CN102909786A - Construction technology for prefabricating concrete crane beam - Google Patents

Construction technology for prefabricating concrete crane beam Download PDF

Info

Publication number
CN102909786A
CN102909786A CN2012104762096A CN201210476209A CN102909786A CN 102909786 A CN102909786 A CN 102909786A CN 2012104762096 A CN2012104762096 A CN 2012104762096A CN 201210476209 A CN201210476209 A CN 201210476209A CN 102909786 A CN102909786 A CN 102909786A
Authority
CN
China
Prior art keywords
concrete
crane beam
pedestal
crane
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104762096A
Other languages
Chinese (zh)
Other versions
CN102909786B (en
Inventor
刘六艺
范开平
王来所
张宝忠
缪买和
郭振华
马岚
杨立峰
王晓莉
马社堂
赵国庆
陈香荣
赵胜荣
郑顺生
赵青
朱丽
杨睿
王康
王涛
许元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201210476209.6A priority Critical patent/CN102909786B/en
Publication of CN102909786A publication Critical patent/CN102909786A/en
Application granted granted Critical
Publication of CN102909786B publication Critical patent/CN102909786B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a construction technology for prefabricating a concrete crane beam. The construction technology comprises reinforced bar manufacturing and installing, embedded part installing, molding board installing, concrete casting and concrete curing. A bottom die for prefabricating the concrete crane beam is a concrete pedestal, and machined crane beam reinforced bars are arranged on the pedestal. Embedded parts on the bottom side of the crane beam are placed and fixed on the concrete pedestal before the reinforced bars are installed; the embedded parts on the side faces of the crane beam are firstly fixed at the corresponding positions of a side die by using screws and then are installed in place together with the side die; the side die is a bamboo plywood board; and the side die is fixed by using a screw rod jack and a steel pipe support rack. The concrete is fed in a bin by using a concrete pump truck and is vibrated by a small-diameter plug-type vibrator. After the demolding of the crane beam, the concrete is cured through watering. The construction technology is convenient to construct and operate, the springing of the crane beam can be accurately controlled, the embedded parts are embedded accurately in position, and the prefabricated concrete crane beam is attractive in appearance.

Description

A kind of concrete crane beam prefabricating and constructing
Technical field
The invention belongs to the industrial building field, be specifically related to a kind of concrete crane beam prefabricating and constructing.
 
Background technology
At present, the most of precast concrete crane girder that adopts of the crane girder of thermal power plant and other industrial premises, the conventional prefabricated employing combined steel formwork of concrete crane beam, steel pipe frame supports the method with Screw arbor with nut at both-ends fixed combination steel form, the concrete crane beam outward appearance that precasts like this is not attractive in appearance, built-in fitting out-of-flatness on the concrete crane beam perhaps can not find built-in fitting after the concrete crane beam demoulding.
 
Summary of the invention
The objective of the invention is to overcome the deficiency of present conventional precast concrete crane girder technique, provide that a kind of construction cost is low, template is easy for installation, the concrete crane beam prefabricating and constructing of built-in fitting fixation, reliable construction quality.
Technical scheme of the present invention is: may further comprise the steps: reinforcing bar peace processed, installation of embedded parts, template installation, concreting, concrete curing;
1) reinforcing bar system peace: the concrete crane beam framework of steel reinforcement is colligation on the concrete pedestal directly;
2) installation of embedded parts: place first at the bottom of the concrete crane beam beam built-in fitting in the relevant position of pedestal end face, the built-in fitting dowel is welded on the crane girder framework of steel reinforcement, the built-in fitting of crane girder side is screwed in the inboard relevant position of side template, along with side template together installation in position, U-bolt is installed before side form is installed, the suspension ring of concrete crane beam adopt without cold drawn I level hot-rolled reinforced bar and make, and each root crane girder arranges two suspension ring, is reserved in respectively crane girder 1/4 place;
3) template is installed: the concrete crane beam bed die adopts the concrete pedestal, and the pedestal end face raises into arch face, and as side template, side template adopts steel pipe screw mandrel jacking level fixing to supportting with the high strength blind bamboo plywood coated with film;
4) adopt the concrete automobile pump that concrete distributing is put in storage, use the poker vibrator vibrated concrete;
5) with the maintenance crane girder concrete of directly sprinkling water, remain that concrete surface is moistening, curing time is no less than 14 days.
The present invention has the following advantages compared with the prior art: constructing operation is convenient, can accurately control the arch camber of crane girder, and the built-in fitting position is buried underground precisely, the concrete crane beam good looking appearance that precasts.Improve efficiency of construction, reduced construction cost.
Description of drawings
Fig. 1 is that the prefabricated master of concrete crane beam of the present invention looks schematic diagram.
Fig. 2 is the prefabricated schematic side view of concrete crane beam of the present invention.
Fig. 3 is the prefabricated horizontal layout schematic diagram of concrete crane beam of the present invention.
Among the figure: 1-concrete pedestal, 2-side template, the vertical back cord of 3-, the horizontal back cord of 4-, 5-screw mandrel jacking, 6-horizontal support steel pipe, the vertical vertical rod in 7-steel pipe frame middle part, vertical vertical rod around the 8-steel pipe frame, 9-steel pipe frame horizontal cross bar, 10-U type bolt, 11-concrete crane beam.
 
The specific embodiment
Select a smooth area to be not less than 600m 2Place (and the place has a good transport service to the plant building that concrete crane beam is installed).The pouring concrete sclerosis of the prefabricated place of concrete crane beam, concreting thickness is 20cm.Some concrete pedestals 1 are built in place in sclerosis, concrete pedestal (namely concrete crane beam bed die) is arranged and is seen Fig. 3, centre-to-centre spacing is 4m between pedestal and the pedestal, the pedestal length and width are identical with the length and width of concrete crane beam bottom surface, pedestal lowest part height is not less than 30cm, and the pedestal end face is constructed into arch face (sagitta be pedestal length 3 ‰) along its length.After prefabricated place maturing and pedestal concrete reach the 28 day length of time; mark crane girder bottom steel bar stress and stirrup position with slate pencil at pedestal; at the pedestal placement cushion block of concrete bar protective layer that keeps at a certain distance away, at pedestal manufactured crane girder reinforcing bar is installed.Built-in fitting is placed on first the relevant position of pedestal end face at the bottom of the concrete crane beam beam, the built-in fitting dowel is welded on the crane girder framework of steel reinforcement, the built-in fitting of crane girder side is fixed on first side template 2 inboard relevant positions, along with side template together installation in position, the U-bolt 10 of crane girder is installed (being welded and fixed U-bolt with ∠ 30 * 4 angle bar frames) before side form is installed, the suspension ring of concrete crane beam adopt without cold drawn I level hot-rolled reinforced bar and make, and each root crane girder arranges two suspension ring, is reserved in respectively crane girder 1/4 place.After the crane girder tie with reinforcing bar was complete, the beginning side form was installed.Side form adopts high strength blind bamboo plywood coated with film (thick 18mm), the vertical back cord 3 of side template arranged outside, vertical back cord (5 * 8cm wood a tree, used in making timber for boats) spacing is 50cm, with long iron nail vertical back cord is fixed on the side form, be close to vertical back cord lateral surface and arrange horizontal back cord 4, laterally the back cord spacing is 60cm.Side form adopts steel pipe frame (outer diameter of steel pipes is 48mm, wall thickness 3.5mm), screw mandrel jacking 5 levels fixing to supportting.Steel pipe frame comprises horizontal support steel pipe 6, the vertical vertical rod 7 in steel pipe frame middle part, steel pipe frame vertical vertical rod 8 all around, steel pipe frame horizontal cross bar 9.After side form installs, check installation location (center line, the top mark height) precision of U-bolt, after positioning accuracy meets design requirement, the support welding of U-bolt on the crane girder framework of steel reinforcement, and the perpendicularity of inspection side form, after adjustment screw mandrel jacking is reinforced firm side template, begin to build the crane girder concrete.Concrete adopts the concrete mixer cloth to put in storage minor diameter (φ 30) poker vibrator vibrated concrete.Crane girder concreting begins form removal after complete 7 days, and after the crane girder form removal, the side adopts plastic sheeting to hide.Directly watering maintenance is adopted in the concrete maintenance of crane girder, and maintenance work is undertaken by the special messenger, remains that concrete surface is moistening, and curing time is no less than 14 days.

Claims (6)

1. a concrete crane beam prefabricating and constructing is characterized in that may further comprise the steps: reinforcing bar peace processed, installation of embedded parts, template installation, concreting, concrete curing;
1) reinforcing bar system peace: the concrete crane beam framework of steel reinforcement is colligation on the concrete pedestal directly;
2) installation of embedded parts: place first at the bottom of the concrete crane beam beam built-in fitting in the relevant position of pedestal end face, the built-in fitting dowel is welded on the crane girder framework of steel reinforcement, the built-in fitting of crane girder side is screwed in the inboard relevant position of side template, along with side template together installation in position, U-bolt is installed before side form is installed, and the suspension ring of concrete crane beam adopt without cold drawn I level hot-rolled reinforced bar and make;
3) template is installed: the concrete crane beam bed die adopts the concrete pedestal, and the pedestal end face raises into arch face, and as side template, side template adopts steel pipe screw mandrel jacking level fixing to supportting with the high strength blind bamboo plywood coated with film;
4) adopt the concrete automobile pump that concrete distributing is put in storage, use the poker vibrator vibrated concrete;
5) with the maintenance crane girder concrete of directly sprinkling water, remain that concrete surface is moistening, curing time is no less than 14 days.
2. concrete crane beam prefabricating and constructing according to claim 1 is characterized in that the pedestal length and width are identical with concrete crane beam bottom surface length and width, the high 30cm of pedestal lowest part.
3. concrete crane beam prefabricating and constructing according to claim 1 is characterized in that each root crane girder arranges two suspension ring, is reserved in respectively crane girder 1/4 place.
4. concrete crane beam prefabricating and constructing according to claim 1 is characterized in that at the pedestal placement cushion block of concrete bar protective layer that keeps at a certain distance away.
5. concrete crane beam prefabricating and constructing according to claim 1, it is characterized in that side form adopts the high strength blind bamboo plywood coated with film of thick 18mm, the vertical back cord of side template arranged outside, vertical back cord spacing is 50cm, be close to vertical back cord lateral surface and arrange horizontal back cord, laterally the back cord spacing is 60cm, and side form adopts steel pipe frame, screw mandrel jacking level fixing to supportting.
6. concrete crane beam prefabricating and constructing according to claim 5 is characterized in that steel pipe frame comprises horizontal support steel pipe, the vertical vertical rod in steel pipe frame middle part, steel pipe frame vertical vertical rod all around, steel pipe frame horizontal cross bar.
CN201210476209.6A 2012-11-22 2012-11-22 Construction technology for prefabricating concrete crane beam Active CN102909786B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210476209.6A CN102909786B (en) 2012-11-22 2012-11-22 Construction technology for prefabricating concrete crane beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210476209.6A CN102909786B (en) 2012-11-22 2012-11-22 Construction technology for prefabricating concrete crane beam

Publications (2)

Publication Number Publication Date
CN102909786A true CN102909786A (en) 2013-02-06
CN102909786B CN102909786B (en) 2014-10-29

Family

ID=47608472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210476209.6A Active CN102909786B (en) 2012-11-22 2012-11-22 Construction technology for prefabricating concrete crane beam

Country Status (1)

Country Link
CN (1) CN102909786B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434372A (en) * 2022-08-09 2022-12-06 深圳市建工集团股份有限公司 Be used for basement outer wall post-cast strip assembled template to exempt from to chisel hair and block and establish device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2554888A1 (en) * 1975-12-05 1977-06-08 Esli James Forrest Multi stage reinforced concrete beam casting - includes base layer partially set before adding tensioning members followed by upper layers
US4629408A (en) * 1985-09-06 1986-12-16 Arctic Equipment Rental, Inc. Portable concrete beam harping system
JP2002250093A (en) * 2001-02-23 2002-09-06 Sanwa Kensetsu:Kk Construction method of t-type beam slab
CN101125441A (en) * 2007-08-31 2008-02-20 中铁二局股份有限公司 Post-tensioned method prestressed concrete box beam whole opening prefabricated construction method
CN101748681A (en) * 2009-12-22 2010-06-23 浙江省大成建设集团有限公司 Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN101905485A (en) * 2010-07-15 2010-12-08 孙允禄 Application method of stress template molding die in continuous production of cement components

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2554888A1 (en) * 1975-12-05 1977-06-08 Esli James Forrest Multi stage reinforced concrete beam casting - includes base layer partially set before adding tensioning members followed by upper layers
US4629408A (en) * 1985-09-06 1986-12-16 Arctic Equipment Rental, Inc. Portable concrete beam harping system
JP2002250093A (en) * 2001-02-23 2002-09-06 Sanwa Kensetsu:Kk Construction method of t-type beam slab
CN101125441A (en) * 2007-08-31 2008-02-20 中铁二局股份有限公司 Post-tensioned method prestressed concrete box beam whole opening prefabricated construction method
CN101748681A (en) * 2009-12-22 2010-06-23 浙江省大成建设集团有限公司 Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN101905485A (en) * 2010-07-15 2010-12-08 孙允禄 Application method of stress template molding die in continuous production of cement components

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434372A (en) * 2022-08-09 2022-12-06 深圳市建工集团股份有限公司 Be used for basement outer wall post-cast strip assembled template to exempt from to chisel hair and block and establish device
CN115434372B (en) * 2022-08-09 2024-06-04 深圳市建工集团股份有限公司 Be used for basement outer wall post-cast strip assembled template to exempt from to chisel hair to block and establish device

Also Published As

Publication number Publication date
CN102909786B (en) 2014-10-29

Similar Documents

Publication Publication Date Title
CN204054323U (en) Steel construction assembled beam making bench
CN104088461B (en) Y type cast-in-situ concrete columns template system and construction method thereof
CN101619602B (en) Construction method of cast-in-place concrete cored slabs with self stationary high-strength thin-wall pipe internal mold
CN103352563B (en) The board-like bar frame gang form of self-supporting and construction method thereof
CN103174166B (en) A kind of recreation facility built-in fitting of complete integral installation and mounting method thereof
CN107130791A (en) Combining aluminum alloy mould plate is used for the construction method of assembly concrete precast construction
CN101343948B (en) Prefabricated casket beam reinforced bar binding stand and reinforced bar binding method using the same
CN103410269B (en) Prestressing without bondn cast-in-place reinforced concrete hollow slab constructing structure and construction method
CN103306463B (en) Metal liner concrete air channel construction method
CN201738250U (en) Arch culvert and arch ring steel die trolley
CN102926538A (en) Reaction box and construction method of reaction wall
CN107460889A (en) Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof
CN102409848A (en) Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor
CN107237492A (en) The installation method of sizing cylindrical form
CN106013803A (en) Installing process of aluminum formwork
CN102909786B (en) Construction technology for prefabricating concrete crane beam
CN112227399A (en) Template mounting and dismounting device of large cup-shaped foundation and template supporting and dismounting method
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN205224420U (en) Anticorrosive industry factory building precast concrete stand
CN105442736A (en) Anti-floating construction method for cast-in-place concrete hollow floor sectional type combined device
CN102561694A (en) Construction method for support mould with large-curvature spherical concrete structure
CN202882227U (en) Pre-embedded zigzag concrete horse-shaped stool
CN101967884A (en) Method for controlling concrete planeness of large-area steel bar truss template
CN214834742U (en) Anti-bank template structure
CN204955097U (en) Prefabricated T web reinforcing bar bed -jig

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant