CN102849180A - Launching process of jack-up offshore drilling platform by airbag - Google Patents

Launching process of jack-up offshore drilling platform by airbag Download PDF

Info

Publication number
CN102849180A
CN102849180A CN201210347402XA CN201210347402A CN102849180A CN 102849180 A CN102849180 A CN 102849180A CN 201210347402X A CN201210347402X A CN 201210347402XA CN 201210347402 A CN201210347402 A CN 201210347402A CN 102849180 A CN102849180 A CN 102849180A
Authority
CN
China
Prior art keywords
platform
pier
air bag
water
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210347402XA
Other languages
Chinese (zh)
Other versions
CN102849180B (en
Inventor
胡德祥
吕宏伟
赵京坤
张晓宇
王建才
许明玉
于鹏飞
杨丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING LUHAI PETROLEUM EQUIPMENT RESEARCH INSTITUTE CO LTD
China Petroleum Liaohe Equipment Co
Original Assignee
LIAONING LUHAI PETROLEUM EQUIPMENT RESEARCH INSTITUTE CO LTD
China Petroleum Liaohe Equipment Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING LUHAI PETROLEUM EQUIPMENT RESEARCH INSTITUTE CO LTD, China Petroleum Liaohe Equipment Co filed Critical LIAONING LUHAI PETROLEUM EQUIPMENT RESEARCH INSTITUTE CO LTD
Priority to CN201210347402.XA priority Critical patent/CN102849180B/en
Publication of CN102849180A publication Critical patent/CN102849180A/en
Application granted granted Critical
Publication of CN102849180B publication Critical patent/CN102849180B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to the technical field of offshore oil drilling, in particular to a launching process of a jack-up offshore drilling platform by an airbag. The process includes the steps of firstly, horizontally constructing the platform on a building berth; secondly, using an over-sized and ultrahigh-pressure launching airbag; thirdly, lengthening a bearing segment of the structure of the building berth; fourthly, distributing a construction pier; fifthly, using a footing blocking fixture to block footings; sixthly, performing secondary pier reversing after closing the platform; seventhly, dragging the fixed platform; eighthly, distributing the airbag below a main hull of the platform; ninthly, removing the construction pier of the platform; tenthly, shifting the platform to the water edge after second pier reversing; eleventhly, releasing to launch; and twelfthly, recovering the airbag and the footing blocking fixture. The drilling platform uses the airbag which is stable, efficient and low in cost to launch, the airbag is stable and controllable, launching period of the platform is shortened, construction cost and difficulty in construction of the platform are greatly reduced, and requirements of the platform for shipyards are lowered effectively.

Description

Self-lifting type marine drilling platform air bag launching process
Technical field:
The present invention relates to a kind of offshore oil drilling technical field, particularly a kind of self-lifting type marine drilling platform air bag launching process.
Background technology:
The water technology is at present both at home and abroad main under the self-lifting type marine drilling platform adopts under building dock launching, the arine railway water and refutes the technology such as launch a ship.The building dock launching technology is had relatively high expectations to the capital construction of shipyard, and shipyard must possess the Large Ship Dock that adapts with the institute construct platform, and this technology is only applicable to have the Large Ship Dock shipyard, and general middle boatyard can't use.Water technology under the arine railway need to possess the required slideway of lower water, needs to increase the extra investment cost; And the building berth of slideway has been installed, and having limited the applicability that building berth is built project, lower horizontal stability control ratio is complicated, in order to guarantee that water steadying is controlled under the platform, need the complicated sliding system of design, and the platform construction difficulty is larger.Refute the technology of launching a ship, need to solve the problems such as complicated platform horizontal translation, upper barge, need to possess half large-scale latent refuting, to having relatively high expectations in the residing waters of shipyard, the water process is consuming time longer under the platform.Other launching technology can't satisfy the specific (special) requirements of water under the platform.
Summary of the invention:
The technical problem to be solved in the present invention provides a kind of self-lifting type marine drilling platform air bag launching process, the method has realized that drilling platform adopts the air bag launching of steady high efficiency, low cost, steadily controlled, shorten the water cycle under the platform, greatly lower the laid down cost of platform and build difficulty, effectively reduce construct platform to the door of shipyard requirement.The construction that has overcome the jack-up platform in the water technology under the existing self-lifting type marine drilling platform need possess the large-scale capital construction facility that Large Ship Dock, complicated slideway or half are dived and refuted etc., and laid down cost is high, builds the large deficiency of difficulty.
The technical solution used in the present invention is: a kind of self-lifting type marine drilling platform air bag launching process, and the method step is as follows:
One, platform level on building berth is built: low different construction pier after high before arranging, and platform maintenance level is built;
Two, adopt water ballonet under super large, the superhigh pressure;
Three, berth structure is carried elongated segment: according to water calculation sheet water level and requirement for bearing capacity under the platform, prolong building berth carrying segment length, and extra large operation is swept in the Xia Shui waters, remove sharp-pointed hard foreign material, incised wound hull when avoiding lower water;
Four, arrange the construction pier;
Five, adopt shoe shutoff frock that shutoff is implemented in shoe: shoe shutoff frock adopts the steel-wood structure design, adopts wire sling and platform reliably to be connected and fixed, and main body and shoe shutoff frock adopt transition processing; Open wire sling behind the lower water, shoe shutoff frock can break away from hull, uses in order to follow-up secondary after reclaiming;
Six, platform closes up the processing of falling the pier of rear secondary: close up rear platform and carry out the secondary process of falling the pier and process, replace original construction pier, reach platform and building berth keeping parallelism after closing up, required sliding force requirement when satisfying under the platform water;
Seven, traction fixed platform: secondary falls after pier finishes, with winch and trailer coupling platform is drawn fixing, to prevent the uncontrollable downward slippage of airbag aeration rear platform;
Eight, the layout of air bag under the platform main body: according to the size of air bag and the characteristics of platform structure, air bag is carried out orderly layout, satisfy platform structure to the requirement of air bag bearing capacity; After air bag deploys, air bag is inflated, until reach lower water calculation sheet requirement pressure, made the platform main body be lifted away from the construction pier fully;
Nine, the platform construction pier is removed: air bag is suppressed and is finished, and the platform main body is removed all platform construction piers after breaking away from the construction pier, and removes the hard implements of building berth upper gasbag rolling place, keeps the building berth cleaning smooth;
Ten, the secondary rear platform of falling the pier is to the translation of waterside: secondary falls behind the pier, need to carry out to the waterside translation platform, winch traction control retracting platform is adopted in operation, step is divided into: arrange in advance air bag, platform translation certain distance, braking platform, replenish the airbag aeration pressurize, circulation comes and goes above-mentioned steps, until it is required to the waterside translation distance to reach under the platform water;
11, the lower water of threading off: dead work finishes, and after institute's water level that requires satisfies, opens buckle release, applies starting force by mechanism, overcomes platform movement friction dead point, the inflation/deflation operation of air bag before and after cooperating, and implementation platform is flexible lower water steadily;
12, air bag and shoe shutoff frock reclaim: platform is regained lower water ballonet after descend smoothly water, removes also withdrawal shoe shutoff frock, avoids affecting behind the water under the platform spud leg the standing of the bottom, and so far platform air bag launching work all finishes.
The invention has the beneficial effects as follows: the present invention is owing to adopted the mode of the air bag launching of steady high efficiency, low cost, thereby have steadily controlled, shorten the water cycle under the platform, greatly lower the laid down cost of platform and the advantage of construction difficulty, effectively reduce construct platform to the door of shipyard requirement.
The specific embodiment:
A kind of self-lifting type marine drilling platform air bag launching process, the method step is as follows:
One, platform level on building berth is built: low different construction pier after high before arranging, and platform maintenance level is built;
Two, adopt water ballonet under super large, the superhigh pressure;
Three, berth structure is carried elongated segment: according to water calculation sheet water level and requirement for bearing capacity under the platform, prolong building berth carrying segment length, and extra large operation is swept in the Xia Shui waters, remove sharp-pointed hard foreign material, incised wound hull when avoiding lower water;
Four, arrange the construction pier;
Five, adopt shoe shutoff frock that shutoff is implemented in shoe: shoe shutoff frock adopts the steel-wood structure design, adopts wire sling and platform reliably to be connected and fixed, and main body and shoe shutoff frock adopt transition processing; Open wire sling behind the lower water, shoe shutoff frock can break away from hull, uses in order to follow-up secondary after reclaiming;
Six, platform closes up the processing of falling the pier of rear secondary: close up rear platform and carry out the secondary process of falling the pier and process, replace original construction pier, reach platform and building berth keeping parallelism after closing up, required sliding force requirement when satisfying under the platform water;
Seven, traction fixed platform: secondary falls after pier finishes, with winch and trailer coupling platform is drawn fixing, to prevent the uncontrollable downward slippage of airbag aeration rear platform;
Eight, the layout of air bag under the platform main body: according to the size of air bag and the characteristics of platform structure, air bag is carried out orderly layout, satisfy platform structure to the requirement of air bag bearing capacity; After air bag deploys, air bag is inflated, until reach lower water calculation sheet requirement pressure, made the platform main body be lifted away from the construction pier fully;
Nine, the platform construction pier is removed: air bag is suppressed and is finished, and the platform main body is removed all platform construction piers after breaking away from the construction pier, and removes the hard implements of building berth upper gasbag rolling place, keeps the building berth cleaning smooth;
Ten, the secondary rear platform of falling the pier is to the translation of waterside: secondary falls behind the pier, need to carry out to the waterside translation platform, winch traction control retracting platform is adopted in operation, step is divided into: arrange in advance air bag, platform translation certain distance, braking platform, replenish the airbag aeration pressurize, circulation comes and goes above-mentioned steps, until it is required to the waterside translation distance to reach under the platform water;
11, the lower water of threading off: dead work finishes, and after institute's water level that requires satisfies, opens buckle release, applies starting force by mechanism, overcomes platform movement friction dead point, the inflation/deflation operation of air bag before and after cooperating, and implementation platform is flexible lower water steadily;
12, air bag and shoe shutoff frock reclaim: platform is regained lower water ballonet after descend smoothly water, removes also withdrawal shoe shutoff frock, avoids affecting behind the water under the platform spud leg the standing of the bottom, and so far platform air bag launching work all finishes.
Be understandable that, more than about specific descriptions of the present invention, only for the present invention being described and being not to be subject to the described technical scheme of the embodiment of the invention, those of ordinary skill in the art is to be understood that, still can make amendment or be equal to replacement the present invention, to reach identical technique effect; Use needs as long as satisfy, all within protection scope of the present invention.

Claims (1)

1. self-lifting type marine drilling platform air bag launching process, it is characterized in that: the method step is as follows:
One, platform level on building berth is built: low different construction pier after high before arranging, and platform maintenance level is built;
Two, adopt water ballonet under super large, the superhigh pressure;
Three, berth structure is carried elongated segment: according to water calculation sheet water level and requirement for bearing capacity under the platform, prolong building berth carrying segment length, and extra large operation is swept in the Xia Shui waters, remove sharp-pointed hard foreign material, incised wound hull when avoiding lower water;
Four, arrange the construction pier;
Five, adopt shoe shutoff frock that shutoff is implemented in shoe: shoe shutoff frock adopts the steel-wood structure design, adopts wire sling and platform reliably to be connected and fixed, and main body and shoe shutoff frock adopt transition processing; Open wire sling behind the lower water, shoe shutoff frock can break away from hull, uses in order to follow-up secondary after reclaiming;
Six, platform closes up the processing of falling the pier of rear secondary: close up rear platform and carry out the secondary process of falling the pier and process, replace original construction pier, reach platform and building berth keeping parallelism after closing up, required sliding force requirement when satisfying under the platform water;
Seven, traction fixed platform: secondary falls after pier finishes, with winch and trailer coupling platform is drawn fixing, to prevent the uncontrollable downward slippage of airbag aeration rear platform;
Eight, the layout of air bag under the platform main body: according to the size of air bag and the characteristics of platform structure, air bag is carried out orderly layout, satisfy platform structure to the requirement of air bag bearing capacity; After air bag deploys, air bag is inflated, until reach lower water calculation sheet requirement pressure, made the platform main body be lifted away from the construction pier fully;
Nine, the platform construction pier is removed: air bag is suppressed and is finished, and the platform main body is removed all platform construction piers after breaking away from the construction pier, and removes the hard implements of building berth upper gasbag rolling place, keeps the building berth cleaning smooth;
Ten, the secondary rear platform of falling the pier is to the translation of waterside: secondary falls behind the pier, need to carry out to the waterside translation platform, winch traction control retracting platform is adopted in operation, step is divided into: arrange in advance air bag, platform translation certain distance, braking platform, replenish the airbag aeration pressurize, circulation comes and goes above-mentioned steps, until it is required to the waterside translation distance to reach under the platform water;
11, the lower water of threading off: dead work finishes, and after institute's water level that requires satisfies, opens buckle release, applies starting force by mechanism, overcomes platform movement friction dead point, the inflation/deflation operation of air bag before and after cooperating, and implementation platform is flexible lower water steadily;
12, air bag and shoe shutoff frock reclaim: platform is regained lower water ballonet after descend smoothly water, removes also withdrawal shoe shutoff frock, avoids affecting behind the water under the platform spud leg the standing of the bottom, and so far platform air bag launching work all finishes.
CN201210347402.XA 2012-09-18 2012-09-18 Launching process of jack-up offshore drilling platform by airbag Expired - Fee Related CN102849180B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210347402.XA CN102849180B (en) 2012-09-18 2012-09-18 Launching process of jack-up offshore drilling platform by airbag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210347402.XA CN102849180B (en) 2012-09-18 2012-09-18 Launching process of jack-up offshore drilling platform by airbag

Publications (2)

Publication Number Publication Date
CN102849180A true CN102849180A (en) 2013-01-02
CN102849180B CN102849180B (en) 2014-12-31

Family

ID=47396258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210347402.XA Expired - Fee Related CN102849180B (en) 2012-09-18 2012-09-18 Launching process of jack-up offshore drilling platform by airbag

Country Status (1)

Country Link
CN (1) CN102849180B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104859788A (en) * 2015-05-08 2015-08-26 中国海洋石油总公司 Octagon floating drilling production storage and offloading (FDPSO) rapid construction method
CN105253270A (en) * 2015-10-30 2016-01-20 青岛海西重机有限责任公司 Combined buoyancy tank type offshore platform launching device and offshore platform launching method
CN105586863A (en) * 2014-11-11 2016-05-18 江苏海王星海洋油气装备有限公司 Bottom hull type mobile platform and launching technology of bottom hull type mobile platform

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01197196A (en) * 1988-02-02 1989-08-08 Mitsubishi Heavy Ind Ltd Launching way recovery method
CN102424101A (en) * 2011-11-19 2012-04-25 南通贝斯特船舶与海洋工程设计有限公司 Technology for launching ship with airbags
CN202337334U (en) * 2012-03-27 2012-07-18 广新海事重工股份有限公司 Self-floating launching poppet platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01197196A (en) * 1988-02-02 1989-08-08 Mitsubishi Heavy Ind Ltd Launching way recovery method
CN102424101A (en) * 2011-11-19 2012-04-25 南通贝斯特船舶与海洋工程设计有限公司 Technology for launching ship with airbags
CN202337334U (en) * 2012-03-27 2012-07-18 广新海事重工股份有限公司 Self-floating launching poppet platform

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
孙菊香: "船舶气囊下水技术现状与展望", 《军民两用技术与产品》 *
孙菊香等: "船舶气囊下水技术大步走向世界", 《中国修船》 *
张远平: "气囊首次用于大型钻井平台下水获成功", 《中国船舶报》 *
聂晓玲: "船舶与海洋平台平地建造及气囊下水研究", 《哈尔滨工程大学工程硕士学位论文》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586863A (en) * 2014-11-11 2016-05-18 江苏海王星海洋油气装备有限公司 Bottom hull type mobile platform and launching technology of bottom hull type mobile platform
CN104859788A (en) * 2015-05-08 2015-08-26 中国海洋石油总公司 Octagon floating drilling production storage and offloading (FDPSO) rapid construction method
CN105253270A (en) * 2015-10-30 2016-01-20 青岛海西重机有限责任公司 Combined buoyancy tank type offshore platform launching device and offshore platform launching method

Also Published As

Publication number Publication date
CN102849180B (en) 2014-12-31

Similar Documents

Publication Publication Date Title
CN101980917B (en) Liquid storing and offloading device and drilling and production installations on sea based thereon
CN107697238B (en) Deep-water floating type multifunctional dry-tree semi-submersible platform and offshore installation method thereof
CN104229099B (en) A kind of ocean engineering ship carries the system and method for lower water
CN105035260B (en) The method that platform upper chunk is thrown aside at support overall pulling down sea is floated using double ships
US11846079B2 (en) Fast-laid floating breakwater
CN101920771A (en) Method for undock ballasting in ship building
CN104029798B (en) Self installation production platform
CN103452086A (en) Mat-assisted driving movable platform
CN102849180B (en) Launching process of jack-up offshore drilling platform by airbag
CN103422483A (en) Float-over mounting method for jacket in shallow water
CN103010615B (en) Water oil storage device with mooring function and assembly method thereof
CN104210627B (en) Build the device and method of lower water for jack-up unit level land
CN104805821B (en) Marine oil field natural gas compressing processes jack-up unit
CN203806103U (en) Offshore buoyancy mounting device for ultra-large module
KR20200015935A (en) Decimal method
CN106314707A (en) Gasbag type anti-sinking overturn-preventing device
CN204023540U (en) A kind of drilling platform
CN109823484A (en) A kind of floating box structure inhibiting platform heaving
CN201882241U (en) Lightweight portable floating dock
KR101368582B1 (en) Mooring disconnect arrangement
CN104554639A (en) Installation equipment for large offshore wind power equipment
CN203094846U (en) Water oil storage device with mooring function
CN102424101A (en) Technology for launching ship with airbags
CN204642060U (en) A kind of large-scale coastal waters wind power equipment installs equipment
CN204802046U (en) Anti sinking prevents toppling gasbag device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141231

Termination date: 20170918