CN102926779A - 一种采煤工作面液压掩护式支架结构 - Google Patents
一种采煤工作面液压掩护式支架结构 Download PDFInfo
- Publication number
- CN102926779A CN102926779A CN2012104627925A CN201210462792A CN102926779A CN 102926779 A CN102926779 A CN 102926779A CN 2012104627925 A CN2012104627925 A CN 2012104627925A CN 201210462792 A CN201210462792 A CN 201210462792A CN 102926779 A CN102926779 A CN 102926779A
- Authority
- CN
- China
- Prior art keywords
- shielding
- base
- bracket
- support
- shield
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开一种采煤工作面液压掩护式支架结构,由前梁、主梁和侧护板、底座、前后连杆、前梁千斤顶、推移千斤顶、操纵阀分别安装到位;在主梁一端设置一个掩护梁以挡住采空区矸石进入作业空间,该掩护梁的上端与顶梁铰接,下端通过前后连杆与底座连接;以上所述的底座、前后连杆和掩护梁形成四连杆机构以保持稳定的梁端距和承受水平推力;在支架的两侧设置活动侧护板以将架间密封,将顶梁设置为5.0mm。本发明有益效果为:支撑力较小、切顶性能差、支撑力集中在靠近煤壁的顶板上,所以支护强度较大、且均匀,掩护性好,能承受较大的水平推力,对顶板反复支撑的次数少,能带压移架,可提高作业可控性、有利于确保对顶板及时支护。
Description
技术领域
本发明涉及液压技术领域,尤其涉及一种采煤工作面液压掩护式支架结构。
背景技术
液压系统具有功率大、工作压力和流量可调性好、热量可被带回油箱等优点,采用液压系统装置能比其他装置产生更多的动力,在同等的功率下,液压装置的体积小、重量轻、功率密度大、结构紧凑;同时,液压装置工作比较平稳,由于重量轻、惯性小、反应快、液压装置易于实现快速启动,制动和频繁的换向。在煤层工作面环境,一般选用掩护式液压支架,煤层厚度变化较大则选用调高范围大且抗水平推力强且带护帮的掩护式支架以改善支架受力状况。其结构一般包括顶梁、掩护梁、底座等箱体结构,立柱以增加工作行程来满足支架调高范围的需要。为了提高移架速度,确保对顶板的及时支护,采用液压系统按液压支架在采煤工作面的安置位置来划分,中间液压支架是安装在除工作面端头以外的采煤工作面所有位置的支架,按其结构形式来划分,可分为三种基本类型,即:支撑式、掩护式和支撑掩护式。因此,为适应不同采煤环境的需求,提高效率与支架局部的牢固性,对现有支架组件结构与材料进行创新显得非常重要。
发明内容
本发明的目的是提供一种支护强度较大、有利于提高支架外界工作效果、可提高作业可控性、有利于确保对顶板及时支护、可降低劳动强度的采煤工作面液压掩护式支架结构,以解决现有技术的诸多不足。
本发明的目的通过以下技术方案来具体实现:
一种采煤工作面液压掩护式支架结构,主要由以下步骤组成:
⑴首先,由前梁、主梁和侧护板、底座、前后连杆、前梁千斤顶、推移千斤顶、操纵阀分别安装到位;
⑵在主梁一端设置一个掩护梁以挡住采空区矸石进入作业空间,该掩护梁的上端与顶梁铰接,下端通过前后连杆与底座连接;
⑶以上所述的底座、前后连杆和掩护梁形成四连杆机构以保持稳定的梁端距和承受水平推力,设置立柱的支撑力间接作用于顶梁或直接作用于顶梁上,其中的掩护式支架由2根立柱组成,同时,都倾斜布置以增加支架的调高范围;
⑷在支架的两侧设置活动侧护板以将架间密封,将顶梁设置为5.0mm。
本发明所述的采煤工作面液压掩护式支架结构的有益效果为:支撑力较小、切顶性能差、支撑力集中在靠近煤壁的顶板上,所以支护强度较大、且均匀,掩护性好,能承受较大的水平推力,对顶板反复支撑的次数少,能带压移架,有利于提高支架外界工作效果、可提高作业可控性、有利于确保对顶板及时支护、可降低劳动强度。
具体实施方式
本发明实施例所述采煤工作面液压掩护式支架结构,其主要步骤包括:
⑴首先,由前梁、主梁和侧护板、底座、前后连杆、前梁千斤顶、推移千斤顶、操纵阀分别安装到位;
⑵在主梁一端设置一个掩护梁以挡住采空区矸石进入作业空间,该掩护梁的上端与顶梁铰接,下端通过前后连杆与底座连接;
⑶以上所述的底座、前后连杆和掩护梁形成四连杆机构以保持稳定的梁端距和承受水平推力,设置立柱的支撑力间接作用于顶梁或直接作用于顶梁上,其中的掩护式支架由2根立柱组成,同时,都倾斜布置以增加支架的调高范围;
⑷在支架的两侧设置活动侧护板以将架间密封,将顶梁设置为5.0mm。
Claims (1)
1.一种采煤工作面液压掩护式支架结构,其特征在于,
⑴首先,由前梁、主梁和侧护板、底座、前后连杆、前梁千斤顶、推移千斤顶、操纵阀分别安装到位;
⑵在主梁一端设置一个掩护梁以挡住采空区矸石进入作业空间,该掩护梁的上端与顶梁铰接,下端通过前后连杆与底座连接;
⑶以上所述的底座、前后连杆和掩护梁形成四连杆机构以保持稳定的梁端距和承受水平推力,设置立柱的支撑力间接作用于顶梁或直接作用于顶梁上,其中的掩护式支架由2根立柱组成,同时,都倾斜布置以增加支架的调高范围;
⑷在支架的两侧设置活动侧护板以将架间密封,将顶梁设置为5.0mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104627925A CN102926779A (zh) | 2012-11-16 | 2012-11-16 | 一种采煤工作面液压掩护式支架结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104627925A CN102926779A (zh) | 2012-11-16 | 2012-11-16 | 一种采煤工作面液压掩护式支架结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102926779A true CN102926779A (zh) | 2013-02-13 |
Family
ID=47641691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012104627925A Pending CN102926779A (zh) | 2012-11-16 | 2012-11-16 | 一种采煤工作面液压掩护式支架结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102926779A (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3813195A1 (de) * | 1988-04-20 | 1989-11-02 | Gewerk Eisenhuette Westfalia | Hobelanlage fuer untertaegige gewinnungsbetriebe |
AU736955B2 (en) * | 1999-11-10 | 2001-08-09 | Yankuang Group Corporation | A sub-level caving hydraulic support with a low-positioned door for passing caved coal |
CN1526914A (zh) * | 2003-03-05 | 2004-09-08 | 兖矿集团有限公司 | 低位放顶煤液压支架 |
CN2844442Y (zh) * | 2005-11-04 | 2006-12-06 | 天地科技股份有限公司 | 一种两柱掩护式大采高放顶煤液压支架 |
CN101457652A (zh) * | 2008-05-13 | 2009-06-17 | 天地科技股份有限公司 | 一种超大采高液压支架 |
CN101463729A (zh) * | 2009-01-15 | 2009-06-24 | 天地科技股份有限公司 | 大采高放顶煤液压支架 |
CN201381867Y (zh) * | 2008-12-19 | 2010-01-13 | 河北天择重型机械有限公司 | 充填式液压支架 |
-
2012
- 2012-11-16 CN CN2012104627925A patent/CN102926779A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3813195A1 (de) * | 1988-04-20 | 1989-11-02 | Gewerk Eisenhuette Westfalia | Hobelanlage fuer untertaegige gewinnungsbetriebe |
AU736955B2 (en) * | 1999-11-10 | 2001-08-09 | Yankuang Group Corporation | A sub-level caving hydraulic support with a low-positioned door for passing caved coal |
CN1526914A (zh) * | 2003-03-05 | 2004-09-08 | 兖矿集团有限公司 | 低位放顶煤液压支架 |
CN2844442Y (zh) * | 2005-11-04 | 2006-12-06 | 天地科技股份有限公司 | 一种两柱掩护式大采高放顶煤液压支架 |
CN101457652A (zh) * | 2008-05-13 | 2009-06-17 | 天地科技股份有限公司 | 一种超大采高液压支架 |
CN201381867Y (zh) * | 2008-12-19 | 2010-01-13 | 河北天择重型机械有限公司 | 充填式液压支架 |
CN101463729A (zh) * | 2009-01-15 | 2009-06-24 | 天地科技股份有限公司 | 大采高放顶煤液压支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9926784B2 (en) | Float-swing hydraulic support | |
AU2012100340A4 (en) | Dual Station Two-leg Low-position Top Coal Caving Hydraulic Support | |
CN202946177U (zh) | 一种改进的煤矿用液压支架 | |
CN202402072U (zh) | 浮动伸缩式充填隔离板 | |
CN203531940U (zh) | 迈步式超前支护液压支架 | |
CN202467880U (zh) | 薄煤层炮采固体废物充填液压支架 | |
CN203022776U (zh) | 掘进迎头临时支护装置 | |
CN102926787A (zh) | 一种提高液压支架初撑力的方法 | |
CN202451192U (zh) | 薄煤层炮采液压切顶支架 | |
CN102926779A (zh) | 一种采煤工作面液压掩护式支架结构 | |
CN201671650U (zh) | 极薄煤层综采液压支架 | |
CN203269456U (zh) | 一种双向液压支架侧推千斤顶 | |
CN102926784A (zh) | 一种采煤工作面液压支撑掩护式支架结构 | |
CN102979544A (zh) | 一种液压支架的前梁结构 | |
CN202509622U (zh) | 一种钢结构支撑梁 | |
CN102926777A (zh) | 一种液压支架的顶梁结构 | |
CN201981682U (zh) | 用于钢结构的内天沟节点机构 | |
CN202215273U (zh) | 前置单摆杆式端头液压支架 | |
CN201826878U (zh) | 煤矿井下遥控滑轮式掩护支架 | |
CN102926783A (zh) | 一种采煤工作面液压支撑式支架结构 | |
CN102926789A (zh) | 一种液压支架中心距与宽度的确定方法 | |
CN204371398U (zh) | 一种新型精密防护综采工作面 | |
CN209555272U (zh) | 一种高炉离线同步推移用活动式推进装置 | |
CN102383817B (zh) | 一种低位放顶煤液压支架 | |
CN201940601U (zh) | 一种更换钢包滑板及水口的机械装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130213 |