CN107503257B - 一种傍山高填路堤稳定与变形控制结构及施工方法 - Google Patents
一种傍山高填路堤稳定与变形控制结构及施工方法 Download PDFInfo
- Publication number
- CN107503257B CN107503257B CN201710706228.6A CN201710706228A CN107503257B CN 107503257 B CN107503257 B CN 107503257B CN 201710706228 A CN201710706228 A CN 201710706228A CN 107503257 B CN107503257 B CN 107503257B
- Authority
- CN
- China
- Prior art keywords
- pile
- embankment
- humanoid
- layer
- light
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000006641 stabilisation Effects 0.000 title claims abstract description 12
- 238000011105 stabilization Methods 0.000 title claims abstract description 12
- 238000010276 construction Methods 0.000 title claims description 35
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 70
- 239000010959 steel Substances 0.000 claims abstract description 70
- 239000011381 foam concrete Substances 0.000 claims abstract description 43
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 28
- 239000004567 concrete Substances 0.000 claims abstract description 21
- 239000004575 stone Substances 0.000 claims abstract description 18
- 238000009412 basement excavation Methods 0.000 claims abstract description 17
- 239000010410 layer Substances 0.000 claims description 59
- 238000010008 shearing Methods 0.000 claims description 40
- 230000002787 reinforcement Effects 0.000 claims description 26
- 230000004888 barrier function Effects 0.000 claims description 19
- 238000005553 drilling Methods 0.000 claims description 19
- 238000003780 insertion Methods 0.000 claims description 16
- 230000037431 insertion Effects 0.000 claims description 16
- 238000005266 casting Methods 0.000 claims description 12
- 239000004746 geotextile Substances 0.000 claims description 12
- 239000002689 soil Substances 0.000 claims description 12
- 239000004568 cement Substances 0.000 claims description 11
- 238000005096 rolling process Methods 0.000 claims description 11
- 239000002893 slag Substances 0.000 claims description 9
- 238000013461 design Methods 0.000 claims description 7
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 239000006260 foam Substances 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 6
- 239000002002 slurry Substances 0.000 claims description 6
- 239000000758 substrate Substances 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 5
- 239000011435 rock Substances 0.000 claims description 5
- 238000004458 analytical method Methods 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 239000004744 fabric Substances 0.000 claims description 4
- 239000002344 surface layer Substances 0.000 claims description 4
- 238000004140 cleaning Methods 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims description 3
- 238000005345 coagulation Methods 0.000 claims description 3
- 239000002131 composite material Substances 0.000 claims description 3
- 239000011440 grout Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 230000002459 sustained effect Effects 0.000 claims description 3
- 238000013316 zoning Methods 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000009413 insulation Methods 0.000 abstract description 2
- 238000005452 bending Methods 0.000 description 4
- 230000006378 damage Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000007704 transition Effects 0.000 description 3
- 238000007596 consolidation process Methods 0.000 description 2
- 230000001934 delay Effects 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 238000004062 sedimentation Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004181 pedogenesis Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710706228.6A CN107503257B (zh) | 2017-08-17 | 2017-08-17 | 一种傍山高填路堤稳定与变形控制结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710706228.6A CN107503257B (zh) | 2017-08-17 | 2017-08-17 | 一种傍山高填路堤稳定与变形控制结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107503257A CN107503257A (zh) | 2017-12-22 |
CN107503257B true CN107503257B (zh) | 2019-08-02 |
Family
ID=60692161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710706228.6A Active CN107503257B (zh) | 2017-08-17 | 2017-08-17 | 一种傍山高填路堤稳定与变形控制结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107503257B (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056439A (zh) * | 2018-09-20 | 2018-12-21 | 杭州市交通规划设计研究院 | 傍山高填方路基的多层次结构和施工方法 |
CN109267453A (zh) * | 2018-10-23 | 2019-01-25 | 中铁四局集团第工程有限公司 | 一种试车场高速环道超大斜面沥青碾压方法 |
CN110593277A (zh) * | 2019-03-14 | 2019-12-20 | 中铁二院工程集团有限责任公司 | 一种陡坡防滑加固结构及构筑方法 |
CN110004948A (zh) * | 2019-04-19 | 2019-07-12 | 贵州省交通规划勘察设计研究院股份有限公司 | 一种滑坡加固系统及其加固方法 |
CN110055828B (zh) * | 2019-04-28 | 2023-09-26 | 中铁二院工程集团有限责任公司 | 一种路堤大坡度齿轨铁路结构的构筑方法 |
CN111411637A (zh) * | 2020-04-30 | 2020-07-14 | 浙江大学城市学院 | 高陡地形泡沫混凝土轻质路堤结构及施工方法 |
CN111501796B (zh) * | 2020-04-30 | 2021-06-15 | 浙江大学城市学院 | 一种高路堤边坡稳定结构及施工方法 |
CN113308953B (zh) * | 2021-05-17 | 2023-03-31 | 浙大城市学院 | 利用既有挡墙的泡沫混凝土拼宽路堤的施工方法 |
CN113308957B (zh) * | 2021-05-17 | 2023-03-31 | 浙大城市学院 | 挡墙轻质土拼宽路堤的施工方法 |
CN114411479B (zh) * | 2022-01-13 | 2023-06-13 | 中铁十二局集团第三工程有限公司 | 跨冲沟段傍山施工便道及其施工方法 |
CN115404734B (zh) * | 2022-09-30 | 2024-03-26 | 中国电建集团贵州电力设计研究院有限公司 | 一种用于高填方道路部分垮塌的生态修复方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001262535A (ja) * | 2000-03-16 | 2001-09-26 | Tootetsu:Kk | 石詰めマットの構築方法及びこれに用いるコンクリート部材 |
JP2008031841A (ja) * | 2007-10-04 | 2008-02-14 | Maxstone Kk | 覆工用目地割りパネルの製造法 |
JP2013002187A (ja) * | 2011-06-18 | 2013-01-07 | Iritech Co Ltd | 斜面を段切り状に整地するために使用される擁壁パネル及びその工法 |
CN203716019U (zh) * | 2014-01-27 | 2014-07-16 | 浙江省交通规划设计研究院 | 一种滨海软土地基傍河路堤的拓宽结构 |
CN106988327A (zh) * | 2017-05-22 | 2017-07-28 | 张玉芳 | 一种竖向控制注浆钢花管桩基托梁挡墙结构及其施工方法 |
CN207109475U (zh) * | 2017-08-17 | 2018-03-16 | 浙江交工集团股份有限公司 | 傍山高填路堤稳定与变形控制结构 |
-
2017
- 2017-08-17 CN CN201710706228.6A patent/CN107503257B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001262535A (ja) * | 2000-03-16 | 2001-09-26 | Tootetsu:Kk | 石詰めマットの構築方法及びこれに用いるコンクリート部材 |
JP2008031841A (ja) * | 2007-10-04 | 2008-02-14 | Maxstone Kk | 覆工用目地割りパネルの製造法 |
JP2013002187A (ja) * | 2011-06-18 | 2013-01-07 | Iritech Co Ltd | 斜面を段切り状に整地するために使用される擁壁パネル及びその工法 |
CN203716019U (zh) * | 2014-01-27 | 2014-07-16 | 浙江省交通规划设计研究院 | 一种滨海软土地基傍河路堤的拓宽结构 |
CN106988327A (zh) * | 2017-05-22 | 2017-07-28 | 张玉芳 | 一种竖向控制注浆钢花管桩基托梁挡墙结构及其施工方法 |
CN207109475U (zh) * | 2017-08-17 | 2018-03-16 | 浙江交工集团股份有限公司 | 傍山高填路堤稳定与变形控制结构 |
Also Published As
Publication number | Publication date |
---|---|
CN107503257A (zh) | 2017-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107503257B (zh) | 一种傍山高填路堤稳定与变形控制结构及施工方法 | |
CN207109475U (zh) | 傍山高填路堤稳定与变形控制结构 | |
CN103882884B (zh) | 一种锚索土工格栅支挡结构及其施工方法 | |
CN106930321B (zh) | 一种大直径顶管结合洞桩修建地下结构的施工方法 | |
CN105525627B (zh) | 一种双向锚定板挡土墙及其施工方法 | |
CN103981876B (zh) | 用于深厚软基河道与傍河路堤共建的组合构件及施工方法 | |
CN109750571B (zh) | 一种道路塌方应急与永久支挡一体化结构及施工方法 | |
CN108560349A (zh) | 软土地区高路堤支挡结构 | |
CN202323970U (zh) | 边坡联合加固系统 | |
CN103074882A (zh) | 用于采用碎石桩加固处理岛状多年冻土地基的施工方法 | |
CN110685286A (zh) | 一种复杂地质条件下临近道路的深基坑支护施工工艺 | |
CN101838957B (zh) | 整体式t形外悬臂道路及其施工方法 | |
CN111395060B (zh) | 岩溶区既有路堑拓宽路基结构的设计及施工方法 | |
CN113006097A (zh) | 一种治理巨型滑坡的通透式截水抗滑结构及其施工方法 | |
CN104480956B (zh) | 一种小直径模袋混凝土桩复合地基 | |
CN108914954A (zh) | 预支护与永久支护结合的边坡支护方法 | |
CN114575355A (zh) | 一种土护降施工方法 | |
CN208604438U (zh) | 软土地区高路堤支挡结构 | |
CN111827312B (zh) | 一种边坡加筋挡土墙及其施工方法 | |
CN207032212U (zh) | 一种新老路基在浸水路段稳固拼接的排水加固结构 | |
CN113186955A (zh) | 一种复合型边坡加固结构 | |
CN102425179B (zh) | 一种微型钢管灌注桩支撑加筋土渗沟结构 | |
CN110939142A (zh) | 用于边坡的路基结构 | |
CN102561368B (zh) | 一种预压实加筋土块柔性支护结构 | |
CN109024621A (zh) | 路堤高边坡管桩复合挡土墙支护结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 310015 No. 51 Huzhou street, Hangzhou, Zhejiang, Gongshu District Patentee after: Zhejiang University City College Country or region after: China Address before: 310015 No. 50 Huzhou Street, Hangzhou City, Zhejiang Province Patentee before: Zhejiang University City College Country or region before: China |
|
TR01 | Transfer of patent right |
Effective date of registration: 20240409 Address after: 310007 No.161 Baochu Road, Xihu District, Hangzhou City, Zhejiang Province Patentee after: HANGZHOU TRAFFIC ENGINEERING GROUP Co.,Ltd. Country or region after: China Address before: 310015 No. 51 Huzhou street, Hangzhou, Zhejiang, Gongshu District Patentee before: Zhejiang University City College Country or region before: China |