CN102912803B - 一种用于处理后筑式高陡填方边坡的ltbd方法 - Google Patents
一种用于处理后筑式高陡填方边坡的ltbd方法 Download PDFInfo
- Publication number
- CN102912803B CN102912803B CN201210377161.3A CN201210377161A CN102912803B CN 102912803 B CN102912803 B CN 102912803B CN 201210377161 A CN201210377161 A CN 201210377161A CN 102912803 B CN102912803 B CN 102912803B
- Authority
- CN
- China
- Prior art keywords
- slope
- domatic
- tree
- formula
- blind shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
一种用于处理后筑式高陡填方边坡的LTBD组合加固技术方法,包括:表层土分区分层换填碾压、中部坡体树状盲井、下部坡体砼面板护坡等技术问题。针对后筑式高陡填土边坡自身的特殊性及其失稳根本原因,以大气降雨临界下渗深度为切入点,提出一种自上而下采用“表层土分区分层换填碾压+中部坡体树状盲井+下部坡体砼面板护坡”进行后筑式高陡填土边坡加固的立体组合处理技术。其优点是:分区分批地对填土区域进行碾压、夯实,避免了边坡碾压边缘效应问题,保证碾压质量,增强了抗剪强度,解决了浅表层及深层整体的局部稳定性问题;在技术方面具有针对性强、可靠性高等优点,在施工方面具有工艺简单、工期短、造价低等优点。
Description
技术领域
本发明技术涉及后筑式高陡填方边坡的一种加固技术领域,具体的说是一种自上而下采用“表层土分区分层换填碾压+中部坡体树状盲井+下部坡体砼面板护坡”联合处理后筑式高陡填方边坡的立体组合加固技术(简称LTBD方法)。
背景技术
山区、丘陵地带新建建设工程时,为满足场地平整需要,将会形成大量的高陡填方边坡。填方边坡由于物质成分复杂、结构松散,在大气降雨、地震等不利诱发因素作用下极易产生失稳,造成巨大经济损失。
根据高陡填方边坡加固实施阶段的不同,可分为前筑式和后筑式两种,其中前筑式是指在填方过程中进行边坡加固,主要加固措施有强夯、土工格栅等;后筑式是指在填方完成后进行边坡加固,主要加固措施有挡土墙、抗滑桩、格构锚固等。对于后筑式高陡填方边坡而言,采用单一的抗滑支挡措施加固时,由于填土自身强度低、自稳能力差,达到设计安全标准常需大截面的抗滑桩或多排抗滑桩,且桩间土容易挤出造成治理工程失效;采用单一的锚固措施加固时,由于填土与锚固体的粘结强度较低,达到设计安全标准常需大直径的长预应力锚索,且当填土碎块石含量较高时,成孔难度大、预应力易损失。由此可见,传统加固措施不仅施工工艺复杂、成本高、周期长,而且技术可靠度不高,难以从根源上解决填方边坡的永久稳定性问题,为此有必要从后筑式高陡填方边坡自身特殊性及其变形失稳机理角度来建立该类边坡的治理体系。
发明内容
本发明目的是针对后筑式高陡填方边坡自身特殊性及其变形失稳根本原因,以大气降雨临界下渗深度为切入点,提出一种自上而下的分层立体组合加固技术,从根源上阻隔导致后筑式高陡填方边坡产生变形失稳的通道,提高治理可靠度,降低施工成本,缩短施工工期。
本发明提供一种用于处理后筑式高陡填方边坡的LTBD方法,其步骤如下:
①表层土分区分层换填碾压:在潜在滑移面以上部分将填方坡面线坡顶面以下2.0m深度范围内的填土采用三七灰土进行换填,并以距坡面3m为界采用不同吨位的振动压路机进行分区分层碾压,即在距坡面3m以外的A1区用14t振动压路机进行碾压,在距坡面3m以内的A2区用2t振动压路机进行碾压;
②中部坡体树状盲井技术:将坡顶面以下1.2倍大气降雨临界下渗深度范围内即中部坡体树状盲井排水区B的填土,通过设置竖向集水井和水平向排水井,形成地下排水系统,达到快速疏导坡体内地下水的目地,其中,排水井长度以进入潜在滑移面的深度不小于5.0m为控制标准,竖向集水井长度以进入水平向排水井不超过0.5m为控制标准,同时采用H100型夯实机对坡面进行夯实;
③下部坡体砼面板护坡:将坡顶面以下1.2倍大气降雨临界下渗深度范围外即下部砼面板护坡区C的填土,采用H100型夯实机对坡面进行夯实,并顺坡面用C25砼面板进行砌筑护坡。
所述中部坡体树状盲井按下列方式完成:首先采用FS-120B型水平潜孔钻机,沿排水井与填方坡面交线的坡面走向方向按照3.0m间距布置水平向排水井,排水井直径为45mm,双层土工布内的树状盲井填料采用卵石:粗砂=6:4,卵石粒径30~40mm;然后采用DZJ-90振动沉管桩机,沿坡面倾向方向按照2.0m间距布置竖向集水井,集水井直径为400mm,双层土工布内的树状盲井填料采用卵石:粗砂=6:4,卵石粒径30~40mm。
本发明一种用于处理后筑式高陡填方边坡的LTBD方法,其优点是:分区分批地对填土区域进行碾压、夯实,避免了边坡碾压边缘效应问题,保证碾压质量,增强了抗剪强度,解决了浅表层及深层整体的局部稳定性问题;在技术方面具有针对性强、可靠性高等优点,在施工方面具有工艺简单、工期短、造价低等优点。
附图说明:
图1为用于处理后筑式高陡填方边坡的LTBD方法的处理后筑式高陡填方边典型剖面图。
图2为用于处理后筑式高陡填方边坡的LTBD方法的中部坡体树状盲井平面布置图。
图3为中部坡体树状盲井结构图。
图中,1–填方坡面线,2–潜在滑移面,3–竖向集水井,4–水平向排水井,5–坡面,6–C25砼面板,7–排水井与原坡体交线,8–排水井与潜在滑移面交线,9–排水井与填方坡面交线,10–双层土工布,11–树状盲井填料,A1–14t振动压路机分层碾压区,A2–2t振动压路机分层碾压区,B–中部坡体树状盲井排水区,C–下部砼面板护坡区,h–降雨临界下渗深度。
具体实施方式:
根椐图1、图2、图3所示:一种用于处理后筑式高陡填方边坡的LTBD技术,具体实施步骤如下:
①表层土分区分层换填碾压:在潜在滑移面2以上部分将填方坡面线1坡顶面以下2.0m深度范围内的填土采用三七灰土进行换填,灰土配合比生石灰:粘性土=3:7,单层换填厚度20~30cm;然后将距坡面3m以外A1区的换填土采用14t振动压路机进行分层碾压,碾压压实系数不小于0.95;最后将距坡面3m以内A2区的换填土采用2t振动压路机进行分层碾压,碾压压实系数不小于0.92。
②中部坡体树状盲井:将坡顶面以下1.2h倍大气降雨临界下渗深度范围内即中部坡体树状盲井排水区B区的填土,通过设置竖向集水井3和水平向排水井4,形成地下排水系统;然后采用H100型夯实机对坡面夯实5进行夯实,夯击数不少于2击,夯迹搭接长度不小于10cm。
③下部坡体砼面板护坡:将坡顶面以下1.2h倍大气降雨临界下渗深度范围外即下部砼面板护坡区C区的填土,首先采用H100型夯实机对坡面进行夯实,夯击数不少于3击,夯迹搭接长度不小于15cm;然后垂直于夯实后坡面,按4.0×4.0m间距呈正方形布置3.0m长土钉;最后在坡面上铺设200×200mm间距的φ8钢筋网,并对C25砼面板6进行喷射,喷射厚度为150mm。
所述中部树状盲井按下列方式完成:首先采用FS-120B型水平潜孔钻机,沿排水井与填方坡面交线9的坡面走向方向按照3.0m间距布置水平向排水井4,排水井直径为45mm,排水井长度以进入潜在滑移面2的深度不小于5.0m为控制标准,双层土工布10内的树状盲井填料11采用卵石:粗砂=6:4,卵石粒径30~40mm;然后采用DZJ-90振动沉管桩机,沿坡面倾向方向按照2.0m间距布置竖向集水井3,集水井直径为400mm,竖向集水井3长度以进入水平向排水井4不超过0.5m为控制标准,双层土工布10内的树状盲井填料11采用卵石:粗砂=6:4,卵石粒径30~40mm。
Claims (2)
1.一种用于处理后筑式高陡填方边坡的LTBD方法,其特征在于,其步骤如下:
①表层土分区分层换填碾压:在潜在滑移面(2)以上部分将填方坡面线(1)坡顶面以下2.0m深度范围内的填土采用三七灰土进行换填,并以距坡面3m为界采用不同吨位的振动压路机进行分区分层碾压,即在距坡面3m以外的A1区用14t振动压路机进行碾压,在距坡面3m以内的A2区用2t振动压路机进行碾压;
②中部坡体树状盲井技术:将坡顶面以下1.2倍大气降雨临界下渗深度范围内即中部坡体树状盲井排水区(B)的填土,通过设置竖向集水井(3)和水平向排水井(4),形成地下排水系统,达到快速疏导坡体内地下水的目地,其中,排水井长度以进入潜在滑移面(2)的深度不小于5.0m为控制标准,竖向集水井(3)长度以进入水平向排水井(4)不超过0.5m为控制标准,同时采用H100型夯实机对坡面(5)进行夯实;
③下部坡体砼面板护坡:将坡顶面以下1.2倍大气降雨临界下渗深度范围外即下部砼面板护坡区(C)的填土,采用H100型夯实机对坡面进行夯实,并顺坡面用C25砼面板(6)进行砌筑护坡。
2.根椐权利要求1所述的一种用于处理后筑式高陡填方边坡的LTBD方法,其特征在于:所述中部坡体树状盲井按下列方式完成:首先采用FS-120B型水平潜孔钻机,沿排水井与填方坡面交线(9)的坡面走向方向按照3.0m间距布置水平向排水井(4),排水井直径为45mm,双层土工布(10)内的树状盲井填料(11)采用卵石:粗砂=6:4,卵石粒径30~40mm;然后采用DZJ-90振动沉管桩机,沿坡面倾向方向按照2.0m间距布置竖向集水井(3),集水井直径为400mm,双层土工布(10)内的树状盲井填料(11)采用卵石:粗砂=6:4,卵石粒径30~40mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210377161.3A CN102912803B (zh) | 2012-10-08 | 2012-10-08 | 一种用于处理后筑式高陡填方边坡的ltbd方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210377161.3A CN102912803B (zh) | 2012-10-08 | 2012-10-08 | 一种用于处理后筑式高陡填方边坡的ltbd方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102912803A CN102912803A (zh) | 2013-02-06 |
CN102912803B true CN102912803B (zh) | 2015-09-09 |
Family
ID=47611353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210377161.3A Active CN102912803B (zh) | 2012-10-08 | 2012-10-08 | 一种用于处理后筑式高陡填方边坡的ltbd方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102912803B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191308799A (en) * | 1913-04-14 | 1913-07-24 | Giulio Serrazanetti | Improvements in Retaining Walls for Preventing Land Slips. |
CN1730841A (zh) * | 2005-08-05 | 2006-02-08 | 贾燎 | 一种压密石灰土换填实体边坡支护方法 |
CN101392511A (zh) * | 2008-10-17 | 2009-03-25 | 安徽省水利水电勘测设计院 | 堤防加固置换取土工艺方法 |
CN102704497A (zh) * | 2012-05-31 | 2012-10-03 | 中冶集团武汉勘察研究院有限公司 | 一种用于处理高填方边坡的rpw法技术 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2665144B2 (ja) * | 1994-03-15 | 1997-10-22 | 強化土エンジニヤリング株式会社 | 補強土構造物 |
CN101575835A (zh) * | 2009-05-25 | 2009-11-11 | 铁道第三勘察设计院集团有限公司 | 隐式支挡路基结构 |
-
2012
- 2012-10-08 CN CN201210377161.3A patent/CN102912803B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191308799A (en) * | 1913-04-14 | 1913-07-24 | Giulio Serrazanetti | Improvements in Retaining Walls for Preventing Land Slips. |
CN1730841A (zh) * | 2005-08-05 | 2006-02-08 | 贾燎 | 一种压密石灰土换填实体边坡支护方法 |
CN101392511A (zh) * | 2008-10-17 | 2009-03-25 | 安徽省水利水电勘测设计院 | 堤防加固置换取土工艺方法 |
CN102704497A (zh) * | 2012-05-31 | 2012-10-03 | 中冶集团武汉勘察研究院有限公司 | 一种用于处理高填方边坡的rpw法技术 |
Also Published As
Publication number | Publication date |
---|---|
CN102912803A (zh) | 2013-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638673B (zh) | 一种复合支挡结构的施工方法 | |
CN203741868U (zh) | 一种带组合锚索的钢筋混凝土挡墙结构 | |
CN103669399B (zh) | 混凝土面板加筋挡土墙及其施工方法 | |
CN107503257B (zh) | 一种傍山高填路堤稳定与变形控制结构及施工方法 | |
CN103410167A (zh) | 一种立体加筋刚柔复合生态挡土墙及施工方法 | |
CN206090588U (zh) | 高填方边坡处理施工结构 | |
CN207109475U (zh) | 傍山高填路堤稳定与变形控制结构 | |
CN203429660U (zh) | 一种立体加筋刚柔复合生态挡土墙 | |
CN106759376A (zh) | 用于临近既有地下结构的基坑桩锚支护体系及其施工方法 | |
CN107447597A (zh) | 一种无砟轨道铁路膨胀土路堑结构及施工方法 | |
CN107604940A (zh) | 一种钢管格栅膨胀土挡墙及其施工方法 | |
CN102704497B (zh) | 一种用于处理高填方边坡的方法 | |
CN102912800B (zh) | 一种用于处理后筑式高陡填方边坡的立体组合加固方法 | |
CN207646754U (zh) | 一种桩体贯入式填土体加筋承载结构 | |
CN109881683A (zh) | 一种联合人工填土注浆加固技术的多桩分阶支挡结构及其施工方法 | |
CN203284795U (zh) | 一种带锚定板的扶壁式挡土墙 | |
CN102296620B (zh) | 帷幕止水护坡墙及其施工方法 | |
CN206667263U (zh) | 一种基坑支护结构 | |
CN102912803B (zh) | 一种用于处理后筑式高陡填方边坡的ltbd方法 | |
CN102912802B (zh) | 一种用于处理后筑式高陡填方边坡的方法 | |
RU121275U1 (ru) | Армированная грунтоцементная стена для защиты зданий и сооружений от откапываемого вблизи котлована | |
CN206070564U (zh) | 一种新型复合支挡结构 | |
CN204940310U (zh) | 一种组合支挡结构 | |
CN211447015U (zh) | 一种h形抗滑桩板墙 | |
CN107313432B (zh) | 一种上软下硬地层基坑支护结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |