CN110345384A - A kind of shale gas hydrate slurry rapid transport discharge mechanism and method - Google Patents

A kind of shale gas hydrate slurry rapid transport discharge mechanism and method Download PDF

Info

Publication number
CN110345384A
CN110345384A CN201910769263.1A CN201910769263A CN110345384A CN 110345384 A CN110345384 A CN 110345384A CN 201910769263 A CN201910769263 A CN 201910769263A CN 110345384 A CN110345384 A CN 110345384A
Authority
CN
China
Prior art keywords
slurries
hydrate slurry
storage tank
vehicle
fluid reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910769263.1A
Other languages
Chinese (zh)
Other versions
CN110345384B (en
Inventor
刘武
郭琴
孟良
任魁杰
鲁玉婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201910769263.1A priority Critical patent/CN110345384B/en
Publication of CN110345384A publication Critical patent/CN110345384A/en
Application granted granted Critical
Publication of CN110345384B publication Critical patent/CN110345384B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D36/00Filter circuits or combinations of filters with other separating devices
    • B01D36/04Combinations of filters with settling tanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D36/00Filter circuits or combinations of filters with other separating devices
    • B01D36/04Combinations of filters with settling tanks
    • B01D36/045Combination of filters with centrifugal separation devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects
    • B60P3/22Tank vehicles
    • B60P3/224Tank vehicles comprising auxiliary devices, e.g. for unloading or level indicating
    • B60P3/2245Adaptations for loading or unloading
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects
    • B60P3/22Tank vehicles
    • B60P3/2295Means for heating, cooling, or insulating tanks or equipments
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/08Pipe-line systems for liquids or viscous products
    • F17D1/14Conveying liquids or viscous products by pumping

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Transportation (AREA)
  • Water Supply & Treatment (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention relates to a kind of shale gas hydrate slurry rapid transport discharge mechanism and methods, belong to gas hydrates storaging and transport technology field.Hydrate slurry liquid/gas separator is designed, separation upper section installs rotating wheel, and helical flow path is arranged in middle section, and the first fluid reservoir and slurries separation chamber is arranged in lower section, carries out the thickening of hydrate slurry fluid dewatering;Slurries tank car installs slurries vehicle-mounted storage tank, and mating urgent gasification system, safety instrumented systems are, it can be achieved that hydrate slurry safe storage and rapid transport;Air temperature type vaporizer, electric heating carburetor are installed in tank car chassis, set immersed pump in storage tank, in conjunction with mating pipe-line system, form four kinds of hydrate slurry fast discharging techniques.The present invention provides a kind of shale gas hydrate slurry rapid transport discharging method, slurries enter dewatering slurries separator along a tangential direction, through centrifugation, settle, be separated by filtration after in the storage of slurries vehicle-mounted storage tank and rapid transport is to user terminal, enter pipeline network of fuel gas in city after unloading by corresponding unloading process.

Description

A kind of shale gas hydrate slurry rapid transport discharge mechanism and method
Technical field
The present invention relates to a kind of shale gas hydrate slurry rapid transport discharge mechanism and methods, belong to gas hydrates Technical field of transportation.
Background technique
Shale gas refers to preservation in rich organic matter mud shale and its interlayer, with absorption or free state for the side of being primarily present The Unconventional gas of formula, main component are methane.Shale gas field gathering and transferring process are as follows: shale gas well is transported to by flow line The well site Duo Jing, after pretreatment, apart from gas gathering station, well group is connected with gas collection main line by gas collection branch line farther out, transports to gas collection It stands and carries out final process, be then directly entered gas gathering station apart from the closer well group of gas gathering station.
Since shale gas exploitation has fast producing initial stage pressure drop, stable yields low output, in spies such as periods of low pressure production time length Point, ground surface works also have the particularity and difficult point for being different from conventional gas field in planning and designing.For example, shale gas pipe network stores up " surface gathering and transferring design scale is difficult really " present in transportation technique, " reverse irrigation of low pressure individual well ", " it is steady that new access gas well influences pipe network operation It is qualitative ", " later period pressurization exploitation " the problems such as.
To avoid shale gas field gathering system in the different production phases from above-mentioned problem occur, gas hydrates can be passed through The collection of storaging and transport technology progress shale gas is defeated and handles.The technology is the technology of an emerging development in recent years, 1m3Hydrate storage 150~180m3Natural gas, core concept are that solid hydrate is formed under high pressure low temperature using water and natural gas, are utilized The self-shield effect property of hydrate, enables hydrate long term storage and transport under low-temperature atmosphere-pressure.Since the technology has simple process, Lower production costs, synthesis and storage and transportation technique do not need very harsh pressure and temperature condition, self good storage capacity, from The advantages that protective effect is strong and stability is high has it more relative to the storaging and transport technologies such as pipeline transportation, LNG, CNG, ANG excellent Gesture.
Patent " a kind of gas hydrate storage and transportation apparatus ", 201310579317.0, open 103672403 B of notification number CN, A kind of gas hydrates long distance delivery device persistently to freeze without external equipment and tie up pressure is provided, it is mountable in train and Long-distance dispatching is carried out on transport vehicle, but the device is externally provided with LNG set in hydrate storage chamber, hydrate storage and transportation technology needs and LNG Storaging and transport technology fit applications are transported with the storage for realizing gas hydrate, and the limitation of the application conditions of the technique is larger.
Patent " a kind of bulk gas hydrates storage and transportation apparatus ", 201820225880.6, open notification number CN 208041596 U develop a kind of blocky gas hydrates storage and transportation apparatus, with the haulagman such as train, cold-storage transporting automobile, ship Tool matches, and carries out long-distance transportation, realizes that the decomposition of solid-state hydrate and gas export by injection circulating hot water, but solid-state The thermal decomposition rate of hydrate is slower, and the required natural gas unloading time is longer.
At present for hydrate long range memory structure it is also very immature, however it remains many problems, such as be hydrated Object preparation need high pressure low temperature environment, hydrate reserves it is small, it is defeated apart from it is short, maintain hydrate generate low temperature environment it is at high cost, It is easily affected by the external environment, decomposition of hydrate needs additional heat injection etc..For solid-state hydrate, hydrate slurry preparation and Condition of storage readily satisfies, and can greatly reduce energy consumption, and hydrate slurry storage and transportation form economy is higher.Meanwhile natural gas Hydrate slurry has good mobility, and slurry transporting equipment is simple, avoids the inconvenience of natural gas solid-state hydrate handling transport.
For this purpose, we design a kind of hydrate slurry without external equipment refrigeration according to hydrate slurry condition of storage Storage device can be used for the gas hydrate slurry liquid conveying of long range, to avoid gas field gathering system due to shale gas yield A series of the problems such as decline rate is fast, ductwork pressure and yield contradictory relation and later period newly-increased production capacity are uncertain difficulties of bring Topic.
Summary of the invention
The purpose of the present invention is to provide a kind of shale gas hydrate slurry rapid transport discharge mechanism and method, from ensuring The height of hydrate slurry storage and transportation apparatus safe operation is set out, the generation of comprehensive analysis gas hydrate slurry liquid, condition of storage, Insecurity factor that may be present in the conveying of consideration device, transhipment and uninstall process, in conjunction with shale gas field surface gathering system Productive prospecting carries out the transhipment discharge mechanism design of shale gas hydrate slurry, for surface gathering system provide it is a kind of it is safe, low at This natural gas transports new way.
Present invention mainly solves following problems:
(1) hydrate slurry separative unit is designed, rotating wheel carries out hydrate slurry centrifugal dehydration with helical flow path and separates, First fluid reservoir carries out hydrate slurry sedimentation separation, and slurries separation chamber carries out hydrate slurry and is separated by filtration.
(2) slurries vehicle-mounted storage tank structure is designed, setting horizontal electrode heating plate, vertical heating plate carry out accident conditions in tank Urgent gasification process down realizes dehydration thickening rear slurry storage and transhipment in conjunction with the matched safety instrumented systems of slurries tank car.
(3) hydrate slurry fast discharging unit is designed, air temperature type vaporizer, electric heating carburetor is arranged in tank car chassis, Storage tank is equipped with immersed pump, and it is fast can to carry out hydrate slurry by four kinds of different gasification pressurization modes for the mating pipe-line system of control box Speed unloading.
(4) a kind of shale gas hydrate slurry rapid transport discharging method is designed, it is vehicle-mounted in slurries after dewatering slurries thickening It is stored in storage tank, conveys tank car rapid transport to gas point is used by slurries, starched using four kinds of processands that tank car carries Liquid is unloaded.
To achieve the goals above, technical scheme is as follows.
A kind of shale gas hydrate slurry rapid transport discharge mechanism, including hydrate slurry separative unit, slurry storage Transport unit, slurries fast discharging unit;
The hydrate slurry separative unit includes dewatering slurries separator 1, rotating wheel 2, helical flow path 3, the first liquid storage Room 4, slurries separation chamber 5, the first cooling water return pipe 6, the second cooling water return pipe 7, bracket 8;The slurry storage transshipment note Member includes headstock 9, tank car chassis 10, slurries vehicle-mounted storage tank 11, control box 12, urgent gasification system, safety instrumented systems, pipeline System;The slurries fast discharging unit includes air temperature type vaporizer 13, electric heating carburetor 14, immersed pump 15;
The dewatering slurries separator 1 is made of separation upper section, separation middle section, separation lower section, and inside is equipped with rotating wheel 2, helical flow path 3, the first fluid reservoir 4, slurries separation chamber 5, are mounted on slurries vehicle-mounted storage tank 11 by bracket 8, point From upper section be equipped with rotating wheel 2, the separation middle section be equipped with helical flow path 3, the separation lower section be equipped with the first fluid reservoir 4, Slurries separation chamber 5,4 lower part of the first fluid reservoir are equipped with the first cooling water return pipe 6,5 lower part of slurries separation chamber Equipped with the second cooling water return pipe 7, the headstock 9 is connect with tank car chassis 10, and 10 top of tank car chassis is equipped with slurries Vehicle-mounted storage tank 11, control box 12, lower part are equipped with air temperature type vaporizer 13, electric heating carburetor 14, the slurries vehicle-mounted storage tank 11 Inside is equipped with urgent gasification system, immersed pump 15, is equipped with safety instrumented systems, pipe-line system in the control box 12.
Further, the helical flow path 3 is the spiral pipe that a diameter is constant, internal diameter is gradually reduced, pipeline Wall surface is equipped with the aperture that several diameters are 1~3mm.
Further, the slurries separation chamber 5 is located inside fluid reservoir 4, what combination shape was combined with two Concentric cylinder is identical.
Further, the slurries separation chamber 5 is by slurries filtering table 16, the second fluid reservoir 17,18 structure of slurries delivery pipe At;
The slurries filtering table 16 is a hollow round table-like porous filter plate, is located at 17 top of the second fluid reservoir, Slurries delivery pipe 18 is set inside second fluid reservoir 17.
Further, the slurries vehicle-mounted storage tank 11 is the storage tank of an inner/outer tube double-layer structure, and interior cylinder material uses 0Cr18Ni9 austenitic stainless steel, outer cylinder material use Q345R low-alloy steel, and inner/outer tube backing material uses expoxy glass, every Hot mode is high vacuum multilayer insulation.
Further, the urgent gasification system includes conducting rod 19, insulator 20, horizontal heating plate 21, conductive plate 22, vertical heating plate 23;
The conducting rod 19 is equipped with insulator 20, connects at the top of horizontal heating plate 21, with slurries vehicle-mounted storage tank 11, described Conductive plate 22 be equipped with vertical heating plate 23, connect with 11 bottom of slurries vehicle-mounted storage tank.
A kind of shale gas hydrate slurry rapid transport discharging method, specifically includes following steps;
S1, centrifuge separation: hydrate slurry enters dewatering slurries separator 1 through slurries inlet tube with tangential direction, rotation 2 rotation of wheel, hydrate slurry enter helical flow path 3 after circular motion and are centrifuged, and drop passes through under the action of the centrifugal 3 wall surface aperture of helical flow path moves to 1 inner wall of dewatering slurries separator, after collecting at after small liquid stream enter the first fluid reservoir 4, water Polymer beads with do not separate drop along helical flow path 3 enter slurries separation chamber 5;
S2, be separated by filtration: in slurries separation chamber 5, hydrate particle with do not separate drop slurries filtering table 16 carry out It is separated by filtration, liquid stream enters the second fluid reservoir 17 through 16 aperture of slurries filtering table, and the hydrate particle after separation is conveyed through slurries Pipe 18 enters slurries vehicle-mounted storage tank 11;
S3, it settles, be separated by filtration: collecting into the hydrate particle carried secretly in the liquid stream of the first fluid reservoir 4 and be suspended in water Upper layer, as the time increases, water level is gradually increasing in the first fluid reservoir 4, after water level rises to 5 height of slurries separation chamber, Hydrate slurry enters slurries separation chamber 5 by overflow, and slurries vehicle-mounted storage tank is entered after slurries separation chamber 5 is separated by filtration 11;
S4, storage transhipment: hydrate slurry stores in slurries vehicle-mounted storage tank 11, and the water separated is through the first cooling water Return pipe 6, the second cooling water return pipe 7 are back to water tank and are recycled, and slurries vehicle-mounted storage tank 11 is completed will after loading Slurries are transported to downstream gas point, when emergency episode occurs, using the urgent gasification system being arranged in slurries vehicle-mounted storage tank 11 into The urgent unloading processing of row;
S5, fast discharging: make after being unloaded, being gasified by the unloading process that tank car carries with gas point for gas peak regulation With.
Further, unloading process described in step S5 includes that tank car carries the pressurization of immersed pump 15 unloading process, using sky Warm formula vaporizer 13 is pressed unloading process with electric heating carburetor 14 from pressure unloading process, using air temperature type vaporizer 13 certainly, is combined Formula unloading process;
The combined type unloading process is the combined type unloading work that immersed pump 15, air temperature type vaporizer 13 are carried using tank car Skill or the combined type unloading process that immersed pump 15, air temperature type vaporizer 13, electric heating carburetor 14 are carried using tank car.
Invention has the beneficial effects that:
(1) it is de- to carry out hydrate slurry for the modes such as centrifugation, filtering, sedimentation designed by hydrate slurry separative unit Water thickening, improves hydrate slurry concentration in vehicle-mounted storage tank, increases effective gas-storing capacity of hydrate slurry tank car.
(2) the urgent gasification structure of slurries vehicle-mounted storage tank is designed, horizontal electrode heating plate, vertical heating plate are set in tank, The Quick-gasifying processing of hydrate slurry under accident conditions can be achieved.
(3) the slurries vehicle-mounted storage tank of inner/outer tube double-layer structure is designed, interior cylinder material uses 0Cr18Ni9 austenitic stainless steel, Outer cylinder material uses Q345R low-alloy steel, and heat-insulated mode is high vacuum multilayer insulation, freezes without external equipment, can effectively keep away Exempt from slurry storage transport process to gasify, guarantees the safe storage of hydrate slurry.
(4) hydrate slurry tank car is unloaded equipped with air temperature type vaporization pressurization, electric heating vaporization pressurization is unloaded, immersed pump is pressurized It unloads and combined type is pressurized four kinds of included processands of unloading, lower according to the actual situation can carry out hydrate slurry Quick-unloading.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of shale gas hydrate slurry rapid transport discharge mechanism in the embodiment of the present invention.
Fig. 2 is that shale gas hydrate slurry rapid transport unloads flow diagram in the embodiment of the present invention.
Fig. 3 is the main view of dewatering slurries separator in the embodiment of the present invention.
Fig. 4 is dewatering slurries separator " A-A " view in the embodiment of the present invention.
Fig. 5 is the structural schematic diagram of slurries vehicle-mounted storage tank in the embodiment of the present invention.
Fig. 6 is the schematic diagram of the safety control system of slurries vehicle-mounted storage tank in the embodiment of the present invention.
Fig. 7 is the flow diagram of hydrate slurry processand in the embodiment of the present invention.
Specific embodiment
A specific embodiment of the invention is described with reference to the accompanying drawing, to better understand the present invention.
Embodiment
In the present embodiment, Fig. 1 is the structure of shale gas hydrate slurry rapid transport discharge mechanism in the embodiment of the present invention Schematic diagram, shale gas hydrate slurry rapid transport discharge mechanism include hydrate slurry separative unit, slurry storage transshipment note Member, slurries fast discharging unit;
The hydrate slurry separative unit includes dewatering slurries separator 1, rotating wheel 2, helical flow path 3, the first liquid storage Room 4, slurries separation chamber 5, the first cooling water return pipe 6, the second cooling water return pipe 7, bracket 8;The slurry storage transshipment note Member include headstock 9, tank car chassis 10, slurries vehicle-mounted storage tank 11, control box 12, urgent gasification system S1, safety instrumented systems S2, Pipe-line system S3;The slurries fast discharging unit includes air temperature type vaporizer 13, electric heating carburetor 14, immersed pump 15;
The dewatering slurries separator 1 is made of separation upper section, separation middle section, separation lower section, and inside is equipped with rotating wheel 2, helical flow path 3, the first fluid reservoir 4, slurries separation chamber 5, are mounted on slurries vehicle-mounted storage tank 11 by bracket 8, point From upper section be equipped with rotating wheel 2, the separation middle section be equipped with helical flow path 3, the separation lower section be equipped with the first fluid reservoir 4, Slurries separation chamber 5,4 lower part of the first fluid reservoir are equipped with the first cooling water return pipe 6,5 lower part of slurries separation chamber Equipped with the second cooling water return pipe 7, the headstock 9 is connect with tank car chassis 10, and 10 top of tank car chassis is equipped with slurries Vehicle-mounted storage tank 11, control box 12, lower part are equipped with air temperature type vaporizer 13, electric heating carburetor 14, the slurries vehicle-mounted storage tank 11 Inside is equipped with urgent gasification system S1, immersed pump 15, is equipped with safety instrumented systems S2, pipe-line system S3 in the control box 12.
Fig. 2 is that shale gas hydrate slurry rapid transport unloads flow diagram, shale gas hydration in the embodiment of the present invention Object slurries rapid synthesis process flow are as follows: shale gas well transports to well Cong Pingtai by flow line, is removed by desanding sled CSQ After sand processing, enter hydrate reactor after converging by gas collection header in the form of bubbling, water is pressurized latter portion in water tank CSG Point enter atomizing spray unit by first flow distributing valve V1 enters hydrate reactor in the form of water mist, and a part of water leads to Cross second flow distributing valve V2, the open/close states of third flow divider valve V3 are entered injection unit and entered water in a manner of water flow jet Close object reactor.Data acquisition module passes through data transmission module for system pressure, temperature, gas-liquid flow, valve opening state Etc. information be transmitted to data processing module, method is quickly closed according to shale gas hydrate slurry, carries out hydrate generating rate, life Calculated at amount, relevant parameter and calculated result is stored in data storage module, parameter control module hydrate reactor pressure, Temperature, degree of supercooling control quickly generate water when it meets hydration reaction condition, shale gas and water in hydrate reactor FYQ Object slurries are closed, and enter slurry tank vehicle CC, rapid transport after carrying out dewatering slurries thickening by hydrate slurry liquid/gas separator FLQ3 It to terminal gas point, is stored in after being unloaded by processand in storage tank CG, for urban pipe network peak regulation after vaporizer QHQ gasification It uses.
Fig. 3 is the main view of dewatering slurries separator in the embodiment of the present invention, and helical flow path 3 is in dewatering slurries separator The spiral pipe that one diameter is constant, internal diameter is gradually reduced, pipeline wall surface are equipped with the aperture that several diameters are 1~3mm.
Fig. 4 is dewatering slurries separator " A-A " view in the embodiment of the present invention.As shown in Figure 3, Figure 4, the slurries point It is located inside fluid reservoir 4 from room 5, slurries described in the identical of the concentric cylinder that combination shape is combined with two separate Room 5 is made of slurries filtering table 16, the second fluid reservoir 17, slurries delivery pipe 18, and the slurries filtering table 16 is one hollow Round table-like porous filter plate, be located at the top of the second fluid reservoir 17, slurries delivery pipe be set inside second fluid reservoir 17 18。
Fig. 5 is the structural schematic diagram of slurries vehicle-mounted storage tank in the embodiment of the present invention, and the slurries vehicle-mounted storage tank 11 is one The storage tank of a inner/outer tube double-layer structure, interior cylinder material use 0Cr18Ni9 austenitic stainless steel, and outer cylinder material uses the low conjunction of Q345R Jin Gang, inner/outer tube backing material use expoxy glass, and heat-insulated mode is high vacuum multilayer insulation.
The urgent gasification system includes conducting rod 19, insulator 20, horizontal heating plate 21, conductive plate 22, adds vertically Hot plate 23;The conducting rod 19 is equipped with insulator 20, connects at the top of horizontal heating plate 21, with slurries vehicle-mounted storage tank 11, described Conductive plate 22 be equipped with vertical heating plate 23, connect with 11 bottom of slurries vehicle-mounted storage tank.
Fig. 6 is the schematic diagram of the safety control system of slurries vehicle-mounted storage tank in the embodiment of the present invention, mainly includes into drain System, air inlet system and exhaust system, I&C system security system, evacuation system.Hydrate slurry by V1 valve, that V2 valve enters slurries is vehicle-mounted Storage tank, gas enters gas concentration unit by V4 valve, V5 valve in tank, and storage tank is arranged fluid level indicator and carries out slurry loading, if Inner canister pressure gauge is set, in favor of the situation of change of observed content device pressure at any time in driving process;It is provided at the top of storage tank One shell safe explosion-proof device S3;Storage tank valve one end arranges vacuum evacuation device VV and surveys full device MV, to operate and to examine It surveys;It unloads when operating, slurries enter after tank car carries vaporizer pr gasification through V6 valve returns to slurries vehicle-mounted storage tank, and pressure of storage tank increases Certain value is added to, slurries to V3 valve, V1 valve convey outward.The mounting device of system setting further includes S1, S2 safety on pipeline Bleeder valve and fire arrester D.
Fig. 7 is the flow diagram of hydrate slurry processand in the embodiment of the present invention, and shale gas hydrate slurry is fast Speed transhipment discharging method, specifically includes following steps;
S1, centrifuge separation: hydrate slurry enters dewatering slurries separator 1 through slurries inlet tube with tangential direction, rotation 2 rotation of wheel, hydrate slurry enter helical flow path 3 after circular motion and are centrifuged, and drop passes through under the action of the centrifugal 3 wall surface aperture of helical flow path moves to 1 inner wall of dewatering slurries separator, after collecting at after small liquid stream enter the first fluid reservoir 4, water Polymer beads with do not separate drop along helical flow path 3 enter slurries separation chamber 5;
S2, be separated by filtration: in slurries separation chamber 5, hydrate particle with do not separate drop slurries filtering table 16 carry out It is separated by filtration, liquid stream enters the second fluid reservoir 17 through 16 aperture of slurries filtering table, and the hydrate particle after separation is conveyed through slurries Pipe 18 enters slurries vehicle-mounted storage tank 11;
S3, it settles, be separated by filtration: collecting into the hydrate particle carried secretly in the liquid stream of the first fluid reservoir 4 and be suspended in water Upper layer, as the time increases, water level is gradually increasing in the first fluid reservoir 4, after water level rises to 5 height of slurries separation chamber, Hydrate slurry enters slurries separation chamber 5 by overflow, and slurries vehicle-mounted storage tank is entered after slurries separation chamber 5 is separated by filtration 11;
S4, storage transhipment: hydrate slurry stores in slurries vehicle-mounted storage tank 11, and the water separated is through the first cooling water Return pipe 6, the second cooling water return pipe 7 are back to water tank and are recycled, and slurries vehicle-mounted storage tank 11 is completed will after loading Slurries are transported to downstream gas point, when emergency episode occurs, using the urgent gasification system being arranged in slurries vehicle-mounted storage tank 11 into The urgent unloading processing of row;
S5, fast discharging: make after being unloaded, being gasified by the unloading process that tank car carries with gas point for gas peak regulation With.
Unloading process described in step S5 includes that tank car carries the pressurization of immersed pump 15 unloading process, using air temperature type vaporizer 13 press unloading process, combined type unloading process from pressure unloading process, using air temperature type vaporizer 13 and electric heating carburetor 14 certainly;
The combined type unloading process is the combined type unloading work that immersed pump 15, air temperature type vaporizer 13 are carried using tank car Skill or the combined type unloading process that immersed pump 15, air temperature type vaporizer 13, electric heating carburetor 14 are carried using tank car.
The above processand includes 4 kinds of processes of unloading:
C1, pressurization unloading process: immersed pump 15 is carried using tank car, hydrate slurry pressurization is offloaded to storage tank CG;
C2, first are from pressure unloading process: being back to tank car after slurries gasify using air temperature type vaporizer 13 and press unloading certainly To storage tank CG;
C3, second are from pressure unloading process: after successively slurries are gasified using air temperature type vaporizer 13, electric heating carburetor 14 It is back to tank car and is offloaded to storage tank CG from pressure;
C4, combined type unloading process: immersed pump 15, air temperature type vaporizer 13 are carried using tank car or dived using tank car is included Liquid pump 15, air temperature type vaporizer 13, electric heating carburetor 14 combined type unloading process slurries are gasified after be back to tank car and unload It is loaded onto storage tank CG.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art For, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also considered as Protection scope of the present invention.

Claims (8)

1. a kind of shale gas hydrate slurry rapid transport discharge mechanism, it is characterised in that: including hydrate slurry separative unit, Slurry storage transports unit, slurries fast discharging unit;
The hydrate slurry separative unit includes dewatering slurries separator (1), rotating wheel (2), helical flow path (3), the first storage Liquid chamber (4), slurries separation chamber (5), the first cooling water return pipe (6), the second cooling water return pipe (7), bracket (8);The slurry Liquid storage transhipment unit includes headstock (9), tank car chassis (10), slurries vehicle-mounted storage tank (11), control box (12), urgent gasification system System, safety instrumented systems, pipe-line system;The slurries fast discharging unit includes air temperature type vaporizer (13), electric heating vaporization Device (14), immersed pump (15);
The dewatering slurries separator (1) is made of separation upper section, separation middle section, separation lower section, and inside is equipped with rotating wheel (2), helical flow path (3), the first fluid reservoir (4), slurries separation chamber (5) are mounted on slurries vehicle-mounted storage tank (11) by bracket (8) On, the separation upper section is equipped with rotating wheel (2), and the separation middle section is equipped with helical flow path (3), and the separation lower section is set There are the first fluid reservoir (4), slurries separation chamber (5), the first fluid reservoir (4) lower part is equipped with the first cooling water return pipe (6), Slurries separation chamber (5) lower part is equipped with the second cooling water return pipe (7), and the headstock (9) and tank car chassis (10) are even It connects, tank car chassis (10) top is equipped with slurries vehicle-mounted storage tank (11), control box (12), and lower part is equipped with air temperature type vaporizer (13), electric heating carburetor (14), the slurries vehicle-mounted storage tank (11) is internal to be equipped with urgent gasification system, immersed pump (15), institute It states and is equipped with safety instrumented systems, pipe-line system in control box (12).
2. shale gas hydrate slurry rapid transport discharge mechanism according to claim 1, it is characterised in that: the spiral shell Eddy flow road (3) is the spiral pipe that a diameter is constant, internal diameter is gradually reduced, and it is 1~3mm that pipeline wall surface, which is equipped with several diameters, Aperture.
3. shale gas hydrate slurry rapid transport discharge mechanism according to claim 1, it is characterised in that: the slurry Liquid separation chamber (5) is located at fluid reservoir (4) inside, and the concentric cylinder that combination shape is combined with two is identical.
4. shale gas hydrate slurry rapid transport discharge mechanism according to claim 1, it is characterised in that: the slurry Liquid separation chamber (5) is made of slurries filtering table (16), the second fluid reservoir (17), slurries delivery pipe (18);
The slurries filtering table (16) is a hollow round table-like porous filter plate, is located at the top of the second fluid reservoir (17), Slurries delivery pipe (18) are set inside second fluid reservoir (17).
5. shale gas hydrate slurry rapid transport discharge mechanism according to claim 1, it is characterised in that: the slurry Liquid vehicle-mounted storage tank (11) is the storage tank of an inner/outer tube double-layer structure, and interior cylinder material uses 0Cr18Ni9 austenitic stainless steel, outside Cylinder material uses Q345R low-alloy steel, and inner/outer tube backing material uses expoxy glass, and heat-insulated mode is high vacuum multilayer insulation.
6. shale gas hydrate slurry rapid transport discharge mechanism according to claim 1, it is characterised in that: described is tight Anxious gasification system includes conducting rod (19), insulator (20), horizontal heating plate (21), conductive plate (22), vertical heating plate (23);
The conducting rod (19) is equipped with insulator (20), horizontal heating plate (21), connect with slurries vehicle-mounted storage tank (11) top, The conductive plate (22) is equipped with vertical heating plate (23), connect with slurries vehicle-mounted storage tank (11) bottom.
7. a kind of shale gas hydrate slurry rapid transport discharging method, it is characterised in that: specifically include following steps;
S1, centrifuge separation: hydrate slurry enters dewatering slurries separator (1), rotating wheel through slurries inlet tube with tangential direction (2) it rotates, hydrate slurry enters helical flow path (3) after circular motion and is centrifuged, and drop leads under the action of the centrifugal Cross helical flow path (3) wall surface aperture and move to dewatering slurries separator (1) inner wall, after collecting at after small liquid stream enter the first liquid storage Room (4), hydrate particle with do not separate drop along helical flow path (3) enter slurries separation chamber (5);
S2, be separated by filtration: in slurries separation chamber (5), hydrate particle with do not separate drop in slurries filtering table (16) progress It is separated by filtration, liquid stream enters the second fluid reservoir (17) through slurries filtering table (16) aperture, and the hydrate particle after separation is through slurries Delivery pipe (18) enters slurries vehicle-mounted storage tank (11);
S3, it settles, be separated by filtration: collecting into the hydrate particle carried secretly in the liquid stream of the first fluid reservoir (4) and be suspended in water Upper layer, as the time increases, the first fluid reservoir (4) interior water level is gradually increasing, when water level rises to slurries separation chamber (5) height Afterwards, hydrate slurry enters slurries separation chamber (5) by overflow, and slurries vehicle is entered after slurries separation chamber (5) are separated by filtration It carries storage tank (11);
S4, storage transhipment: hydrate slurry storage in slurries vehicle-mounted storage tank (11), the water separated are returned through the first cooling water Flow tube (6), the second cooling water return pipe (7) are back to water tank and are recycled, and slurries vehicle-mounted storage tank (11) is completed to load Slurries are transported to downstream gas point afterwards, when emergency episode occurs, using the urgent gasification being arranged in slurries vehicle-mounted storage tank (11) System carries out urgent unloading processing;
S5, fast discharging: it is used after being unloaded, being gasified by the unloading process that tank car carries with gas point for gas peak regulation.
8. shale gas hydrate slurry rapid transport discharging method according to claim 7, it is characterised in that: step S5 institute The unloading process stated includes that tank car carries immersed pump (15) pressurization unloading process, unloads work from pressure using air temperature type vaporizer (13) Skill presses unloading process, combined type unloading process using air temperature type vaporizer (13) and electric heating carburetor (14) certainly;
The combined type unloading process is the combined type unloading work that immersed pump (15), air temperature type vaporizer (13) are carried using tank car Skill or the combined type unloading process for using tank car included immersed pump (15), air temperature type vaporizer (13), electric heating carburetor (14).
CN201910769263.1A 2019-08-20 2019-08-20 Shale gas hydrate slurry rapid transferring and unloading device and method Active CN110345384B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910769263.1A CN110345384B (en) 2019-08-20 2019-08-20 Shale gas hydrate slurry rapid transferring and unloading device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910769263.1A CN110345384B (en) 2019-08-20 2019-08-20 Shale gas hydrate slurry rapid transferring and unloading device and method

Publications (2)

Publication Number Publication Date
CN110345384A true CN110345384A (en) 2019-10-18
CN110345384B CN110345384B (en) 2024-03-26

Family

ID=68180813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910769263.1A Active CN110345384B (en) 2019-08-20 2019-08-20 Shale gas hydrate slurry rapid transferring and unloading device and method

Country Status (1)

Country Link
CN (1) CN110345384B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112221432A (en) * 2020-09-25 2021-01-15 河南理工大学 Hydrate generating, storing and transporting integrated device
CN114962977A (en) * 2022-04-21 2022-08-30 西南石油大学 Natural gas hydrate storage and regasification device and method

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1344238A (en) * 1999-03-24 2002-04-10 Bg知识产权有限公司 Formation, processing, transportation and storage of hydrates
JP2003073679A (en) * 2001-08-31 2003-03-12 Mitsubishi Heavy Ind Ltd Dehydrator for gas hydrate slurry
US20050214079A1 (en) * 2004-02-17 2005-09-29 Lovie Peter M Use of hydrate slurry for transport of associated gas
US20100083568A1 (en) * 2007-02-19 2010-04-08 Naoki Yanagisawa Method of production storage and transportation for gas hydrate
CN101818088A (en) * 2009-12-15 2010-09-01 江苏工业学院 Efficient continuous preparation method and device for natural gas hydrate
CN201921551U (en) * 2011-01-11 2011-08-10 常州大学 Hydrate separator
CN102927442A (en) * 2012-11-15 2013-02-13 常州大学 Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device
CN104611080A (en) * 2014-12-19 2015-05-13 西南石油大学 An integrated utilization device and a method for natural gas hydrate slurry
CN106731023A (en) * 2016-12-20 2017-05-31 中国科学院广州能源研究所 A kind of gas-liquid separation device suitable for gas hydrate slurries
CN107557088A (en) * 2017-09-30 2018-01-09 中国科学院广州能源研究所 A kind of gas hydrate decomposes and reaction solution retracting device
CN108105584A (en) * 2017-12-21 2018-06-01 沈阳航天新光压力容器有限公司 A kind of LNG Storage, Transport method using low-temperature storage tank
CN108434790A (en) * 2018-05-09 2018-08-24 常州大学 A kind of hydrate slurry gas-liquid-solid three-phase separator
CN108439541A (en) * 2018-03-20 2018-08-24 常州大学 A method of it carrying out natural gas peak-shaving using hydrate and purifies water
CN108815881A (en) * 2018-08-06 2018-11-16 西南石油大学 A kind of hydrate slurry processing device and method
CN210266727U (en) * 2019-08-20 2020-04-07 西南石油大学 Shale gas hydrate thick liquid fast transferring uninstallation device

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1344238A (en) * 1999-03-24 2002-04-10 Bg知识产权有限公司 Formation, processing, transportation and storage of hydrates
JP2003073679A (en) * 2001-08-31 2003-03-12 Mitsubishi Heavy Ind Ltd Dehydrator for gas hydrate slurry
US20050214079A1 (en) * 2004-02-17 2005-09-29 Lovie Peter M Use of hydrate slurry for transport of associated gas
US20100083568A1 (en) * 2007-02-19 2010-04-08 Naoki Yanagisawa Method of production storage and transportation for gas hydrate
CN101818088A (en) * 2009-12-15 2010-09-01 江苏工业学院 Efficient continuous preparation method and device for natural gas hydrate
CN201921551U (en) * 2011-01-11 2011-08-10 常州大学 Hydrate separator
CN102927442A (en) * 2012-11-15 2013-02-13 常州大学 Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device
CN104611080A (en) * 2014-12-19 2015-05-13 西南石油大学 An integrated utilization device and a method for natural gas hydrate slurry
CN106731023A (en) * 2016-12-20 2017-05-31 中国科学院广州能源研究所 A kind of gas-liquid separation device suitable for gas hydrate slurries
CN107557088A (en) * 2017-09-30 2018-01-09 中国科学院广州能源研究所 A kind of gas hydrate decomposes and reaction solution retracting device
CN108105584A (en) * 2017-12-21 2018-06-01 沈阳航天新光压力容器有限公司 A kind of LNG Storage, Transport method using low-temperature storage tank
CN108439541A (en) * 2018-03-20 2018-08-24 常州大学 A method of it carrying out natural gas peak-shaving using hydrate and purifies water
CN108434790A (en) * 2018-05-09 2018-08-24 常州大学 A kind of hydrate slurry gas-liquid-solid three-phase separator
CN108815881A (en) * 2018-08-06 2018-11-16 西南石油大学 A kind of hydrate slurry processing device and method
CN210266727U (en) * 2019-08-20 2020-04-07 西南石油大学 Shale gas hydrate thick liquid fast transferring uninstallation device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
宋磊, 钱旭, 吴敏, 李立: "天然气水合物的储存和运输可行性研究", 油气储运, no. 03, 25 March 2005 (2005-03-25) *
李丹;敬加强;孙亮;李艳芳;萧瑛;: "天然气水合物浆体储运技术", 油气储运, no. 04, 25 April 2009 (2009-04-25) *
饶永超;王树立;代文杰;郑亚星;刘朝阳;姜英豪;: "天然气水合物浆体流变性与安全流动边界研究进展", 化工进展, no. 10, 5 October 2015 (2015-10-05) *
黄辉;粟科华;李伟;: "水合物储运技术在天然气领域的应用前景", 油气田地面工程, no. 01, 20 January 2016 (2016-01-20) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112221432A (en) * 2020-09-25 2021-01-15 河南理工大学 Hydrate generating, storing and transporting integrated device
CN112221432B (en) * 2020-09-25 2022-11-22 河南理工大学 Hydrate generating, storing and transporting integrated device
CN114962977A (en) * 2022-04-21 2022-08-30 西南石油大学 Natural gas hydrate storage and regasification device and method

Also Published As

Publication number Publication date
CN110345384B (en) 2024-03-26

Similar Documents

Publication Publication Date Title
CN102155615B (en) LNG (liquefied natural gas) pump-free air-entrapping method with BOG (boil off gas) recycling function and LNG pump-free air-entrapping device
EP0442767B1 (en) Method and apparatus for treating a natural gas
CN102927442B (en) Gas hydrate pipeline conveying method and gas hydrate pipeline conveying device
CN111457246B (en) Hydrogen storage type hydrogen filling station
CN110345384A (en) A kind of shale gas hydrate slurry rapid transport discharge mechanism and method
CN101955827B (en) Preparation method of solid natural gas hydrate
CN101829441B (en) Three-phase separator for free water
CN106753630A (en) A kind of gas hydrates synthesize decomposer and synthesis technique
CN103759135B (en) A kind of LNG storage means of BOG zero-emission and device
CN210266727U (en) Shale gas hydrate thick liquid fast transferring uninstallation device
CN110451745B (en) Oil-based drilling waste supercritical treatment system
CN107524911A (en) The liquid oxygen filling of underwater operation platform and recovery system
CN116025322B (en) Multistage carbon dioxide pre-fracturing system and method
CN108278479A (en) A kind of magnesium hydride storage tank
CN205331788U (en) LNG filling station storage tank system with built -in immersed pump
CN101880925B (en) Method and device for recovering mixed solvent in gel spinning
CN104196508B (en) Gas hydrates Rapid Thermal excites quarrying apparatus
CN110374557A (en) A kind of gas hydrates subsea production system and method based on fluidisation exploitation
CN100415698C (en) Method for continuous preparation of solid natural gas
KR101274310B1 (en) gas hydrate continually manufacturing method
CN105221847B (en) A kind of gas hydrates pipeline and decomposer
CN109652154B (en) Skid-mounted type integrated device and method for deoiling and dewatering natural gas
CN105349194A (en) Offshore platform hypergravity desulphurization apparatus and method thereof
CN105013411B (en) A kind of heat-insulated also empty suspended-bed reactor in underground
CN103922337A (en) Method and equipment for preparing activated carbon carrier for storing natural gas from hard husks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230407

Address after: No.8 Xindu Avenue, Xindu District, Chengdu, Sichuan 610000

Applicant after: SOUTHWEST PETROLEUM University

Applicant after: CHINA PETROLEUM & CHEMICAL Corp.

Address before: 610500, Xindu Avenue, Xindu District, Sichuan, Chengdu, 8

Applicant before: SOUTHWEST PETROLEUM University

GR01 Patent grant
GR01 Patent grant