CN102852343A - Sp板装配式古城墙加固结构及施工方法 - Google Patents
Sp板装配式古城墙加固结构及施工方法 Download PDFInfo
- Publication number
- CN102852343A CN102852343A CN201210389268XA CN201210389268A CN102852343A CN 102852343 A CN102852343 A CN 102852343A CN 201210389268X A CN201210389268X A CN 201210389268XA CN 201210389268 A CN201210389268 A CN 201210389268A CN 102852343 A CN102852343 A CN 102852343A
- Authority
- CN
- China
- Prior art keywords
- city wall
- shaped steel
- soil body
- wall
- hack lever
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
一种SP板装配式古城墙加固结构及施工方法,加固结构位于城墙土体底部的墙体基础之上,包括对称位于墙体基础两侧的独立基础,所述独立基础沿城墙土体的长度方向间隔设置,独立基础上表面固定有型钢架杆,所述型钢架杆贴合在城墙土体两侧的外表面上,型钢架杆的倾角与城墙土体的倾角一致,城墙土体两侧对称的型钢架杆之间由贯通城墙的横向拉杆连接,同侧相邻的型钢架杆之间由水平拉杆连接,相邻两型钢架杆的翼缘与腹板形成的槽内插放有SP预应力空心板,所述型钢架杆和SP预应力空心板的外侧砌筑有外墙。本发明解决了古城墙内填土遇雨水膨胀后将外砌砖墙挤塌,无可靠加固措施的技术问题。
Description
技术领域
本发明属于古建筑加固领域,特别是一种将SP板插放于型钢内作为古城墙的加固结构及施工方法。
背景技术
我国拥有五千年的历史和文化,同时也遗留了大量的城墙遗址。城墙经历岁月的侵蚀,不可避免的会坍塌损毁,在坍塌后能进行有效的修缮则成了古城墙加固技术中的重点。现有技术中,城墙采用的是内填素土夯实,外包青砖的加固方法。这种加固方法加固的城墙,一旦遇上连续的大雨,城墙内的土经雨水浸泡后便会膨胀,随着侧压力越来越大,外侧的青砖墙体一旦无法抵抗巨大的侧压力,城墙即出现垮塌,坍塌后内部的沙土就会全部涌出来。
现有古城墙出现垮塌后,再进行修复也只是将填土重新夯实再外砌青砖,并无可靠地加固措施,一旦几天连续下雨,垮塌现象还会发生。许多著名旅游胜地的城墙经过修缮后,城墙的第二次倒塌通常为“雨水之祸”,例如平遥古城墙的二次坍塌,不仅造成巨大的经济损失还产生许多负面的社会影响。
发明内容
本发明的目的是提供一种SP板装配式古城墙加固结构及施工方法,解决古城墙内填土遇雨水膨胀后将外砌砖墙挤塌,无可靠加固措施的技术问题。
为实现上述目的,本发明采用如下技术方案:
一种SP板装配式古城墙加固结构,位于城墙土体底部的墙体基础之上,包括对称位于墙体基础两侧的独立基础,所述独立基础沿城墙土体的长度方向间隔设置,独立基础顶面通过预埋件固定有型钢架杆,所述型钢架杆贴合在城墙土体两侧的外表面上,型钢架杆的倾角与城墙土体的倾角一致,城墙土体两侧对称的型钢架杆之间由贯通城墙的横向拉杆连接,城墙土体同侧相邻的型钢架杆之间由水平拉杆连接,同侧相邻两型钢架杆的翼缘与腹板形成的槽内插放有SP预应力空心板,所述型钢架杆和SP预应力空心板的外侧砌筑有外墙。
所述型钢架杆为H型钢或工字钢,标高低于城墙土体顶部200mm。
所述横向拉杆为H型钢,工字钢或槽钢,分层拉结在城墙两侧对称的型钢架杆下翼缘之间。
所述水平拉杆为H型钢,工字钢或槽钢,分层拉结在同侧相邻的型钢架杆下翼缘之间。
所述型钢架杆与横向拉杆及水平拉杆之间的连接为焊接或锚固。
这种SP板装配式古城墙加固结构的施工方法,步骤如下:
步骤一:作业区清理完毕后,沿城墙土体长度方向在墙体基础的两侧对称做一系列间隔的钢筋混凝土独立基础,独立基础的顶面预埋钢板埋件;
步骤二:对应独立基础的位置在城墙土体上分层打水平通孔;
步骤三:在独立基础的预埋件上连接型钢架杆;
步骤四:将横向拉杆放入水平通孔内并连接城墙土体两侧的型钢架杆;
步骤五:同侧相邻的型钢架杆之间分层连接水平拉杆;
步骤六:使用吊车将SP预应力空心板插放在相邻两型钢架杆的翼缘与腹板形成的槽内;
步骤七:SP预应力空心板与型钢架杆接触缝隙用水泥砂浆灌实;
步骤八:回填城墙坍塌部位的土体和水平贯通部位的土体,每填充500mm后,均应夯实三遍;
步骤九:进行城墙的外墙砌筑,边砌筑边用水泥砂浆填充外墙与SP预应力空心板之间的空隙。
与现有技术相比本发明具有以下特点和有益效果:
本发明克服了现有古城墙垮塌后,进行的修复只是将填土重新夯实再外砌青砖的方法,一旦几天连续下雨,垮塌现象还会发生,并无可靠加固措施的技术问题。
本发明的SP板装配式古城墙加固架能有效地抵抗土的侧压力,SP板本身具有较大的承载力,将它插放于型钢的槽内后形成挡土墙,城墙两侧型钢通过拉杆拉结一起来抵抗土的侧压力,外侧再用砂浆砌筑青砖将土巩固在墙内,结构安全可靠。
本发明施工方法简单易行,费用低廉,省时省力。
附图说明
下面结合附图对本发明做进一步详细的说明。
图1是本发明的主视结构示意图。
图2是图1中A-A剖面的结构示意图。
图3是图1中B-B剖面的结构示意图。
附图标记:1-城墙土体、2-墙体基础、3-独立基础、4-型钢架杆、5-横向拉杆、6-水平拉杆、7-SP预应力空心板、8-外墙、9-预埋件。
具体实施方式
实施例参见图1-2所示,一种SP板装配式古城墙加固结构,位于城墙土体1底部的墙体基础2之上,包括对称位于墙体基础2两侧的独立基础3,所述独立基础3沿城墙土体的长度方向间隔设置,独立基础3顶面通过预埋件9固定有型钢架杆4,所述型钢架杆4贴合在城墙土体两侧的外表面上,型钢架杆4的倾角与城墙土体1的倾角一致,城墙土体1两侧对称的型钢架杆4之间由贯通城墙的横向拉杆5连接,城墙土体1同侧相邻的型钢架杆4之间由水平拉杆6连接,同侧相邻两型钢架杆4的翼缘与腹板形成的槽内插放有SP预应力空心板7,所述型钢架杆4和SP预应力空心板7的外侧砌筑有外墙8。
所述型钢架杆4为H型钢或工字钢,标高低于城墙土体顶部200mm。所述横向拉杆5为H型钢,工字钢或槽钢,分层拉结在城墙两侧对称的型钢架杆下翼缘之间。所述水平拉杆6为H型钢,工字钢或槽钢,分层拉结在同侧相邻的型钢架杆下翼缘之间。所述型钢架杆4与横向拉杆5及水平拉杆6之间的连接为焊接或锚固。
这种SP板装配式古城墙加固架的施工方法,步骤如下:
步骤一:将倒塌的城墙砖清理到作业区外,作业区清理完毕后,沿城墙土体1长度方向在墙体基础2的两侧对称做一系列间隔的独立钢筋混凝土基础,独立基础3的顶面预埋钢板埋件;
步骤二:对应独立基础的位置在城墙土体1上分层打水平通孔;
步骤三:在独立基础的预埋钢板上连接型钢架杆4;
步骤四:将横向拉杆5放入水平通孔内并连接城墙土体两侧的型钢架杆4;
步骤五:同侧相邻的型钢架杆4之间分层连接水平拉杆6;
步骤六:使用吊车将SP预应力空心板7插放在相邻两型钢架杆4的翼缘与腹板形成的槽内;
步骤七:SP预应力空心板7与型钢架杆4接触缝隙用水泥砂浆灌实;
步骤八:回填城墙坍塌部位的土体和水平贯通部位的土体,每填充500mm后,均应夯实三遍;
步骤九:进行城墙的外墙8砌筑,边砌筑边用水泥砂浆填充外墙8与SP预应力空心板7之间的空隙。
本发明中使用的构件,均需要根据城墙的土质、厚度、高矮经计算决定,例如本实施例中,独立基础可沿城墙方向每隔9米设置一个,尺寸可设为800×800×1000mm;独立基础顶面预埋尺寸为700×500×20mm的钢板预埋件;型钢架杆4可使用350×350H型钢;如图3所示,横向拉杆5可使用两槽钢焊接而成,焊脚尺寸为5mm。横向拉杆5沿城墙土体高度方向可拉结5道,水平拉杆6可使用25#槽钢,由沿城墙土体拉结三道;SP预应力空心板7的尺寸可为厚度300mm,宽度1200mm,长度8950mm,并用吊车将SP板插放于H型钢的槽内。
本发明步骤二中,在独立基础的位置将城墙土体贯通时,宽度应保持在2000mm左右,注意对填土进行保护,防止坍塌伤人。
本发明的所有型钢在安装前均应除锈,并涂刷两遍防锈漆,支架就位连接后再涂一遍防锈漆。
Claims (6)
1.一种SP板装配式古城墙加固结构,位于城墙土体(1)底部的墙体基础(2)之上,其特征在于:包括对称位于墙体基础(2)两侧的独立基础(3),所述独立基础(3)沿城墙土体的长度方向间隔设置,独立基础(3)顶面通过预埋件(9)固定有型钢架杆(4),所述型钢架杆(4)贴合在城墙土体两侧的外表面上,型钢架杆(4)的倾角与城墙土体(1)的倾角一致,城墙土体(1)两侧对称的型钢架杆(4)之间由贯通城墙的横向拉杆(5)连接,城墙土体(1)同侧相邻的型钢架杆(4)之间由水平拉杆(6)连接,同侧相邻两型钢架杆(4)的翼缘与腹板形成的槽内插放有SP预应力空心板(7),所述型钢架杆(4)和SP预应力空心板(7)的外侧砌筑有外墙(8)。
2.根据权利要求1所述的SP板装配式古城墙加固结构,其特征在于:所述型钢架杆(4)为H型钢或工字钢,标高低于城墙土体顶部200mm。
3.根据权利要求1所述的SP板装配式古城墙加固结构,其特征在于:所述横向拉杆(5)为H型钢,工字钢或槽钢,分层拉结在城墙两侧对称的型钢架杆下翼缘之间。
4.根据权利要求1所述的SP板装配式古城墙加固结构,其特征在于:所述水平拉杆(6)为H型钢,工字钢或槽钢,分层拉结在同侧相邻的型钢架杆下翼缘之间。
5.根据权利要求1所述的SP板装配式古城墙加固结构,其特征在于:所述型钢架杆(4)与横向拉杆(5)及水平拉杆(6)之间的连接为焊接或锚固。
6.根据权利要求1-5所述SP板装配式古城墙加固结构的施工方法,其特征在于:步骤如下:
步骤一:作业区清理完毕后,沿城墙土体(1)长度方向在墙体基础(2)的两侧对称做一系列间隔的钢筋混凝土独立基础(3),独立基础(3)的顶面预埋钢板埋件;
步骤二:对应独立基础的位置在城墙土体(1)上分层打水平通孔;
步骤三:在独立基础的预埋件上连接型钢架杆(4);
步骤四:将横向拉杆(5)放入水平通孔内并连接城墙土体两侧的型钢架杆(4);
步骤五:同侧相邻的型钢架杆(4)之间分层连接水平拉杆(6);
步骤六:使用吊车将SP预应力空心板(7)插放在相邻两型钢架杆(4)的翼缘与腹板形成的槽内;
步骤七:SP预应力空心板(7)与型钢架杆(4)接触缝隙用水泥砂浆灌实;
步骤八:回填城墙坍塌部位的土体和水平贯通部位的土体,每填充500mm后,均应夯实三遍;
步骤九:进行城墙的外墙(8)砌筑,边砌筑边用水泥砂浆填充外墙(8)与SP预应力空心板(7)之间的空隙。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210389268.XA CN102852343B (zh) | 2012-10-15 | 2012-10-15 | Sp板装配式古城墙加固结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210389268.XA CN102852343B (zh) | 2012-10-15 | 2012-10-15 | Sp板装配式古城墙加固结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102852343A true CN102852343A (zh) | 2013-01-02 |
CN102852343B CN102852343B (zh) | 2014-12-17 |
Family
ID=47399283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210389268.XA Expired - Fee Related CN102852343B (zh) | 2012-10-15 | 2012-10-15 | Sp板装配式古城墙加固结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102852343B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758361A (zh) * | 2014-01-06 | 2014-04-30 | 北京筑福国际工程技术有限责任公司 | 既有建筑后增短肢墙和钢拉杆的抗震加固施工方法 |
CN108442726A (zh) * | 2018-04-08 | 2018-08-24 | 太原理工大学 | 一种古代夯土城墙结构保护装置 |
CN110094076A (zh) * | 2019-05-22 | 2019-08-06 | 吕晓波 | 一种古城墙的修复结构 |
CN112832547A (zh) * | 2021-01-06 | 2021-05-25 | 机械工业勘察设计研究院有限公司 | 一种古城墙的整体加固防护结构和施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10252282A (ja) * | 1998-04-28 | 1998-09-22 | Hooku:Kk | コンクリート躯体の補強工法 |
JP2000136639A (ja) * | 1998-10-30 | 2000-05-16 | Taisei Corp | 磁石を用いた鉄骨造の耐震補強壁等の取り付け方法 |
CN2937283Y (zh) * | 2006-08-16 | 2007-08-22 | 胡卫军 | Sp预应力混凝土空心墙板墙 |
CN102251525A (zh) * | 2011-04-12 | 2011-11-23 | 兰州理工大学 | 框架预应力锚杆加固重力式挡墙支护结构及其施工方法 |
CN202831670U (zh) * | 2012-10-15 | 2013-03-27 | 胡卫军 | Sp板装配式古城墙加固结构 |
-
2012
- 2012-10-15 CN CN201210389268.XA patent/CN102852343B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10252282A (ja) * | 1998-04-28 | 1998-09-22 | Hooku:Kk | コンクリート躯体の補強工法 |
JP2000136639A (ja) * | 1998-10-30 | 2000-05-16 | Taisei Corp | 磁石を用いた鉄骨造の耐震補強壁等の取り付け方法 |
CN2937283Y (zh) * | 2006-08-16 | 2007-08-22 | 胡卫军 | Sp预应力混凝土空心墙板墙 |
CN102251525A (zh) * | 2011-04-12 | 2011-11-23 | 兰州理工大学 | 框架预应力锚杆加固重力式挡墙支护结构及其施工方法 |
CN202831670U (zh) * | 2012-10-15 | 2013-03-27 | 胡卫军 | Sp板装配式古城墙加固结构 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758361A (zh) * | 2014-01-06 | 2014-04-30 | 北京筑福国际工程技术有限责任公司 | 既有建筑后增短肢墙和钢拉杆的抗震加固施工方法 |
CN108442726A (zh) * | 2018-04-08 | 2018-08-24 | 太原理工大学 | 一种古代夯土城墙结构保护装置 |
CN110094076A (zh) * | 2019-05-22 | 2019-08-06 | 吕晓波 | 一种古城墙的修复结构 |
CN112832547A (zh) * | 2021-01-06 | 2021-05-25 | 机械工业勘察设计研究院有限公司 | 一种古城墙的整体加固防护结构和施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102852343B (zh) | 2014-12-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102425082A (zh) | 高速铁路岩溶强烈发育车站道岔区路基加固构造 | |
CN112554198B (zh) | 紧邻高层建筑物的深基坑防护结构的施工方法 | |
WO2017084573A1 (zh) | 抗隆支护结构 | |
CN102852343B (zh) | Sp板装配式古城墙加固结构及施工方法 | |
CN111456081A (zh) | 一种桩基挡墙结构及施工方法 | |
CN105240018A (zh) | 竖井施工装置及方法 | |
CN112482202A (zh) | 一种拉杆式多用途钢栈桥桥台及其施工方法 | |
CN111622234B (zh) | 一种斜竖向组合钢管桩承托的卸荷式薄壁箱型挡墙及施工工艺 | |
CN112049011B (zh) | 一种大跨度预应力现浇桥梁逆作法施工方法 | |
CN110805049B (zh) | 一种山体边坡超厚度喷锚永久支护结构的施工方法 | |
CN104712341A (zh) | 浅覆土区域盾构掘进地层加固体系及其构建方法 | |
CN204059361U (zh) | 一种采用抗拔phc管桩做立柱的支撑结构 | |
CN202831670U (zh) | Sp板装配式古城墙加固结构 | |
CN110924404A (zh) | 一种深厚回填土填充墙基础施工工法 | |
CN110952563A (zh) | 既有地铁隧道上方基坑开挖的临时抗浮结构 | |
CN206337566U (zh) | 基坑竖向预应力锚杆支撑结构 | |
CN204753289U (zh) | 一种湿陷性黄土地基层上道路拓宽体系 | |
CN211713972U (zh) | 既有地铁隧道上方基坑开挖的临时抗浮结构 | |
CN209958372U (zh) | 铁路新增二线台后路基桩管帷幕支护结构 | |
CN112983493A (zh) | 一种盾构近距离下穿大断面桥涵的加固结构及施工方法 | |
CN106120853A (zh) | 一种框架桥的逆序施工方法 | |
CN112160325A (zh) | 增强预应力管桩刚度的复合支护结构 | |
KR101151052B1 (ko) | 가설 흙막이 철근콘크리트 구조물 설치 방법 | |
CN205063369U (zh) | 超深基坑螺旋下降物料快速运输通道 | |
CN204059362U (zh) | 一种采用抗压phc管桩做立柱的支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |