CN102838336B - Cast-in-situ gypsum hollow wall and preparation method thereof - Google Patents

Cast-in-situ gypsum hollow wall and preparation method thereof Download PDF

Info

Publication number
CN102838336B
CN102838336B CN201110169048.1A CN201110169048A CN102838336B CN 102838336 B CN102838336 B CN 102838336B CN 201110169048 A CN201110169048 A CN 201110169048A CN 102838336 B CN102838336 B CN 102838336B
Authority
CN
China
Prior art keywords
wall
template
cast
gypsum
inner support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110169048.1A
Other languages
Chinese (zh)
Other versions
CN102838336A (en
Inventor
高学全
王文龙
焦瑞生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN TIANFANG CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
HENAN TIANFANG CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN TIANFANG CONSTRUCTION ENGINEERING Co Ltd filed Critical HENAN TIANFANG CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201110169048.1A priority Critical patent/CN102838336B/en
Publication of CN102838336A publication Critical patent/CN102838336A/en
Application granted granted Critical
Publication of CN102838336B publication Critical patent/CN102838336B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a cast-in-situ gypsum hollow wall in the field of building construction. The cast-in-situ gypsum hollow wall comprises the components of, by weight: 60-75% of gypsum, 5-15% of cement, 10-20% of fly ash, and 2-8% of lime. The invention also discloses a preparation method of the hollow wall. According to the invention, a wall template is arranged on an inner support and an outer support; pre-embedded parts such as electrical conduits, junction boxes, and door and window wood bricks are arranged on the template; a plurality of water bags are arranged in the inner support; the materials are well mixed by stirring, and the mixture is delivered into the template through a pipeline; when the wall is hardened, water in the water bags is drawn out, and the water bags are fetched; ports left by the water bags are sealed; a rest section of template without cast wall is installed, and casting is carried out until the top is reached; and when the wall is hardened, all the templates are removed. According to the invention, the surface of the wall is smooth and flat. The wall is light and green, and has the functions of sound insulation and heat insulation. The strength of the wall is high, and the wall is prevented from cracking. The construction is convenient and simple, a mechanization degree is high, and labor intensity is low. With the method, construction cost is reduced.

Description

A kind of cast-in-situ gypsum hollow wall and preparation method thereof
Technical field
The present invention relates to a kind of body of wall and preparation method thereof, the specifically cast-in-situ gypsum hollow wall in building operation, also relates to the preparation method of this body of wall, belongs to building field.
Background technology
At present, in building operation, the filled with masonry of skeleton construction, generally adopts the various building blocks such as air-entrained concrete building block, gypsum block, and GRC wallboard etc., in building process, need a large amount of labor forces, and labour intensity is large, and effect is low, and construction cost is high.Build by laying bricks or stones completely, need on metope, whitewash the whitewash mortar that 10-20mm is thick, just can carry out surface layer finishing.Owing to whitewashing the common fault of quality, cause cracks on wall surface, need often reprocess, cause the time-consuming waste of Denging.The built-in fitting such as various conduits, terminal box in masonry need in body of wall, slot burrow pre-buried, it is very inconvenient that each work post coordinates, to the processing at fluting place not in place, easily cause wall crazing, built-in fitting position does not meet the disadvantages such as drawing requirement, even affects the quality of successive projects.
Summary of the invention
Task of the present invention is to provide a kind of cast-in-situ gypsum hollow wall, and the preparation method of this body of wall is also provided.
For realizing above-mentioned task, technical solution of the present invention is:
Cast-in-situ gypsum hollow wall, is made up of the component of following weight per-cent: gypsum 60%-75%, cement 5%-15%, flyash 10%-20%, lime 2-8%.
The method of described cast-in-situ gypsum hollow wall, comprises the steps:
(1) wall form is arranged on the inside and outside support of template, support is apart from the bottom of the beam of building or retain a bit of distance at the bottom of floor;
Wherein inner support evenly arranges along short transverse;
The built-in fittings such as conduit, terminal box, door and window woodbox are wherein set in template;
(2) multiple water pockets that are filled with water are set in the inner support of wall form;
(3) material therefor is added in stirrer at the scene successively, after stirring, send in template by pipeline;
(4) after the gypsum wall sclerosis of first pouring into a mould, extract the water in water pocket out, take out water pocket, the mouth that shutoff water pocket stays;
(5) template of that a bit of distance retaining at the bottom of the beam of locating distance building or at the bottom of floor again, once-cast is at the bottom of beam or at the bottom of floor;
(6) until after after the gypsum wall sclerosis of cast, remove whole templates.
After testing, indices meets the testing requirement of national standard JG/T169-2005 to body of wall of the present invention.
The present invention has the following advantages:
Surface of wall is smooth, smooth, and than general masonry light weight, sound-insulating, can regulate indoor humidity, environmental protection, plasters without carrying out wall plaster again, can directly carry out facing decoration.Strength of wall body is high, does not ftracture, and the built-in fitting one-step installation such as various conduits, terminal box put in place; Construct simple and direct, mechanization degree is high, and labour intensity is low, has reduced construction cost.
Embodiment
Example 1, cast-in-situ gypsum hollow wall material therefor and consumption thereof, 600 kilograms, gypsum, 120 kilograms of cement, 200 kilograms, flyash, 80 kilograms, lime.
The method of cast-in-situ gypsum hollow wall:
Wall form is installed, and the outer support of a pair of symmetry of template adopts sizing Assembled stand, and support can be according to the height of body of wall, length arbitrary combination, and support retains 200mm at the bottom of the beam of building.Template inner support length is design wall thickness, and height 100mm installs one group of inner support along each meter of left and right of body of wall short transverse, the reserved circular hole that can wear bolt of inner support, by bolt by firm two side template drawknots.The built-in fittings such as conduit, terminal box, door and window woodbox are fixed in template with double sticky tape, and reality is all criticized with gesso in all gaps, ensures in the time building not spillage material.
Water pocket is installed, multiple water pockets are installed equably in the inner support of wall form, slowly water filling, water fills rear sealing.
Cast, adds material therefor in stirrer at the scene successively, after stirring, slowly sends in template by pipeline, after the gypsum wall sclerosis of first pouring into a mould, extracts the water in water pocket out, takes out water pocket, the mouth that the sheet material shutoff water pocket made from light material stays.
The template of the 200mm height retaining at the bottom of the beam of locating distance building again, once-cast is at the bottom of beam, until after after the gypsum wall sclerosis of cast, remove whole templates, construction completes.
Example 2, method be with example 1, material therefor and consumption thereof: 750 kilograms, gypsum, 130 kilograms of cement, flyash double centner, 20 kilograms, lime.
Example 3, method be with example 1, material therefor and consumption thereof: 700 kilograms, gypsum, 50 kilograms of cement, 200 kilograms, flyash, 50 kilograms, lime.
Example 4, method be with example 1, material therefor and consumption thereof: 650 kilograms, gypsum, 150 kilograms of cement, 170 kilograms, flyash, 30 kilograms, lime.

Claims (1)

1. a preparation method for cast in situs gypsum hollow body of wall, material therefor and the consumption thereof of the cast in situs gypsum hollow body of wall described in the method are: 600 kilograms, gypsum, 120 kilograms of cement, 200 kilograms, flyash, 80 kilograms, lime; The method comprises the steps:
(1) wall form is arranged on the inside and outside support of template, support is apart from retaining 200mm distance at the bottom of the beam of building or at the bottom of floor; Template inner support length is design wall thickness, and height 100mm, fills one group of inner support along each meter ampere of body of wall short transverse, the reserved circular hole that can wear bolt of inner support, by bolt by firm two side template drawknots;
Wherein inner support evenly arranges along short transverse;
Conduit, terminal box, door and window woodbox built-in fitting are wherein set in template;
(2) multiple water pockets that are filled with water are set in the inner support of wall form;
(3) material therefor is added in stirrer at the scene successively, after stirring, send in template by pipeline;
(4) after the gypsum wall sclerosis of first pouring into a mould, extract the water in water pocket out, take out water pocket, the mouth that shutoff water pocket stays;
(5) template of the 200mm height retaining at the bottom of the beam of locating distance building or at the bottom of floor again, once-cast is at the bottom of beam or at the bottom of floor;
(6) until after after the gypsum wall sclerosis of cast, remove whole templates.
CN201110169048.1A 2011-06-22 2011-06-22 Cast-in-situ gypsum hollow wall and preparation method thereof Expired - Fee Related CN102838336B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110169048.1A CN102838336B (en) 2011-06-22 2011-06-22 Cast-in-situ gypsum hollow wall and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110169048.1A CN102838336B (en) 2011-06-22 2011-06-22 Cast-in-situ gypsum hollow wall and preparation method thereof

Publications (2)

Publication Number Publication Date
CN102838336A CN102838336A (en) 2012-12-26
CN102838336B true CN102838336B (en) 2014-09-24

Family

ID=47366103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110169048.1A Expired - Fee Related CN102838336B (en) 2011-06-22 2011-06-22 Cast-in-situ gypsum hollow wall and preparation method thereof

Country Status (1)

Country Link
CN (1) CN102838336B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916789A (en) * 2017-10-27 2018-04-17 江苏南通三建集团股份有限公司 A kind of method of the embedding box of concrete holllow building block wall poling
CN109057829B (en) * 2018-09-06 2023-12-15 山东科技大学 Dry material finished product bag with built-in water bag group and method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532317A (en) * 2008-03-13 2009-09-16 杨小平 Cast-in-place lightweight inner partition wall
CN101653966A (en) * 2009-09-02 2010-02-24 武汉理工大学 Method for preparing special plastering mortar for self-energy-saving air-entrained concrete wall material

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532317A (en) * 2008-03-13 2009-09-16 杨小平 Cast-in-place lightweight inner partition wall
CN101653966A (en) * 2009-09-02 2010-02-24 武汉理工大学 Method for preparing special plastering mortar for self-energy-saving air-entrained concrete wall material

Also Published As

Publication number Publication date
CN102838336A (en) 2012-12-26

Similar Documents

Publication Publication Date Title
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
RU2019116875A (en) DRY BUILDING COMPOSITION SUITABLE FOR WET SPREADING WITH THE HELP OF A SCREW PUMP AND CONTAINING A BINDER AND A FILLER OBTAINED FROM A BIOLOGICAL COMPOSITION, PREPARATION AND APPLICATION
CN102433958A (en) Prefabricated wall board construction member
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN102838336B (en) Cast-in-situ gypsum hollow wall and preparation method thereof
CN103883022A (en) Building envelope inner and outer wall anti-seismic and sound insulation anti-cracking integrated structure and construction method thereof
CN108894498A (en) A kind of building filling wall integrated construction technique
CN103643769B (en) Wall plastering construction technique
CN103242000B (en) Method for manufacturing waterproof heat-preservation heat-insulation building material by utilizing renewable recourse
CN105985080A (en) Residential kitchen foaming cement common vertical flue and manufacturing method thereof
CN104790565A (en) Cast-in-site ardealite load bearing wall composite structure main building construction method
CN114525883A (en) Precast simple partition wall board and manufacturing method thereof
CN109779311A (en) The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove and hole
Lanos et al. Formulation and implementation
CN109707184A (en) The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove
CN109235710A (en) A kind of building non-bearing is whole to pour inner separation wall body and its construction method
CN109779312A (en) The blank integral vacuum toilet of fulgurite separate type, wall setting water pipe groove and hole
CN205577171U (en) Cast -in -place light composite wall that builds of assembled non -bearing
CN109779317A (en) Fulgurite is embedded, the blank integral vacuum toilet of wall setting water pipe groove
CN111825420A (en) GRC cement board and preparation method thereof
CN206319482U (en) Inner partition plate
CN110451856A (en) A kind of decoration integrated inner partition plate of precast construction and preparation method thereof
CN107217855A (en) A kind of ceramsite concrete light-weight structural wall board construction
CN108789808A (en) A kind of prefabricated hollow wall board and preparation method thereof
CN109779307A (en) The blank integral vacuum toilet of fulgurite separate type, wall setting water pipe groove

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140924

Termination date: 20170622

CF01 Termination of patent right due to non-payment of annual fee