CN102916427B - 一种多回输电线路的综合三相不平衡度计算方法 - Google Patents
一种多回输电线路的综合三相不平衡度计算方法 Download PDFInfo
- Publication number
- CN102916427B CN102916427B CN201210359708.7A CN201210359708A CN102916427B CN 102916427 B CN102916427 B CN 102916427B CN 201210359708 A CN201210359708 A CN 201210359708A CN 102916427 B CN102916427 B CN 102916427B
- Authority
- CN
- China
- Prior art keywords
- transmission line
- back transmission
- tri
- unbalance factor
- phase unbalance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210359708.7A CN102916427B (zh) | 2012-09-25 | 2012-09-25 | 一种多回输电线路的综合三相不平衡度计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210359708.7A CN102916427B (zh) | 2012-09-25 | 2012-09-25 | 一种多回输电线路的综合三相不平衡度计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102916427A CN102916427A (zh) | 2013-02-06 |
CN102916427B true CN102916427B (zh) | 2014-09-17 |
Family
ID=47614707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210359708.7A Active CN102916427B (zh) | 2012-09-25 | 2012-09-25 | 一种多回输电线路的综合三相不平衡度计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102916427B (zh) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103235198B (zh) * | 2013-04-14 | 2015-03-25 | 国家电网公司 | 一种同塔双回输电线路的导线相序排列的确定方法 |
CN103279617B (zh) * | 2013-06-04 | 2016-05-11 | 广东电网公司电力科学研究院 | 同塔多回输电线路与母线连接的方法和系统 |
CN103390254B (zh) * | 2013-08-08 | 2016-03-09 | 国网重庆市电力公司南岸供电分公司 | 一种低压台区线损水平综合评价方法 |
CN103412199B (zh) * | 2013-08-12 | 2016-05-25 | 上海电力学院 | 一种同塔多回输电线路不平衡度的计算方法 |
CN103795075B (zh) * | 2014-01-18 | 2015-09-09 | 国家电网公司 | 变电站内输电线路三相电流不平衡导线相序排列调整方法 |
CN104281784A (zh) * | 2014-10-27 | 2015-01-14 | 武汉大学 | 基于blt方程的平行多回输电线路不平衡度计算方法 |
CN105119310B (zh) * | 2015-10-14 | 2018-05-25 | 上海鸿岩机械科技有限公司 | 一种三相不平衡负荷调整快速算法 |
CN107394777A (zh) * | 2017-09-05 | 2017-11-24 | 杭州清源电力设计有限公司 | 一种三相不平衡配电网合环操作方法、系统 |
CN107979067B (zh) * | 2017-10-20 | 2022-07-08 | 中国电力科学研究院有限公司 | 一种零序电流保护方法及系统 |
CN108414821B (zh) * | 2018-05-17 | 2023-05-19 | 福建奥通迈胜电力科技有限公司 | 基于零序电压的配电变压器低压侧电压三相不平衡评估方法 |
CN109787254B (zh) * | 2019-02-18 | 2020-07-03 | 石家庄科林电气股份有限公司 | 一种三相负荷不平衡调节周期的切换策略 |
CN110112760B (zh) * | 2019-06-12 | 2020-11-03 | 南方电网科学研究院有限责任公司 | 一种基于换相开关的三相不平衡调节方法、系统及集控器 |
CN110460072A (zh) * | 2019-08-21 | 2019-11-15 | 天津大学 | 考虑相位指标的低压台区三相不平衡问题实时治理策略 |
CN114362213A (zh) * | 2021-12-01 | 2022-04-15 | 国网宁夏电力有限公司经济技术研究院 | 同塔四回输电线路三相不平衡最优相序筛选方法及系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101465546A (zh) * | 2009-01-08 | 2009-06-24 | 上海交通大学 | 电能质量综合评估系统 |
CN102063657A (zh) * | 2010-12-23 | 2011-05-18 | 中国电力科学研究院 | 一种城市配电网运行水平与供电能力评估方法 |
CN102279327A (zh) * | 2011-05-06 | 2011-12-14 | 重庆大学 | 光伏并网发电在线监测与状态评估系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005045969A (ja) * | 2003-07-24 | 2005-02-17 | Tm T & D Kk | 三相電源の保護制御装置の断線検出装置 |
-
2012
- 2012-09-25 CN CN201210359708.7A patent/CN102916427B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101465546A (zh) * | 2009-01-08 | 2009-06-24 | 上海交通大学 | 电能质量综合评估系统 |
CN102063657A (zh) * | 2010-12-23 | 2011-05-18 | 中国电力科学研究院 | 一种城市配电网运行水平与供电能力评估方法 |
CN102279327A (zh) * | 2011-05-06 | 2011-12-14 | 重庆大学 | 光伏并网发电在线监测与状态评估系统 |
Non-Patent Citations (4)
Title |
---|
500kV同塔双回线路不平衡度及换位方式研究;陈恺等;《电力与电工》;20090930;第29卷(第3期);第5-8及12页 * |
Comparison of two current modulation strategies for matrix converters under unbalanced input voltage conditions;Frede Blaabjerg等;《IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS》;20020430;第29卷(第2期);第289-296页 * |
Frede Blaabjerg等.Comparison of two current modulation strategies for matrix converters under unbalanced input voltage conditions.《IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS》.2002,第29卷(第2期),第289-296页. |
陈恺等.500kV同塔双回线路不平衡度及换位方式研究.《电力与电工》.2009,第29卷(第3期),第5-8及12页. |
Also Published As
Publication number | Publication date |
---|---|
CN102916427A (zh) | 2013-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102916427B (zh) | 一种多回输电线路的综合三相不平衡度计算方法 | |
Laaksonen | Advanced islanding detection functionality for future electricity distribution networks | |
Girgis et al. | Application of active power sensitivity to frequency and voltage variations on load shedding | |
CN106877342A (zh) | 一种切负荷控制实现方法 | |
Shahmohammadi et al. | Proper sizing and placement of distributed power generation aids the intentional islanding process | |
CN102403716A (zh) | 一种多馈入交直流电网动态等值的方法 | |
CN107516903B (zh) | 一种考虑经济性及多时间尺度安全稳定性的精准负荷控制方法 | |
Wu et al. | Reliability evaluation and sensitivity analysis to AC/UHVDC systems based on sequential Monte Carlo simulation | |
CN108336741B (zh) | 一种全过程电压稳定性分析的故障筛选方法及系统 | |
CN104331628A (zh) | 电网安全性综合指标评价方法 | |
CN107871202A (zh) | 一种计及多电压等级的电网可靠性评估方法 | |
CN106548265B (zh) | 一种基于连锁故障事故链搜索的输电网可靠性评估方法 | |
CN104376506A (zh) | 一种基于确定性分析的电力系统风险评估方法 | |
CN107067127A (zh) | 一种电力系统高风险连锁故障事故链搜索方法 | |
CN102542355A (zh) | 一种运行规划分负荷方法 | |
Maresch et al. | An underfrequency load shedding scheme for high dependability and security tolerant to induction motors dynamics✰ | |
Juanuwattanakul et al. | Voltage stability enhancement for unbalanced multiphase distribution networks | |
CN106026118A (zh) | 基于节点电压回复指标的电网动态无功补偿节点选择方法 | |
CN110458330B (zh) | 一种基于灰色关联分析法的级联断面解列优化方法及系统 | |
CN105743135B (zh) | 一种受端电网特高压交直流最优受电比例评估方法 | |
CN103235198A (zh) | 一种同塔双回输电线路的导线相序排列的确定方法 | |
Bashir et al. | Islanding detection of a distributed generation system using angle between negative sequence voltage and current | |
CN109787285B (zh) | 用于决策新能源机群并网方案的方法及系统 | |
Chang et al. | Simplified frequency estimation for unit scheduling criteria for grids with high wind penetration | |
Altaf et al. | Sensitivity analysis and performance ranking of different passive power system parameters for islanding detection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Co-patentee after: XI'AN JIAOTONG University Patentee after: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd. Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Co-patentee before: XI'AN JIAOTONG University Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Corp. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200414 Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Patentee after: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd. Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Co-patentee before: XI'AN JIAOTONG University Patentee before: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd. |