CN205422716U - 一种充填采矿法镶嵌式构造 - Google Patents

一种充填采矿法镶嵌式构造 Download PDF

Info

Publication number
CN205422716U
CN205422716U CN201620250662.9U CN201620250662U CN205422716U CN 205422716 U CN205422716 U CN 205422716U CN 201620250662 U CN201620250662 U CN 201620250662U CN 205422716 U CN205422716 U CN 205422716U
Authority
CN
China
Prior art keywords
nugget
mosaic
stage casing
ore
drop shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620250662.9U
Other languages
English (en)
Inventor
姜仁义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620250662.9U priority Critical patent/CN205422716U/zh
Application granted granted Critical
Publication of CN205422716U publication Critical patent/CN205422716U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

一种充填采矿法镶嵌式构造,其特征在于充填采矿法采用截菱形矿块(80)结构,镶嵌式构造,中深孔(22)凿岩,无人驾驶铲运机出矿,矿块的底部与中段出矿联络巷(31)相通,中段出矿联络巷(31)与中段运输巷(32)、溜井联络道(33)、溜井(34)相通,溜井(34)与下部集运水平相通。由于采用镶嵌式构造,回采矿块之间不留矿柱,回采过程中采用中深孔(22)凿岩,本实用新型既能够获得较高的回采率,又可获得较高的生产效率。

Description

一种充填采矿法镶嵌式构造
技术领域
本实用新型属于地下矿充填采矿法领域,涉及一种充填采矿法镶嵌式构造。
背景技术
在采用充填采矿法的地下矿山,矿块的结构和构造形式有多种,矿岩不稳固时,常应用下向进路充填采矿法、上向进路充填采矿法,进路的结构有矩形、梯形、六边形等,构造形式多属于条柱式,其中六边形进路构成镶嵌式构造,可以获得较高的回采率,但浅孔凿岩,进路出矿,效率低。
由此,本实用新型提供一种充填采矿法镶嵌式构造,矿块的结构形式采用截菱形(即截去4个角的菱形),镶嵌式构造,中深孔凿岩,既能够获得较高的回采率,又可获得较高的效率。
发明内容
本实用新型的目的在于提供一种构造形式,既能够获得较高的回采率,又可获得较高的效率。
本实用新型一种充填采矿法镶嵌式构造采用截菱形矿块结构,镶嵌式构造,中深孔凿岩,无人驾驶铲运机出矿,矿块的底部与中段出矿联络巷相通,中段出矿联络巷与中段运输巷、溜井联络道、溜井相通,溜井与下部集运水平相通,矿块内崩落的矿石由无人驾驶铲运机从矿块底部运出,经出矿联络巷、运输巷、溜井联络道、溜井下放至下部集运水平;矿块的顶部与回风联络巷、回风巷相通,新鲜风流自运输巷经出矿联络巷、采场空间顶部、回风联络巷进入回风巷;矿体极不稳固时,采用下向式开采,在截菱形矿块顶部布置凿岩回风巷与回风联络巷、回风巷相通,在凿岩回风巷中向下凿中深孔,回采过程中,所有矿块均采用胶结充填,下中段矿块处于上中段两相邻已胶结充填矿块的下部;矿体稳固性稍好时,采用上向式开采,在截菱形矿块底部空间向上凿中深孔至上一相邻截菱形矿块底部空间,充填时保留此空间作为向上部相邻矿块凿中深孔和出矿的空间,上向式开采采用两步回采,一步采胶结充填矿块超前于二步采尾砂充填矿块一个中段以上,回采过程中,二步采尾砂充填矿块处于上中段两相邻已胶结充填矿块的中间。
由于采用镶嵌式构造,回采矿块之间不留矿柱,回采过程中采用中深孔凿岩,本实用新型既能够获得较高的回采率,又可获得较高的效率。
附图说明
图1~图3是本发明实施例1的示意图,其中图1是图2沿Ⅰ-Ⅰ的剖视图,图2是图1沿Ⅱ-Ⅱ的剖视图,图3是图1沿Ⅲ-Ⅲ的剖视图。
图4~图6是本发明实施例2的示意图,其中图4是图5沿Ⅰ-Ⅰ的剖视图,图5是图4沿Ⅱ-Ⅱ的剖视图,图6是图4沿Ⅲ-Ⅲ的剖视图。
图中:11-矿体,12-崩落的矿石,13-胶结充填,14-尾砂充填,21-凿岩回风巷,22-中深孔,23-底部空间,31-出矿联络巷,32-运输巷,33-溜井联络道,34-溜井,41-回风联络巷,42-回风巷,80-截菱形矿块。
具体实施方式
实施例1
参见图1~图3,本实用新型一种充填采矿法镶嵌式构造的优选实施例1充填采矿法采用截菱形矿块80结构,镶嵌式构造,中深孔22凿岩,无人驾驶铲运机出矿,矿块的底部与中段出矿联络巷31相通,中段出矿联络巷31与中段运输巷32、溜井联络道33、溜井34相通,溜井34与下部集运水平相通,矿块内崩落的矿石12由无人驾驶铲运机从矿块底部运出,经出矿联络巷31、运输巷32、溜井联络道33、溜井34下放至下部集运水平;矿块的顶部与回风联络巷41、回风巷42相通,新鲜风流自运输巷31经出矿联络巷32、采场空间顶部、回风联络巷41进入回风巷42;矿体11极不稳固时,采用下向式开采,在截菱形矿块80顶部布置凿岩回风巷21与回风联络巷41、回风巷42相通,在凿岩回风巷21中向下凿中深孔22,回采过程中,所有矿块均采用胶结充填13,下中段矿块处于上中段两相邻已胶结充填13矿块的下部。
实施例2
参见图4~图6,矿体11稳固性稍好时,采用上向式开采,在截菱形矿块80底部空间向上凿中深孔22至上一相邻截菱形矿块80底部空间23,充填时保留此空间作为向上部相邻矿块凿中深孔22和出矿的空间,上向式开采采用两步回采,一步采胶结充填13矿块超前于二步采尾砂充填14矿块一个中段以上,回采过程中,二步采尾砂充填14矿块处于上中段两相邻已胶结充填13矿块的中间,其余与实施例1相似。

Claims (3)

1.一种充填采矿法镶嵌式构造,其特征在于,充填采矿法采用截菱形矿块(80)结构,镶嵌式构造,矿块的底部与中段出矿联络巷(31)相通,中段出矿联络巷(31)与中段运输巷(32)、溜井联络道(33)、溜井(34)相通,溜井(34)与下部集运水平相通,矿块的顶部与回风联络巷(41)、回风巷(42)相通。
2.根据权利要求1所述的充填采矿法镶嵌式构造,其特征在于矿体(11)极不稳固时,在截菱形矿块(80)顶部布置凿岩回风巷(21)与回风联络巷(41)、回风巷(42)相通,所有矿块均采用胶结充填(13),下中段矿块处于上中段两相邻已胶结充填(13)矿块的下部。
3.根据权利要求1所述的充填采矿法镶嵌式构造,其特征在于矿体(11)稳固性稍好时,截菱形矿块底部空间(23)为凿岩和出矿的空间,一步采胶结充填(13)矿块超前于二步采尾砂充填(14)矿块一个中段以上,二步采尾砂充填(14)矿块处于上中段两相邻已胶结充填(13)矿块的中间。
CN201620250662.9U 2016-03-29 2016-03-29 一种充填采矿法镶嵌式构造 Expired - Fee Related CN205422716U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620250662.9U CN205422716U (zh) 2016-03-29 2016-03-29 一种充填采矿法镶嵌式构造

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620250662.9U CN205422716U (zh) 2016-03-29 2016-03-29 一种充填采矿法镶嵌式构造

Publications (1)

Publication Number Publication Date
CN205422716U true CN205422716U (zh) 2016-08-03

Family

ID=56521781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620250662.9U Expired - Fee Related CN205422716U (zh) 2016-03-29 2016-03-29 一种充填采矿法镶嵌式构造

Country Status (1)

Country Link
CN (1) CN205422716U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223955A (zh) * 2016-08-04 2016-12-14 西北矿冶研究院 一种菱形梯段胶结充填采矿法
CN113803072A (zh) * 2021-08-18 2021-12-17 中南大学 基于智能掘进机的厚大矿体非爆采矿方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223955A (zh) * 2016-08-04 2016-12-14 西北矿冶研究院 一种菱形梯段胶结充填采矿法
CN106223955B (zh) * 2016-08-04 2018-09-28 西北矿冶研究院 一种菱形梯段胶结充填采矿法
CN113803072A (zh) * 2021-08-18 2021-12-17 中南大学 基于智能掘进机的厚大矿体非爆采矿方法

Similar Documents

Publication Publication Date Title
CN108612530B (zh) 一种上盘围岩破碎倾斜中厚矿体的采矿方法
CN106121648B (zh) 一种分段空场采矿底盘进路放矿嗣后充填采矿法
CN104727820B (zh) 一种两步骤分段空场嗣后充填采矿方法
CN103628877B (zh) 一种多层缓倾斜薄-中厚矿床充填采矿方法
CN101338674B (zh) 直接装运矿石的无底柱分段崩落采矿法
CN104481539B (zh) 自拉槽挤压爆破崩落采矿法
CN104533416B (zh) 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN106223958A (zh) 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法
CN107178366B (zh) 一种点柱矿体的回采方法
CN104060991A (zh) 一种用于缓倾斜薄矿脉的脉内斜坡道上向分层充填采矿法
CN102086765B (zh) 一种极薄铜矿体高分段多分层采矿方法
CN106194188B (zh) 电耙-爆力协同搬运伪倾斜房柱采矿法
CN102392678A (zh) 井上下联合压裂增透抽采瓦斯的方法
CN106089209B (zh) 柔性隔离层充当假顶的分段崩落协同采矿方法
CN104564072A (zh) 近距离煤层群完全无煤柱连续卸压开采方法
CN107687341A (zh) 一种极厚大不稳固矿体的上向分层点柱式充填采矿方法
CN102720500A (zh) 一种急倾斜薄矿体机械化地下开采方法
CN106869936A (zh) 一种适于陡坡地形的露天采矿新方法
CN102777180A (zh) 一种煤矿主动式区域性防治冲击地压的方法
CN101915118A (zh) 高瓦斯中硬煤层递进式瓦斯抽放方法
CN107503748A (zh) 一种极厚大稳固矿体的上向分层充填采矿方法
CN103147759B (zh) 一种倾斜小矿体探矿—浅孔留矿采矿方法
CN106640080A (zh) 一种深部高应力环境下自稳窿形采场布置采矿方法
CN104612692B (zh) 分段崩矿底部结构跟随形成连续充填采矿法
CN205422716U (zh) 一种充填采矿法镶嵌式构造

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803