CN102913280B - 大水矿井顶板水排出方法 - Google Patents

大水矿井顶板水排出方法 Download PDF

Info

Publication number
CN102913280B
CN102913280B CN201210426062.XA CN201210426062A CN102913280B CN 102913280 B CN102913280 B CN 102913280B CN 201210426062 A CN201210426062 A CN 201210426062A CN 102913280 B CN102913280 B CN 102913280B
Authority
CN
China
Prior art keywords
water
lane
roof
belt lane
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210426062.XA
Other languages
English (en)
Other versions
CN102913280A (zh
Inventor
梁和平
祝德胜
李瑛�
李玉忠
孟凡刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kailuan Group Co Ltd Donghuantuo Mining Branch
Original Assignee
Kailuan Group Co Ltd Donghuantuo Mining Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kailuan Group Co Ltd Donghuantuo Mining Branch filed Critical Kailuan Group Co Ltd Donghuantuo Mining Branch
Priority to CN201210426062.XA priority Critical patent/CN102913280B/zh
Publication of CN102913280A publication Critical patent/CN102913280A/zh
Application granted granted Critical
Publication of CN102913280B publication Critical patent/CN102913280B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)
  • Sewage (AREA)

Abstract

本发明公开了一种大水矿井顶板水排出方法,首先在工作面开采前,在轨道巷和皮带巷中施工排水沟和间隔设立蓄水钻窝;在皮带巷下方开拓一条与皮带巷平行的疏水通道,疏水通道末端设立水煤体分离设施,在皮带巷中间隔设立贯通眼,通过贯通眼将皮带巷与疏水通道贯通,并在贯通处设挡水结构,然后在上部轨道巷和下部皮带巷中向煤层顶板布置疏干钻孔,将顶板水预先放出;在预放顶板水的同时,进行工作面开采,工作面产生的浑水从贯通眼中进入疏水通道,直至流入水煤体分离设施。本发明针对顶板水的富水性,设计了超前放水与工作面水煤体两个疏水净化通道,排水时互不影响,实现工作面采煤与排水同步进行。

Description

大水矿井顶板水排出方法
技术领域
本发明属于煤矿开采技术领域。
背景技术
在煤矿开采技术领域,日涌水量大于1万吨或超过正常日涌水量2倍以上的矿井称为大水矿井。
我国重点煤矿受水威胁的煤炭储量大约250亿t,其中受地表水体(江、河、湖、海等)、松散含水层、基岩含水层等水体威胁的煤炭储量近100亿t。仅就受河流影响来看,就有200多个矿井受100余条大小河流威胁,而华北、华东、东北地区的煤田普遍被第四系和第三系松散层含水层覆盖,造成其开采效益相对最好的浅部露头区煤层开采困难。
煤矿顶板透水是一个受多种因素影响的非常复杂的问题,受到地质条件和构造、水文地质条件以及人工开采条件的影响,可以总结为受到水源、覆岩地层、地质构造和采掘活动4种因素的共同控制。在大水条件下,如何实现高产高效开采是国内采矿界需要解决的重大难题。
目前国内外防治顶板水主要是顶板布置泄水钻孔,将顶板水预先放出,由于没有专门的排水通道,一般是从运输巷中直接排入井下水仓,所以预放水时不能与采煤同时进行,而且顶板水预放是一个长期过程,有的需排放2-3年,影响采煤工作面的接续。
再就是由于顶板水不可能预先全部放出,工作面开采时随着顶板垮落,仍有大量的顶板水从工作面排出,排出的水与开采的煤粉混杂在一起,从运输巷中排入井下水仓。因此,顶板预先放出的水和工作面浑水一起进入井下水仓,为以后井下水仓的水煤分离增加了困难,排水难度加大。
发明内容
本发明的目的是针对复杂大水煤矿条件下的顶板预放水与工作面浑水不分带来的排水难度,提出一种多疏水通道系统的顶板水排出方法。
为达到上述目的,本发明大水矿井顶板水排出方法的技术方案是:
第一步:在工作面开采前,首先在上部的轨道巷和下部的皮带巷中施工排水沟,并且每隔一定距离设立蓄水钻窝;沿皮带巷开拓一条疏水通道,疏水通道的标高应低于皮带巷的标高,疏水通道末端设立水煤体分离设施,在皮带巷中每隔一定距离设立贯通眼,通过贯通眼将皮带巷与疏水通道贯通,并在贯通处设挡水结构;
上述的水煤体分离设施可以是沉淀池,亦可以是振动筛。
第二步、在上部轨道巷和下部皮带巷中向煤层顶板布置泄水钻孔,将顶板水预先放出,放出的水从排水沟逐个进入蓄水钻窝,固体物在蓄水钻窝逐步得到沉淀,沉淀后的清水排至井下水仓,蓄水钻窝的固体物定期清除;
第三步、在预放顶板水的同时,进行工作面开采,工作面产生的浑水从贯通眼中进入疏水通道,直至流入水煤体分离设施,浑水中的煤和水得到分离,分离水排入井下水仓,分离煤运至井下煤仓。
本发明的积极效果是:
针对顶板水的富水性,设计了超前放水与工作面水煤体两个疏水净化通道,排水时互不影响,实现工作面采煤与排水同步进行;而且进入水仓前进行了净化和煤水分离,大大减少了水仓的固体物淤积,减少了清淤工作量,排水方便。
附图说明
下面结合附图说明本发明的实施。
图1是本发明实施例的示意图。
图例说明,1轨道巷,2-皮带巷,3-工作面,4-贯通眼,5-蓄水钻窝,6-挡水结构,7-疏水通道,8-排水沟,9-水煤体分离设施,10-井下水仓,11-井下煤仓。
具体实施方式
如图1所示,本发明大水矿井顶板水排出方法的技术方案是:
1、在工作面3开采前,首先在上部轨道巷1和下部皮带巷2中施工排水沟8,并且每隔一定距离设立蓄水钻窝5;在皮带巷2下方开拓一条与皮带巷2平行的疏水通道7,疏水通道7末端设立水煤体分离设施9,在皮带巷2中每隔一定距离设立贯通眼4,通过贯通眼4将皮带巷2与疏水通道7贯通,并在贯通处设挡水结构6;
上述的水煤体分离设施9可以是沉淀池,亦可以是振动筛。
2、然后按照传统方法在上部轨道巷1和下部皮带巷2中向煤层顶板布置泄水钻孔,将顶板水预先放出,放出的水从排水沟8逐个进入蓄水钻窝5,固体物在蓄水钻窝5逐步得到沉淀,沉淀后的清水排至井下水仓10,蓄水钻窝5的固体物定期清除;
3、在工作面开采时,工作面3产生的浑水从贯通眼4中进入疏水通道7,直至流入水煤体分离设施9,浑水中的煤和水得到分离,分离水排入井下水仓10,分离煤运至井下煤仓11。

Claims (1)

1.一种大水矿井顶板水排出方法,其特征在于,方法如下:
第一步:在工作面开采前,首先在上部的轨道巷和下部的皮带巷中施工排水沟,并且间隔设立蓄水钻窝;沿皮带巷开拓一条疏水通道,疏水通道的标高应低于皮带巷的标高,疏水通道末端设立水煤体分离设施,在皮带巷中间隔设立贯通眼,通过贯通眼将皮带巷与疏水通道贯通,并在贯通处设挡水结构;
上述的水煤体分离设施是沉淀池或振动筛;
第二步、在上部轨道巷和下部皮带巷中向煤层顶板布置泄水钻孔,将顶板水预先放出,放出的水从排水沟逐个进入蓄水钻窝,固体物在蓄水钻窝逐步得到沉淀,沉淀后的清水排至井下水仓,蓄水钻窝的固体物定期清除;
第三步、在预放顶板水的同时,进行工作面开采,工作面产生的浑水从贯通眼中进入疏水通道,直至流入水煤体分离设施,浑水中的煤和水得到分离,分离水排入井下水仓,分离煤运至井下煤仓。
CN201210426062.XA 2012-10-30 2012-10-30 大水矿井顶板水排出方法 Expired - Fee Related CN102913280B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210426062.XA CN102913280B (zh) 2012-10-30 2012-10-30 大水矿井顶板水排出方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210426062.XA CN102913280B (zh) 2012-10-30 2012-10-30 大水矿井顶板水排出方法

Publications (2)

Publication Number Publication Date
CN102913280A CN102913280A (zh) 2013-02-06
CN102913280B true CN102913280B (zh) 2014-11-12

Family

ID=47611822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210426062.XA Expired - Fee Related CN102913280B (zh) 2012-10-30 2012-10-30 大水矿井顶板水排出方法

Country Status (1)

Country Link
CN (1) CN102913280B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104791007B (zh) * 2015-04-23 2017-03-08 中交第二航务工程局有限公司 一种穿越富水破碎带隧道施工过程中的排水方法
CN106089296B (zh) * 2016-06-16 2018-09-18 陕西省煤田地质有限公司 一种煤层顶板离层水的防治办法
CN106285777B (zh) * 2016-10-28 2018-05-08 河北钢铁集团矿业有限公司 大水矿山矿房超前放水的方法
CN108590754A (zh) * 2018-04-24 2018-09-28 中煤西安设计工程有限责任公司 一种单斜煤层采区集中泄水巷布置方法
CN108643966A (zh) * 2018-04-24 2018-10-12 中煤西安设计工程有限责任公司 一种工作面底板集中泄水巷布置方法
CN109458217A (zh) * 2018-11-07 2019-03-12 陕西南梁矿业有限公司 一种矿井含水层疏放水合理利用装置及方法
CN110714798B (zh) * 2019-09-03 2021-02-05 海南矿业股份有限公司 一种用于无底柱矿山采场的排水分布方法
CN113338938B (zh) * 2021-04-21 2023-04-04 紫金矿业集团股份有限公司 金属矿山露天井下协同开采的安全控制方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482078A (zh) * 2002-09-09 2004-03-17 神华集团有限责任公司 煤矿井下采空区水的净化方法
CN101196123A (zh) * 2007-12-27 2008-06-11 淮北矿业(集团)有限责任公司 采煤工作面顶板离层水体防治方法
CN102061920A (zh) * 2010-12-24 2011-05-18 西安科技大学 富含水矿区水解放工作面开采方法
CN102505963A (zh) * 2011-11-11 2012-06-20 山西晋城无烟煤矿业集团有限责任公司 回采工作面顶板水预疏放施工方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2843976B2 (ja) * 1995-09-18 1999-01-06 株式会社桜川ポンプ製作所 坑内排水装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482078A (zh) * 2002-09-09 2004-03-17 神华集团有限责任公司 煤矿井下采空区水的净化方法
CN101196123A (zh) * 2007-12-27 2008-06-11 淮北矿业(集团)有限责任公司 采煤工作面顶板离层水体防治方法
CN102061920A (zh) * 2010-12-24 2011-05-18 西安科技大学 富含水矿区水解放工作面开采方法
CN102505963A (zh) * 2011-11-11 2012-06-20 山西晋城无烟煤矿业集团有限责任公司 回采工作面顶板水预疏放施工方法

Non-Patent Citations (9)

* Cited by examiner, † Cited by third party
Title
JP特开平9-79000A 1997.03.25 *
WL-I型煤矿井下水煤分离系统的改进设计;王建州等;《煤矿机械》;20120115;第33卷(第1期);第188页至第190页 *
大平矿超前疏放钻孔治理顶板水害实践;张光辉等;《中州煤炭》;20100125(第01期);第90页至第91页 *
平朔井工三矿首采区特厚煤层综采顶板水综合防治技术实践;赵春虎等;《煤矿安全高效开采理论技术与实践》;中国矿业大学出版社;20100930;第205页至第210页 *
张亚鹤等.炮采工作面顶板水治理探索.《中州煤炭》.2009,(第12期),第34页至第35页. *
张光辉等.大平矿超前疏放钻孔治理顶板水害实践.《中州煤炭》.2010,(第01期),第90页至第91页. *
炮采工作面顶板水治理探索;张亚鹤等;《中州煤炭》;20091225(第12期);第34页至第35页 *
王建州等.WL-I型煤矿井下水煤分离系统的改进设计.《煤矿机械》.2012,第33卷(第1期),第188页至第190页. *
赵春虎等.平朔井工三矿首采区特厚煤层综采顶板水综合防治技术实践.《煤矿安全高效开采理论技术与实践》.中国矿业大学出版社,2010,第205页至第210页. *

Also Published As

Publication number Publication date
CN102913280A (zh) 2013-02-06

Similar Documents

Publication Publication Date Title
CN102913280B (zh) 大水矿井顶板水排出方法
CN103557002B (zh) 一种盘区机械化集中溜井上向水平分层充填采矿法
CN109577980B (zh) 一种基于含水层冻结的地下长壁工作面保水采煤方法
CN102080518B (zh) 煤层顶板复杂分支井抽采瓦斯方法
CN101176400B (zh) 一种矿山塌陷区土地复垦新方法
CN102926803B (zh) 复杂水文条件下水、煤同采的排水方法
CN100560937C (zh) 一种薄基岩浅埋煤层长壁工作面保水开采方法
CN104074541A (zh) 一种水体下固体充填开采设计方法
CN109441450A (zh) 一种覆岩水文地质条件扰动下煤水双资源矿井开采模式
CN102086765A (zh) 一种极薄铜矿体高分段多分层采矿法
CN102777180A (zh) 一种煤矿主动式区域性防治冲击地压的方法
CN101915118A (zh) 高瓦斯中硬煤层递进式瓦斯抽放方法
CN104975868A (zh) 基于定向钻进的顶板高位走向大直径长钻孔瓦斯抽采方法
CN104963721A (zh) 一种采用顺层孔与穿层孔结合的井下立体快速疏放水方法
CN107152309B (zh) 一种煤层为主含水层的高水高排水害防治方法
CN108590754A (zh) 一种单斜煤层采区集中泄水巷布置方法
CN101979828A (zh) 一种煤层气多分支水平井系统及其助排井
CN102926802B (zh) 利用煤矿井下泄水巷减少淤煤的方法
CN101158285A (zh) 一种铜矿的地下开采方法
CN102943691B (zh) 大水煤矿井底水仓减少淤煤泥的方法
RU2441167C1 (ru) Способ дегазации сближенного пласта
CN205422716U (zh) 一种充填采矿法镶嵌式构造
CN201818293U (zh) 一种煤层气多分支水平井系统及其助排井
CN102748031A (zh) 大坡度高埋深富水地层斜井tbm法施工水压控制方法
CN208220720U (zh) 一种煤炭开采水与瓦斯共治系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141112

Termination date: 20151030

EXPY Termination of patent right or utility model