CN108789808A - A kind of prefabricated hollow wall board and preparation method thereof - Google Patents

A kind of prefabricated hollow wall board and preparation method thereof Download PDF

Info

Publication number
CN108789808A
CN108789808A CN201810636602.4A CN201810636602A CN108789808A CN 108789808 A CN108789808 A CN 108789808A CN 201810636602 A CN201810636602 A CN 201810636602A CN 108789808 A CN108789808 A CN 108789808A
Authority
CN
China
Prior art keywords
layer
installation
structure sheaf
preformed hole
insulating layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810636602.4A
Other languages
Chinese (zh)
Inventor
邬新邵
吴丁顺
许立军
刘鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuhuan Sports Industry Development Group Co Ltd
Original Assignee
Hunan Wuhuan Sports Industry Development Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Wuhuan Sports Industry Development Group Co Ltd filed Critical Hunan Wuhuan Sports Industry Development Group Co Ltd
Priority to CN201810636602.4A priority Critical patent/CN108789808A/en
Publication of CN108789808A publication Critical patent/CN108789808A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/26Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
    • E04C2/284Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
    • E04C2/288Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/46Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose specially adapted for making walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/52Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits
    • E04C2/521Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits serving for locating conduits; for ventilating, heating or cooling

Abstract

The invention discloses a kind of prefabricated hollow wall board and preparation method thereof, it is to be designed to coordinate the popularization and application of assembled architecture technology, belongs to building material field.Prefabricated hollow wall board is made of wallboard, pendant, hanging ring, embedded part and installation preformed hole;Wherein, wallboard is made of interior decoration layer, installation extra play, structure sheaf, insulating layer, enhancement layer and exterior decoration layer from inside to outside, closely knit consolidation between each layer;Embedded part is made of water heating air built-in pipe and electric wire built-in pipe;Installation preformed hole is by installation switch preformed hole, installation wiring board preformed hole and installs what pipe fitting preformed hole formed;Pendant is fixedly arranged at the two sides of structure sheaf, and hanging ring is fixedly arranged at the top of structure sheaf, and embedded part is embedded in the inside of enhancement layer, respectively with each installation preformed hole unicom.The invention has the advantages that construction weight can be mitigated, promotes the realization of integration finishing, raise labour productivity, expand the usable floor area and shake-proof ability of building.

Description

A kind of prefabricated hollow wall board and preparation method thereof
Technical field
It is to coordinate the popularization of assembled architecture technology the invention discloses a kind of prefabricated hollow wall board and preparation method thereof Using and design, belong to building material field.
Background technology
China is intensive since 2015 to put into effect relevant assembled architecture file, the publication of year ends 2015《Industrialized building Evaluation criterion》, determine that assembled architecture is popularized in the whole nation in 2016 in an all-round way, and make a breakthrough;On November 14th, 2015 lives Build portion's appearance《Building industry modernization development outline》Plan to the year two thousand twenty assembled architecture account for the ratio 20% of new building with On, 50% or more the ratio of new building is accounted for assembled architecture in 2025;State Council puts into effect on 2 22nd, 2016《About energetically Develop the instruction of assembled architecture》It is required that wanting adaptation to local conditions development prefabricated concrete structure, steel construction and Modern Wood knot The assembled architectures such as structure strive the time with 10 years or so, the ratio that assembled architecture accounts for new building area being made to reach 30%; On March 5th, 2016, government work report proposition will greatly develop steel construction and assembled architecture, improve construction standard and matter Amount;On July 5th, 2016 lives the portion of building and puts into effect《House town and country construction portion scientific and technical project plan assembled architecture science and technology in 2016 Demonstrative project list》And disclose scientific and technical project construction assembled architecture science and technology demonstrative project list in 2016;2016 9 The moon, State Council on the 14th held Executive Meeting of the State Council, and proposition will greatly develop assembled architecture and push industry restructuring upgrading; 2016 Nian9Yue27 State Council put into effect《The General Office of the State Council is about the instruction for greatly developing assembled architecture》, to energetically City progress, is given priority at the following assembled architecture accounting new building target in development assembled architecture and steel construction key area It is clear.
According to the requirement for promoting supply side structural reform and novel Urbanization Progress, steel construction, concrete are greatly developed Equal assembled architectures have and develop energy conservation and environmental protection NPD projects, improve building safety level, push the one action such as neutralizing superfluous production capacity more The benefits of obtaining.Country determines, is more than that 3,000,000 other cities are attached most importance to Jing-jin-ji region, the Yangtze River Delta, Pearl River Delta group of cities and permanent resident population Point is accelerated to improve the ratio that assembled architecture accounts for new building area.For this purpose, to meet the market requirement, assembled architecture is improved Standard criterion promotes Integration Design, industrialized production, prefabricated construction, integration finishing, supports component component manufacturing enterprise Kind and specification are improved, guiding Corporation R & D applicable technology, equipment and equipment improve assembled building materials application percentage, promote to build The mode of making modernizes.Be applicable in, the assembled architecture of economy, safety, green, beauty service development pattern transformation, promoted the masses Quality of the life.
It is assembled by planks such as prefabricated large-scale inside and outside wall board, floor and roof boardings, also known as large panel building.It is industry Change the main Types of total-prefabricated construction in building.
The invention discloses a kind of prefabricated hollow wall boards and preparation method thereof, can mitigate construction weight, promote integration The realization of finishing, raises labour productivity, and expands the usable floor area and shake-proof ability of building.
Invention content
The scheme that the present invention uses is a kind of prefabricated hollow wall board as shown in Figs 1-4, by wallboard, pendant, hanging ring, embedded part With installation preformed hole composition;Wherein, wallboard is from inside to outside by interior decoration layer, installation extra play, structure sheaf, insulating layer, enhancing Layer is with exterior decoration layer composition, closely knit consolidation between each layer;Pendant is fixedly arranged at the two sides of structure sheaf, and hanging ring is fixedly arranged at structure sheaf Top, embedded part is embedded in the inside of enhancement layer, is connected to respectively with each installation preformed hole;It is solid respectively that extra play, insulating layer are installed For knot on the two sides of structure sheaf, interior decoration layer is bonded in the surface of installation extra play, and enhancement layer passes through insulating layer nail joint in structure sheaf On, exterior decoration layer is bonded in the surface of enhancement layer.
The interior decoration layer includes inner wall surface coat of plaster and inner wall surface decorative layer, and inner wall surface coat of plaster is according to inner wall surface The design of decorative layer determines, when the decorative layer of inner wall surface is covering with paint or wallpaper wall paper, preferential recommendation is used in installation extra play Surface scrape three times putty and replace coat of plaster;Inner wall surface decorative layer carries out after main structure construction is complete.
The installation extra play is attached to the level of the Buried pipe on hollow wall panel, and various installations need inbuilt Embedded part includes water heating air built-in pipe and electric wire built-in pipe is embedded in installation extra play, according to wanting on the inner surface of structure sheaf After asking the arrangement for carrying out pipeline and embedded part and connection, formed with cementing material filling build-in;Preferential recommendation uses 1:2.5 or 1:3 Filling build-in of the cement mortar as installation extra play, the thickness for installing extra play is identical as the maximum gauge of embedded part.
The structure sheaf is the main stress layer of prefabricated hollow wall panel, is concrete hollow made of batch production is prefabricated Wallboard, preferential recommendation are made of the hollow steel bar concrete slab of 120-200 millimeters thicks, there is a plurality of perforative circle from top to bottom Hole, 80-140 millimeters of Circularhole diameter, centre-to-centre spacing 160-200 millimeters of hole, lateral opening hole back gauge edges of boards are not less than 100 millimeters;Knot Bury two hanging rings at the top of structure layer, the position of structure sheaf plate width direction at edges of boards about 1/4, in thickness direction Centre, and at the center of holes distance;Structure sheaf both sides are each to bury two pendants, as prefabricated hollow wall board and building frame Connector setting between trestle or shear wall;The embedded height of pendant is located at the height about 1/4 of prefabricated hollow wall panel The intermediate position of thickness direction, interior outside are consolidated with installation extra play, insulating layer respectively.
The insulating layer is attached to the level of structure sheaf outer surface, and thickness is 20-25 millimeters;Preferential recommendation uses Extruded sheet makes, and is not limited to extruded sheet, other heat preserving and insulating materials are also in the row of the design of the present invention;Insulating layer is completely layered on structure Layer outer surface.
The enhancement layer is the stress level on structure sheaf across insulating layer nail joint;Preferential recommendation uses steel wire system Make, the load of exterior decoration layer is mainly directly passed to the device of insulating layer, otherwise hollowing cracking will occur for exterior decoration layer; Nail for nail joint enhancement layer uses cement steel nail, and the length of nail is 25-30 millimeters.
The component that prefabricated hollow wall board is connect with column when the pendant is installation, including anchor rod and hook two parts, Anchor rod is perpendicular to the straight-bar of structure sheaf side, and rod end has a ring of 40-50 millimeters of diameter, anchor rod and hook latch closure in succession at Whole, preferential recommendation uses the reinforcement fabrication of 25-30 millimeters of diameter, and anchor rod one end is embedded in the inside 150-200 of structure sheaf Millimeter, anchoring ring is 30-40 millimeters exposed, and the hook other end is connect with the column of building when mounted.
The hanging ring includes latch closure and bail two parts, and latch closure is linked to be entirety with bail, and preferential recommendation uses diameter 25- The depth of 30 millimeters of reinforcement fabrication, 150-200 millimeters of latch closure central diameter, the inside of bail bending embedment structure sheaf is not less than 200 millimeters, bending length is not less than 150 millimeters;Latch closure is exposed at the top of structure sheaf.
The embedded part is made of water heating air built-in pipe and electric wire built-in pipe, and preferential recommendation uses rigid plastics control Make;The internal diameter of water heating air built-in pipe is not less than 30 millimeters, and the internal diameter of electric wire built-in pipe is not less than 29 millimeters, wall thickness 1.5-2.0 millis Rice;Embedded part is horizontally embedded in structure sheaf, and one end is exposed at the both sides of structure sheaf, and the other end is connected to installation preformed hole;Installation When, corresponding pipeline is passed into preformed hole in embedded part.
The installation preformed hole is by installation switch preformed hole, installation wiring board preformed hole and installation pipe fitting preformed hole group At;Preferential recommendation uses 50 millimeters of length and width, the square hole that 30-50 millimeters of depth;By corresponding switch enclosure, plug wire hole when boxing out Box, faucet base box etc. are embedded in installation preformed hole;Preformed hole is installed and passes through interior decoration layer and installation extra play and embedded part Connection, the positions and dimensions size for installing preformed hole are corresponding with the positions and dimensions size of device to be installed.
The preparation method of the prefabricated hollow wall board is first to make structure sheaf, respectively in structure sheaf after acceptance(check) Interior outside setting installation extra play 1, insulating layer and enhancement layer, are arranged the coat of plaster and exterior decoration layer of interior decoration layer after acceptance(check) Coat of plaster, in the face layer of architectural surface and the exterior decoration layer of construction interior decoration layer after agent structure is installed and is checked and accepted.
The making of the structure sheaf is, with cementitious matter, aggregate, enhancing material, filler material, additive, admixture, plasticizers 32.5 grades of ordinary cements of 275kg or 42.5 grades of the ordinary cement of 223kg are used with materials, preferential recommendation cementitious matters such as water, Aggregate is enhanced material and is adopted using the silicon ash of 1-2kg, filler material using the Machine-made Sand of the slag rubble and 346-421kg of 764-832kg With 5-10 millimeters of building waste 326kg of grain size, additive uses high efficiency water reducing agent 0.25-0.73kg, admixture to use than table Area is 550-590m2/ kg, volume are the ground slag of 225kg, and plasticizers use volume for the air entraining agent of 0.54kg, through mixing It makes, pour, vibrating, is steam-cured, made of cutting;Its production process is, install in a mold reinforcing bar and pendant, hanging ring, embedded part with Preformed hole is installed, concrete is inserted into mold, after pouring molding, send steam-cured room steam-cured together with mold, after the intensity for reaching requirement Form removal, then installation extra play, insulating layer and enhancement layer are set.
The construction of the installation extra play is carried out under natural heat dissipation to atmospheric temperature under steam curing temperature in structure sheaf, Specific practice is that first bullet puts embedded part and installs the position line of preformed hole in the inner wall surface of structure sheaf, and embedded part is reserved with installation The embedded part in hole is fixed on scheduled position, then fills cementing material, is conserved after floating, then interior decoration layer of constructing coat of plaster, apply Working hour pays attention to that in embedded part and installation preformed hole mortar must not be entered.
The insulating layer and enhancement layer construction are carried out after structure sheaf form removal;Specific practice is to have cleared up structure sheaf Wall face side after, adhesive insulating layer, and in the outside nail joint enhancement layer of insulating layer, insulating layer and enhancement layer is made to be fixedly arranged at knot The outer surface of structure layer.
The outer surface for being fixedly arranged at structure sheaf when the coat of plaster construction of the exterior decoration layer in insulating layer and enhancement layer is laggard The plastering layer thickness of row, preferential recommendation exterior decoration layer is 7-14 millimeters, and the coat of plaster of exterior decoration layer is made to be completely covered on enhancement layer Outer surface.
Description of the drawings
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention Example and its explanation are applied for explaining the present invention, is not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of prefabricated hollow wall board from inside to outside;
Fig. 2 is the schematic diagram of prefabricated hollow wall board from outside to inside;
Fig. 3 is hanging ring schematic diagram;
Fig. 4 is pendant schematic diagram.
In figure:1- wallboards;11- interior decoration layers;12- installs extra play;13- structure sheafs;14- insulating layers;15- enhancement layers; 16- exterior decoration layers;2- pendants;3- hanging rings;4- embedded parts;41- water heating air built-in pipes;42- electric wire built-in pipes;5- installs preformed hole; 51- installation switch preformed holes;52- installs wiring board preformed hole;53- installs pipe fitting preformed hole.
Specific implementation mode
The embodiment of the present invention is described in detail below in conjunction with attached drawing, but the present invention can be defined by the claims Implement with the multitude of different ways of covering.
The embodiment of the present invention
Certain engineering is using a kind of prefabricated hollow wall board as shown in Figs 1-4, by wallboard 1, pendant 2, hanging ring 3, embedded part 4 It is formed with installation preformed hole 5;Wherein, wallboard 1 is from inside to outside by interior decoration layer 11, installation extra play 12, structure sheaf 13, heat preservation Layer 14, enhancement layer 15 and exterior decoration layer 16 form, closely knit consolidation between each layer;Pendant 2 is fixedly arranged at the two sides of structure sheaf 13, Hanging ring 3 is fixedly arranged at the top of structure sheaf 13, and embedded part 4 is embedded in the inside of enhancement layer 15, is connected to respectively with each installation preformed hole 5; Installation extra play 12, insulating layer 14 are fixedly arranged at the two sides of structure sheaf 13 respectively, and interior decoration layer 11 is bonded in installation extra play 12 Surface, enhancement layer 15 pass through 14 nail joint of insulating layer on structure sheaf 13, and exterior decoration layer 16 is bonded in the surface of enhancement layer 15.
The interior decoration layer 11 includes inner wall surface coat of plaster and inner wall surface decorative layer, and inner wall surface coat of plaster is used and installed It scrapes three times putty and replaces coat of plaster in the surface of extra play 12;Inner wall surface decorative layer carries out after main structure construction is complete.
The installation extra play 12 is attached to the level of the Buried pipe on hollow wall panel, and various installations need embedded Embedded part 4 include that water heating air built-in pipe 41 and electric wire built-in pipe 42 are embedded in installation extra play 12, in structure sheaf 13 After carrying out pipeline and the arrangement of embedded part 4 on surface as requested and connecting, formed with cementing material filling build-in;Using 1:3 Filling build-in of the cement mortar as installation extra play 12, the thickness for installing extra play 12 are identical as the maximum gauge of embedded part 4.
The structure sheaf 13 is the main stress layer of prefabricated hollow wall panel, is that concrete made of being prefabricated in the factory is empty Core-wall plate is made of the hollow steel bar concrete slab of 200 millimeters thicks made of mixing material, is had from top to bottom a plurality of perforative Circular hole, 120 millimeters of Circularhole diameter, 180 millimeters of hole centre-to-centre spacing, 150 millimeters lateral opening of hole back gauge edges of boards;With 8 millimeters of diameter 150 millimeters of bar spacing is fabricated to way and double-layer reinforced mesh, and the distance of two reinforced mesh is 150 millimeters;13 top of structure sheaf Two hanging rings 3 are buried, inlet part and the reinforced mesh welding of hanging ring 3 are firm;The position of structure sheaf 13 is in the width side of plate To at edges of boards about 1/4, in the centre of thickness direction, and at the center of holes distance;13 both sides of structure sheaf are each to bury two A pendant 2,;Pendant 2 is arranged as the connector between prefabricated hollow wall board and building frame column or shear wall;Pendant 2 Embedded height is located at the intermediate position of the thickness direction at the height about 1/4 of prefabricated hollow wall panel, the inlet part of pendant 2 and Reinforced mesh welding is firm, and interior outside is consolidated with installation extra play 12, insulating layer 14 respectively.
The insulating layer 14 is attached to the level of 13 outer surface of structure sheaf, and thickness is 20 millimeters;Using extruded sheet It makes, insulating layer 14 is completely layered on 13 outer surface of structure sheaf.
The enhancement layer 15 is the stress level on structure sheaf 13 across 14 nail joint of insulating layer;Using steel wire system Make, the nail for nail joint enhancement layer 15 uses cement steel nail, and the length of nail is 30 millimeters.
The component that prefabricated hollow wall board is connect with column when the pendant 2 is installation, including anchor rod and hook two parts, Anchor rod is perpendicular to the straight-bar of 13 side of structure sheaf, and rod end has a ring of 40 millimeters of diameter, anchor rod and hook latch closure in succession at Whole, using 30 millimeters of reinforcement fabrication of diameter, anchor rod one end is embedded in 150 millimeters of the inside of structure sheaf 13, outside anchoring ring 40 millimeters of dew, the hook other end are connect with the column of building when mounted.
The hanging ring 3 includes latch closure and bail two parts, and latch closure is linked to be entirety with bail, using 30 millimeters of steel of diameter Muscle makes, 150 millimeters of latch closure central diameter, and the depth of the inside of bail bending embedment structure sheaf 13 is not less than 200 millimeters, bending Length is not less than 150 millimeters;Latch closure is exposed at the top of structure sheaf 13.
The embedded part 4 is made of water heating air built-in pipe 41 and electric wire built-in pipe 42, is made of plastic conduit;Water The internal diameter of heating built-in pipe 41 is not less than 30 millimeters, and the internal diameter of electric wire built-in pipe is not less than 29 millimeters, 1.5 millimeters of wall thickness;Embedded part 4 Horizontally embedded one end is exposed at the both sides of structure sheaf 13 in structure sheaf 13, and the other end is connected to installation preformed hole 5;When installation, Corresponding pipeline is passed into preformed hole 5 in embedded part 4.
The installation preformed hole 5 is pre- by installation switch preformed hole 51, installation wiring board preformed hole 52 and installation pipe fitting It boxes out 53 compositions;Using 50 millimeters of length and width, the square hole that 50 millimeters of depth;By corresponding switch enclosure, plug wire hole box, water when boxing out Leading base box etc. is embedded in installation preformed hole 5;Preformed hole 5 is installed and passes through interior decoration layer 11 and installation extra play 12 and embedded part 4 connections, the positions and dimensions size for installing preformed hole 5 are corresponding with the positions and dimensions size of device to be installed.
The preparation method of the prefabricated hollow wall board is structure sheaf 13 first to be made, respectively in structure sheaf after acceptance(check) 13 interior outside setting installation extra play 12, insulating layer 14 and enhancement layer 15, is arranged the plastering of interior decoration layer 11 after acceptance(check) The coat of plaster of layer and exterior decoration layer 16, in the architectural surface of construction interior decoration layer 11 and outside after agent structure is installed and checked and accepted Fit up the face layer of layer 16.
The making of the structure sheaf 13 is, with cementitious matter, aggregate, enhancing material, filler material, additive, admixture, plasticising The materials such as material and water, preferential recommendation cementitious matter is using 32.5 grades of ordinary cements of 275kg or 42.5 grades of the light water of 223kg Mud, aggregate are enhanced material and 1.5 silicon ash, filler material are used to use grain size using the Machine-made Sand of the slag rubble and 421kg of 768kg 5-10 millimeters of building waste 326kg, additive use high efficiency water reducing agent 0.46kg, admixture to use specific surface area for 550- 590m2/ kg, volume are the ground slag of 225kg, and plasticizers use volume for the air entraining agent of 0.54kg, through mixing, pour, shake Made of dynamic, steam-cured, cutting;Its production process is that installation reinforcing bar and pendant 2, hanging ring 3, embedded part 4 and installation are reserved in a mold Concrete is inserted mold, after pouring molding, send steam-cured room steam-cured together with mold, reach form removal after the intensity of requirement by hole 5, then Setting installation extra play 12, insulating layer 14 and enhancement layer 15.
The construction of the installation extra play 12 be in structure sheaf 13 under steam curing temperature under natural heat dissipation to atmospheric temperature It carries out, specific practice is that first bullet puts embedded part 4 and installs the position line of preformed hole 5 in the inner wall surface of structure sheaf 13, by embedded part 4 It is fixed on scheduled position with the embedded part of installation preformed hole 5, then fills cementing material, is conserved after floating, then interior decoration layer of constructing 11 coat of plaster when construction, pays attention to that in embedded part 4 and installation preformed hole 5 mortar must not be entered.
The insulating layer 14 and the construction of enhancement layer 15 are carried out after 13 form removal of structure sheaf;Specific practice is to clear up Behind the wall face side of structure sheaf 13, adhesive insulating layer 14, and in the outside nail joint enhancement layer 15 of insulating layer 14, make insulating layer 14 The outer surface of structure sheaf 13 is fixedly arranged at enhancement layer 15.
When the coat of plaster construction of the exterior decoration layer 16 the outer of structure sheaf 13 is fixedly arranged in insulating layer 14 and enhancement layer 15 It is carried out behind surface, the plastering layer thickness of exterior decoration layer 16 is 10 millimeters, and the coat of plaster of exterior decoration layer 16 is made to be completely covered on enhancing The outer surface of layer 15.

Claims (6)

1. a kind of prefabricated hollow wall board, characterized in that by wallboard (1), pendant (2), hanging ring (3), embedded part (4) and installation preformed hole (5) it forms;Wherein, wallboard (1) is from inside to outside by interior decoration layer (11), installation extra play (12), structure sheaf (13), insulating layer (14), enhancement layer (15) is with exterior decoration layer (16) composition, closely knit consolidation between each layer;Pendant (2) is fixedly arranged at structure sheaf (13) Two sides, hanging ring (3) is fixedly arranged at the top of structure sheaf (13), and embedded part (4) is embedded in the inside of enhancement layer (15), respectively with respectively Preformed hole (5) unicom is installed;Installation extra play (12), insulating layer (14) are fixedly arranged at the two sides of structure sheaf (13), interior decoration respectively Layer (11) is bonded in the surface of installation extra play (12), and enhancement layer (15) passes through insulating layer (14) nail joint on structure sheaf (13), Exterior decoration layer (16) is bonded in the surface of enhancement layer (15);The interior decoration layer (11) includes inner wall surface coat of plaster and inner wall surface Decorative layer, inner wall surface coat of plaster finish laggard on the surface for being attached to installation extra play (12) in installation extra play (12) construction Row, inner wall surface decorative layer carry out after main structure construction is complete;The installation extra play (12) is attached on hollow wall panel Buried pipe level, it includes water heating air built-in pipe (41) and electric wire built-in pipe that various installations, which need inbuilt embedded part (4), (42) it is embedded in installation extra play (12), carries out pipeline and embedded part (4) as requested on the inner surface of structure sheaf (13) Arrangement and connection after, with cementing material filling build-in formed;The structure sheaf (13) is the main of prefabricated hollow wall panel Stress layer, which is that batch production is prefabricated, to be formed, and has a plurality of perforative circular hole, top to bury hanging ring (3) from top to bottom, both sides are buried Pendant (2), interior outside are consolidated with installation extra play (12), insulating layer (14) respectively;The insulating layer (14) is attached to knot The level of structure layer (13) outer surface;The enhancement layer (15) be across insulating layer (14) nail joint on structure sheaf (13) by Power level;The component that prefabricated hollow wall board is connect with column when the pendant (2) is installation, one end is embedded in structure sheaf (13) Inside, the other end are connect with the column of building when mounted;The hanging ring (3) includes latch closure and bail two parts, latch closure with Bail is linked to be entirety, and bail is embedded in the inside of structure sheaf (13), and latch closure is exposed at the top of structure sheaf (13);The embedded part (4) it is made of water heating air built-in pipe (41) and electric wire built-in pipe (42);Embedded part (4) is horizontally embedded in structure sheaf (13), and one End is exposed at the both sides of structure sheaf (13), and the other end is connected to installation preformed hole (5);When installation, by corresponding pipeline in embedded part (4) preformed hole (5) is passed into;The installation preformed hole (5) is reserved by installation switch preformed hole (51), installation wiring board Hole (52) is formed with installation pipe fitting preformed hole (53);Preformed hole (5) is installed and passes through interior decoration layer (11) and installation extra play (12) it is connected to embedded part (4), the positions and dimensions size of the positions and dimensions size of installation preformed hole (5) and device to be installed It is corresponding.
2. a kind of preparation method of prefabricated hollow wall board according to claim 1, characterized in that first make structure sheaf (13), installation extra play (12), insulating layer (14) and enhancement layer are set in the interior outside of structure sheaf (13) respectively after acceptance(check) (15), the coat of plaster of the coat of plaster and exterior decoration layer (16) of interior decoration layer (11) is set after acceptance(check), waits for that agent structure is installed Finish the face layer of the architectural surface and exterior decoration layer (16) after checking and accepting in construction interior decoration layer (11).
3. a kind of preparation method of prefabricated hollow wall board according to claim 2, characterized in that structure sheaf (13) is to use glue The materials such as ramming material, aggregate, enhancing material, filler material, additive, admixture, plasticizers and water, through mixing, pour, vibrate, it is steam-cured, Made of cutting;Its production process is to install reinforcing bar and pendant (2), hanging ring (3), embedded part (4) and installation preformed hole in a mold (5), concrete is inserted into mold, after pouring molding, send steam-cured room steam-cured together with mold, reach form removal after the intensity of requirement, then Setting installation extra play (12), insulating layer (14) and enhancement layer (15).
4. a kind of preparation method of prefabricated hollow wall board according to claim 2, characterized in that extra play (12) is to tie Structure layer (13) carries out under steam curing temperature under natural heat dissipation to atmospheric temperature, and specific practice is the inner wall surface in structure sheaf (13) Embedded part (4) and installation preformed hole (5) are set, then fill cementing material, is conserved after floating, then interior decoration layer (11) of constructing plastering Layer when construction, pays attention to the position of installation preformed hole (5).
5. a kind of preparation method of prefabricated hollow wall board according to claim 2, characterized in that insulating layer (14) and enhancing Layer (15) construction is carried out after structure sheaf (13) form removal;Specific practice is after having cleared up the wall face side of structure sheaf (13), Adhesive insulating layer (14), and in the outside nail joint enhancement layer (15) of insulating layer (14), keep insulating layer (14) and enhancement layer (15) solid It ties in the outer surface of structure sheaf (13).
6. a kind of preparation method of prefabricated hollow wall board according to claim 2, characterized in that exterior decoration layer (16) are smeared Grieshoch carries out after insulating layer (14) and enhancement layer (15) are fixedly arranged at the outer surface of structure sheaf (13), makes smearing for exterior decoration layer (16) Grieshoch is completely covered on the outer surface of enhancement layer (15).
CN201810636602.4A 2018-06-20 2018-06-20 A kind of prefabricated hollow wall board and preparation method thereof Pending CN108789808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810636602.4A CN108789808A (en) 2018-06-20 2018-06-20 A kind of prefabricated hollow wall board and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810636602.4A CN108789808A (en) 2018-06-20 2018-06-20 A kind of prefabricated hollow wall board and preparation method thereof

Publications (1)

Publication Number Publication Date
CN108789808A true CN108789808A (en) 2018-11-13

Family

ID=64083566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810636602.4A Pending CN108789808A (en) 2018-06-20 2018-06-20 A kind of prefabricated hollow wall board and preparation method thereof

Country Status (1)

Country Link
CN (1) CN108789808A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113199622A (en) * 2021-04-19 2021-08-03 福建厚德节能科技发展有限公司 Aerated concrete plate with preset pipeline, preparation method and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013107339A1 (en) * 2013-07-11 2015-01-15 I.C.B. Innovations-Center-Bad GmbH & Co. KG Kit for dressing and tubing of sanitary facilities
CN204163266U (en) * 2014-07-17 2015-02-18 仇国辉 The large plate of hollow lath component building hollow wall
CN105256961A (en) * 2015-09-29 2016-01-20 上海通璞建筑科技有限公司 External wall system
CN205712716U (en) * 2016-04-26 2016-11-23 李藏柱 A kind of assembled architecture hollow precast concrete member

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013107339A1 (en) * 2013-07-11 2015-01-15 I.C.B. Innovations-Center-Bad GmbH & Co. KG Kit for dressing and tubing of sanitary facilities
CN204163266U (en) * 2014-07-17 2015-02-18 仇国辉 The large plate of hollow lath component building hollow wall
CN105256961A (en) * 2015-09-29 2016-01-20 上海通璞建筑科技有限公司 External wall system
CN205712716U (en) * 2016-04-26 2016-11-23 李藏柱 A kind of assembled architecture hollow precast concrete member

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113199622A (en) * 2021-04-19 2021-08-03 福建厚德节能科技发展有限公司 Aerated concrete plate with preset pipeline, preparation method and construction method

Similar Documents

Publication Publication Date Title
CN104018598B (en) A kind of external wall structure and construction installation method
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN104612282B (en) Construction method of prefabricated steel fiber sludge-made ceramisite concrete wall based on T-shaped groove connection
CN104675124B (en) A kind of prefabricated Niche type construction technology of Separate Home electronic box hole to be provided
CN104746772B (en) Ash concrete hollow partition board anti-cracking construction method
CN105619596A (en) Preparation method of foam concrete composite board
CN105401654A (en) Environment-friendly assembled type ecological house and construction method thereof
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN112459291A (en) Prefabricated heat insulation structure integrated wall structure and construction process thereof
CN104775554A (en) Die plate dismantling-free cast-in-place concrete partition wall and construction method thereof
US20180155246A1 (en) Insulated concrete forms, insulating cement, and related articles produced therefrom
CN105649235A (en) Construction technique for MS dense thin-wall building block filling
CN108049521A (en) A kind of assembled wall structure of the assembled light raw-soil and bionical soil RPC materials
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN113771202A (en) Production method of heat-preservation sound-insulation composite floor slab
CN103938763B (en) A kind of non-load bearing wall easy to assemble
CN108675708A (en) A kind of concrete link plate and preparation method thereof
CN108789808A (en) A kind of prefabricated hollow wall board and preparation method thereof
CN218714288U (en) Decoration-free building structure
CN101761287A (en) Reinforced concrete windowsill coping adverse construction method
CN207194239U (en) Lightgage steel joist concrete anticracking fills wall
CN109853803A (en) Assembled integral floor and fabrication and installation method
CN206337672U (en) A kind of useless brick facing prefabricated thermal insulation exterior wall plate
CN115534095A (en) Assembled counter-beating prefabricated part and production process thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181113

RJ01 Rejection of invention patent application after publication