CN102864779A CN2012104122066A CN201210412206A CN102864779A CN 102864779 A CN102864779 A CN 102864779A CN 2012104122066 A CN2012104122066 A CN 2012104122066A CN 201210412206 A CN201210412206 A CN 201210412206A CN 102864779 A CN102864779 A CN 102864779A
Authority
CN
China
Prior art keywords
jack
cofferdam
steel
shoulder pole
pole girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104122066A
Other languages
English (en)
Other versions
CN102864779B (zh
Inventor
黄忠睦
刘健
张利军
吴宇
刘水
刘庆平
喻安湘
邓毅
薛昌汭
杨平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
No5 Branch China Railway Engineering Bureau Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No5 Branch China Railway Engineering Bureau Ltd filed Critical No5 Branch China Railway Engineering Bureau Ltd
Priority to CN201210412206.6A priority Critical patent/CN102864779B/zh
Publication of CN102864779A publication Critical patent/CN102864779A/zh
Application granted granted Critical
Publication of CN102864779B publication Critical patent/CN102864779B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种千斤顶同步控制下沉双壁钢围堰的方法,充分利用了钢管桩、同步千斤顶、精轧螺纹钢杆、扁担梁和双拼工字钢梁,其特征在于包括以下步骤:其特征在于包括建门架、设置扁担梁、两根精轧螺纹钢杆及其螺帽、初次提升围堰、二次提升围堰和下沉围堰等步骤。该方法利用包括同步千斤顶和门架的结合,有效解决了由于人为因素等导致围堰下沉过程中受力不均匀的问题,确保了围堰下沉过程中的安全。适用于在水中建设路桥或建筑物。

Description

一种千斤顶同步控制下沉双壁钢围堰的方法
技术领域
本发明涉及一种吊装方法,尤其是下沉双壁钢围堰的方法。
背景技术
在水中建设路桥或建筑物时,建造承台和水中墩,用到下沉双壁钢围堰。双壁钢围堰具有结构刚度大、使用范围广、安全系数高等特点,在深水基础工程中应用广泛。目前双壁钢围堰下沉大多采用手拉葫芦的方式,由于人为操作等因素,导致同步性较差,围堰受力不均匀,易产生裂缝和安全事故。
发明内容
本发明的目的是提供一种同步性好、围堰受力均匀和安全的千斤顶同步控制下沉双壁钢围堰的方法。为达上述目的,本发明的技术方案为:
一种千斤顶同步控制下沉双壁钢围堰的方法,充分利用了钢管桩、同步千斤顶、精轧螺纹钢杆、扁担梁和双拼工字钢梁,其特征在于包括以下步骤:
(1)建门架,在双壁钢围堰壁的两侧,利用包括钢管桩、钢管及双拼工字钢梁制作若干个间隔均布的围堰起吊下沉的门架,每个门架顶面中间放置一个同步千斤顶;
(2)设置扁担梁、两根精轧螺纹钢杆及其螺帽,在各同步千斤顶的顶部放置扁担梁,扁担梁和双拼工字钢梁上间各隔设有两个可穿过精轧螺纹钢杆的透孔,并在透过该两孔中的两根精轧螺纹钢杆设有上螺帽、下螺帽;其中,上螺帽设在扁担梁上面的精轧螺纹钢杆上,下螺帽设在双拼工字钢梁上面的精轧螺纹钢杆上;双拼工字钢梁下方的精轧螺纹钢杆的下端与首节围堰固定连接;
(3)初次提升围堰,将各千斤顶与同步器连接后,由同步器能过油管同时向各同步千斤顶内供油,供油后各千斤顶使其活塞杆伸长顶上面的扁担梁,并通过精轧螺纹钢杆带动首节围堰缓慢提升,围堰被缓慢顶起后迅速将下螺帽向工字钢梁上面拧紧,确保千斤顶回油后各个门架能够同时均匀受力;千斤顶回油后,其活塞杆收缩,扁担梁下落,把上螺帽向扁担梁上面拧紧;
(4)二次提升围堰,由同步器再次向各千斤顶供油,千斤顶再次顶升扁担梁带动首节围堰上升,直到围堰被顶起一定的高度并确定各门架无异常后割除钢管桩与钢平台之间定位围堰的牛腿;割除牛腿时应快速及时,并将切割后的牛腿及时吊装至钢平台上面;
(5)下沉围堰,将千斤顶回油,使下螺帽与工字钢梁承力,将扁担梁和上螺帽抬升,由同步器同时向各千斤顶供油,千斤顶顶升扁担梁,待扁担梁和上螺帽受力且下螺帽与工字钢梁间有空隙后,将下螺帽向上拧升10cm,随后将千斤顶回油,围堰缓慢下落,直至下螺帽与工字钢梁上面密贴并受力,此循环下放围堰10cm;重复千斤顶回油、抬升扁担梁和上螺帽、向各千斤顶供油、千斤顶顶升扁担梁、将下螺帽并向上拧10cm、千斤顶回油……的动作,直至围堰入水并自浮后拆除门架。
上述千斤顶同步控制下沉双壁钢围堰的方法,由于千斤顶工作时全部由同步器控制,充分利用了同步千斤顶和门架的结合,有效解决了由于人为因素等导致围堰下沉过程中受力不均匀的问题,确保了围堰下沉过程中的安全。
附图说明
图1是本发明的结构示意图;
图2是图1中沿A-A线剖视的结构示意图;
在图中,钢平台1,双拼工字钢梁梁2,扁担梁3,围堰4,钢管桩5,上螺帽6,外钢管7,下螺帽8,精轧螺纹钢杆9,千斤顶活塞杆10,同步千斤顶11,内钢管12,牛腿13。
具体实施方式
下面结合附图,对本发明作进一步说明。
图1所示,是本发明的结构示意图,结合图1中沿A-A线剖视的结构示意图一起来看本发明实施的具体步骤为:
(1)建门架,在双壁钢围堰4的两侧,利用钢平台1、钢管桩5、内钢管12和外钢管7,以及双拼I4Oa工字钢梁2制作10个间隔均布的围堰起吊下沉的门架,其中,内钢管12和外钢管7分别设置在围堰4两侧的钢平台1与钢管桩5上,而工字钢梁2横架在内钢管12和外钢管7上面,构成门架。每个门架顶放置一个100t同步千斤顶11;
(2)设置扁担梁、两根精轧螺纹钢杆及其螺帽,在各同步千斤顶11的顶部放置扁担梁3,扁担梁3和双拼工字钢梁2上间隔设有两个可穿过精轧螺纹钢杆9的透孔,并在透过该孔中的两根精轧螺纹钢杆9设有上螺帽6、下螺帽8;其中,上螺帽6设在扁担梁3上面的精轧螺纹钢杆9上,下螺帽8设在双拼工字钢梁2上面的精轧螺纹钢杆9上;双拼工字钢梁2下方的精轧螺纹钢杆9的下端与围堰4的首节固定连接;
(3)初次提升围堰,将各千斤顶11与同步器连接后,由同步器能过油管同时向各同步千斤顶11供油,供油后各千斤顶11使其活塞杆10伸长顶上面的扁担梁3,并通过精轧螺纹钢杆9带动围堰4缓慢提升,围堰4被缓慢顶起后迅速将下螺帽8向工字钢梁2上面拧紧,确保千斤顶回油后各个门架能够同时均匀受力;千斤顶11回油后,其活塞杆10收缩,扁担梁3下落,把上螺帽6向扁担梁3上面拧紧;
(4)二次提升围堰,由同步器再次向各同步千斤顶11供油,千斤顶11的活塞杆10再次顶升扁担梁3带动围堰上升,直到围堰被顶起约50cm并确定各门架无异常后割除钢管桩5与钢平台1之间定位围堰4的牛腿13;割除牛腿13时应快速及时,并将切割后的牛腿13及时吊装至钢平台1上面;
(5)下沉围堰,将千斤顶11回油,使下螺帽8与工字钢梁3承力,将扁担梁3和上螺帽6抬升13cm,再由同步器同时向各千斤顶11供油,千斤顶11顶升扁担梁3,待扁担梁3和上螺帽6受力且下螺帽8与工字钢梁2间有空隙后,将下螺帽8向上拧升10cm,随后将千斤顶11回油,围堰4缓慢下落,直至下螺帽8与工字钢梁2上面密贴并受力,此步骤下放围堰10cm;重复:千斤顶11回油、抬升扁担梁3和上螺帽6、向各千斤顶11供油、千斤顶11顶升扁担梁3和将下螺帽8向上拧10cm,千斤顶11回油……的动作,直至围堰4入水并自浮后拆除门架。

Claims (1)

1.一种千斤顶同步控制下沉双壁钢围堰的方法,充分利用了钢管桩、同步千斤顶、精轧螺纹钢杆、扁担梁和双拼工字钢梁,其特征在于包括以下步骤:
(1)建门架,在双壁钢围堰(4)壁的两侧,利用包括钢管桩(5)、钢管(7、12)及双拼工字钢梁(2)制作若干个间隔均布的围堰(4)起吊下沉的门架,每个门架顶面中间放置一个同步千斤顶(11);
(2)设置扁担梁、两根精轧螺纹钢杆及其螺帽,在各同步千斤顶(11)的顶部放置扁担梁(3),扁担梁(3)和双拼工字钢梁(2)上各间隔设有两个可穿过精轧螺纹钢杆(9)的透孔,并在透过该两孔中的两根精轧螺纹钢杆(9)设有上螺帽(6)、下螺帽(8);其中,上螺帽(6)设在扁担梁(3)上面的精轧螺纹钢杆(9)上,下螺帽(8)设在双拼工字钢梁(2)上面的精轧螺纹钢杆(9)上;双拼工字钢梁(2)下方的精轧螺纹钢杆(9)的下端与围堰(4)的首节固定连接;
(3)初次提升围堰,将各千斤顶(11)与同步器连接后,由同步器能过油管同时向各同步千斤顶(11)内供油,供油后各千斤顶(11)使其活塞杆(10)伸长顶上面的扁担梁(3),并通过精轧螺纹钢杆(9)带动围堰(4)缓慢提升,围堰(4)被缓慢顶起后迅速将下螺帽(8)向工字钢梁(2)上面拧紧,确保千斤顶(11)回油后各个门架能够同时均匀受力;千斤顶(11)回油后,其活塞杆(10)收缩,扁担梁(3)下落,把上螺帽(6)向扁担梁(3)上面拧紧;
(4)二次提升围堰,由同步器再次向各千斤顶(11)供油,千斤顶(11)再次顶升扁担梁(3)带动首节围堰(4)上升,直到围堰(4)被顶起一定的高度并确定各门架无异常后割除钢管桩(5)与钢平台(1)之间定位围堰(4)的牛腿(13);
(5)下沉围堰,将千斤顶(11)回油,使下螺帽(8)与工字钢梁(2)承力,将扁担梁(3)和上螺帽(6)抬升,由同步器同时向各千斤顶(11)供油,千斤顶(11)顶升扁担梁(3),待扁担梁(3)和上螺帽(6)受力且下螺帽(8)与工字钢梁(2)间有空隙后,将下螺帽(8)并向上拧升10cm,随后将千斤顶(11)回油,围堰(4)缓慢下落,直至下螺帽(8)与工字钢梁(2)上面密贴并受力,此步骤下放围堰(4)10cm;重复:千斤顶(11)回油、抬升扁担梁(3)和上螺帽(6)、向各千斤顶(11)供油、千斤顶(11)顶升扁担梁(3)、将下螺帽(8)向上拧10cm、千斤顶回(11)油……的动作,直至围堰(4)入水并自浮后拆除门架。
CN201210412206.6A 2012-10-25 2012-10-25 一种千斤顶同步控制下沉双壁钢围堰的方法 Active CN102864779B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210412206.6A CN102864779B (zh) 2012-10-25 2012-10-25 一种千斤顶同步控制下沉双壁钢围堰的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210412206.6A CN102864779B (zh) 2012-10-25 2012-10-25 一种千斤顶同步控制下沉双壁钢围堰的方法

Publications (2)

Publication Number Publication Date
CN102864779A true CN102864779A (zh) 2013-01-09
CN102864779B CN102864779B (zh) 2015-05-20

Family

ID=47443890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210412206.6A Active CN102864779B (zh) 2012-10-25 2012-10-25 一种千斤顶同步控制下沉双壁钢围堰的方法

Country Status (1)

Country Link
CN (1) CN102864779B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525620A (zh) * 2016-01-15 2016-04-27 中交第一航务工程局有限公司 一种沉箱顶升装置及其操作方法
CN106968176A (zh) * 2017-03-24 2017-07-21 中建三局基础设施工程有限公司 一种桥梁深水嵌岩基础施工方法
CN107447771A (zh) * 2017-10-11 2017-12-08 浙江大学城市学院 一种陆上承台施工系统及施工方法
CN107869144A (zh) * 2017-11-17 2018-04-03 中铁二十二局集团第四工程有限公司 一种预掏槽环封双壁钢围堰深水基础综合施工方法
CN108179735A (zh) * 2018-02-28 2018-06-19 中国葛洲坝集团第五工程有限公司 一种卵石层大型深水基础施工平台及方法
CN108411847A (zh) * 2018-04-28 2018-08-17 中交航局第工程有限公司 一种桩帽整体反吊底系统及其使用方法
CN108532616A (zh) * 2018-05-04 2018-09-14 中国建筑第四工程局有限公司 一种桥梁双壁钢围堰千斤顶同步下沉施工工法
CN108677978A (zh) * 2018-05-04 2018-10-19 中国建筑第四工程局有限公司 一种桥梁无粘结预应力拼接双壁钢围堰下沉施工工法
CN110513056A (zh) * 2019-08-28 2019-11-29 胜利油田现河工贸有限责任公司 作业现场环保围堰

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6172123A (ja) * 1984-09-18 1986-04-14 Kajima Corp 転圧装置
CN201991011U (zh) * 2011-04-27 2011-09-28 中铁二十局集团第二工程有限公司 水中墩承台双壁钢围堰施工用起吊下放系统
CN102251530A (zh) * 2011-04-27 2011-11-23 中铁二十局集团第二工程有限公司 黄河主河道水中墩承台施工用双壁钢围堰施工工艺
CN102409690A (zh) * 2011-09-21 2012-04-11 长沙理工大学 多台连续千斤顶同步下放无底双壁钢套箱围堰的施工工艺

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6172123A (ja) * 1984-09-18 1986-04-14 Kajima Corp 転圧装置
CN201991011U (zh) * 2011-04-27 2011-09-28 中铁二十局集团第二工程有限公司 水中墩承台双壁钢围堰施工用起吊下放系统
CN102251530A (zh) * 2011-04-27 2011-11-23 中铁二十局集团第二工程有限公司 黄河主河道水中墩承台施工用双壁钢围堰施工工艺
CN102409690A (zh) * 2011-09-21 2012-04-11 长沙理工大学 多台连续千斤顶同步下放无底双壁钢套箱围堰的施工工艺

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525620A (zh) * 2016-01-15 2016-04-27 中交第一航务工程局有限公司 一种沉箱顶升装置及其操作方法
CN105525620B (zh) * 2016-01-15 2018-10-02 中交第一航务工程局有限公司 一种沉箱顶升装置及其操作方法
CN106968176A (zh) * 2017-03-24 2017-07-21 中建三局基础设施工程有限公司 一种桥梁深水嵌岩基础施工方法
CN107447771A (zh) * 2017-10-11 2017-12-08 浙江大学城市学院 一种陆上承台施工系统及施工方法
CN107869144A (zh) * 2017-11-17 2018-04-03 中铁二十二局集团第四工程有限公司 一种预掏槽环封双壁钢围堰深水基础综合施工方法
CN108179735B (zh) * 2018-02-28 2023-09-08 中国葛洲坝集团路桥工程有限公司 一种卵石层大型深水基础施工平台及方法
CN108179735A (zh) * 2018-02-28 2018-06-19 中国葛洲坝集团第五工程有限公司 一种卵石层大型深水基础施工平台及方法
CN108411847A (zh) * 2018-04-28 2018-08-17 中交航局第工程有限公司 一种桩帽整体反吊底系统及其使用方法
CN108411847B (zh) * 2018-04-28 2024-01-09 中交一航局第一工程有限公司 一种桩帽整体反吊底系统及其使用方法
CN108532616A (zh) * 2018-05-04 2018-09-14 中国建筑第四工程局有限公司 一种桥梁双壁钢围堰千斤顶同步下沉施工工法
CN108677978B (zh) * 2018-05-04 2021-06-15 中国建筑第四工程局有限公司 一种桥梁无粘结预应力拼接双壁钢围堰下沉施工工法
CN108677978A (zh) * 2018-05-04 2018-10-19 中国建筑第四工程局有限公司 一种桥梁无粘结预应力拼接双壁钢围堰下沉施工工法
CN110513056A (zh) * 2019-08-28 2019-11-29 胜利油田现河工贸有限责任公司 作业现场环保围堰

Also Published As

Publication number Publication date
CN102864779B (zh) 2015-05-20

Similar Documents

Publication Publication Date Title
CN102864779B (zh) 一种千斤顶同步控制下沉双壁钢围堰的方法
CN102080357B (zh) 钢管墩贝雷梁现浇支架整体落梁装置及方法
CN105839536A (zh) 一种斜拉桥索塔的施工方法
CN104005338B (zh) 一种大跨斜拉桥塔梁三向临时固结结构
CN104963301A (zh) 用于墩顶梁段与桥墩拆除的拖拉平移下放装置及方法
CN106812328B (zh) 带吊挂层的张弦预应力钢结构网架整体二步提升施工方法
CN101899907A (zh) 钢筋混凝土柱置换加固方法和卸载钢筋混凝土柱负荷装置
CN103912137B (zh) 建筑物抬升施工的提升装置
CN102277980B (zh) 一种单层工业厂房屋盖整体顶升的装置及其施工方法
CN104695337A (zh) 自提升滑翻施工系统及施工方法
CN105088970B (zh) 一种波形钢腹板pc箱梁斜拉桥的施工方法
CN203296361U (zh) 大跨度钢结构跨外组对吊装平台
CN102635070B (zh) 斜拉桥钢塔互拉式竖向转体施工方法
CN102561212A (zh) 一种独柱混凝土桥墩竖向开裂加固的方法
CN216194059U (zh) 预制桥梁拆建一体机
CN106320192A (zh) 一种用于大跨径混凝土连续梁桥的梁段置换加固方法
CN202000265U (zh) 桥梁高墩混凝土施工模板
CN203866711U (zh) 一种大跨斜拉桥塔梁三向临时固结结构
CN102535339A (zh) 薄壁空心高墩悬臂灌注连续梁牛腿托架及其搭建方法
CN202369921U (zh) 倒梯形桁架
CN107345399A (zh) 轻质高强度混凝土预应力装配式套箱
CN210315224U (zh) 一种高墩翻模施工安全通道系统
CN203755173U (zh) 用于桥梁高墩液压爬升的模板装置
CN105162033A (zh) 一种机械化自升降门型跨越架
CN105220609B (zh) 组合梁自锚式悬索桥及其施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP FI

Free format text: FORMER OWNER: NO 5 BRANCH OF SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

Effective date: 20140514

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 530031 NANNING, GUANGXI ZHUANG AUTONOMOUS REGION TO: 530000 NANNING, GUANGXI ZHUANG AUTONOMOUS REGION

TA01 Transfer of patent application right

Effective date of registration: 20140514

Address after: 530000, No. 56, Sau Road, Nanning, the Guangxi Zhuang Autonomous Region

Applicant after: China Railway Shanghai Engineering Bureau Group Fifth Engineering Co., Ltd.

Address before: 530031, the Guangxi Zhuang Autonomous Region, Nanning Jiangnan District Wuyi Road, No. 5 South Avenue, Yonghe Bridge at the end of the four Railway Bureau

Applicant before: No.5 Branch, China Railway Engineering Bureau Ltd.

C14 Grant of patent or utility model
GR01 Patent grant