, the environment in seabed provides the condition of temperature, recovery pressure provides pressure condition, high-pressure service pump is squeezed into seawater in pipe water condition is provided, generate through hydrate after coil pipe, carry by high-pressure delivery pump.In the process of carrying, play cyclone hydrate liquid form with similar spiral flow in pipeline is travelled forward, promote the further generation of hydrate, prevented the deposition of hydrate, improve the hydrate transfer efficiency; After hydrate is carried disembarkation by the hydrate delivery unit, enter hydrate separation and resolving cell, at first pass through knockout drum, free water is separated, obtain comparatively dry hydrate slurry.Gas pipeline is arranged if land and be larger consumption, hydrate enters decomposing unit, after hydrate enters and decomposes tank, at first the rock gas decomposed inputs land gas pipeline by compressor, and the fresh water that the hydrate generated by seawater and rock gas obtains after decomposing, in the input water storage tank.Can absorb a large amount of heat in the process of decomposition of hydrate, this part cold energy is recycled by heat-exchanger rig, puies forward high-octane utilization ratio.If do not have in user's the situation of land gas pipeline or less gas consumption, hydrate enters " hydrate moulding " device, the hydrate slurry generates gradually " hydrate brick " in mould, obtains hydrate solids, by means of transportation such as hydrate transport vehicles, is transported; Operating mode should be controlled in the conduit running process stable, mutually the superpose generation of the worst case that causes of multiple fluctuating factor need to be prevented; For preventing the too high and too low generation hydrate solids of temperature of overpressure, should as the case may be, add appropriate anti polymerizer to guarantee the safe transport of hydrate slurry in pipe.

Claims (6)

1. a gas hydrate delivery method, comprise the steps:
(1) gas collection step: natural gas via overcompression machine is delivered to pre-treater, and rock gas is carried out to preliminary purification, removes small solid particle polluter wherein; Operating conditions by pressure meter, thermometer and flowmeter Real-Time Monitoring gas pipeline; Draw up by seabed the seawater come at first filter through filter simultaneously, pass through subsequently the aqueduct that delivers into of transfer pump, aqueduct arranges pressure meter equally, thermometer and flowmeter carry out the monitoring of operating mode, one dosing mouth is set after the flowmeter of aqueduct, adds hydrate formation promoter to promote that hydrate generates fast; Rock gas and seawater are through after the effect of air and liquid mixer, and both fully mix, and enter seabed, for the generation of hydrate is prepared;
(2) hydrate generates and the transportation step: the hydrate that enters seabed through rock gas and the seawater of gas-liquid mixed generates coil pipe, and in pipeline, temperature is 1-5 ℃, and manifold pressure is 3-8MPa, generates hydrate crystal; Hydrate crystal enters pipe-line transportation system after generating, and cyclone has been set in pipe-line transportation system, and the hydrate slurry is rotated in the transportation of submarine pipeline, and the velocity in pipes of hydrate slurry is 1.0~3.5m/s;
(3) hydrate separation and decomposition step: the hydrate slurry that contains free water enters knockout drum after transporting disembarkation by pipeline through screw pump; After the hydrate slurry that contains free water is separated in knockout drum, free water directly enters sea by drain opening; Isolated hydrate slurry adopts resolution process method and/or separating treatment method to process:
The resolution process method: carried the hydrate slurry of removing free water of coming by knockout drum, further dewater through spiral shell pressure type water separator, isolated water enters sea through drain opening; Then enter the decomposition tank through screw pump, the hydrate slurry progressively resolves into rock gas in decomposing tank, one deck isolation net is set in tank, block hydrate is retained on isolation net, at the bottom of the clastic hydrate is fallen tank, a Jet injector is set in pipe, recycle by water transport pump the fresh water that decomposition of hydrate obtains, and fresh water is introduced to Jet injector, Jet injector guarantees the clastic hydrate persistent movement at the bottom of tank, to improve the decomposition rate of hydrate; The fresh water decomposited is transferred in water storage tank; Cold energy in the process of decomposition of hydrate is recycled by heat-exchanger rig; The natural gas via overcompression machine input gas holder obtained at the decomposition tank stores in gas holder; Natural gas via in gas holder is inputted cyclone separator by compressor, and the moisture in rock gas is further separated, and then input processing device, in treatment device, rock gas is carried out to purified treatment, removes SO 2, CO 2gas, make rock gas meet the outer defeated standard of pipeline, finally by the overcompression machine, enters multi-purpose station pipeline;
The hydrate separation method: carried the hydrate slurry of removing free water of coming by knockout drum, further dewater through spiral shell pressure type water separator, the water that sub-argument goes out enters sea through drain opening; The hydrate slurry enters the hydrate forming unit through screw pump, under the cryogenic high pressure condition, makes the hydrate slurry generate gradually hydrate brick or hydrate ball in mould, thereby obtains hydrate solids;
In each step, the data that obtain in pressure meter and thermometer are all inputted computer data acquisition system and are carried out Treatment Analysis, guarantee the normal operation of whole system.
2. method according to claim 1, is characterized in that, in described resolution process method step, a dosing mouth is set before water transport pump, and the decomposition situation according to hydrate, add hydrate inhibitor in right amount, improves decomposition rate.
3. a gas hydrate pipe conveying equipment, comprise gas collection unit, hydrate generation and delivery unit, hydrate separation and three parts of resolving cell; Wherein:
The gas collection unit, comprise computer data acquiring device (1), gas-entered passageway and intake tunnel, intake tunnel is by seawer inlet pipeline (11), filter (2), transfer pump (3), pressure meter (4), thermometer (5), flowmeter (6), dosing mouth (7) forms, gas-entered passageway is by Imported gas pipeline (8), compressor (9), rock gas pre-treater (10), pressure meter (12), thermometer (13), flowmeter (14) forms, and gas-entered passageway and intake tunnel meet at air and liquid mixer (15); The computer data acquiring device is by being arranged on pressure meter, thermometer, the flowmeter Real-Time Monitoring operating conditions on gas-entered passageway and intake tunnel;
Hydrate generates and delivery unit, comprise and generate coil pipe import (21), hydrate generation coil pipe (20) hydrate slurry conveyance conduit (19) and play the passage that cyclone (22) connects and composes successively, hydrate generates coil pipe and is provided with pressure meter (17), thermometer (18), a computer data acquiring device (16) is by pressure meter, thermometer Real-Time Monitoring operating conditions; Generate the input end that the coil pipe import is this unit, be connected with the output terminal of air and liquid mixer in the gas collection unit by pipeline; Play the output terminal that spinning is set to this unit, be connected with the screw pump of hydrate separation and resolving cell input end by pipeline;
The decomposition of hydrate unit, comprise the first screw pump (34), knockout drum (35), the spiral shell pressure type water separator (38) that are communicated with successively, the second screw pump (39), decompose tank (40), decompose tank (40) and be provided with heat-exchanger rig (41), decompose tank (40) bottom one Jet injector (42) is set, Jet injector water transport pump, the water storage tank (45) outer with decomposing tank is connected; The top of decomposing tank is connected with the first compressor (46), gas holder (47) second compressors (48), cyclone separator (49), treatment device (50) the 3rd compressor (51) successively; Pressure meter, thermometer are installed with pressure and temperature in the monitoring tank on knockout drum, decomposition tank and gas holder; Computer data acquisition system (55) is carried out Treatment Analysis by pressure meter and thermometer image data, guarantees the normal operation of whole system;
Hydrate separation unit: comprise the first screw pump (34), knockout drum (35), the spiral shell pressure type water separator (52) that are communicated with successively, three screw pump (53) and hydrate forming unit (54), be equipped with pressure meter, thermometer with pressure and temperature in the monitoring tank on knockout drum; Computer data acquisition system (55) is carried out Treatment Analysis by pressure meter and thermometer image data, guarantees the normal operation of whole system.
4. equipment according to claim 3, is characterized in that, a dosing mouth is set before water transport pump in the decomposition of hydrate unit.
5. equipment according to claim 3, is characterized in that, described cyclone comprises conduit entrance (23), spiral hole (24), plays coil road (25), flange (26) and pipe outlet (27); Play coil (25) and be comprised of 3-6 the less pipe of internal diameter, playing coil is 5-20 ° with axial angle.
6. equipment according to claim 3, is characterized in that, described cyclone comprises conduit entrance (28), spiral hole (29), dumping-guiding plate (30), flange (31) and pipe outlet (32), for dumping-guiding plate (30), it is arranged on the wall of pipe interior, its long limit and tube wall are fixedly linked, minor face radially points to conduit axis, bond length is dumping-guiding plate height h, scope is 20-50mm, dumping-guiding plate is uniformly distributed at pipe interior, enter flow resistance and guarantee uniform inflow for reducing dumping-guiding plate, the dumping-guiding plate front portion is the straight section of 10-50cm, evenly be twisted into subsequently certain cornerite a, the scope of cornerite is 5 °-30 °, for reducing resistance, the dumping-guiding plate leading edge is frustrated into obtuse, for avoiding streaming, the dumping-guiding plate trailing edge is processed into wing, when dumping-guiding plate is installed with etc. arc length or etc. central angle evenly be fixed on tube wall, the number that dumping-guiding plate is installed is 3-9.
CN 201210458591 2012-11-15 2012-11-15 Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device Active CN102927442B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210458591 CN102927442B (en) 2012-11-15 2012-11-15 Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210458591 CN102927442B (en) 2012-11-15 2012-11-15 Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device

Publications (2)

Publication Number Publication Date
CN102927442A CN102927442A (en) 2013-02-13
CN102927442B true CN102927442B (en) 2013-12-18

Family

ID=47642315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210458591 Active CN102927442B (en) 2012-11-15 2012-11-15 Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device

Country Status (1)

Country Link
CN (1) CN102927442B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104843705A (en) * 2015-04-10 2015-08-19 常州大学 Device for hydrate method recovery and reutilization of carbon dioxide

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103254956B (en) * 2013-05-06 2014-10-29 常州大学 Device for recycling vent natural gas by hydrate method
CN103672403B (en) * 2013-11-18 2016-01-27 常州大学 A kind of gas hydrate storage and transportation apparatus
CN103991985A (en) * 2014-05-28 2014-08-20 常州大学 Hydrate-process seawater desalting device utilizing LNG (liquefied natural gas) gasifying cold energy and hydrate-process seawater desalting method utilizing LNG gasifying cold energy
CN107543009B (en) * 2017-09-26 2019-10-11 常州大学 A kind of gas pipeline hydrate particle separator
CN109772826B (en) * 2019-03-15 2021-07-27 常州大学 Pipe cleaner special for removing blockage of natural gas pipeline hydrate
CN110345384B (en) * 2019-08-20 2024-03-26 西南石油大学 Shale gas hydrate slurry rapid transferring and unloading device and method
CN111707801B (en) * 2020-06-30 2022-08-16 中国海洋石油集团有限公司 Device and method for testing generation of natural gas hydrate under simulated flow state
CN114186169B (en) * 2021-11-26 2023-12-12 西南石油大学 Natural gas gathering and transportation pipeline transportation efficiency evaluation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818088A (en) * 2009-12-15 2010-09-01 江苏工业学院 Efficient continuous preparation method and device for natural gas hydrate
CN102269322A (en) * 2011-01-20 2011-12-07 于雅群 Hydrate collecting and packing equipment
CN102345791A (en) * 2011-10-09 2012-02-08 常州大学 Gas-liquid two-phase helical flow generating device in pipeline
CN102392646A (en) * 2011-12-07 2012-03-28 常州大学 Marine gas hydrate electronic-spraying pump composite exploitation method and apparatus

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0424387D0 (en) * 2004-11-04 2004-12-08 Univ Heriot Watt Novel hydrate based systems

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818088A (en) * 2009-12-15 2010-09-01 江苏工业学院 Efficient continuous preparation method and device for natural gas hydrate
CN102269322A (en) * 2011-01-20 2011-12-07 于雅群 Hydrate collecting and packing equipment
CN102345791A (en) * 2011-10-09 2012-02-08 常州大学 Gas-liquid two-phase helical flow generating device in pipeline
CN102392646A (en) * 2011-12-07 2012-03-28 常州大学 Marine gas hydrate electronic-spraying pump composite exploitation method and apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104843705A (en) * 2015-04-10 2015-08-19 常州大学 Device for hydrate method recovery and reutilization of carbon dioxide
CN104843705B (en) * 2015-04-10 2017-06-06 常州大学 A kind of hydrate reclaims carbon dioxide and the device recycled to it

Also Published As

Publication number Publication date
CN102927442A (en) 2013-02-13

Similar Documents

Publication Publication Date Title
CN102927442B (en) Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device
US10786780B2 (en) Method and system for lowering the water dew point of a hydrocarbon fluid stream subsea
CN104812876B (en) Gas dewatering and liquid from the combination of well stream inhibit
CN103864243B (en) Two-stage sea water desalination method based on hydration and two-stage sea water desalination device based on hydration
RU2618783C2 (en) Multiphase flow separation system
CN104496753A (en) Ethylene glycol desalination and dehydration regeneration process suitable for offshore gas field development
WO2015018945A2 (en) Subsea well stream treatment
CN106884627A (en) A kind of sea bed gas hydrate quarrying apparatus
CN102174991B (en) Updip entrance double-layer tubular slug flow catcher
CN105065908A (en) Sulfur-contained natural gas collection integrated device
CN204534129U (en) A kind of device of anti-frozen block
CN103233233B (en) Method and process for preventing subsea oil-water hybrid delivery pipe corrosion
CN110345384A (en) A kind of shale gas hydrate slurry rapid transport discharge mechanism and method
CN203640686U (en) Compression expansion separation heating system with vortex tube throttle valve for high-hydrogen-sulfide-content natural gas
CN102337877A (en) Mining system for marginal oil field with marine heavy oil and method
CN202844614U (en) Desalting flash tank containing easily soluble monovalent salt ethylene glycol
CN203743848U (en) Gathering and transportation system
CN105257985A (en) Natural gas hydrate pipeline transportation method and device
CN206111115U (en) Coiled tubing underbalance sand washing device
CN210396709U (en) Natural gas hydrate underwater production system based on fluidization exploitation
CN104525533A (en) Scale removing process for digital pressurizing pry of oilfield
CN204852927U (en) Pipe -line transportation gas hydrate device
CN106753632A (en) A kind of small-sized well head natural gas purification method of purification and device
CN104595720A (en) Freezing blockage preventing device
CN202000987U (en) Sewage separately discharging and storing device for gas gathering station of oil and gas field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191216

Address after: 213311 building 7, No. 8-2, Dutou street, Daitou Town, Liyang, Changzhou City, Jiangsu Province

Patentee after: Liyang Chang Technology Transfer Center Co., Ltd.

Address before: 213164 Jiangsu Province, Changzhou city Wujin District Gehu Lake Road No. 1

Patentee before: Changzhou University

TR01 Transfer of patent right