CN107237492A - The installation method of sizing cylindrical form - Google Patents

The installation method of sizing cylindrical form Download PDF

Info

Publication number
CN107237492A
CN107237492A CN201710554190.5A CN201710554190A CN107237492A CN 107237492 A CN107237492 A CN 107237492A CN 201710554190 A CN201710554190 A CN 201710554190A CN 107237492 A CN107237492 A CN 107237492A
Authority
CN
China
Prior art keywords
typified form
typified
waist hoop
cylindrical form
matched moulds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710554190.5A
Other languages
Chinese (zh)
Inventor
程健
陈世华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710554190.5A priority Critical patent/CN107237492A/en
Publication of CN107237492A publication Critical patent/CN107237492A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/021Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for circular columns

Abstract

The present invention is a kind of installation method for cylindrical form of shaping, and belongs to the method for construction, its operating procedure is as follows:One), preparation of construction, two), the installation of typified form, three), pour, four), form removal;Wherein, typified form is plank sheathing, is customized by template construct producer burst;Waist hoop is made of steel band, and this typified form is installed according to following orders:Formwork → matched moulds → reinforcing, protection;Wherein, formwork:The typified form that burst is customized is buckled into cylindrical form, bottom concrete joint filling, along the height of this cylindrical form, the waist hoop of compartment of terrain installation from the bottom to top;Matched moulds:When the height of cylinder is more than three meters, typified form needs section by section matched moulds up and down, and matched moulds junction needs the fissure of displacement to install and installs waist hoop;Second consolidation, protection:Guard timber, cross bar, vertical pole, vertical rod and diagonal brace is set to be reinforced, protected in the periphery of typified form;Easy, convenient disassembly is not only installed, and can be used for multiple times, reduce cost, quality is improved.

Description

The installation method of sizing cylindrical form
Technical field
The invention belongs to the method for construction, more particularly, to a kind of installation method of typified form.
Background technology
During construction, pouring for circular columns generally uses Arc moulding board, and this Arc moulding board uses glue Plywood makes, and takes cyclotom to splice, but this construction method can cause template the number of turnover it cannot be guaranteed that, material is seriously unrestrained Take, while spending a large amount of manpowers, the duration is difficult to ensure, presentation quality is difficult to control to.
The content of the invention
The purpose of the present invention is in view of the above-mentioned problems, proposing a kind of installation method for cylindrical form of shaping, not only structure Simply, install easily, convenient disassembly, and template clad can area is big, splice less, good toughness, and impact resistance, intensity are high, Ke Yiduo Secondary Reusability, reduces cost, improves the construction quality of circular columns.
The object of the present invention is achieved like this:A kind of installation method for cylindrical form of shaping, its operating procedure is such as Under:
One), preparation of construction:
1), the preparation of material:
1., typified form:By design drawing, this sizing cylindrical form (abbreviation typified form) is plank sheathing, by template Manufacturing factory customizes;
2., waist hoop:According to design, waist hoop 3 is made of steel band, and width × thickness of this waist hoop 3 can be 5cm × 0.05cm, Reinforce and use when being installed for typified form 2, the screw that screw gun twists fastening is moved with standby electricity on this waist hoop 3;
3., the common lumps of wood:Wide × a height of 5cm × 10cm the lumps of wood can be used;
4., common steel tube.
Two), the installation of typified form:
Typified form is installed according to following orders:Formwork → matched moulds → reinforcing, protection;Wherein:
1), formwork:
The typified form 2 that burst is customized is buckled into cylindrical form, and the base plane of this cylindrical form is from the ground 0.5cm~1cm, and concrete joint filling is used, along the height of this cylindrical form, on the outer peripheral face of this cylindrical form under Supreme compartment of terrain is installed waist hoop 3 and is simultaneously screwed, and this spacing two-by-two between adjacent waist hoop 3 can be 20cm~30cm;
2), matched moulds:
When the height of cylinder 1 is more than three meters, typified form 2 needs section by section matched moulds, two pieces up and down of matched moulds junction up and down Typified form 2 need to stagger (stagger perps) installation, arranged in dislocation to ensure the up rightness and globality of cylinder, due to sizing Template 2 is installation of staggering, and waist hoop 3 (i.e. steel band) must be installed on the position of the horizontal interface of two pieces of typified forms 2 up and down Reinforced, waist hoop 3 will be covered on interface position horizontally, and ensure that interface position is reinforcing the pars intermedia of waist hoop 3 Position, to strengthen the steadiness of typified form 2, when the waist hoop 3 is installed, is first measured, in stock mould with steel ruler to typified form 2 The surrounding of the sustained height of plate 2 nails on three~tetra- small nails, and then waist hoop 3 is placed on nail, can keep waist hoop 3 Horizontal level, when installing screw, the degree of tightening of each screw will be consistent;
3), reinforce, protect:
1., to typified form second consolidation, protection:
The 2-in-1 mould of typified form (closing up) is simultaneously installed after waist hoop 3, second consolidation, protection is carried out to typified form 2, fixed Four vertical vertical guard timbers 5 are uniformly arranged on the outer peripheral face of pattern plate 2, this guard timber 5 can use wide × a height of 5cm × 10cm side It is wooden into, and herein on the lateral surface of four guard timbers 5 compartment of terrain layering from bottom to top setting level and square arrangement Two cross bar 4-1 and two vertical pole 4-2 fix guard timber 5, cross bar 4-1, vertical pole 4-2 and the embedded bar of bottom or expiring for surrounding Hall scaffold is connected, meanwhile, the infall two-by-two of vertical pole 4-2, cross bar 4-1 in each layer up and down are fixedly mounted vertical rod 6 and connected One is connected into, this vertical pole 4-2, cross bar 4-1 and vertical rod 6 can use steel pipe to be made, this adjacent upper lower vertical bar, upper sheer pole two-by-two Between spacing can be 150cm, meanwhile, between each guard timber 5 and ground along guard timber 5 length direction be arranged at intervals diagonal brace 7, this diagonal brace 7 can be made of steel pipe, typified form 2 can not only so be protected, be reached the effect of second consolidation, Er Qieke With the pressure of buffering vibration rod, make the concrete quality of pouring more preferable;
2., the reinforcing of cylinder head node typified form:
Typified form 2 can according to in-site installation the need for arbitrarily cut, make the typified form 2 of cylinder head node and fine strain of millet, plate Template between spliced, for highly less fine strain of millet (explanation:Depth of beam be equal to or less than 750 ㎜ beam for height compared with Small fine strain of millet), the template of beam is connected with the nailing of typified form 2 of cylinder head node, then installs the lumps of wood and steel pipe reinforcing.
Three), pour:
The typified form 2 of cylinder 1 is installed, reinforces and terminate, after acceptance(check), is poured using general casting craft mixed Solidifying soil.
Four), form removal:
During form removal, steel pipe (i.e. cross bar 4-1, vertical pole 4-2, the vertical rod 6 reinforcing outside the typified form 2 of cylinder 1 successively With diagonal brace 7), the lumps of wood (i.e. guard timber 5), steel band (i.e. waist hoop 3) remove, now, typified form 2 is stripped naturally to be opened, if any individual The template do not opened naturally, it is only necessary to tap and shaken in convex-concave groove interface position batten, typified form 2 just can be certainly So the demoulding (tight disabled tools are pried open), and carry out 1., the repairing of typified form 2:Typified form 2 is wooden, after use, if occurring Shadow scratch, breakage, can with putty filling it is smooth after, then sealed with special mending paint, if the larger damage of appearance, can be hammered into Contract plate, then repaired with putty and mending paint;2., the maintenance of typified form 2:, it is necessary to thoroughly clean in it after the use of typified form 2 Top layer, during cleaning, should not use sharp instruments, in order to avoid the epoxy resin on damage typified form 2 top layer, if typified form 2 need long-term storage, and applying finish on the top layer of typified form 2 is protected by;3., the storage of typified form 2:Typified form 2 is being deposited It should avoid exposing to the sun and rain during putting, at the construction field (site), typified form 2, which should stand, is stored in smooth drying bed on the ground, such as room Outer storage, bottom should set × a height of 10cm × 10cm wide no less than three lumps of wood to support.
The installation method of sizing cylindrical form proposed by the invention, is not only simple in structure, installs easy, dismounting side Just, and template clad can area is big, splice less, good toughness, impact resistance, intensity are high, can multiple Reusability, reduce cost, Improve the construction quality of circular columns.
The installation method of sizing cylindrical form proposed by the invention is made furtherly in conjunction with drawings and examples It is bright.
Brief description of the drawings
Fig. 1 is the schematic top plan view when installation method of sizing cylindrical form proposed by the invention is used.
Fig. 2 is the schematic front view when installation method of sizing cylindrical form proposed by the invention is used.
In Fig. 1, Fig. 2:
1st, cylinder 2, typified form 3, waist hoop 4-1, cross bar 4-2, vertical pole 5, guard timber 6, vertical rod 7, diagonal brace
Embodiment
In Maanshan City (Tai Bai main roads) certain Technology Park engineering, a diameter of 700 ㎜ of cylinder, highly be 5.1 meters, construction The middle installation method for having used sizing cylindrical form proposed by the invention, concrete operation step is as follows:
One), preparation of construction:
1), the preparation of material:
1., typified form:By design drawing, this sizing cylindrical form (abbreviation typified form) is plank sheathing, by template Manufacturing factory customizes;
2., waist hoop:According to design, waist hoop 3 is made of steel band, and width × thickness of this steel band is 5cm × 0.05cm, for fixed Reinforce and use when pattern plate 2 is installed, the screw that screw gun twists fastening is moved with standby electricity on this waist hoop 3;
3., the common lumps of wood:Use the wide × a height of 5cm × 10cm lumps of wood;
4., common steel tube.
Two), the installation of typified form:
Sizing~template is installed according to following orders:Formwork → matched moulds → reinforcing, protection;Wherein:
1), formwork:
The typified form 2 that burst is customized is buckled into cylindrical form, and the base plane of this cylindrical form is from the ground 0.5cm~1cm, and concrete joint filling is used, along the height of this cylindrical form, on the outer peripheral face of this cylindrical form under Supreme compartment of terrain is installed waist hoop 3 and is simultaneously screwed, and this spacing two-by-two between adjacent waist hoop 3 is 20cm~30cm;
2), matched moulds:
When the height of cylinder 1 is more than three meters, typified form 2 needs section by section matched moulds, two pieces up and down of matched moulds junction up and down Typified form 2 need to stagger (stagger perps) installation, arranged in dislocation to ensure the up rightness and globality of cylinder, due to sizing Template 2 is installation of staggering, and installation waist hoop 3 (i.e. steel band) is corresponded on the position of the horizontal interface of typified form up and down and is added Gu, waist hoop 3 (steel band) is covered on interface position horizontally, while interface position is being reinforced the centre of waist hoop 3 (steel band), To strengthen the steadiness of typified form 2, when this waist hoop 3 (steel band) is installed, first typified form 2 is measured with steel ruler, fixed The surrounding of the sustained height of pattern plate 2 nails on three~tetra- small nails, and then waist hoop 3 (steel band) is placed on nail, can The horizontal level of waist hoop 3 (steel band) is kept, when installing screw, the degree of tightening of each screw is consistent;
3), reinforce, protect:
Typified form second consolidation, protection:
The 2-in-1 mould of typified form (closing up) is simultaneously installed after waist hoop 3, second consolidation, protection is carried out to typified form 2, in sizing Four vertical vertical guard timbers 5, the wide × a height of 5cm × 10cm of this guard timber 5 lumps of wood system are uniformly arranged on the outer peripheral face of template 2 Into, and herein on the lateral surface of four guard timbers 5 the setting level of compartment of terrain layering from bottom to top and two of square arrangement Cross bar 4-1, two vertical pole 4-2 fix guard timber 5, cross bar 4-1, vertical pole 4-2 and the embedded bar of bottom or the full hall pin of surrounding Hand cradle is connected, meanwhile, vertical rod 6 is fixedly mounted in every layer of vertical pole 4-2 up and down, cross bar 4-1 infall two-by-two and one is connected into Body, this vertical pole 4-2, cross bar 4-1 and vertical rod 6 are made of steel pipe, this two-by-two between adjacent upper lower vertical bar, upper sheer pole between Away from being 150cm, meanwhile, it is arranged at intervals diagonal brace 7, this diagonal brace 7 along the length direction of guard timber 5 between each guard timber 5 and ground It is made, typified form 2 can not only be so protected of steel pipe, reaches the effect of second consolidation, and can be with buffering vibration The pressure of rod, makes the concrete quality of pouring more preferable;
The reinforcing of cylinder head node typified form:
Typified form 2 can according to in-site installation the need for arbitrarily cut, make the typified form 2 of cylinder head node and fine strain of millet, plate Template between spliced, because the height of fine strain of millet is 750 ㎜, the template of beam is connected with the nailing of typified form 2 of cylinder head node, The lumps of wood is installed again and steel pipe is reinforced.
Three), pour:
The typified form 2 of cylinder 1 is installed, reinforces and terminate, after acceptance(check), is poured using general casting craft mixed Solidifying soil.
Four), form removal:
During form removal, steel pipe (i.e. vertical pole 4-2, cross bar 4-1, the vertical rod 6 reinforcing outside the typified form 2 of cylinder 1 successively With diagonal brace 7), the lumps of wood (i.e. guard timber 5), steel band (i.e. waist hoop 3) remove, now, typified form 2 is stripped naturally to be opened, and is not had individually There is the template that nature opens, shaken as long as being tapped in convex-concave groove interface position batten, typified form 2 just can be stripped naturally (tight disabled tools are pried open), and carry out 1., the repairing of typified form 2:Typified form 2 is wooden, after use, if there is slight draw Trace, breakage, can with putty filling it is smooth after, then sealed with general mending paint, if the larger damage of appearance, first hammers into contract plate, Repaired again with putty and mending paint;2., the maintenance of typified form 2:, it is necessary to thoroughly clean its endosexine after the use of typified form 2, During cleaning, sharp instruments should not be used, in order to avoid the epoxy resin on damage typified form 2 top layer, if typified form 2 needs length Phase deposits, and applying finish on the top layer of typified form 2 is protected by;3., the storage of typified form 2:Typified form 2 is in storage process In should avoid exposing to the sun and rain, at the construction field (site), typified form 2, which should stand, is stored in smooth drying bed on the ground, such as outdoor storage, Bottom should set × a height of 10cm × 10cm wide no less than three lumps of wood to support.
The installation method of sizing cylindrical form proposed by the invention is applied in this Technology Park engineering, not only The duration is shortened, and construction quality is significantly improved, the cylinder impression quality of shaping is good, and surface is without quality such as voids and pits Common fault, therefore obtained Maanshan City's Quality Supervision Station, owner, the consistent favorable comment of supervision companies.

Claims (7)

1. the present invention is a kind of installation method for cylindrical form of shaping, its operating procedure is as follows:
One), preparation of construction:
1), the preparation of material:
1., typified form:By design drawing, this sizing cylindrical form is plank sheathing, and by template construct, producer customizes;
2., waist hoop:According to design, waist hoop (3) is made of steel band, is reinforced and is used when being installed for typified form (2), in this waist hoop (3) screw that screw gun twists fastening is moved on standby electricity;
3., the common lumps of wood:Use the wide × a height of 5cm × 10cm lumps of wood;
4., common steel tube;
Two), the installation of typified form:
Typified form is installed according to following orders:Formwork → matched moulds → reinforcing, protect → pours → form removal;Wherein:
1), formwork:
The typified form (2) that burst is customized is buckled into cylindrical form, the base plane of this cylindrical form 0.5cm from the ground ~1cm, and use concrete joint filling, along the height of this cylindrical form, on the outer peripheral face of this cylindrical form from the bottom to top Waist hoop (3) is installed and is screwed in compartment of terrain;
2), matched moulds:
When the height of cylinder (1) is more than three meters, typified form (2) needs section by section matched moulds, two pieces up and down of matched moulds junction up and down Typified form (2) need to stagger stagger perps installation, arranged in dislocation to ensure the up rightness and globality of cylinder, due to sizing Template (2) is installation of staggering, and must install waist hoop (3) on the position of the horizontal interface of two pieces of typified forms (2) up and down enters Row is reinforced, and waist hoop (3) will be covered on interface position horizontally, and ensures that interface position is reinforcing the centre of waist hoop (3) Position, to strengthen the steadiness of typified form (2), when the waist hoop (3) is installed, is first measured with steel ruler to typified form (2), Three~tetra- small nails are nailed in the surrounding of the sustained height of typified form (2), then waist hoop (3) are placed on nail, i.e., The horizontal level of waist hoop (3) can be kept, when installing screw, the degree of tightening of each screw will be consistent;
3), reinforce, protect:
1., to typified form second consolidation, protection:
Typified form (2) matched moulds is to close up and install after waist hoop (3), second consolidation, protection is carried out to typified form (2), fixed Four vertical vertical guard timbers (5) are uniformly arranged on the outer peripheral face of pattern plate (2), and herein on the lateral surface of four guard timbers (5) Compartment of terrain is layered two cross bars (4-1) and two vertical poles (4-2) of setting level and square arrangement to consolidate from bottom to top Determine guard timber (5), cross bar (4-1), the vertical pole (4-2) of bottom are connected with the full hall scaffold of embedded bar or surrounding, meanwhile, Every layer of vertical pole (4-2), the infall two-by-two of cross bar (4-1) are fixedly mounted vertical rod (6) and linked into an integrated entity up and down, meanwhile, each Guard timber (5) is arranged at intervals diagonal brace (7) between ground along the length direction of guard timber (5), so can not only be to typified form (2) Protected, reach the effect of second consolidation, and the pressure of energy buffering vibration rod, make the concrete quality of pouring more preferable;
2., the reinforcing of cylinder head node typified form:
Typified form (2) can according to in-site installation the need for arbitrarily cut, make the typified form (2) of cylinder head node and fine strain of millet, plate Template between spliced, for highly less fine strain of millet be depth of beam be equal to or less than 750 ㎜ beam, the template and circle of beam Typified form (2) nailing connection of column cap node, then the lumps of wood and steel pipe reinforcing are installed;
Three), pour:
The typified form (2) of cylinder (1) is installed, reinforces and terminate, and after acceptance(check), is poured using general casting craft mixed Solidifying soil;
Four), form removal:
During form removal, it is successively cross bar (4-1), vertical pole (4-2) the steel pipe reinforced outside the typified form (2) of cylinder (1), stands Bar (6) and diagonal brace (7), the lumps of wood are that guard timber (5), steel band i.e. waist hoop (3) are removed, now, and typified form (2) is stripped naturally to be opened Open, if any the template do not opened naturally individually, it is only necessary to tap and shaken in convex-concave groove interface position batten, stock mould Plate (2) just can be stripped naturally, and tight disabled tools are pried open, and carry out 1., the repairing of typified form (2):Typified form (2) is wood System, after use, if there is shadow scratch, breakage, can with putty filling it is smooth after, then sealed with mending paint, if occurring larger Damage, can hammer into contract plate, then repaired with putty and mending paint;2., the maintenance of typified form (2):After typified form (2) use, Need thoroughly to clean its endosexine, during cleaning, sharp instruments should not be used, in order to avoid damage typified form (2) top layer Epoxy resin, if typified form (2) needs long-term storage, applies finish on the top layer of typified form (2) and is protected by;3., stock mould The storage of plate (2):Typified form (2) should avoid exposing to the sun and rain during storage, at the construction field (site), and typified form (2) should stand It is vertical to be stored in smooth drying bed on the ground, such as outdoor storage, bottom should set × a height of 10cm × 10cm's wide no less than three The lumps of wood is supported.
2. the installation method of sizing cylindrical form according to claim 1, it is characterised in that width × thickness of this steel band Spend for 5cm × 0.05cm.
3. the installation method of sizing cylindrical form according to claim 1, it is characterised in that this adjacent waist hoop two-by-two (3) spacing between is 20cm~30cm.
4. the installation method of sizing cylindrical form according to claim 1, it is characterised in that this guard timber (5) width × height It is made up of the 5cm × 10cm lumps of wood.
5. the installation method of sizing cylindrical form according to claim 1, it is characterised in that this cross bar (4-1), vertical pole (4-2) and vertical rod (6) are made of steel pipe.
6. the installation method of sizing cylindrical form according to claim 1, it is characterised in that above and below this is adjacent two-by-two Spacing between vertical pole, upper sheer pole is 150cm.
7. the installation method of sizing cylindrical form according to claim 1, it is characterised in that this diagonal brace (7) uses steel pipe system Into.
CN201710554190.5A 2017-07-10 2017-07-10 The installation method of sizing cylindrical form Pending CN107237492A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710554190.5A CN107237492A (en) 2017-07-10 2017-07-10 The installation method of sizing cylindrical form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710554190.5A CN107237492A (en) 2017-07-10 2017-07-10 The installation method of sizing cylindrical form

Publications (1)

Publication Number Publication Date
CN107237492A true CN107237492A (en) 2017-10-10

Family

ID=59990344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710554190.5A Pending CN107237492A (en) 2017-07-10 2017-07-10 The installation method of sizing cylindrical form

Country Status (1)

Country Link
CN (1) CN107237492A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108687941A (en) * 2018-05-21 2018-10-23 浙江庄辰建筑科技有限公司 A kind of prefabricated post mold
CN108979137A (en) * 2018-06-29 2018-12-11 浙江展诚建设集团股份有限公司 The assembling and disassembling construction method of Round Concrete column composite wooden template
CN109235879A (en) * 2018-09-20 2019-01-18 上海宝冶建筑工程有限公司 A kind of ellipse column template
CN110242043A (en) * 2019-06-26 2019-09-17 中国五冶集团有限公司 A kind of wooden circle template package assembly

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184794A (en) * 2013-03-12 2013-07-03 杭州二建建设有限公司 Quick formwork construction method for cylindrical strap type butt splicing wooden template
CN203961284U (en) * 2014-07-16 2014-11-26 陕西建工第十一建设集团有限公司 A kind of concrete cylindrical regularization constructing structure
CN206245736U (en) * 2016-12-07 2017-06-13 北京首钢建设集团有限公司 A kind of groove and tognue type steel band reinforces wooden round die device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184794A (en) * 2013-03-12 2013-07-03 杭州二建建设有限公司 Quick formwork construction method for cylindrical strap type butt splicing wooden template
CN203961284U (en) * 2014-07-16 2014-11-26 陕西建工第十一建设集团有限公司 A kind of concrete cylindrical regularization constructing structure
CN206245736U (en) * 2016-12-07 2017-06-13 北京首钢建设集团有限公司 A kind of groove and tognue type steel band reinforces wooden round die device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
佘敏: "《定型弧形木模板结构分析及施工技术研究》", 《中国知网硕士论文库工程科技II辑》 *
王兆熊等: "《木质圆柱定型模板安装技术》", 《施工技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108687941A (en) * 2018-05-21 2018-10-23 浙江庄辰建筑科技有限公司 A kind of prefabricated post mold
CN108979137A (en) * 2018-06-29 2018-12-11 浙江展诚建设集团股份有限公司 The assembling and disassembling construction method of Round Concrete column composite wooden template
CN109235879A (en) * 2018-09-20 2019-01-18 上海宝冶建筑工程有限公司 A kind of ellipse column template
CN110242043A (en) * 2019-06-26 2019-09-17 中国五冶集团有限公司 A kind of wooden circle template package assembly

Similar Documents

Publication Publication Date Title
CN104846744B (en) Construction method for pouring and forming urban viaduct curve type pier stud in one-off mode
CN102277959B (en) Standard steel frame formwork system for concrete floor slabs and construction method thereof
CN107237492A (en) The installation method of sizing cylindrical form
CN103184794B (en) Cylinder hoop tuype is to spelling wooden form quick template supporting construction method
CN112412027A (en) Method for manufacturing large-section special-shaped load-bearing concrete bare concrete member
CN102359272A (en) Construction method for waffle slab by using veitch cylinder as hole reservation die
CN103806647A (en) Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case
CN111441525A (en) Large-span dome support keel formwork connecting system and construction method
CN103410269A (en) Unbonded prestress cast-in-place reinforced concrete hollow slab construction structure and method
CN105442629B (en) A kind of large scale equipment T stage vibration isolation mounts construction
CN103206088B (en) Parts of shear wall structure wall, slab integral pouring construction method
CN101761232A (en) Construction technology of large-scale fair-faced concrete cylindrical structural part with paper tube template
CN113152262A (en) Bridge single-column pier reinforcement construction method
CN107327157B (en) Reinforced structure of concrete floor
CN113202222A (en) Construction method for assembled type superposed beam slab
CN101705692B (en) Molding construction method of large-scale equipment foundation deep reserved foundation bolt hole
CN104213708A (en) Integral construction method of anchor bolt-free fireproof wall
CN111663770B (en) Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold
CN111648256A (en) Pier body reinforcing construction method
CN114277672B (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN111561094A (en) Construction method and application of load reduction component in hollow floor system of underground garage
CN108979133B (en) Dense rib floor mold and use method thereof
CN104947853A (en) Built-in stand type cast-in-place reinforced concrete pillar and construction method
CN208858150U (en) A kind of close rib building roof mold
CN107586068B (en) Upright column concrete and construction method of concrete upright column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171010

WD01 Invention patent application deemed withdrawn after publication